SEARCHING
... please wait

Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Queiles y ValSpainConfederación Hidrográfica del EbroFVal2501/9310/9505/9712/9882375480520V
0.33
(1)
(1)
0.80(5)0.80(1)30030080145(F)
Francisco J. Múgica - formerly Nueva ItaliaMexicoGobierno del Estado de MichoacánIEl Marqués10003/08- /09- /10- /1190375367451V
0.30
 1.00 1.00 300300650(-) -
Portugues
[A-G]
USAUS Army Corps of Engineers, Jacksonville and Department of Natural Resources of Puerto RicoFPortugues2004/0801/1105/1212/1367375270310V(3')0.35(3')*0.35(1)30030011451(F)
Cheshmeh AsheghIranFars Regional Water CompanyF I WCheshmeh Ashegh6906/1010/1105/1403/1760375130250 (1) (1) (12)300600 -
900
12080(N)
Cisokan PSS (Upper dam)IndonesiaPLNHCirumanis - /14- /16- /17- /1898375 350           

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Spain

Owner: Confederación Hidrográfica del Ebro

Type: Gravity

Purpose(s): Flood Control

River: Val

Reservoir capacity: 25 m3x106

Construction Dates

Start of Project: 01/93

Start of RCC: 01/93

End of RCC: 05/97

End of Project: 12/98

Specifications

Height: 82 metres

Length: 375 metres

Volume of RCC: 480 m3x103

Total volume: 520 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.33Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against precast concrete panels
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
145Low-lime flyash (ASTM Class F)
  
Queiles y Val completed
Queiles y Val completed

Full Dam Information

Details

Country: Mexico

Owner: Gobierno del Estado de Michoacán

Type: Gravity

Purpose(s): Irrigation

River: El Marqués

Reservoir capacity: 100 m3x106

Construction Dates

Start of Project: 03/08

Start of RCC: 03/08

End of RCC: -/10

End of Project: -/11

Specifications

Height: 90 metres

Length: 375 metres

Volume of RCC: 367 m3x103

Total volume: 451 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
0.30 
Downstream
SlopeType
1.00 
Spillway
SlopeType
1.00 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
65
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Francisco J. Múgica - formerly Nueva Italia completed
Francisco J. Múgica - formerly Nueva Italia completed

Full Dam Information

Details

Country: USA

Owner: US Army Corps of Engineers, Jacksonville and Department of Natural Resources of Puerto Rico

Type: Arch-Gravity

Purpose(s): Flood Control

River: Portugues

Reservoir capacity: 20 m3x106

Construction Dates

Start of Project: 04/08

Start of RCC: 04/08

End of RCC: 05/12

End of Project: 12/13

Specifications

Height: 67 metres

Length: 375 metres

Volume of RCC: 270 m3x103

Total volume: 310 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.35RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.35Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
114
Pozzolan (kg/m3)Pozzolan Type
51Low-lime flyash (ASTM Class F)
  
Portugues completed
Portugues completed

Full Dam Information

Details

Country: Iran

Owner: Fars Regional Water Company

Type: Gravity

Purpose(s): Flood Control / Irrigation / Water Supply

River: Cheshmeh Ashegh

Reservoir capacity: 69 m3x106

Construction Dates

Start of Project: 06/10

Start of RCC: 06/10

End of RCC: 05/14

End of Project: 03/17

Specifications

Height: 60 metres

Length: 375 metres

Volume of RCC: 130 m3x103

Total volume: 250 m3x103

Construction Methods

Facings

Upstream
SlopeType
 Traditional concrete against formwork
Downstream
SlopeType
 Traditional concrete against formwork
Spillway
SlopeType
 Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300600  -
 900

Cementitious material

Cement (kg/m3)
120
Pozzolan (kg/m3)Pozzolan Type
80Natural pozzolan (ASTM Class N)
  
Cheshmeh Ashegh completed
Cheshmeh Ashegh completed

Full Dam Information

Details

Country: Indonesia

Owner: PLN

Type: Gravity

Purpose(s): Hydropower

River: Cirumanis

Reservoir capacity: -

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/17

End of Project: -/18

Specifications

Height: 98 metres

Length: 375 metres

Volume of RCC: -

Total volume: 350 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates