Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
MiyatokoJapanF WMiyatoko506/8906/9012/9301/97482561722800.60(1)0.80(1)0.80(1)1805009624(F)
GuangzhaoChinaHBeipan324510/0402/0605/08- /092014122420280V
0.25
(9)0.75(1)0.75(1)30030061
71
91
87
(F)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Japan

Owner: -

Type: Gravity

Purpose(s): Flood Control / Water Supply

River: Miyatoko

Reservoir capacity: 5 m3x106

Construction Dates

Start of Project: 06/89

Start of RCC: 06/89

End of RCC: 12/93

End of Project: 01/97

Specifications

Height: 48 metres

Length: 256 metres

Volume of RCC: 172 m3x103

Total volume: 280 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.60Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
180500

Cementitious material

Cement (kg/m3)
96
Pozzolan (kg/m3)Pozzolan Type
24Low-lime flyash (ASTM Class F)
  
Miyatoko completed
Miyatoko completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Beipan

Reservoir capacity: 3245 m3x106

Construction Dates

Start of Project: 10/04

Start of RCC: 10/04

End of RCC: 05/08

End of Project: -/09

Specifications

Height: 201 metres

Length: 412 metres

Volume of RCC: 2420 m3x103

Total volume: 280 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against precast concrete panels with hot poured membrane
0.25 
Downstream
SlopeType
0.75Traditional concrete against formwork
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
61
71
Pozzolan (kg/m3)Pozzolan Type
91Low-lime flyash (ASTM Class F)
87 
Guangzhao completed
Guangzhao completed

 

Search again