Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Marathia
[H-F]
GreeceMinistry of AgricultureI WMarathia311/9112/9204/9306/932826531480.50(13)0.50(10)0.50(13)200 -
300
200 -
300
5515(N)
Ano Mera
[H-F]
GreeceMinistry of AgricultureI WAno Mera104/9303/95- /95- /973217049640.50(13)0.50(10)0.50(1)200 -
300
200 -
300
5515(N)
ShinmiyagawaJapanMinistry of AgricultureIMiya1003/9407/9708/0003/0369325393480V(1)0.83(1)0.83(1)2507509139(F)
R'milTunisiaMinistry of AgricultureIR’mil4408/9910/0005/0111/011826064160V(15)0.90(16)0.90(12)*3003001000(-) -
Steno
[H-F]
GreeceMinistry of AgricultureI WSteno102/0007/0110/0206/033217069700.70(13)0.70(10)0.70(1)200 -
300
200 -
300
555(N)
Koris Gefiri (Maiden’s bridge)
[H-F]
GreeceMinistry of AgricultureI WPartheni311/0503/0707/10- /16422211701900.80(13)0.80(3)0.80(1)*300 -
450
300 -
450
5010(N)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Greece

Owner: Ministry of Agriculture

Type: Hardfill

Purpose(s): Irrigation / Water Supply

River: Marathia

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: 11/91

Start of RCC: 11/91

End of RCC: 04/93

End of Project: 06/93

Specifications

Height: 28 metres

Length: 265 metres

Volume of RCC: 31 m3x103

Total volume: 48 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.50Reinforced concrete cast against precast units or slip-formed facing elements
Downstream
SlopeType
0.50RCC against precast concrete blocks
Spillway
SlopeType
0.50Reinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
200  -200  -
300300

Cementitious material

Cement (kg/m3)
55
Pozzolan (kg/m3)Pozzolan Type
15Natural pozzolan (ASTM Class N)
  
Marathia completed
Marathia completed

Full Dam Information

Details

Country: Greece

Owner: Ministry of Agriculture

Type: Hardfill

Purpose(s): Irrigation / Water Supply

River: Ano Mera

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 04/93

Start of RCC: 04/93

End of RCC: -/95

End of Project: -/97

Specifications

Height: 32 metres

Length: 170 metres

Volume of RCC: 49 m3x103

Total volume: 64 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.50Reinforced concrete cast against precast units or slip-formed facing elements
Downstream
SlopeType
0.50RCC against precast concrete blocks
Spillway
SlopeType
0.50Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
200  -200  -
300300

Cementitious material

Cement (kg/m3)
55
Pozzolan (kg/m3)Pozzolan Type
15Natural pozzolan (ASTM Class N)
  
Ano Mera completed
Ano Mera completed

Full Dam Information

Details

Country: Japan

Owner: Ministry of Agriculture

Type: Gravity

Purpose(s): Irrigation

River: Miya

Reservoir capacity: 10 m3x106

Construction Dates

Start of Project: 03/94

Start of RCC: 03/94

End of RCC: 08/00

End of Project: 03/03

Specifications

Height: 69 metres

Length: 325 metres

Volume of RCC: 393 m3x103

Total volume: 480 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.83Traditional concrete against formwork
Spillway
SlopeType
0.83Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
91
Pozzolan (kg/m3)Pozzolan Type
39Low-lime flyash (ASTM Class F)
  
Shinmiyagawa completed
Shinmiyagawa completed

Full Dam Information

Details

Country: Tunisia

Owner: Ministry of Agriculture

Type: Gravity

Purpose(s): Irrigation

River: R’mil

Reservoir capacity: 44 m3x106

Construction Dates

Start of Project: 08/99

Start of RCC: 08/99

End of RCC: 05/01

End of Project: 11/01

Specifications

Height: 18 metres

Length: 260 metres

Volume of RCC: 64 m3x103

Total volume: 160 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC supported by fill shoulders
Downstream
SlopeType
0.90Mechanically compacted unformed face of RCC
Spillway
SlopeType
0.90Reinforced conventional concrete cast after RCC placement  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
R'mil completed
R'mil completed

Full Dam Information

Details

Country: Greece

Owner: Ministry of Agriculture

Type: Hardfill

Purpose(s): Irrigation / Water Supply

River: Steno

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 02/00

Start of RCC: 02/00

End of RCC: 10/02

End of Project: 06/03

Specifications

Height: 32 metres

Length: 170 metres

Volume of RCC: 69 m3x103

Total volume: 70 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.70Reinforced concrete cast against precast units or slip-formed facing elements
Downstream
SlopeType
0.70RCC against precast concrete blocks
Spillway
SlopeType
0.70Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
200  -200  -
300300

Cementitious material

Cement (kg/m3)
55
Pozzolan (kg/m3)Pozzolan Type
5Natural pozzolan (ASTM Class N)
  
Steno completed
Steno completed

Full Dam Information

Details

Country: Greece

Owner: Ministry of Agriculture

Type: Hardfill

Purpose(s): Irrigation / Water Supply

River: Partheni

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: 11/05

Start of RCC: 11/05

End of RCC: 07/10

End of Project: -/16

Specifications

Height: 42 metres

Length: 221 metres

Volume of RCC: 170 m3x103

Total volume: 190 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.80Reinforced concrete cast against precast units or slip-formed facing elements
Downstream
SlopeType
0.80RCC against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300  -300  -
450450

Cementitious material

Cement (kg/m3)
50
Pozzolan (kg/m3)Pozzolan Type
10Natural pozzolan (ASTM Class N)
  
Koris Gefiri (Maiden’s bridge) under construction
Koris Gefiri (Maiden’s bridge) under construction

 