Dam Search Results
- Dimensions
- Height: 95 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Jordão | Brazil | COPEL (Companhia Paranense de Energia) | H | Jordão | 110 | 05/94 | 01/95 | 02/96 | 09/96 | 95 | 550 | 570 | 647 | V | (1) | 0.74 | (3)* | 0.74 | (12) | 400 | 400 | 60 | 15 | (N) |
| Platanovryssi | Greece | Public Power Corporation (PPC) | H I | Nestos | 84 | 01/89 | 10/95 | 03/97 | 06/99 | 95 | 305 | 420 | 440 | 0.10 | (14) | 0.75 | (14)* | 0.75 | (13) | 300 | 300 | 50 | 225 | (C) |
| Kubusugawa | Japan | Toyama Prefecture | F H I W | Kubusu | 10 | 03/93 | 04/98 | - /99 | 10/02 | 95 | 253 | 364 | 469 | V 0.40 | (1) (1) | 0.78 | (1) | 0.78 | (1) | 250 | 750 | 84 | 36 | (F) |
| Khun Dan Prakan Chon (formerly Tha Dan) | Thailand | Royal Irrigation Department | I | Nakhon Nayok | 224 | 11/99 | 03/01 | 07/04 | 01/05 | 95 | 2600 | 4900 | 5400 | V 0.40 | (14) | 0.80 | (14)* | 0.80 | (14)* | 300 | 300 | 90 | 100 | (F) |
| Jupudu | China | Datang International Power Generation Co. Ltd. | H | Lixian (Black) | 174 | 11/04 | - /05 | - /06 | - /07 | 95 | 320 | 480 | 800 | V 0.20 | (3) | 0.80 | (3) | 0.80 | (3) | |||||
| Longqiao [A] | China | Lichuan City Yujaing Valley Hudropower Ltd. Hubei Province | H R | Yu | 26 | 12/05 | 03/06 | 02/07 | 05/07 | 95 | 156 | 135 | 160 | curve | (3') | curve | (3) | (3) | ||||||
| Beydag [H-F] | Turkey | DSI - State Hydraulic Works | I W | Kucuk Menderes | 248 | 04/94 | 07/06 | 04/08 | 11/08 | 95 | 800 | 2350 | 2650 | 0.25 | (6) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 60 | 30 | (F) |
| Tiechuanqiao [A] | China | Yupaojiang | 25 | - /07 | - /08 | - /10 | - /11 | 95 | ||||||||||||||||
| Kargi | Turkey | Limak Energy | H | Sakarya | 50 | - /11 | - /15 | 12/16 | 06/17 | 95 | 270 | 535 | ||||||||||||
| Fengman (new) | China | Northeast China Electric Power | H | Songhua | 10377 | - /13 | - /15 | - /21 | - /22 | 95 | 1068 | 2700 | ||||||||||||
| Gölecik | Turkey | DSI - State Hydraulic Works | I W | Gölecik | 36 | 12/16 | 02/21 | 06/24 | - /24 | 95 | 424 | 900 | V | (3') | 0.80 | (3')* | 0.80 | (12) | 300 | 300 | 72 | 48 | (F) | |
| Taghzirt | Morocco | Direction des Aménagements Hydrauliques | H I | Derna | 85 | - /22 | - /24 | - /26 | - /27 | 95 | ||||||||||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Brazil
Owner: COPEL (Companhia Paranense de Energia)
Type: Gravity
Purpose(s): Hydropower
River: Jordão
Reservoir capacity: 110 m3x106
Construction Dates
Start of Project: 05/94
Start of RCC: 05/94
End of RCC: 02/96
End of Project: 09/96
Specifications
Height: 95 metres
Length: 550 metres
Volume of RCC: 570 m3x103
Total volume: 647 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.74 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.74 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |

Details
Country: Greece
Owner: Public Power Corporation (PPC)
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Nestos
Reservoir capacity: 84 m3x106
Construction Dates
Start of Project: 01/89
Start of RCC: 01/89
End of RCC: 03/97
End of Project: 06/99
Specifications
Height: 95 metres
Length: 305 metres
Volume of RCC: 420 m3x103
Total volume: 440 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Slip-formed/extruded facing elements |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Slip-formed/extruded facing elements [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 50 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 225 | High-lime flyash (ASTM Class C) |

Details
Country: Japan
Owner: Toyama Prefecture
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Kubusu
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: 03/93
Start of RCC: 03/93
End of RCC: -/99
End of Project: 10/02
Specifications
Height: 95 metres
Length: 253 metres
Volume of RCC: 364 m3x103
Total volume: 469 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.40 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: Thailand
Owner: Royal Irrigation Department
Type: Gravity
Purpose(s): Irrigation
River: Nakhon Nayok
Reservoir capacity: 224 m3x106
Construction Dates
Start of Project: 11/99
Start of RCC: 11/99
End of RCC: 07/04
End of Project: 01/05
Specifications
Height: 95 metres
Length: 2600 metres
Volume of RCC: 4900 m3x103
Total volume: 5400 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Slip-formed/extruded facing elements |
| 0.40 |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Slip-formed/extruded facing elements [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Slip-formed/extruded facing elements [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Datang International Power Generation Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Lixian (Black)
Reservoir capacity: 174 m3x106
Construction Dates
Start of Project: 11/04
Start of RCC: 11/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 95 metres
Length: 320 metres
Volume of RCC: 480 m3x103
Total volume: 800 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork |
| 0.20 |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Lichuan City Yujaing Valley Hudropower Ltd. Hubei Province
Type: Thin Arch
Purpose(s): Hydropower / Recreation
River: Yu
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: 12/05
Start of RCC: 12/05
End of RCC: 02/07
End of Project: 05/07
Specifications
Height: 95 metres
Length: 156 metres
Volume of RCC: 135 m3x103
Total volume: 160 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| curve | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| RCC against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Hardfill
Purpose(s): Irrigation / Water Supply
River: Kucuk Menderes
Reservoir capacity: 248 m3x106
Construction Dates
Start of Project: 04/94
Start of RCC: 04/94
End of RCC: 04/08
End of Project: 11/08
Specifications
Height: 95 metres
Length: 800 metres
Volume of RCC: 2350 m3x103
Total volume: 2650 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.25 | Traditional concrete against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 30 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): unknown
River: Yupaojiang
Reservoir capacity: 25 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/10
End of Project: -/11
Specifications
Height: 95 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: Limak Energy
Type: Gravity
Purpose(s): Hydropower
River: Sakarya
Reservoir capacity: 50 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: 12/16
End of Project: 06/17
Specifications
Height: 95 metres
Length: 270 metres
Volume of RCC: 535 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Northeast China Electric Power
Type: Gravity
Purpose(s): Hydropower
River: Songhua
Reservoir capacity: 10377 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/21
End of Project: -/22
Specifications
Height: 95 metres
Length: 1068 metres
Volume of RCC: -
Total volume: 2700 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Gölecik
Reservoir capacity: 36 m3x106
Construction Dates
Start of Project: 12/16
Start of RCC: 12/16
End of RCC: 06/24
End of Project: -/24
Specifications
Height: 95 metres
Length: 424 metres
Volume of RCC: -
Total volume: 900 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 48 | Low-lime flyash (ASTM Class F) |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Derna
Reservoir capacity: 85 m3x106
Construction Dates
Start of Project: -/22
Start of RCC: -/22
End of RCC: -/26
End of Project: -/27
Specifications
Height: 95 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Search again