Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
La Puebla de CazallaSpainConfederación Hidrográfica del GuadalquivirICorbones7403/8808/8910/9112/9171220205220V
0.20
(3)
(3)
0.80(3)*0.80(3)*30030080130(F)
Cana BravaBrazilCompanhia Energética Mercosul (of the Tractebel Group)HTocantins230003/9902/0010/0110/0271510527833 (1) (3)*ogee(1)3003004050(S)
XixiChinaXixi Reservoir Development Co. Ltd.F H I WDaxi85- /03- /04- /05- /0671243231244          (F)
PleikrongVietnamEVN (Electrictie de Vietnam)HPo Ko104811/0502/0512/06- /0771495326450V(1)0.80(1)0.80(1)30030080210(N)
XinjiangshankouChinaHKaidu - /97- /04- /06- /0871              
Yacoub El Mansour - OuirganeMoroccoDirection des Aménagements HydrauliquesWN’Fis7007/0510/0607/0703/0871233202216V(11)0.75(1)*0.75(1)*30030001000(-) -
Chonghu’erChinaXinjiang-Xinhua-Chonghuer Hydropower Development Co. Ltd.HBuerjin8010/06- /08- /09- /0971545 480           
Feke IITurkeyAkkur Energy Production Trade and Industry Co. Inc.HGöksu6312/0712/0802/1008/10712561942270.07(6)0.80(3')*separate 30030060
60
60
50
(F)
TongzilinChinaHYalongjiang1- /08- /10- /12- /1471              
KavsaktepeTurkeyDSI - State Hydraulic WorksIRobozik1609/08- /14- /16- /17712683303500.15(3')0.70(3')*0.70(3)3003008139(N)
Site CCanadaBC HydroHPeace - /1607/1710/19- /20718001740 V 0.80 0.80 30030060
60
90
120
(F)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Spain

Owner: Confederación Hidrográfica del Guadalquivir

Type: Gravity

Purpose(s): Irrigation

River: Corbones

Reservoir capacity: 74 m3x106

Construction Dates

Start of Project: 03/88

Start of RCC: 03/88

End of RCC: 10/91

End of Project: 12/91

Specifications

Height: 71 metres

Length: 220 metres

Volume of RCC: 205 m3x103

Total volume: 220 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork
0.20RCC against formwork
Downstream
SlopeType
0.80RCC against formwork  [stepped face]
Spillway
SlopeType
0.80RCC against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
130Low-lime flyash (ASTM Class F)
  
La Puebla de Cazalla completed
La Puebla de Cazalla completed

Full Dam Information

Details

Country: Brazil

Owner: Companhia Energética Mercosul (of the Tractebel Group)

Type: Gravity

Purpose(s): Hydropower

River: Tocantins

Reservoir capacity: 2300 m3x106

Construction Dates

Start of Project: 03/99

Start of RCC: 03/99

End of RCC: 10/01

End of Project: 10/02

Specifications

Height: 71 metres

Length: 510 metres

Volume of RCC: 527 m3x103

Total volume: 833 m3x103

Construction Methods

Facings

Upstream
SlopeType
 Traditional concrete against formwork
Downstream
SlopeType
 RCC against formwork  [stepped face]
Spillway
SlopeType
ogeeTraditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
40
Pozzolan (kg/m3)Pozzolan Type
50Ground-granulated blast-furnace slag
  
Cana Brava completed
Cana Brava completed

Full Dam Information

Details

Country: China

Owner: Xixi Reservoir Development Co. Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Daxi

Reservoir capacity: 85 m3x106

Construction Dates

Start of Project: -/03

Start of RCC: -/03

End of RCC: -/05

End of Project: -/06

Specifications

Height: 71 metres

Length: 243 metres

Volume of RCC: 231 m3x103

Total volume: 244 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Xixi completed
Xixi completed

Full Dam Information

Details

Country: Vietnam

Owner: EVN (Electrictie de Vietnam)

Type: Gravity

Purpose(s): Hydropower

River: Po Ko

Reservoir capacity: 1048 m3x106

Construction Dates

Start of Project: 11/05

Start of RCC: 11/05

End of RCC: 12/06

End of Project: -/07

Specifications

Height: 71 metres

Length: 495 metres

Volume of RCC: 326 m3x103

Total volume: 450 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
210Natural pozzolan (ASTM Class N)
  
Pleikrong completed
Pleikrong completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Kaidu

Reservoir capacity: -

Construction Dates

Start of Project: -/97

Start of RCC: -/97

End of RCC: -/06

End of Project: -/08

Specifications

Height: 71 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Morocco

Owner: Direction des Aménagements Hydrauliques

Type: Gravity

Purpose(s): Water Supply

River: N’Fis

Reservoir capacity: 70 m3x106

Construction Dates

Start of Project: 07/05

Start of RCC: 07/05

End of RCC: 07/07

End of Project: 03/08

Specifications

Height: 71 metres

Length: 233 metres

Volume of RCC: 202 m3x103

Total volume: 216 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalReinforced conventional concrete cast before RCC placement
Downstream
SlopeType
0.75Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.75Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Yacoub El Mansour - Ouirgane completed
Yacoub El Mansour - Ouirgane completed

Full Dam Information

Details

Country: China

Owner: Xinjiang-Xinhua-Chonghuer Hydropower Development Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Buerjin

Reservoir capacity: 80 m3x106

Construction Dates

Start of Project: 10/06

Start of RCC: 10/06

End of RCC: -/09

End of Project: -/09

Specifications

Height: 71 metres

Length: 545 metres

Volume of RCC: -

Total volume: 480 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Chonghu’er completed
Chonghu’er completed

Full Dam Information

Details

Country: Turkey

Owner: Akkur Energy Production Trade and Industry Co. Inc.

Type: Gravity

Purpose(s): Hydropower

River: Göksu

Reservoir capacity: 63 m3x106

Construction Dates

Start of Project: 12/07

Start of RCC: 12/07

End of RCC: 02/10

End of Project: 08/10

Specifications

Height: 71 metres

Length: 256 metres

Volume of RCC: 194 m3x103

Total volume: 227 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.07Traditional concrete against precast concrete panels with geomembrane
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
60
Pozzolan (kg/m3)Pozzolan Type
60Low-lime flyash (ASTM Class F)
50 
Feke II completed
Feke II completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Yalongjiang

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/12

End of Project: -/14

Specifications

Height: 71 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Tongzilin completed
Tongzilin completed

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Gravity

Purpose(s): Irrigation

River: Robozik

Reservoir capacity: 16 m3x106

Construction Dates

Start of Project: 09/08

Start of RCC: 09/08

End of RCC: -/16

End of Project: -/17

Specifications

Height: 71 metres

Length: 268 metres

Volume of RCC: 330 m3x103

Total volume: 350 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.15RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.70RCC against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
81
Pozzolan (kg/m3)Pozzolan Type
39Natural pozzolan (ASTM Class N)
  
Photo coming soon

Full Dam Information

Details

Country: Canada

Owner: BC Hydro

Type: Gravity

Purpose(s): Hydropower

River: Peace

Reservoir capacity: -

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: 10/19

End of Project: -/20

Specifications

Height: 71 metres

Length: 800 metres

Volume of RCC: 1740 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
0.80 
Spillway
SlopeType
0.80 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
60
Pozzolan (kg/m3)Pozzolan Type
90Low-lime flyash (ASTM Class F)
120 
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates