Dam Search Results
- Volume
- Volume of RCC: 34 m3x103
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Stagecoach | USA | Upper Yampa Water Conservancy District, Steamboat Springs, Colorado | H I R W | Yampa | 42 | 08/87 | 06/88 | 07/88 | 11/88 | 46 | 116 | 34 | 39 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 71 | 71 | (F) |
| La Touche Poupard | France | CAEDS | I | Chambon | 15 | 08/93 | 04/94 | 08/94 | 12/94 | 36 | 200 | 34 | 46 | V | (1) | 0.75 | (3)* | 0.75 | (1)* | 300 | 300 | 115 | (R) | |
| Taiho auxiliary dam [H-F] | Japan | North Dam Integrated Control Office | E | Taiho | - /02 | - /03 | - /04 | - /05 | 30 | 110 | 34 | 1.20 | (12) | 1.20 | (12) | 250 | 500 1000 | (S) | ||||||
| Wadi Umti [H-F] | Oman | Ministry of Rural Municipalities and Water Resources | F | Wadi Umti | 1 | 04/13 | 11/13 | 07/14 | 07/14 | 16 | 145 | 34 | 58 | 0.70 | (12) | 0.70 | (12) | 0.70 | (12) | 300 | 300 | 60 | 0 | (-) |
| Davarlı | Turkey | DSI - State Hydraulic Works | I | Kara Creek | 1 | - /16 | - /19 | - /21 | - /23 | 39 | 119 | 34 | ||||||||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: USA
Owner: Upper Yampa Water Conservancy District, Steamboat Springs, Colorado
Type: Gravity
Purpose(s): Hydropower / Irrigation / Recreation / Water Supply
River: Yampa
Reservoir capacity: 42 m3x106
Construction Dates
Start of Project: 08/87
Start of RCC: 08/87
End of RCC: 07/88
End of Project: 11/88
Specifications
Height: 46 metres
Length: 116 metres
Volume of RCC: 34 m3x103
Total volume: 39 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 71 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 71 | Low-lime flyash (ASTM Class F) |

Details
Country: France
Owner: CAEDS
Type: Gravity
Purpose(s): Irrigation
River: Chambon
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: 08/93
Start of RCC: 08/93
End of RCC: 08/94
End of Project: 12/94
Specifications
Height: 36 metres
Length: 200 metres
Volume of RCC: 34 m3x103
Total volume: 46 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 115 | ROLAC (mixture of flyash and slag with or without limestone fines) |

Details
Country: Japan
Owner: North Dam Integrated Control Office
Type: Hardfill
Purpose(s): Environmental
River: Taiho
Reservoir capacity: -
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/04
End of Project: -/05
Specifications
Height: 30 metres
Length: 110 metres
Volume of RCC: 34 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 1.20 | Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| 1.20 | Reinforced conventional concrete cast after RCC placement |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 500 |
| 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Ground-granulated blast-furnace slag | |

Details
Country: Oman
Owner: Ministry of Rural Municipalities and Water Resources
Type: Hardfill
Purpose(s): Flood Control
River: Wadi Umti
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 04/13
Start of RCC: 04/13
End of RCC: 07/14
End of Project: 07/14
Specifications
Height: 16 metres
Length: 145 metres
Volume of RCC: 34 m3x103
Total volume: 58 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Kara Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/21
End of Project: -/23
Specifications
Height: 39 metres
Length: 119 metres
Volume of RCC: 34 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates