SEARCHING
... please wait

Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
NangankouChinaDongqiao CountyIZaoshui4- /69- /70- /71- /723285             
Langshan
[A]
ChinaDinggeniu33- /74- /76- /78- /7941173 36           
Liangsanping
[A]
ChinaSixian Water Resources BureauHLeishui4- /79- /80- /81- /82353333           
KengkouChinaKengkou Reservoir Management OfficeH WYouxi 2711/8411/8504/8611/86571234362V(9)0.75(10)0.75(13)250 &
500
250 &
500
60
60
120
80
(F)
GantangpingChinaHydropower Bureau, Lanshan CountyHYonghe9- /84- /86- /88- /9052180 220          (F)
Yuxi
[A]
ChinaWYuxi1- /85- /87- /88- /8938102            (F)
RongdiChinaDepartment of Water Resources & Hydropower, Guangxi Zhuang Autonomous RegionF H IDulanghe1904/8811/8807/8906/915313661108V(7)0.75(10)0.65(1)30030090
69
140
111
(F)
Longmentan Nº1ChinaDehua County, Fujian ProvinceH I WChanxi5312/8512/8708/8909/89581507193V
0.30
(12)
(12)
0.75(10)0.75(13)30030072
54
82
86
(F)
Tongjiezi (with Niurixigou saddle dam)ChinaGuodian Dadu River Basin Hydropower Development Co.F H I NDadu20001/8510/8812/8910/94881029407855V(1)0.75(10)0.75(1)300 -
500
300 -
500
79
82
79
83
(F)
ShangbanChinaHWenchuanxi10- /87- /88- /89- /8947122 74           
Tianshenqiao Nº2ChinaChina Southern Power GridF HNanpan11601/8404/8706/9012/9261471143284V(1)V
0.40
(10)ogee(1)2502507979(F)
Maoeryan
[A]
ChinaShiqi33- /68- /88- /91- /9335              
YantanChinaDatang Yantan Hydropower Co. Ltd.F H NHongshui335003/8502/8903/9212/95110525626905V(1)V
0.80
(1)
(1)*
ogee(1)30030055104(F)
ShuikouChinaShuikou Hydropower PlantF H NMin261303/8710/9005/9205/951017916001710V(1)0.73(1)ogee(1)200 -
330
200 -
330
60
70
110
90
(F)
Wan’anChinaChina Guodian CorporationF H I NGan221611/8412/9012/9206/946811041561480V(1)0.80(1)ogee(1)30030065105(F)
Guangzhou PSS- Lower damChinaChina Southern Power GridHLiuxihe3012/9410/9112/9210/00611533257V(1)0.70(3)*ogee
0.78
(1)
(1)
30030062108(F)
Guxian (GuhXiahn)ChinaYellow River Conservancy CommissionF H ILuo1175- /78- /89- /92- /93125315             
JinjiangChinaJinjiang Electric Co.F HJinjianghe18907/9010/9103/9307/9368229182267V(1)0.75(1)0.65(1)
(1)
30030007080(F)
Puding
[A]
ChinaGuizhou Qianyuan Power Co. Ltd.H I WSanchahe37703/8906/9205/9302/9475196103137V(1)0.35(1)ogee
0.35
(1)
(1)
30030085
54
103
99
(F)
ShuidongChinaFujian Shuikou Power Generation GroupH NYouxi10804/9111/9210/9312/9563197126184V(7)0.75(10)0.75(1)3003005090(F)
DaguangbaChinaHainan Provincial Electric Power Company (HEPCO)H I WChanghua171006/9012/9112/9307/9557719485860V(1)0.75(10)
(3)
0.75(1)3003005596(F)
SuoshaiChinaGuizhou Hongfeng Hydropower PlantHSancha420- /89- /90- /93- /9475196 88           
ShanziChinaLianjiang Water Conservancy BureauF H I WAojiang17208/9211/9305/9406/9566274180272V(5)0.80(10)0.77(13)30030065
55
125
95
(F)
Wenquanbao
[A]
ChinaWenquanbao Reservoir Management OfficeF H I WTanghe710/9110/9206/94- /95481885563V(4)0.30(3)ogee(13)300300110
69
68
85
(F)
CatouChinaDongyuan CountyHYinjiang1- /92- /93- /94- /9435115 2230.90 0.90 0.90      
Maojiang
[A]
ChinaLanshan County Hydropower BureauH IXiang2- /92- /93- /94- /9545150 45          (F)
Sishanping
[A]
ChinaHuangcen Reservoir Management OfficeF H ILeishui3- /92- /93- /94- /9556147 18          (F)
Xibingxi
[A-G]
ChinaDepartment of Electric Power, Lonyan City, Fujian ProvinceH WLongshanxi908/9312/9407/9510/9564932533V
0.08
(4)
(4)
0.65(3)ogee
0.65
(13)300 -
350
300 -
350
80
79
120
105
(F)
Guanyinge (Kwan-in-Temple)ChinaGuanyinge Reservoir Management BureauF H I WTaizi216805/9009/9109/9510/9582104012401876V
0.10
(1)
(1)
0.70(1)0.70(1)270 -
280
7509139(F)
ShimantanChinaDepartment of Water Resources, Henan ProvinceF I WGunhe 12007/9304/9412/9507/9641650272351V(3')0.75(3)*0.75(1)30030098
51
98
107
(F)
ShibanshuiChinaFengdu Water Resources BureauF H RLongxihe10512/9204/94- /95- /9684445335564V(3')0.65(1)0.65(13)3001000126
60
84
90
(F)
BailongtanChinaGuangxi-Guiguang Electric Power Development Co. Ltd.H I NHongshuihe34002/9310/9504/9608/97347106280V(1)0.70(10)*0.70(5)*30030073
99
110
60
(F)
MantaichengChinaWangqing County Water Conservancy BureauH IGayahe1008/9201/9312/9608/973733778100V(1)0.75(10)ogee
0.70
(1)
(1)
300100060120(F)
DahekouChinaChongqing Wujiang Power CompanyF HApengjiang115- /93- /94- /96- /9785149 33           
WanyaoChinaWanyao Reservoir Management BureauF H I WDahexi 22310/9301/9505/9707/9783390320458V
0.20
(1)
(1)
0.70(5)0.75(13)3003006496(F)
ShuangxiChinaDepartment of Electricity, Dapu County, Guangdong ProvinceF H I WMeixihe9501/9503/9610/9712/9760221113172V(9)0.80(1)0.78(1)30030090
55
110
105
(F)
TaolinkouChinaDepartment of Water Resources, Hebei ProvinceF H I R WQinglonghe85911/9212/9412/97- /98755005851350V
0.15
(1)0.78(1)ogee
0.65
(1)
(1)
300300135
70
70
85
(F)
Fengxiangxia
[A]
ChinaFengdu Hydropower BureauHHuilonghe8- /93- /95- /97- /9890158 7700.10 0.76 0.76      
Yongxi Nº3ChinaYongxi Hydroelectric Co. Ltd.F H WDazhangxi6805/9610/9710/9809/9987198170255V(3')0.73(10)ogee
0.73
(1)
(1)
2803000115
80
95
90
(F)
HuatanChinaYa’an Electricity CompanyHYinghe801/9606/9612/9805/99851732402900.20(1)0.80(1)0.80(1)300 -
400
300 -
400
78
74
95
90
(F)
ChangshunChinaDepartment of Water Resources, Hubei ProvinceH WYujiang68- /9103/9712/9806/0069279170200V(3')0.74(3)0.80(1)3005000134
72
89
48
(F)
Waijin
[A]
ChinaFushan Power Station Management BureauH INanxi7- /94- /96- /98- /9947235 240           
Kengxiashan
[A]
ChinaWencheng County Kengxiashan Hydropower Development Co. Ltd.HYuquanxi1- /96- /97- /98- /983480             
Fenhe Nº2ChinaDepartment of Water Resources, Shanxi ProvinceF H WFenhe13011/9608/9803/9906/0087350362448V
0.20
(1)
(1)
0.75(5)0.75(1)3003000127
60
84
93
(F)
JiangyaChinaLishui Hydropower Development Co. Ltd.F H I N WLoushui174107/9510/9604/99- /0113136811001310V(3')0.80(3)*ogee
0.80
(13)300300087
64  46
107
96  107
(F)
Songyue (1st Stage)ChinaHelong Electricity CorporationF H I R WHailanhe2109/9701/9804/9909/99292714477V(1)0.73(10)conduit 300200080100(F)
Yangxishui Nº3ChinaShaoguang Electricity Corporation LtdHYangxishui211/9709/9806/9907/0046202100139V(1)V
0.75
(1)
(1)*
0.70(12)300300  (F)
BaishiChinaDepartment of Water Resources, Liaoning ProvinceF H I WDalinghe164509/9604/9709/9912/0049513111603V
0.10
(1)
(1)
0.70(1)0.76(1)3003007258(F)
Hongpo
[A-G]
ChinaXishan Xingyu Water Resources CorporationWQinggoushui310/9707/9811/9912/99552447177V(3')0.50(1)0.50(1)30030005499(F)
GaobazhouChinaQingjiang Hydropower Development CorporationF H NQingjiang53605/9711/9804/0001/0157440210940V(9)0.75(1)0.75(1)300300123
86
100
86
(F)
DagangouChinaGe'ermu Hydroelectric Responsibility Corporation Ltd.HGeermu9780- /96- /98- /00- /0140              
Shankou Nº3
[A]
ChinaShixing County Power Development CorporationF HDu’anshui (Chengjiang)4809/9902/0001/0103/015717990119V(3')0.75(3')0.80(1)3303000105
63
86
80
(F)
Longshou Nº1
[A-G]
ChinaDepartment of Electricity, Gansu ProvinceHHeihe1304/9903/0006/0109/0180258187210V
0.20
(1)
(1)
0.75(1)0.75(1)300300096
58
109
113
(F)
Shimenzi
[A]
ChinaShimenzi Reservoir Engineering Management OfficeH I WTaxi8006/9806/9906/0110/011101761882110.142
V
(3')
(3')
V
0.18
(3)
(3)
crest(12)300300093
62
110
110
(F)
DachaoshanChinaDepartment of Electricity, Yunnan ProvinceF HLancang (Mekong)8910/9712/9810/0107/021154817571287V
0.20
(3')0.70(10)*0.70(13)30030094
67
94
101
(N)
MianhuatanChinaMianhuatan Hydroelectric Development CorporationF H N WTing203504/9812/9811/0104/02111302500615V(9)0.75(3)*0.70(13)300300082
59  48
100
88  88
(F)
YanwangbiziChinaChaoyang Water Conservancy BureauF H I WDaling217- /96- /97- /01- /023538387220        64118(F)
YushiChinaYushi Reservoir Construction Management BureauF I WBiliuhe89- /98- /99- /01- /0250267218233        7070(F)
XiaoxiheChinaDepartment of Electricity, Feng Shun CountyH IXiaoxihe5- /99- /00- /01- /02621034766          (F)
Shuangkengkou
[A]
ChinaHXiaoxihe12- /99- /00- /01- /0268              
HelongChinaElectricity Corporation, YanjiH R WHailanhe3011/9808/9901/0212/02302444389V(1)0.75(10)ogee(10)*3002000113113(F)
Shapai
[A]
ChinaSichuan Minjiang Hydropower Co. Ltd.HCaopohe1806/9703/0005/0204/03132230380392V
0.10
(3')0.21(3)crest
0.21
(1)300300108
89
72
89
(F)
Xiaoyangxi (and saddle dam)ChinaGuizhou Province Electric Power Co.WXia Oyangxi1505/0001/0110/0212/03451184749V(3')0.75(3')*0.75(12)3503500138
60
113
90
(F)
Yangxishui Nº1ChinaCorporation of Energy Development, Ruyuan County, Guangdong ProvinceH IYangxi10012/0010/0111/0206/0382244241340V(1)V
0.75
(1)
(1)*
0.70(12)300300  (F)
Nankengyuan
[A]
ChinaJiangning Nankengyuan Hydropower Development Co. Ltd.HXiaoxihe1- /98- /00- /02- /0334114             
HengxiChinaHYangxi100- /99- /00- /02- /0382              
Junxi II
[A]
ChinaLongquan City Bureau of HydropowerHJunxi5- /00- /01- /02- /0369192             
WanmipoChinaHunan Wuling Hydroelectric Development CorporationH NYoushui37808/0111/0205/0305/0465238141376V(3')0.75(12)ogee(12)300300086
68
103
83
(F)
Linhekou
[A]
ChinaShaanxi Lan River Hydropower Development CorporationH ILanhe147- /9912/0106/03- /04100311229293curve(3')curve(3')ogee(1)300300074
66
111
111
(F)
TizidongChinaChongging Electricity Ltd.HApeng2508/0110/0210/0311/035619372161 (12) (12) (12)    (F)
Huilong PSS - Upper damChinaHenan Electric Power CorporationHHuilonggou106/0111/0211/03- /05542087376V(3')0.75(3')none 300300  (F)
Maobaguan
[A]
ChinaShaanxi Hanjiang Hydropower Development Co. Ltd.HRenhe2- /00- /02- /03- /046612081106           
Shanggou
[A]
ChinaXifeng County Water Conservancy BureauWYangshui1- /01- /02- /03- /0439176             
WangkengChinaWang Keng Power Station Co. Ltd.HTangkouxi15- /01- /02- /03- /04561593840          (F)
Liubo
[A]
ChinaAnhui Hydropower Development Co. Ltd.,F HXipihe51- /02- /03- /03- /0470258130168          (F)
ZhouningChinaMindong Electromechanical Development CorporationHMuyangxi47- /0204/0303/0406/0473206159199V(3')0.72(3')0.70(12)30030067
50
100
92
(F)
Huilong PSS - Lower damChinaHenan Electric Power CorporationHHuilonggou206/01- /0206/04- /055417588105V(3')0.75(3')*0.75(12)300300  (F)
TongkouChinaBeichuan Bashu Tongkou River Development CorporationHTongkou3610/98- /02- /04- /0472198300352V(1)1.10(1)ogee(1)300300  (F)
PingbanChinaGuangxi-Guiguan Electric Power Co. Ltd.HNanpan27812/01- /02- /0407/0562396150700V(3')0.70(3')ogee(12)300300  (F)
Xuanmiaoguan
[A]
ChinaYineng Co., Ltd. 41- /00- /02- /04- /0566191 66           
Sanjiang
[A]
ChinaSanjianghe7- /02- /03- /04- /0472138 38           
Changtan
[A]
ChinaGuangdong Shanneng group Co.HTuwushui17- /03- /03- /04- /0453124 29           
YujiankouChinaChongqing Yujiankou Hydropower Co. Ltd.HLong908/01- /03- /04- /0550156118147V(3')0.70(3')0.85(1)    (F)
LetanChinaGuangxi-Guiguan Electric Power Co. Ltd.,H I NXijiang950- /02- /03- /04- /056658650210           
Yujianhe
[A]
ChinaGuiyang Water Conservancy BureauF I WWu11- /02- /03- /04- /05811801051100.10 0.76 0.76      
Xiakou
[A]
ChinaHubei Nanzhang Xiakou Electric Co. Ltd.HJuhe99- /02- /03- /04- /0585192 131           
Jiemian Ataguia
[H-F]
China  - /00- /02- /04- /0616             (F)
QinglianxiChinaHMeixi20- /00- /02- /04- /0696178             
Zhaolaihe
[A]
ChinaChangyang Electric Power BureauH I WDuhu7012/0303/0405/0510/05107206166255curve(3')curve(3') (3')300300084
126
126
103
(F)
XiheChinaHanjiang Hydropower Development Ltd.F H NHan22911/0302/0405/0506/0763346194631          (F)
SuofengyingChinaGuizhou-Wujiang Hydropower Development Co. Ltd.F H I N WWu20110/0006/0308/0503/06116165421739V
0.25
(3')
(3')
0.70(3')0.70(1)30030006495(F)
ChangzhouChinaHXun56- /93- /02- /05- /0756              
Xiaqiao
[A]
ChinaGuangxi Longjiang Electric Power CorporationHLong49- /02- /03- /05- /0668167172226           
Huizhou PSS - Lower damChinaChina Southern Power GridHCaitouhe30- /02- /03- /05- /1161420235242           
Tangkeng
[A]
ChinaQingtian Yongwen Hydropower Co.HGuxi12- /03- /04- /05- /0566    (12) (12) (12)     
XixiChinaXixi Reservoir Development Co. Ltd.F H I WDaxi85- /03- /04- /05- /0671243231244          (F)
BaiseChinaGuangxi-Youjiang Hydraulic Development Co.Ltd.F H I N WYou566010/0112/0204/0612/0613072019952672V(9)0.80(1)0.80(1)300300080
50
132
110
(F)
Dahuashui
[A]
ChinaWujaing Qingshuihe Hydropower Development Co. Ltd.F HQingshuihe27612/0304/0511/06- /07135198550670curve(3')curve(3') (1)300300081
94
81
94
(F)
Niuqiao
[A]
ChinaNiu Qiao Reservoir Development Co. Ltd.HQingtonghe26- /03- /0512/06- /0762201 710           
Qilitang
[A]
ChinaHLiuchi71- /03- /04- /06- /0781              
XinjiangshankouChinaHKaidu - /97- /04- /06- /0871              
BaishaChinaChina Huadian CorporationF HWanan199- /04- /05- /06- /0675172211239           
LeidatanChinaLeidatan CorporationHYingtaoyuangou9403/03- /05- /0606/0784202240340V(3')0.70(3')0.70(1)     
Hongkou Ataguia
[H-F]
China  - /04- /05- /06- /0736              
XiaoxiChinaHunan Xiangtou Xinshao Youxi Hydropower Development Corporation Ltd.HZishui168- /04- /05- /06- /0747268             
ZhoubaChinaChengdu Haineng Power Co. Ltd.F HMabianhe204- /04- /05- /06- /0773163229405V(1)0.70(1)0.78(1)300300110
66
73
66
(F)
Shaba
[A]
ChinaGuizhou Zhongsui Energy Ltd.HHongdu99- /04- /05- /06- /07871486790           
Wuchuanshaba
[A]
ChinaHWujiang9940- /04- /05- /06- /0787              
DaxiaChinaChina Guodian CorporationH IQuan20- /04- /05- /06- /0788160 205           
ZaoshiChinaLishui Basin Hydraulic and Hydroelectric Development CorporationF H N WDieshui1439- /04- /05- /06- /0788351450930V
0.25
(3')0.80(3')0.75(1)300300053
83
99
102
(F)
JupuduChinaDatang International Power Generation Co. Ltd.HLixian (Black)17411/04- /05- /06- /0795320480800V
0.20
(3)0.80(3)0.80(3)     
TukaheChinaDatang International Power Generation Co. Ltd.H Lixian7804/0412/05- /06- /0759300255570V(3') (3') (3')300300065
93
110
113
(S)
Longqiao
[A]
ChinaLichuan City Yujaing Valley Hudropower Ltd. Hubei ProvinceH RYu2612/0503/0602/0705/0795156135160curve(3')curve(3) (3)     
Huizhou PSS - Upper damChinaChina Southern Power GridHXiaojinhe3010/0412/0505/07- /11561688493V(1)0.75(1)0.70(1)30030064125(F)
Longtan (Stage 1)ChinaLongtan Hydropower Development Co. Ltd.F H N WHongshui1621007/0110/0406/0712/0919283246237400V
0.25
(3')0.70(3')0.68(12)30030099
86
121
109
(F)
HongkouChinaFujian Hongkou Hydropower Co. Ltd.H WHuotong449- /03- /05- /07- /08130341681830           
Luojiaohe
[A]
ChinaGuizhou Zhongshui Energy Co. Ltd.HLuojiao46- /05- /06- /07- /0781250 110           
Baxiang Nº3ChinaDepartment of Electricity, Feng Shun CountyHBaxianghe8- /05- /06- /07- /08442076383           
TiechengChinaGansu Keyuan Electric Power Group Co. Ltd.HDatong1- /05- /06- /07- /0844143             
ShihuChinaZhouluo County GovernmentF I WLituohe58- /05- /06- /07- /0856193162354           
YumenChinaDepartment of WaterResources, Henan ProvinceF H NLuohe28- /05- /06- /07- /0862244133234           
YoushuiChinaChongqing Youshui River Hydropower Development Co. Ltd.HYoushui152- /05- /06- /07- /0863194             
Qilinguan
[A]
ChinaNanhe Hydropower Development Ltd.HNanhe14- /05- /06- /07- /08771404555           
ManghekouChinaJiyuan City Water BureauMenghe11- /05- /06- /07- /0878215160249           
Bailianya
[A]
ChinaAnhui Water Resources Development Co. Ltd.F H I WDongpi480- /05- /06- /0704/09105422485600V(1)0.335(1)0.335(1)300300072
56
108
84
(F)
NanshaChinaRed River Hydropower Development Co. Ltd.HHonghe21202/06- /07- /0707/0885              
SilinChinaGuizhou-Wujiang Hydropower Development CorporationF H I NWujiang159311/0511/0603/08- /091173108251100V(1)0.70(1)0.70(1)  66
89
100
109
(F)
Weihou
[A]
ChinaXilin River Hydropower Development Co. Ltd.HTuoniang13303/05- /0604/08- /0982              
GuangzhaoChinaGuizhou Qianyuan Power Co. Ltd.HBeipan324510/0402/0605/08- /0920141224202800V
0.25
(9)0.75(1)0.75(1)30030061
71
91
87
(F)
GelantanChinaDatang International Hydropower Generation Co. Ltd.HLixian40901/0309/0608/08- /091134669031200V
0.20
(3')0.75(3')0.75(1)  77
93
77
93
(S)
JinghongChinaHuaneng Lancang River Hydropower Co. Ltd.F H RLancang (Mekong)1139- /04- /05- /08- /091087058483068V(3)0.80(3) (1)300 64
93
93
93
(S)
PengshuiChinaDatang International Power Generation Co. Ltd.H IChangxi1465- /05- /06- /08- /091173266081330V(3')0.70(3')0.70(1)  64
81
96
121
(F)
LiujiadongChinaGuangxi Water Conservancy and Electric Power CorporationHGui26- /06- /07- /08- /0861166 127           
ShuheChinaDatang Shaanxi Power Generation Co LtdHHanjiang176- /06- /07- /08- /0972              
Qingxi
[A]
ChinaGuizhou Qianyuan Power Co. Ltd.HFurong98- /06- /07- /08- /0982166 154           
NonglingChinaDehong Longjiang Hydropower Development Co. Ltd.HLong233- /06- /07- /08- /0991280 486           
ShankouChinaXinjiang Yili River Basin Development AuthorityHTekes12104/06- /07- /08- /0950496             
Yunlonghe Nº3
[A]
ChinaEngshi Yuefeng Yunlong River Hydropower Development Co. Ltd.HYunlong4403/0604/0704/09- /11139119182207curve(3')curve(3') (3')     
Yunkou
[A]
ChinaYujiang Hydropower Co. Ltd.HWuni3506/0704/0806/09- /12119152200205           
WuduChinaSichuan Wudu Water Conservancy and Hydropower Group Ltd.F H I WFu57210/04- /07- /09- /1012063111511580V(3')0.75(3')0.80(3')    (F)
Huanghuazhai
[A]
ChinaChina Datang CorporationHGetu174807/06- /07- /09- /10110253280292        5296(F)
Tianhuaban
[A]
ChinaYunnan Dianneng Niulanjiang Hydropower Development Co. Ltd.HNiulan6612/06- /07- /09- /10113160182360curve(3')curve(3')ogee(3)     
BaishiyaChinaQuifeng Water Supply Co. of Fangchenggang CityH I WXijiang26- /04- /07- /09- /1274190230240  0.75        
Chonghu’erChinaXinjiang-Xinhua-Chonghuer Hydropower Development Co. Ltd.HBurgin8510/06- /08- /09- /0974545 480           
XiaotianlongChinaHongguo Water Resources Development Co.WTuochang1- /07- /08- /09- /0958168 125           
Maduhe
[A]
ChinaYichang Junwang Group Co.HSiyang33- /06- /08- /09- /10100185             
Yangjiayuan
[A]
ChinaGuizhou Tongzihe Hydropower Development Co. Ltd.H WTongzhi78- /07- /08- /09- /1068153             
GeliqiaoChinaWujiang Hydropower Development CorporationHQingshuihe7701/0704/08- /09- /10124104 500           
WuyiChinaDina99- /05- /07- /10- /12103              
YongdingqiaoChinaLiushahe17- /05- /07- /10- /12123              
Jin’anqiaoChinaHanergy, Yunnan Jinsha River Hydropower Co. Ltd. and Yunnan Investment and Development Co. Ltd.H N RJinsha91312/0305/07- /10- /1116064024004430V(3)0.75(3)0.75(1)  72
96
108
117
(F)
Saizhu
[A]
ChinaYunnan Dianneng Group Holding CompanyHXima304/06- /08- /10- /1172160107115curve(3')curve(3') (3)     
QianchangChinaGuodian Yunnan Power Co LtdHPudu22- /07- /08- /10- /1181148             
Tiechuanqiao
[A]
ChinaYupaojiang25- /07- /08- /10- /1195              
ShidiChinaChongqing Wujiang Power CompanyHYoushui163- /06- /08- /10- /1230214 260           
Sanliping
[A]
ChinaHubei Energy Group Co. Ltd.F HNanhe499- /0705/08- /10- /11133285 390 (1) (1) (1)     
LonghuakouChinaMeng County Longhuakou Hydropower Co. Ltd.Longhua30- /08- /09- /10- /1063353 414           
Naen
[A]
ChinaGuangxi Water Conservancy and Electric Power CorporationHBaidu22- /06- /09- /10- /1175217             
Luoboba
[A]
ChinaEnshi Tianfa Electric Ltd.F H RLengshui87- /07- /09- /10- /111141922121          (F)
LechangxiaChinaDepartment of Water Resources, Guandong ProvinceH I NBei374- /08- /09- /10- /1185256             
ShiyaziChinaGuizhou Zhongshui Energy Co. Ltd.HHongdu321- /0704/0812/1112/11135              
GongguoqiaoChinaHuaneng Lancang River Hydropower Co. Ltd.HLancang (Mekong)316- /08- /09- /1103/12105356 1067           
Huhehaote (Hohhot) PSS - Upstream lower damChinaNei Mongol (Inner Mongolia) Electricity CorporationHHalasxinegou7- /07- /09- /11- /1269242185330           
Sanglang
[A]
ChinaSanglang15- /08- /09- /11- /1290              
Qinglong
[A]
ChinaEnshi Mawei Valley Hydropower Development Co. Ltd.HMaweigou2912/08- /09- /11- /12140116 212           
NabiChinaBaise WaCun Hydropower Development Co.HXiyang57- /09- /10- /11- /1169247 289           
LianhuataiChinaGuodian Shaanxi Hydropower Development Co.HDan9502/09- /10- /11- /1170221 221           
LusixiChinaLusi Reservoir Management OfficeWLusixi33- /09- /10- /11- /1239140             
Linxihe
[A]
ChinaHubei Huaqing Power Co. Ltd.HLoushui52- /08- /10- /11- /1274146             
MadushanChinaHonghe Guangyuan Hydropwer and Madushan Development Co. Ltd.H N WHonghe552- /08- /09- /11- /12108353 987           
A’haiChinaYunnan Jinsha River Hydropower Co. Ltd.F H IJinsha885- /08- /10- /11- /12138482 2707           
QingyanggouChinaYumen Hongyuan Industrial CompanyHSule - /09- /10- /11- /1264147             
DengkeChinaYunnan Baoshan Electric Co. Ltd.HLongjiang53- /09- /10- /11- /1276239             
LongkaikouChinaYunnan Jinsha River Hydropower Co. Ltd.F H N R WJinsha55808/0709/08- /12- /1311976828403853V(3)0.75(3)  300300096
60
96
90
(F)
Shankouyan
[A]
ChinaShankouyan Hydro Project Development Co.HYuanhe10511/07- /09- /12- /1399268 272           
ShatuoChinaWujiang Hydroelectric Development CorporationF H NWu91005/06- /10- /12- /1310163115101980V
0.15
(3')0.75(3')0.75(3)3003000   
Dayuhyan
[A]
ChinaGuizhou Water-investment Hydropower Development Co., LtdHMasha61- /09- /10- /12- /1381              
MilanheChinaMilanhe41- /09- /10- /12- /1383              
GuandiChinaYalong River Hydropower Development Co. Ltd.HYalong760- /09- /10- /12- /1316851629703020V
0.30
   0.70   7288(F)
XunyangChinaHanjiang - /08- /10- /12- /1458              
ZhongqiaoChinaZunyi Water Conservancy BureauRen99- /10- /11- /12- /1260              
Nankanghe Nº2
[A]
ChinaXimeng Fubian Hydropower Development Co. Ltd.HNankang31- /10- /11- /12- /1268179             
KalashukeChinaDepartment of Water Resources, Xinjiang ProvinceF H WE’erqisi2419- /07- /10- /13- /14122148925202890  0.75 0.75 3003000  (F)
Mamaya Nº1ChinaGuizhou Qianyuan Power CompanyHBeipan137- /08- /10- /13- /14109250 591           
Luntan
[A]
ChinaLuntan Hydraulic Engineering Co. Ltd.HYangcunshui18012/08- /10- /13- /1490218             
Lizhou
[A]
ChinaChina Huadian CorporationH WMuli190- /09- /11- /13- /14132211             
ChuanjiangChinaChuanjiang98- /10- /11- /13- /1483              
ZhaiziheChinaHouhe119- /10- /11- /13- /1493              
Shannipo
[A]
ChinaGuizhou Qianyuan Power Co. Ltd.HBeipan85- /09- /11- /13- /15119205199267curve(3')curve(3)ogee(3)     
ShaqianChinaHydroChina Co.F HFurong5710/11- /12- /13- /1359              
ShuangfengsiChinaChengde Shuangfengsi Project BureauHLuanhe137- /11- /12- /13- /1450535 550           
HonglingChinaGuodian Haikong Hongling water construction Co. Ltd.H I WDabian662- /11- /12- /13- /1492              
Huhehaote (Hohhot) PSS - Downstream lower damChinaNei Mongol (Inner Mongolia) Electricity CorporationHHalasxinegou7- /12- /12- /13- /1458308205717           
GuanyinyanChinaDatang Huarui Investment Group Ltd.F H N RJinsha2263- /0809/1105/14- /16159125064739364V
0.10
(3')0.75(3')0.75(1)300 5399(F)
XiangjiabaChinaChina Three Gorges CorporationHJinsha52- /06- /10- /14- /16162909             
TongzilinChinaYalongjiang Valley Hydropower DevelopmentHYalong1- /08- /10- /14- /1671              
LudilaChinaYunnan Huadian Hydropower Co. Ltd.HJingsha171801/07- /11- /14- /15140622 1920V
0.20
 0.75        
Longtanzui
[A]
ChinaHHanshuinanhe10- /10- /12- /14- /1598  205           
Lijiahe
[A]
ChinaXian Water Affair GroupHBahe53- /11- /13- /14- /1599352370478           
Songyue (2nd Stage)ChinaHelong Electricity CorporationF H I R WHailanhe21- /12- /13- /14- /1541271  V(1)0.73(10)conduit 300200080100(F)
Daoliuhe
[A]
ChinaDaoliu123- /12- /13- /14- /1560187             
KaheChinaW 20- /12- /13- /14- /1572              
TuokouChinaChina Power International DevelopmentHYuan1384- /10- /12- /15- /1682649             
GuoduoChinaHuaneng Guoduo Hydropower Co. Ltd.HZha Qu80- /12- /13- /15- /1683236 550           
Shuishimen
[A]
ChinaYunxi Shuishimen Reservoir BureauF H WTianhe37- /13- /14- /15- /1686  150           
Dayakou
[A]
ChinaGuangdong Yuedian Group Co., LtdHNanpeng170- /13- /14- /15- /1699300 210           
XinchangheChinaXinchanghe14- /14- /14- /15- /1657145             
XiaorongjiangChinaGuilin Dayu Water Conservancy, Infrastructure, Construction and Investment Co. Ltd.HXiaorong163- /10- /13- /16- /1790255             
LianhuaChinaXiamen Water Resources BureauHLianhuaxi33- /10- /14- /16- /1730333             
HechuanChinaHJialingjiang11- /12- /14- /16- /1751              
LushiChinaHNujiang1288- /12- /14- /16- /18165              
GuanchangChinaH I WQiduxi24- /14- /15- /16- /1754246             
YunheChinaHDangjiahe14- /14- /15- /16- /1768176             
HaokouChinaDatang Investment Group Ltd.HFurong (Pangu)90- /14- /15- /16- /1785211             
Xiangbiling
[A]
ChinaSPIC Guizhou Jinyuan Hydroelectirc PowerplantHNiulan263- /14- /15- /16- /17136459             
Wanjiakouzi
[A]
ChinaChina Datang CorporationHGexiang279- /09- /12- /17- /181684137601020        66100(F)
WunonglongChinaHuaneng Lancang River Hydropower Co. Ltd.HLancang (Mekong)27206/10- /15- /17- /18138247             
Shangshui
[A]
ChinaI W 12- /13- /15- /17- /1858269             
XimiheChinaH I WXimihe17- /14- /16- /17- /1888147             
FendouChinaMuling Fendou Reservoir Construction officeF H I WMulenghe191- /15- /16- /17- /1846406             
XiahushanChinaF H I WDashahe196- /15- /16- /17- /1874296             
Wugachong
[A]
ChinaH I WMabie99- /15- /16- /17- /18108182             
HuangdengChinaYunnan Huaneng Lancang River Hydropower Co.,Ltd.H I RLancang (Mekong)161301/1004/1504/1806/1920346427533670 (3') (3') (12)30030082
67
100
100
(F)
Sanhekou
[A-G]
ChinaZiwuhe710- /1410/1612/1806/19142472             
DahuaqiaoChinaHuaneng Lancang River Hydropower Co. Ltd.HLancang (Mekong)262- /10- /13- /18- /19107232 112           
LidiChinaHuaneng Lancang River Hydropower Co. Ltd.HLancang (Mekong)75- /10- /14- /18- /1975346 1100           
ShangcunChinaWShangcunxi123- /11- /14- /18- /1989338             
Shoukoubao
[H-F]
China 10- /14- /16- /18- /1962              
Maojiahe
[A]
ChinaChina Power Investment CorporationHQingshuihe13- /14- /16- /18- /1975166             
MandianChinaMandian12340- /15- /16- /18- /1978231             
MangshanChinaF H I WChanglehe133- /15- /16- /18- /19101355             
DatengxiaChinaGuangxi Datengxia Gorge Water Conservancy Development Co. .Ltd.F H N WXijiang3479- /14- /16- /1807/2080  7100           
ZhuangliChinaZhuangli reservoir construction and management officeF H I WShizihe133- /15- /17- /18- /194449             
HoushanChinaGouhe160- /16- /17- /18- /1952              
PingzhaiChinaH I WSanchahe1089- /13- /15- /19- /21163              
LuojiuChinaH 346- /15- /17- /19- /2060              
WacunChinaHYoujiang536- /15- /17- /19- /20105365             
GaoshengChinaYalong River Hydropower Development Co. Ltd.HHongdu100- /16- /17- /19- /20121              
Wudongde secondary damChinaChina Yangzi River Three Gorges GroupHJinsha (Yangtze)740004/18- /18- /1906/1996163466            
YunzhenChinaF I W 96- /16- /1903/2001/2176173             
MaojunChinaJunshui117- /16- /18- /20- /2176              
Jinjigou
[H-F]
ChinaShigaoqiao11- /19- /19- /20- /2033              
Meizhou PSS - Upper damChinaChina Southern Power GridH 41- /18- /19- /20- /2160              
Meizhou PSS - Lower damChinaChina Southern Power GridH 45- /18- /19- /20- /2185              
DaguChinaChina Huadian Group Co. Ltd.HYaluzangbu (Brahmaputra)55- /1603/1904/21- /231183859371442        93
60
93
100
 
Yangjiang PSP - Upper damChinaChina Southern Power Grid Co.HMoyang1801/17- /1911/2106/22101477 652      3006000   
Hekou
[A]
China 37- /17- /1912/21- /2283193             
Fengman (new)ChinaNortheast China Electric PowerHSonghua10377- /13- /15- /21- /22951068 2700           
Xijiang
[H-F]
China 472- /16- /18- /21- /2250              
Maling
[A]
ChinaH 219- /16- /18- /21- /2290              
HuangzangsiChinaHHeihe403- /1608/18- /21- /22123              
KongzhaiChinaHBala3- /17- /19- /21- /2247              
Tuxikou
[A]
ChinaF HQianhe160- /18- /19- /21- /22132              
HuanglinxiaChinaH WHanshui22110/18- /2011/2207/2370349             
FuzikouChinaGuilin Dayu Water Infrastructure Development Investment Co. Ltd.F HLijiang18811/11- /13- /22- /2377239 304           
Dahe
[A]
China 44- /15- /17- /22- /23105              
TuobaChinaHuaneng Lancang River Hydropower Co. Ltd.HLangcang (Mekong)1338- /15- /18- /22- /24158508 3600           
Xiakoutang
[A]
ChinaLichuan City Yujiang Valley Hudropower Ltd. Hubei ProvinceF HYu55- /17- /19- /22- /2270              
YuwangheChinaGuizhou Shuicheng Water-investment Co. Ltd.I WYuwanghe1109/16- /19- /2211/2350157106            
LuoyuanhuokouChinaHAo297- /17- /19- /22- /2391              
TingzikouChinaJialing River Tingzikou Water Resources and Hydropower Development Co. Ltd.F H I N WJialing406711/09- /19- /22- /25116995             
WangjiazhouChinaTuoxi21- /16- /20- /22- /2362310             
GuangshanChinaLarge and medium sized Irrigation District Service Center of Qiannan PrefectureI WQingshui104/20- /21- /22- /2232198  V(1)V
1.00
(1)
(17)
none     (F)
MaiwanChinaMaiwan Water ConservancyH INandu61504/2003/2205/2407/2579377             
HuokouChinaDepartment of Water Conservancy, Fujian ProvinceF H WAojiang297- /17- /21- /24- /25913383006630.10 0.76 0.76     (F)
TianjiaotanChinaI WBeimen19104/2011/21- /2408/2552295             
Quanzhou BailaiChinaF H W 54406/2001/22- /2412/25106596             
Lengshuihe
[H-F]
China 10- /20- /22- /24- /2540              
Dongyang
[H-F]
ChinaDongyanggou505/22- /23- /24- /2567136             
DaxingzhaiChinaI WTong11306/2202/2406/25- /2669288             
FengshanChinaH 104- /20- /22- /25- /2590              
NiuluChinaH I WNiulushi66- /18- /22- /25- /2680391             
GujunChinaDazhou Major water works construction and management centerF HZhonhe12812/20- /22- /25- /2677              
Xiyin
[H-F]
ChinaQiuluxi2810/21- /23- /25- /2652395329386           
ShiziyaChina 6- /22- /23- /25- /2664274             
Yunxiao PSP - Upper damChinaChina Nuclear (Guodian Zhangzhou) EnergyH 21- /17- /22- /26- /2768              
GuanyinChinaGuizhou Water Conservancy Investment Group Co, LtdH I WGuanyinsi12112/21- /23- /26- /27109              
TBChinaHLancang (Mekong) 10/21- /23- /26- /27158              
JiaoyanChinaHQingshui21012/21- /23- /26- /2796              
Heibaoshan
[H-F]
ChinaConstruction Headquarters of Heibaoshan Reservoir Project in Wanyuan CityI WDayan2- /22- /24- /26- /2760              
QingyukouChinaF H WBahe14104/22- /24- /28- /2971              
KalaChinaYalong River Hydropower Development Co. Ltd.HYalong23401/2407/25- /28- /29128  2560           

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: China

Owner: Dongqiao County

Type: Gravity

Purpose(s): Irrigation

River: Zaoshui

Reservoir capacity: 4 m3x106

Construction Dates

Start of Project: -/69

Start of RCC: -/69

End of RCC: -/71

End of Project: -/72

Specifications

Height: 32 metres

Length: 85 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Nangankou on Google Earth
Nangankou on Google Earth

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): unknown

River: Dinggeniu

Reservoir capacity: 33 m3x106

Construction Dates

Start of Project: -/74

Start of RCC: -/74

End of RCC: -/78

End of Project: -/79

Specifications

Height: 41 metres

Length: 173 metres

Volume of RCC: -

Total volume: 36 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Sixian Water Resources Bureau

Type: Thin Arch

Purpose(s): Hydropower

River: Leishui

Reservoir capacity: 4 m3x106

Construction Dates

Start of Project: -/79

Start of RCC: -/79

End of RCC: -/81

End of Project: -/82

Specifications

Height: 35 metres

Length: 33 metres

Volume of RCC: 3 m3x103

Total volume: 3 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Liangsanping on Google Earth
Liangsanping on Google Earth

Full Dam Information

Details

Country: China

Owner: Kengkou Reservoir Management Office

Type: Gravity

Purpose(s): Hydropower / Water Supply

River: Youxi

Reservoir capacity: 27 m3x106

Construction Dates

Start of Project: 11/84

Start of RCC: 11/84

End of RCC: 04/86

End of Project: 11/86

Specifications

Height: 57 metres

Length: 123 metres

Volume of RCC: 43 m3x103

Total volume: 62 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against precast concrete panels with hot poured membrane
Downstream
SlopeType
0.75RCC against precast concrete blocks
Spillway
SlopeType
0.75Reinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
250  &250  &
500500

Cementitious material

Cement (kg/m3)
60
60
Pozzolan (kg/m3)Pozzolan Type
120Low-lime flyash (ASTM Class F)
80 
Kengkou completed
Kengkou completed

Full Dam Information

Details

Country: China

Owner: Hydropower Bureau, Lanshan County

Type: Gravity

Purpose(s): Hydropower

River: Yonghe

Reservoir capacity: 9 m3x106

Construction Dates

Start of Project: -/84

Start of RCC: -/84

End of RCC: -/88

End of Project: -/90

Specifications

Height: 52 metres

Length: 180 metres

Volume of RCC: -

Total volume: 220 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Water Supply

River: Yuxi

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/85

Start of RCC: -/85

End of RCC: -/88

End of Project: -/89

Specifications

Height: 38 metres

Length: 102 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Department of Water Resources & Hydropower, Guangxi Zhuang Autonomous Region

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation

River: Dulanghe

Reservoir capacity: 19 m3x106

Construction Dates

Start of Project: 04/88

Start of RCC: 04/88

End of RCC: 07/89

End of Project: 06/91

Specifications

Height: 53 metres

Length: 136 metres

Volume of RCC: 61 m3x103

Total volume: 108 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against precast concrete panels
Downstream
SlopeType
0.75RCC against precast concrete blocks
Spillway
SlopeType
0.65Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
69
Pozzolan (kg/m3)Pozzolan Type
140Low-lime flyash (ASTM Class F)
111 
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Dehua County, Fujian Province

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Chanxi

Reservoir capacity: 53 m3x106

Construction Dates

Start of Project: 12/85

Start of RCC: 12/85

End of RCC: 08/89

End of Project: 09/89

Specifications

Height: 58 metres

Length: 150 metres

Volume of RCC: 71 m3x103

Total volume: 93 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalReinforced conventional concrete cast after RCC placement
0.30Reinforced conventional concrete cast after RCC placement
Downstream
SlopeType
0.75RCC against precast concrete blocks
Spillway
SlopeType
0.75Reinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
72
54
Pozzolan (kg/m3)Pozzolan Type
82Low-lime flyash (ASTM Class F)
86 
Longmentan Nº1 completed
Longmentan Nº1 completed

Full Dam Information

Details

Country: China

Owner: Guodian Dadu River Basin Hydropower Development Co.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Navigation

River: Dadu

Reservoir capacity: 200 m3x106

Construction Dates

Start of Project: 01/85

Start of RCC: 01/85

End of RCC: 12/89

End of Project: 10/94

Specifications

Height: 88 metres

Length: 1029 metres

Volume of RCC: 407 m3x103

Total volume: 855 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75RCC against precast concrete blocks
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300  -300  -
500500

Cementitious material

Cement (kg/m3)
79
82
Pozzolan (kg/m3)Pozzolan Type
79Low-lime flyash (ASTM Class F)
83 
Tongjiezi (with Niurixigou saddle dam) completed
Tongjiezi (with Niurixigou saddle dam) completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Wenchuanxi

Reservoir capacity: 10 m3x106

Construction Dates

Start of Project: -/87

Start of RCC: -/87

End of RCC: -/89

End of Project: -/89

Specifications

Height: 47 metres

Length: 122 metres

Volume of RCC: -

Total volume: 74 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: China Southern Power Grid

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Nanpan

Reservoir capacity: 116 m3x106

Construction Dates

Start of Project: 01/84

Start of RCC: 01/84

End of RCC: 06/90

End of Project: 12/92

Specifications

Height: 61 metres

Length: 471 metres

Volume of RCC: 143 m3x103

Total volume: 284 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
VerticalRCC against precast concrete blocks
0.40 
Spillway
SlopeType
ogeeTraditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250250

Cementitious material

Cement (kg/m3)
79
Pozzolan (kg/m3)Pozzolan Type
79Low-lime flyash (ASTM Class F)
  
Tianshenqiao Nº2 completed
Tianshenqiao Nº2 completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): unknown

River: Shiqi

Reservoir capacity: 33 m3x106

Construction Dates

Start of Project: -/68

Start of RCC: -/68

End of RCC: -/91

End of Project: -/93

Specifications

Height: 35 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Datang Yantan Hydropower Co. Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Navigation

River: Hongshui

Reservoir capacity: 3350 m3x106

Construction Dates

Start of Project: 03/85

Start of RCC: 03/85

End of RCC: 03/92

End of Project: 12/95

Specifications

Height: 110 metres

Length: 525 metres

Volume of RCC: 626 m3x103

Total volume: 905 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
VerticalTraditional concrete against formwork
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
ogeeTraditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
55
Pozzolan (kg/m3)Pozzolan Type
104Low-lime flyash (ASTM Class F)
  
Yantan completed
Yantan completed

Full Dam Information

Details

Country: China

Owner: Shuikou Hydropower Plant

Type: Gravity

Purpose(s): Flood Control / Hydropower / Navigation

River: Min

Reservoir capacity: 2613 m3x106

Construction Dates

Start of Project: 03/87

Start of RCC: 03/87

End of RCC: 05/92

End of Project: 05/95

Specifications

Height: 101 metres

Length: 791 metres

Volume of RCC: 600 m3x103

Total volume: 1710 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.73Traditional concrete against formwork
Spillway
SlopeType
ogeeTraditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
200  -200  -
330330

Cementitious material

Cement (kg/m3)
60
70
Pozzolan (kg/m3)Pozzolan Type
110Low-lime flyash (ASTM Class F)
90 
Shuikou completed
Shuikou completed

Full Dam Information

Details

Country: China

Owner: China Guodian Corporation

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Navigation

River: Gan

Reservoir capacity: 2216 m3x106

Construction Dates

Start of Project: 11/84

Start of RCC: 11/84

End of RCC: 12/92

End of Project: 06/94

Specifications

Height: 68 metres

Length: 1104 metres

Volume of RCC: 156 m3x103

Total volume: 1480 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
ogeeTraditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
65
Pozzolan (kg/m3)Pozzolan Type
105Low-lime flyash (ASTM Class F)
  
Wan’an completed
Wan’an completed

Full Dam Information

Details

Country: China

Owner: China Southern Power Grid

Type: Gravity

Purpose(s): Hydropower

River: Liuxihe

Reservoir capacity: 30 m3x106

Construction Dates

Start of Project: 12/94

Start of RCC: 12/94

End of RCC: 12/92

End of Project: 10/00

Specifications

Height: 61 metres

Length: 153 metres

Volume of RCC: 32 m3x103

Total volume: 57 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.70RCC against formwork  [stepped face]
Spillway
SlopeType
ogeeTraditional concrete against formwork
0.78Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
62
Pozzolan (kg/m3)Pozzolan Type
108Low-lime flyash (ASTM Class F)
  
Guangzhou PSS- Lower dam on Google Earth
Guangzhou PSS- Lower dam on Google Earth

Full Dam Information

Details

Country: China

Owner: Yellow River Conservancy Commission

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation

River: Luo

Reservoir capacity: 1175 m3x106

Construction Dates

Start of Project: -/78

Start of RCC: -/78

End of RCC: -/92

End of Project: -/93

Specifications

Height: 125 metres

Length: 315 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Guxian (GuhXiahn) on Google Earth
Guxian (GuhXiahn) on Google Earth

Full Dam Information

Details

Country: China

Owner: Jinjiang Electric Co.

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Jinjianghe

Reservoir capacity: 189 m3x106

Construction Dates

Start of Project: 07/90

Start of RCC: 07/90

End of RCC: 03/93

End of Project: 07/93

Specifications

Height: 68 metres

Length: 229 metres

Volume of RCC: 182 m3x103

Total volume: 267 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork
Spillway
SlopeType
0.65Traditional concrete against formwork
 Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
80Low-lime flyash (ASTM Class F)
  
Jinjiang completed
Jinjiang completed

Full Dam Information

Details

Country: China

Owner: Guizhou Qianyuan Power Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower / Irrigation / Water Supply

River: Sanchahe

Reservoir capacity: 377 m3x106

Construction Dates

Start of Project: 03/89

Start of RCC: 03/89

End of RCC: 05/93

End of Project: 02/94

Specifications

Height: 75 metres

Length: 196 metres

Volume of RCC: 103 m3x103

Total volume: 137 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.35Traditional concrete against formwork
Spillway
SlopeType
ogeeTraditional concrete against formwork
0.35Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
54
Pozzolan (kg/m3)Pozzolan Type
103Low-lime flyash (ASTM Class F)
99 
Puding completed
Puding completed

Full Dam Information

Details

Country: China

Owner: Fujian Shuikou Power Generation Group

Type: Gravity

Purpose(s): Hydropower / Navigation

River: Youxi

Reservoir capacity: 108 m3x106

Construction Dates

Start of Project: 04/91

Start of RCC: 04/91

End of RCC: 10/93

End of Project: 12/95

Specifications

Height: 63 metres

Length: 197 metres

Volume of RCC: 126 m3x103

Total volume: 184 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against precast concrete panels
Downstream
SlopeType
0.75RCC against precast concrete blocks
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
50
Pozzolan (kg/m3)Pozzolan Type
90Low-lime flyash (ASTM Class F)
  
Shuidong completed
Shuidong completed

Full Dam Information

Details

Country: China

Owner: Hainan Provincial Electric Power Company (HEPCO)

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Changhua

Reservoir capacity: 1710 m3x106

Construction Dates

Start of Project: 06/90

Start of RCC: 06/90

End of RCC: 12/93

End of Project: 07/95

Specifications

Height: 57 metres

Length: 719 metres

Volume of RCC: 485 m3x103

Total volume: 860 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75RCC against precast concrete blocks
 RCC against formwork
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
55
Pozzolan (kg/m3)Pozzolan Type
96Low-lime flyash (ASTM Class F)
  
Daguangba completed
Daguangba completed

Full Dam Information

Details

Country: China

Owner: Guizhou Hongfeng Hydropower Plant

Type: Gravity

Purpose(s): Hydropower

River: Sancha

Reservoir capacity: 420 m3x106

Construction Dates

Start of Project: -/89

Start of RCC: -/89

End of RCC: -/93

End of Project: -/94

Specifications

Height: 75 metres

Length: 196 metres

Volume of RCC: -

Total volume: 88 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Lianjiang Water Conservancy Bureau

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Aojiang

Reservoir capacity: 172 m3x106

Construction Dates

Start of Project: 08/92

Start of RCC: 08/92

End of RCC: 05/94

End of Project: 06/95

Specifications

Height: 66 metres

Length: 274 metres

Volume of RCC: 180 m3x103

Total volume: 272 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against precast concrete panels
Downstream
SlopeType
0.80RCC against precast concrete blocks
Spillway
SlopeType
0.77Reinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
65
55
Pozzolan (kg/m3)Pozzolan Type
125Low-lime flyash (ASTM Class F)
95 
Shanzi completed
Shanzi completed

Full Dam Information

Details

Country: China

Owner: Wenquanbao Reservoir Management Office

Type: Thin Arch

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Tanghe

Reservoir capacity: 7 m3x106

Construction Dates

Start of Project: 10/91

Start of RCC: 10/91

End of RCC: 06/94

End of Project: -/95

Specifications

Height: 48 metres

Length: 188 metres

Volume of RCC: 55 m3x103

Total volume: 63 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork with external geomembrane
Downstream
SlopeType
0.30RCC against formwork
Spillway
SlopeType
ogeeReinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
110
69
Pozzolan (kg/m3)Pozzolan Type
68Low-lime flyash (ASTM Class F)
85 
Wenquanbao completed
Wenquanbao completed

Full Dam Information

Details

Country: China

Owner: Dongyuan County

Type: Gravity

Purpose(s): Hydropower

River: Yinjiang

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/92

Start of RCC: -/92

End of RCC: -/94

End of Project: -/94

Specifications

Height: 35 metres

Length: 115 metres

Volume of RCC: -

Total volume: 223 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.90 
Downstream
SlopeType
0.90   [stepped face]
Spillway
SlopeType
0.90   [stepped face]

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Lanshan County Hydropower Bureau

Type: Thin Arch

Purpose(s): Hydropower / Irrigation

River: Xiang

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/92

Start of RCC: -/92

End of RCC: -/94

End of Project: -/95

Specifications

Height: 45 metres

Length: 150 metres

Volume of RCC: -

Total volume: 45 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Huangcen Reservoir Management Office

Type: Thin Arch

Purpose(s): Flood Control / Hydropower / Irrigation

River: Leishui

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: -/92

Start of RCC: -/92

End of RCC: -/94

End of Project: -/95

Specifications

Height: 56 metres

Length: 147 metres

Volume of RCC: -

Total volume: 18 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Department of Electric Power, Lonyan City, Fujian Province

Type: Arch-Gravity

Purpose(s): Hydropower / Water Supply

River: Longshanxi

Reservoir capacity: 9 m3x106

Construction Dates

Start of Project: 08/93

Start of RCC: 08/93

End of RCC: 07/95

End of Project: 10/95

Specifications

Height: 64 metres

Length: 93 metres

Volume of RCC: 25 m3x103

Total volume: 33 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork with external geomembrane
0.08RCC against formwork with external geomembrane
Downstream
SlopeType
0.65RCC against formwork
Spillway
SlopeType
ogeeReinforced concrete cast against precast units or slip-formed facing elements
0.65 

Placement

Layers (mm)Lifts (mm)
300  -300  -
350350

Cementitious material

Cement (kg/m3)
80
79
Pozzolan (kg/m3)Pozzolan Type
120Low-lime flyash (ASTM Class F)
105 
Xibingxi completed
Xibingxi completed

Full Dam Information

Details

Country: China

Owner: Guanyinge Reservoir Management Bureau

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Taizi

Reservoir capacity: 2168 m3x106

Construction Dates

Start of Project: 05/90

Start of RCC: 05/90

End of RCC: 09/95

End of Project: 10/95

Specifications

Height: 82 metres

Length: 1040 metres

Volume of RCC: 1240 m3x103

Total volume: 1876 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.10Traditional concrete against formwork
Downstream
SlopeType
0.70Traditional concrete against formwork
Spillway
SlopeType
0.70Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
270  -750
280 

Cementitious material

Cement (kg/m3)
91
Pozzolan (kg/m3)Pozzolan Type
39Low-lime flyash (ASTM Class F)
  
Guanyinge (Kwan-in-Temple) completed
Guanyinge (Kwan-in-Temple) completed

Full Dam Information

Details

Country: China

Owner: Department of Water Resources, Henan Province

Type: Gravity

Purpose(s): Flood Control / Irrigation / Water Supply

River: Gunhe

Reservoir capacity: 120 m3x106

Construction Dates

Start of Project: 07/93

Start of RCC: 07/93

End of RCC: 12/95

End of Project: 07/96

Specifications

Height: 41 metres

Length: 650 metres

Volume of RCC: 272 m3x103

Total volume: 351 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75RCC against formwork  [stepped face]
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
98
51
Pozzolan (kg/m3)Pozzolan Type
98Low-lime flyash (ASTM Class F)
107 
Shimantan on Google Earth
Shimantan on Google Earth

Full Dam Information

Details

Country: China

Owner: Fengdu Water Resources Bureau

Type: Gravity

Purpose(s): Flood Control / Hydropower / Recreation

River: Longxihe

Reservoir capacity: 105 m3x106

Construction Dates

Start of Project: 12/92

Start of RCC: 12/92

End of RCC: -/95

End of Project: -/96

Specifications

Height: 84 metres

Length: 445 metres

Volume of RCC: 335 m3x103

Total volume: 564 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.65Traditional concrete against formwork
Spillway
SlopeType
0.65Reinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
3001000

Cementitious material

Cement (kg/m3)
126
60
Pozzolan (kg/m3)Pozzolan Type
84Low-lime flyash (ASTM Class F)
90 
Shibanshui completed
Shibanshui completed

Full Dam Information

Details

Country: China

Owner: Guangxi-Guiguang Electric Power Development Co. Ltd.

Type: Gravity

Purpose(s): Hydropower / Irrigation / Navigation

River: Hongshuihe

Reservoir capacity: 340 m3x106

Construction Dates

Start of Project: 02/93

Start of RCC: 02/93

End of RCC: 04/96

End of Project: 08/97

Specifications

Height: 34 metres

Length: 710 metres

Volume of RCC: 62 m3x103

Total volume: 80 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.70RCC against precast concrete blocks  [stepped face]
Spillway
SlopeType
0.70Traditional concrete against precast concrete panels  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
73
99
Pozzolan (kg/m3)Pozzolan Type
110Low-lime flyash (ASTM Class F)
60 
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Wangqing County Water Conservancy Bureau

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Gayahe

Reservoir capacity: 10 m3x106

Construction Dates

Start of Project: 08/92

Start of RCC: 08/92

End of RCC: 12/96

End of Project: 08/97

Specifications

Height: 37 metres

Length: 337 metres

Volume of RCC: 78 m3x103

Total volume: 100 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75RCC against precast concrete blocks
Spillway
SlopeType
ogeeTraditional concrete against formwork
0.70Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3001000

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
120Low-lime flyash (ASTM Class F)
  
Mantaicheng on Google Earth
Mantaicheng on Google Earth

Full Dam Information

Details

Country: China

Owner: Chongqing Wujiang Power Company

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Apengjiang

Reservoir capacity: 115 m3x106

Construction Dates

Start of Project: -/93

Start of RCC: -/93

End of RCC: -/96

End of Project: -/97

Specifications

Height: 85 metres

Length: 149 metres

Volume of RCC: -

Total volume: 33 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Dahekou on Google Earth
Dahekou on Google Earth

Full Dam Information

Details

Country: China

Owner: Wanyao Reservoir Management Bureau

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Dahexi

Reservoir capacity: 223 m3x106

Construction Dates

Start of Project: 10/93

Start of RCC: 10/93

End of RCC: 05/97

End of Project: 07/97

Specifications

Height: 83 metres

Length: 390 metres

Volume of RCC: 320 m3x103

Total volume: 458 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.20Traditional concrete against formwork
Downstream
SlopeType
0.70Traditional concrete against precast concrete panels
Spillway
SlopeType
0.75Reinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
64
Pozzolan (kg/m3)Pozzolan Type
96Low-lime flyash (ASTM Class F)
  
Wanyao completed
Wanyao completed

Full Dam Information

Details

Country: China

Owner: Department of Electricity, Dapu County, Guangdong Province

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Meixihe

Reservoir capacity: 95 m3x106

Construction Dates

Start of Project: 01/95

Start of RCC: 01/95

End of RCC: 10/97

End of Project: 12/97

Specifications

Height: 60 metres

Length: 221 metres

Volume of RCC: 113 m3x103

Total volume: 172 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against precast concrete panels with hot poured membrane
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.78Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
55
Pozzolan (kg/m3)Pozzolan Type
110Low-lime flyash (ASTM Class F)
105 
Shuangxi completed
Shuangxi completed

Full Dam Information

Details

Country: China

Owner: Department of Water Resources, Hebei Province

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Recreation / Water Supply

River: Qinglonghe

Reservoir capacity: 859 m3x106

Construction Dates

Start of Project: 11/92

Start of RCC: 11/92

End of RCC: 12/97

End of Project: -/98

Specifications

Height: 75 metres

Length: 500 metres

Volume of RCC: 585 m3x103

Total volume: 1350 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.15 
Downstream
SlopeType
0.78Traditional concrete against formwork
Spillway
SlopeType
ogeeTraditional concrete against formwork
0.65Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
135
70
Pozzolan (kg/m3)Pozzolan Type
70Low-lime flyash (ASTM Class F)
85 
Taolinkou completed
Taolinkou completed

Full Dam Information

Details

Country: China

Owner: Fengdu Hydropower Bureau

Type: Thin Arch

Purpose(s): Hydropower

River: Huilonghe

Reservoir capacity: 8 m3x106

Construction Dates

Start of Project: -/93

Start of RCC: -/93

End of RCC: -/97

End of Project: -/98

Specifications

Height: 90 metres

Length: 158 metres

Volume of RCC: -

Total volume: 770 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10 
Downstream
SlopeType
0.76 
Spillway
SlopeType
0.76 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Yongxi Hydroelectric Co. Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Water Supply

River: Dazhangxi

Reservoir capacity: 68 m3x106

Construction Dates

Start of Project: 05/96

Start of RCC: 05/96

End of RCC: 10/98

End of Project: 09/99

Specifications

Height: 87 metres

Length: 198 metres

Volume of RCC: 170 m3x103

Total volume: 255 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.73RCC against precast concrete blocks
Spillway
SlopeType
ogeeTraditional concrete against formwork
0.73Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
2803000

Cementitious material

Cement (kg/m3)
115
80
Pozzolan (kg/m3)Pozzolan Type
95Low-lime flyash (ASTM Class F)
90 
Yongxi Nº3 completed
Yongxi Nº3 completed

Full Dam Information

Details

Country: China

Owner: Ya’an Electricity Company

Type: Gravity

Purpose(s): Hydropower

River: Yinghe

Reservoir capacity: 8 m3x106

Construction Dates

Start of Project: 01/96

Start of RCC: 01/96

End of RCC: 12/98

End of Project: 05/99

Specifications

Height: 85 metres

Length: 173 metres

Volume of RCC: 240 m3x103

Total volume: 290 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.20Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300  -300  -
400400

Cementitious material

Cement (kg/m3)
78
74
Pozzolan (kg/m3)Pozzolan Type
95Low-lime flyash (ASTM Class F)
90 
Huatan completed
Huatan completed

Full Dam Information

Details

Country: China

Owner: Department of Water Resources, Hubei Province

Type: Gravity

Purpose(s): Hydropower / Water Supply

River: Yujiang

Reservoir capacity: 68 m3x106

Construction Dates

Start of Project: -/91

Start of RCC: -/91

End of RCC: 12/98

End of Project: 06/00

Specifications

Height: 69 metres

Length: 279 metres

Volume of RCC: 170 m3x103

Total volume: 200 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.74RCC against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3005000

Cementitious material

Cement (kg/m3)
134
72
Pozzolan (kg/m3)Pozzolan Type
89Low-lime flyash (ASTM Class F)
48 
Changshun completed
Changshun completed

Full Dam Information

Details

Country: China

Owner: Fushan Power Station Management Bureau

Type: Thin Arch

Purpose(s): Hydropower / Irrigation

River: Nanxi

Reservoir capacity: 7 m3x106

Construction Dates

Start of Project: -/94

Start of RCC: -/94

End of RCC: -/98

End of Project: -/99

Specifications

Height: 47 metres

Length: 235 metres

Volume of RCC: -

Total volume: 240 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Wencheng County Kengxiashan Hydropower Development Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Yuquanxi

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/96

Start of RCC: -/96

End of RCC: -/98

End of Project: -/98

Specifications

Height: 34 metres

Length: 80 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Department of Water Resources, Shanxi Province

Type: Gravity

Purpose(s): Flood Control / Hydropower / Water Supply

River: Fenhe

Reservoir capacity: 130 m3x106

Construction Dates

Start of Project: 11/96

Start of RCC: 11/96

End of RCC: 03/99

End of Project: 06/00

Specifications

Height: 87 metres

Length: 350 metres

Volume of RCC: 362 m3x103

Total volume: 448 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.20Traditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against precast concrete panels
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
127
60
Pozzolan (kg/m3)Pozzolan Type
84Low-lime flyash (ASTM Class F)
93 
Fenhe Nº2 completed
Fenhe Nº2 completed

Full Dam Information

Details

Country: China

Owner: Lishui Hydropower Development Co. Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply

River: Loushui

Reservoir capacity: 1741 m3x106

Construction Dates

Start of Project: 07/95

Start of RCC: 07/95

End of RCC: 04/99

End of Project: -/01

Specifications

Height: 131 metres

Length: 368 metres

Volume of RCC: 1100 m3x103

Total volume: 1310 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.80RCC against formwork  [stepped face]
Spillway
SlopeType
ogeeReinforced concrete cast against precast units or slip-formed facing elements
0.80 

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
87
64  46
Pozzolan (kg/m3)Pozzolan Type
107Low-lime flyash (ASTM Class F)
96  107 
Jiangya completed
Jiangya completed

Full Dam Information

Details

Country: China

Owner: Helong Electricity Corporation

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Recreation / Water Supply

River: Hailanhe

Reservoir capacity: 21 m3x106

Construction Dates

Start of Project: 09/97

Start of RCC: 09/97

End of RCC: 04/99

End of Project: 09/99

Specifications

Height: 29 metres

Length: 271 metres

Volume of RCC: 44 m3x103

Total volume: 77 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.73RCC against precast concrete blocks
Spillway
SlopeType
conduit 

Placement

Layers (mm)Lifts (mm)
3002000

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
100Low-lime flyash (ASTM Class F)
  
Songyue (1st Stage) on Google Earth
Songyue (1st Stage) on Google Earth

Full Dam Information

Details

Country: China

Owner: Shaoguang Electricity Corporation Ltd

Type: Gravity

Purpose(s): Hydropower

River: Yangxishui

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 11/97

Start of RCC: 11/97

End of RCC: 06/99

End of Project: 07/00

Specifications

Height: 46 metres

Length: 202 metres

Volume of RCC: 100 m3x103

Total volume: 139 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
VerticalTraditional concrete against formwork
0.75Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.70Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Yangxishui Nº3 on Google Earth
Yangxishui Nº3 on Google Earth

Full Dam Information

Details

Country: China

Owner: Department of Water Resources, Liaoning Province

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Dalinghe

Reservoir capacity: 1645 m3x106

Construction Dates

Start of Project: 09/96

Start of RCC: 09/96

End of RCC: 09/99

End of Project: 12/00

Specifications

Height: 49 metres

Length: 513 metres

Volume of RCC: 111 m3x103

Total volume: 603 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.10Traditional concrete against formwork
Downstream
SlopeType
0.70Traditional concrete against formwork
Spillway
SlopeType
0.76Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
72
Pozzolan (kg/m3)Pozzolan Type
58Low-lime flyash (ASTM Class F)
  
Baishi completed
Baishi completed

Full Dam Information

Details

Country: China

Owner: Xishan Xingyu Water Resources Corporation

Type: Arch-Gravity

Purpose(s): Water Supply

River: Qinggoushui

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: 10/97

Start of RCC: 10/97

End of RCC: 11/99

End of Project: 12/99

Specifications

Height: 55 metres

Length: 244 metres

Volume of RCC: 71 m3x103

Total volume: 77 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.50Traditional concrete against formwork
Spillway
SlopeType
0.50Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
54
Pozzolan (kg/m3)Pozzolan Type
99Low-lime flyash (ASTM Class F)
  
Hongpo under construction
Hongpo under construction

Full Dam Information

Details

Country: China

Owner: Qingjiang Hydropower Development Corporation

Type: Gravity

Purpose(s): Flood Control / Hydropower / Navigation

River: Qingjiang

Reservoir capacity: 536 m3x106

Construction Dates

Start of Project: 05/97

Start of RCC: 05/97

End of RCC: 04/00

End of Project: 01/01

Specifications

Height: 57 metres

Length: 440 metres

Volume of RCC: 210 m3x103

Total volume: 940 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against precast concrete panels with hot poured membrane
Downstream
SlopeType
0.75Traditional concrete against formwork
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
123
86
Pozzolan (kg/m3)Pozzolan Type
100Low-lime flyash (ASTM Class F)
86 
Gaobazhou completed
Gaobazhou completed

Full Dam Information

Details

Country: China

Owner: Ge'ermu Hydroelectric Responsibility Corporation Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Geermu

Reservoir capacity: 9780 m3x106

Construction Dates

Start of Project: -/96

Start of RCC: -/96

End of RCC: -/00

End of Project: -/01

Specifications

Height: 40 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Dagangou on Google Earth
Dagangou on Google Earth

Full Dam Information

Details

Country: China

Owner: Shixing County Power Development Corporation

Type: Thin Arch

Purpose(s): Flood Control / Hydropower

River: Du’anshui (Chengjiang)

Reservoir capacity: 48 m3x106

Construction Dates

Start of Project: 09/99

Start of RCC: 09/99

End of RCC: 01/01

End of Project: 03/01

Specifications

Height: 57 metres

Length: 179 metres

Volume of RCC: 90 m3x103

Total volume: 119 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3303000

Cementitious material

Cement (kg/m3)
105
63
Pozzolan (kg/m3)Pozzolan Type
86Low-lime flyash (ASTM Class F)
80 
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Department of Electricity, Gansu Province

Type: Arch-Gravity

Purpose(s): Hydropower

River: Heihe

Reservoir capacity: 13 m3x106

Construction Dates

Start of Project: 04/99

Start of RCC: 04/99

End of RCC: 06/01

End of Project: 09/01

Specifications

Height: 80 metres

Length: 258 metres

Volume of RCC: 187 m3x103

Total volume: 210 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.20Traditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
96
58
Pozzolan (kg/m3)Pozzolan Type
109Low-lime flyash (ASTM Class F)
113 
Longshou Nº1 completed
Longshou Nº1 completed

Full Dam Information

Details

Country: China

Owner: Shimenzi Reservoir Engineering Management Office

Type: Thin Arch

Purpose(s): Hydropower / Irrigation / Water Supply

River: Taxi

Reservoir capacity: 80 m3x106

Construction Dates

Start of Project: 06/98

Start of RCC: 06/98

End of RCC: 06/01

End of Project: 10/01

Specifications

Height: 110 metres

Length: 176 metres

Volume of RCC: 188 m3x103

Total volume: 211 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.142RCC against formwork (GEVR/GE-RCC)
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
VerticalRCC against formwork
0.18RCC against formwork
Spillway
SlopeType
crestReinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
93
62
Pozzolan (kg/m3)Pozzolan Type
110Low-lime flyash (ASTM Class F)
110 
Shimenzi completed
Shimenzi completed

Full Dam Information

Details

Country: China

Owner: Department of Electricity, Yunnan Province

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Lancang (Mekong)

Reservoir capacity: 89 m3x106

Construction Dates

Start of Project: 10/97

Start of RCC: 10/97

End of RCC: 10/01

End of Project: 07/02

Specifications

Height: 115 metres

Length: 481 metres

Volume of RCC: 757 m3x103

Total volume: 1287 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
0.20 
Downstream
SlopeType
0.70RCC against precast concrete blocks  [stepped face]
Spillway
SlopeType
0.70Reinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
94
67
Pozzolan (kg/m3)Pozzolan Type
94Natural pozzolan (ASTM Class N)
101 
Dachaoshan completed
Dachaoshan completed

Full Dam Information

Details

Country: China

Owner: Mianhuatan Hydroelectric Development Corporation

Type: Gravity

Purpose(s): Flood Control / Hydropower / Navigation / Water Supply

River: Ting

Reservoir capacity: 2035 m3x106

Construction Dates

Start of Project: 04/98

Start of RCC: 04/98

End of RCC: 11/01

End of Project: 04/02

Specifications

Height: 111 metres

Length: 302 metres

Volume of RCC: 500 m3x103

Total volume: 615 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against precast concrete panels with hot poured membrane
Downstream
SlopeType
0.75RCC against formwork  [stepped face]
Spillway
SlopeType
0.70Reinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
82
59  48
Pozzolan (kg/m3)Pozzolan Type
100Low-lime flyash (ASTM Class F)
88  88 
Mianhuatan completed
Mianhuatan completed

Full Dam Information

Details

Country: China

Owner: Chaoyang Water Conservancy Bureau

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Daling

Reservoir capacity: 217 m3x106

Construction Dates

Start of Project: -/96

Start of RCC: -/96

End of RCC: -/01

End of Project: -/02

Specifications

Height: 35 metres

Length: 383 metres

Volume of RCC: 87 m3x103

Total volume: 220 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
64
Pozzolan (kg/m3)Pozzolan Type
118Low-lime flyash (ASTM Class F)
  
Yanwangbizi on Google Earth
Yanwangbizi on Google Earth

Full Dam Information

Details

Country: China

Owner: Yushi Reservoir Construction Management Bureau

Type: Gravity

Purpose(s): Flood Control / Irrigation / Water Supply

River: Biliuhe

Reservoir capacity: 89 m3x106

Construction Dates

Start of Project: -/98

Start of RCC: -/98

End of RCC: -/01

End of Project: -/02

Specifications

Height: 50 metres

Length: 267 metres

Volume of RCC: 218 m3x103

Total volume: 233 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
70Low-lime flyash (ASTM Class F)
  
Yushi completed
Yushi completed

Full Dam Information

Details

Country: China

Owner: Department of Electricity, Feng Shun County

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Xiaoxihe

Reservoir capacity: 5 m3x106

Construction Dates

Start of Project: -/99

Start of RCC: -/99

End of RCC: -/01

End of Project: -/02

Specifications

Height: 62 metres

Length: 103 metres

Volume of RCC: 47 m3x103

Total volume: 66 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower

River: Xiaoxihe

Reservoir capacity: 12 m3x106

Construction Dates

Start of Project: -/99

Start of RCC: -/99

End of RCC: -/01

End of Project: -/02

Specifications

Height: 68 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Electricity Corporation, Yanji

Type: Gravity

Purpose(s): Hydropower / Recreation / Water Supply

River: Hailanhe

Reservoir capacity: 30 m3x106

Construction Dates

Start of Project: 11/98

Start of RCC: 11/98

End of RCC: 01/02

End of Project: 12/02

Specifications

Height: 30 metres

Length: 244 metres

Volume of RCC: 43 m3x103

Total volume: 89 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75RCC against precast concrete blocks
Spillway
SlopeType
ogeeRCC against precast concrete blocks  [stepped face]

Placement

Layers (mm)Lifts (mm)
3002000

Cementitious material

Cement (kg/m3)
113
Pozzolan (kg/m3)Pozzolan Type
113Low-lime flyash (ASTM Class F)
  
Helong on Google Earth
Helong on Google Earth

Full Dam Information

Details

Country: China

Owner: Sichuan Minjiang Hydropower Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Caopohe

Reservoir capacity: 18 m3x106

Construction Dates

Start of Project: 06/97

Start of RCC: 06/97

End of RCC: 05/02

End of Project: 04/03

Specifications

Height: 132 metres

Length: 230 metres

Volume of RCC: 380 m3x103

Total volume: 392 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
0.10 
Downstream
SlopeType
0.21RCC against formwork
Spillway
SlopeType
crestTraditional concrete against formwork
0.21 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
108
89
Pozzolan (kg/m3)Pozzolan Type
72Low-lime flyash (ASTM Class F)
89 
Shapai completed
Shapai completed

Full Dam Information

Details

Country: China

Owner: Guizhou Province Electric Power Co.

Type: Gravity

Purpose(s): Water Supply

River: Xia Oyangxi

Reservoir capacity: 15 m3x106

Construction Dates

Start of Project: 05/00

Start of RCC: 05/00

End of RCC: 10/02

End of Project: 12/03

Specifications

Height: 45 metres

Length: 118 metres

Volume of RCC: 47 m3x103

Total volume: 49 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3503500

Cementitious material

Cement (kg/m3)
138
60
Pozzolan (kg/m3)Pozzolan Type
113Low-lime flyash (ASTM Class F)
90 
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Corporation of Energy Development, Ruyuan County, Guangdong Province

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Yangxi

Reservoir capacity: 100 m3x106

Construction Dates

Start of Project: 12/00

Start of RCC: 12/00

End of RCC: 11/02

End of Project: 06/03

Specifications

Height: 82 metres

Length: 244 metres

Volume of RCC: 241 m3x103

Total volume: 340 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
VerticalTraditional concrete against formwork
0.75Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.70Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Yangxishui Nº1 on Google Earth
Yangxishui Nº1 on Google Earth

Full Dam Information

Details

Country: China

Owner: Jiangning Nankengyuan Hydropower Development Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Xiaoxihe

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/98

Start of RCC: -/98

End of RCC: -/02

End of Project: -/03

Specifications

Height: 34 metres

Length: 114 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Yangxi

Reservoir capacity: 100 m3x106

Construction Dates

Start of Project: -/99

Start of RCC: -/99

End of RCC: -/02

End of Project: -/03

Specifications

Height: 82 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Hengxi on Google Earth
Hengxi on Google Earth

Full Dam Information

Details

Country: China

Owner: Longquan City Bureau of Hydropower

Type: Thin Arch

Purpose(s): Hydropower

River: Junxi

Reservoir capacity: 5 m3x106

Construction Dates

Start of Project: -/00

Start of RCC: -/00

End of RCC: -/02

End of Project: -/03

Specifications

Height: 69 metres

Length: 192 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Hunan Wuling Hydroelectric Development Corporation

Type: Gravity

Purpose(s): Hydropower / Navigation

River: Youshui

Reservoir capacity: 378 m3x106

Construction Dates

Start of Project: 08/01

Start of RCC: 08/01

End of RCC: 05/03

End of Project: 05/04

Specifications

Height: 65 metres

Length: 238 metres

Volume of RCC: 141 m3x103

Total volume: 376 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75Reinforced conventional concrete cast after RCC placement
Spillway
SlopeType
ogeeReinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
86
68
Pozzolan (kg/m3)Pozzolan Type
103Low-lime flyash (ASTM Class F)
83 
Wanmipo completed
Wanmipo completed

Full Dam Information

Details

Country: China

Owner: Shaanxi Lan River Hydropower Development Corporation

Type: Thin Arch

Purpose(s): Hydropower / Irrigation

River: Lanhe

Reservoir capacity: 147 m3x106

Construction Dates

Start of Project: -/99

Start of RCC: -/99

End of RCC: 06/03

End of Project: -/04

Specifications

Height: 100 metres

Length: 311 metres

Volume of RCC: 229 m3x103

Total volume: 293 m3x103

Construction Methods

Facings

Upstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
ogeeTraditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
74
66
Pozzolan (kg/m3)Pozzolan Type
111Low-lime flyash (ASTM Class F)
111 
Linhekou completed
Linhekou completed

Full Dam Information

Details

Country: China

Owner: Chongging Electricity Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Apeng

Reservoir capacity: 25 m3x106

Construction Dates

Start of Project: 08/01

Start of RCC: 08/01

End of RCC: 10/03

End of Project: 11/03

Specifications

Height: 56 metres

Length: 193 metres

Volume of RCC: 72 m3x103

Total volume: 161 m3x103

Construction Methods

Facings

Upstream
SlopeType
 Reinforced conventional concrete cast after RCC placement
Downstream
SlopeType
 Reinforced conventional concrete cast after RCC placement
Spillway
SlopeType
 Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Tizidong on Google Earth
Tizidong on Google Earth

Full Dam Information

Details

Country: China

Owner: Henan Electric Power Corporation

Type: Gravity

Purpose(s): Hydropower

River: Huilonggou

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 06/01

Start of RCC: 06/01

End of RCC: 11/03

End of Project: -/05

Specifications

Height: 54 metres

Length: 208 metres

Volume of RCC: 73 m3x103

Total volume: 76 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
none 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Huilong PSS - Upper dam completed
Huilong PSS - Upper dam completed

Full Dam Information

Details

Country: China

Owner: Shaanxi Hanjiang Hydropower Development Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Renhe

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/00

Start of RCC: -/00

End of RCC: -/03

End of Project: -/04

Specifications

Height: 66 metres

Length: 120 metres

Volume of RCC: 81 m3x103

Total volume: 106 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Xifeng County Water Conservancy Bureau

Type: Thin Arch

Purpose(s): Water Supply

River: Yangshui

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/01

Start of RCC: -/01

End of RCC: -/03

End of Project: -/04

Specifications

Height: 39 metres

Length: 176 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Wang Keng Power Station Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Tangkouxi

Reservoir capacity: 15 m3x106

Construction Dates

Start of Project: -/01

Start of RCC: -/01

End of RCC: -/03

End of Project: -/04

Specifications

Height: 56 metres

Length: 159 metres

Volume of RCC: 38 m3x103

Total volume: 40 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Anhui Hydropower Development Co. Ltd.,

Type: Thin Arch

Purpose(s): Flood Control / Hydropower

River: Xipihe

Reservoir capacity: 51 m3x106

Construction Dates

Start of Project: -/02

Start of RCC: -/02

End of RCC: -/03

End of Project: -/04

Specifications

Height: 70 metres

Length: 258 metres

Volume of RCC: 130 m3x103

Total volume: 168 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Mindong Electromechanical Development Corporation

Type: Gravity

Purpose(s): Hydropower

River: Muyangxi

Reservoir capacity: 47 m3x106

Construction Dates

Start of Project: -/02

Start of RCC: -/02

End of RCC: 03/04

End of Project: 06/04

Specifications

Height: 73 metres

Length: 206 metres

Volume of RCC: 159 m3x103

Total volume: 199 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.72RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.70Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
67
50
Pozzolan (kg/m3)Pozzolan Type
100Low-lime flyash (ASTM Class F)
92 
Zhouning completed
Zhouning completed

Full Dam Information

Details

Country: China

Owner: Henan Electric Power Corporation

Type: Gravity

Purpose(s): Hydropower

River: Huilonggou

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 06/01

Start of RCC: 06/01

End of RCC: 06/04

End of Project: -/05

Specifications

Height: 54 metres

Length: 175 metres

Volume of RCC: 88 m3x103

Total volume: 105 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Beichuan Bashu Tongkou River Development Corporation

Type: Gravity

Purpose(s): Hydropower

River: Tongkou

Reservoir capacity: 36 m3x106

Construction Dates

Start of Project: 10/98

Start of RCC: 10/98

End of RCC: -/04

End of Project: -/04

Specifications

Height: 72 metres

Length: 198 metres

Volume of RCC: 300 m3x103

Total volume: 352 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
1.10Traditional concrete against formwork
Spillway
SlopeType
ogeeTraditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Tongkou completed
Tongkou completed

Full Dam Information

Details

Country: China

Owner: Guangxi-Guiguan Electric Power Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Nanpan

Reservoir capacity: 278 m3x106

Construction Dates

Start of Project: 12/01

Start of RCC: 12/01

End of RCC: -/04

End of Project: 07/05

Specifications

Height: 62 metres

Length: 396 metres

Volume of RCC: 150 m3x103

Total volume: 700 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
ogeeReinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Pingban completed
Pingban completed

Full Dam Information

Details

Country: China

Owner: Yineng Co., Ltd.

Type: Thin Arch

Purpose(s): unknown

River: -

Reservoir capacity: 41 m3x106

Construction Dates

Start of Project: -/00

Start of RCC: -/00

End of RCC: -/04

End of Project: -/05

Specifications

Height: 66 metres

Length: 191 metres

Volume of RCC: -

Total volume: 66 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): unknown

River: Sanjianghe

Reservoir capacity: 7 m3x106

Construction Dates

Start of Project: -/02

Start of RCC: -/02

End of RCC: -/04

End of Project: -/04

Specifications

Height: 72 metres

Length: 138 metres

Volume of RCC: -

Total volume: 38 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Guangdong Shanneng group Co.

Type: Thin Arch

Purpose(s): Hydropower

River: Tuwushui

Reservoir capacity: 17 m3x106

Construction Dates

Start of Project: -/03

Start of RCC: -/03

End of RCC: -/04

End of Project: -/04

Specifications

Height: 53 metres

Length: 124 metres

Volume of RCC: -

Total volume: 29 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Chongqing Yujiankou Hydropower Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Long

Reservoir capacity: 9 m3x106

Construction Dates

Start of Project: 08/01

Start of RCC: 08/01

End of RCC: -/04

End of Project: -/05

Specifications

Height: 50 metres

Length: 156 metres

Volume of RCC: 118 m3x103

Total volume: 147 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.85Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Yujiankou completed
Yujiankou completed

Full Dam Information

Details

Country: China

Owner: Guangxi-Guiguan Electric Power Co. Ltd.,

Type: Gravity

Purpose(s): Hydropower / Irrigation / Navigation

River: Xijiang

Reservoir capacity: 950 m3x106

Construction Dates

Start of Project: -/02

Start of RCC: -/02

End of RCC: -/04

End of Project: -/05

Specifications

Height: 66 metres

Length: 586 metres

Volume of RCC: 50 m3x103

Total volume: 210 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Letan completed
Letan completed

Full Dam Information

Details

Country: China

Owner: Guiyang Water Conservancy Bureau

Type: Thin Arch

Purpose(s): Flood Control / Irrigation / Water Supply

River: Wu

Reservoir capacity: 11 m3x106

Construction Dates

Start of Project: -/02

Start of RCC: -/02

End of RCC: -/04

End of Project: -/05

Specifications

Height: 81 metres

Length: 180 metres

Volume of RCC: 105 m3x103

Total volume: 110 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10 
Downstream
SlopeType
0.76 
Spillway
SlopeType
0.76 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Hubei Nanzhang Xiakou Electric Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Juhe

Reservoir capacity: 99 m3x106

Construction Dates

Start of Project: -/02

Start of RCC: -/02

End of RCC: -/04

End of Project: -/05

Specifications

Height: 85 metres

Length: 192 metres

Volume of RCC: -

Total volume: 131 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Hardfill

Purpose(s): unknown

River: -

Reservoir capacity: -

Construction Dates

Start of Project: -/00

Start of RCC: -/00

End of RCC: -/04

End of Project: -/06

Specifications

Height: 16 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Meixi

Reservoir capacity: 20 m3x106

Construction Dates

Start of Project: -/00

Start of RCC: -/00

End of RCC: -/04

End of Project: -/06

Specifications

Height: 96 metres

Length: 178 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Changyang Electric Power Bureau

Type: Thin Arch

Purpose(s): Hydropower / Irrigation / Water Supply

River: Duhu

Reservoir capacity: 70 m3x106

Construction Dates

Start of Project: 12/03

Start of RCC: 12/03

End of RCC: 05/05

End of Project: 10/05

Specifications

Height: 107 metres

Length: 206 metres

Volume of RCC: 166 m3x103

Total volume: 255 m3x103

Construction Methods

Facings

Upstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
 RCC against formwork (GEVR/GE-RCC)

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
84
126
Pozzolan (kg/m3)Pozzolan Type
126Low-lime flyash (ASTM Class F)
103 
Zhaolaihe completed
Zhaolaihe completed

Full Dam Information

Details

Country: China

Owner: Hanjiang Hydropower Development Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Navigation

River: Han

Reservoir capacity: 229 m3x106

Construction Dates

Start of Project: 11/03

Start of RCC: 11/03

End of RCC: 05/05

End of Project: 06/07

Specifications

Height: 63 metres

Length: 346 metres

Volume of RCC: 194 m3x103

Total volume: 631 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Xihe on Google Earth
Xihe on Google Earth

Full Dam Information

Details

Country: China

Owner: Guizhou-Wujiang Hydropower Development Co. Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply

River: Wu

Reservoir capacity: 201 m3x106

Construction Dates

Start of Project: 10/00

Start of RCC: 10/00

End of RCC: 08/05

End of Project: 03/06

Specifications

Height: 116 metres

Length: 165 metres

Volume of RCC: 421 m3x103

Total volume: 739 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
0.25RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.70Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
64
Pozzolan (kg/m3)Pozzolan Type
95Low-lime flyash (ASTM Class F)
  
Suofengying completed
Suofengying completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Xun

Reservoir capacity: 56 m3x106

Construction Dates

Start of Project: -/93

Start of RCC: -/93

End of RCC: -/05

End of Project: -/07

Specifications

Height: 56 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Guangxi Longjiang Electric Power Corporation

Type: Thin Arch

Purpose(s): Hydropower

River: Long

Reservoir capacity: 49 m3x106

Construction Dates

Start of Project: -/02

Start of RCC: -/02

End of RCC: -/05

End of Project: -/06

Specifications

Height: 68 metres

Length: 167 metres

Volume of RCC: 172 m3x103

Total volume: 226 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Xiaqiao completed
Xiaqiao completed

Full Dam Information

Details

Country: China

Owner: China Southern Power Grid

Type: Gravity

Purpose(s): Hydropower

River: Caitouhe

Reservoir capacity: 30 m3x106

Construction Dates

Start of Project: -/02

Start of RCC: -/02

End of RCC: -/05

End of Project: -/11

Specifications

Height: 61 metres

Length: 420 metres

Volume of RCC: 235 m3x103

Total volume: 242 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Huizhou PSS - Lower dam on Google Earth
Huizhou PSS - Lower dam on Google Earth

Full Dam Information

Details

Country: China

Owner: Qingtian Yongwen Hydropower Co.

Type: Thin Arch

Purpose(s): Hydropower

River: Guxi

Reservoir capacity: 12 m3x106

Construction Dates

Start of Project: -/03

Start of RCC: -/03

End of RCC: -/05

End of Project: -/05

Specifications

Height: 66 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
 Reinforced conventional concrete cast after RCC placement
Downstream
SlopeType
 Reinforced conventional concrete cast after RCC placement
Spillway
SlopeType
 Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Xixi Reservoir Development Co. Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Daxi

Reservoir capacity: 85 m3x106

Construction Dates

Start of Project: -/03

Start of RCC: -/03

End of RCC: -/05

End of Project: -/06

Specifications

Height: 71 metres

Length: 243 metres

Volume of RCC: 231 m3x103

Total volume: 244 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Xixi completed
Xixi completed

Full Dam Information

Details

Country: China

Owner: Guangxi-Youjiang Hydraulic Development Co.Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply

River: You

Reservoir capacity: 5660 m3x106

Construction Dates

Start of Project: 10/01

Start of RCC: 10/01

End of RCC: 04/06

End of Project: 12/06

Specifications

Height: 130 metres

Length: 720 metres

Volume of RCC: 1995 m3x103

Total volume: 2672 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against precast concrete panels with hot poured membrane
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
80
50
Pozzolan (kg/m3)Pozzolan Type
132Low-lime flyash (ASTM Class F)
110 
Baise completed
Baise completed

Full Dam Information

Details

Country: China

Owner: Wujaing Qingshuihe Hydropower Development Co. Ltd.

Type: Thin Arch

Purpose(s): Flood Control / Hydropower

River: Qingshuihe

Reservoir capacity: 276 m3x106

Construction Dates

Start of Project: 12/03

Start of RCC: 12/03

End of RCC: 11/06

End of Project: -/07

Specifications

Height: 135 metres

Length: 198 metres

Volume of RCC: 550 m3x103

Total volume: 670 m3x103

Construction Methods

Facings

Upstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
 Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
81
94
Pozzolan (kg/m3)Pozzolan Type
81Low-lime flyash (ASTM Class F)
94 
Dahuashui completed
Dahuashui completed

Full Dam Information

Details

Country: China

Owner: Niu Qiao Reservoir Development Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Qingtonghe

Reservoir capacity: 26 m3x106

Construction Dates

Start of Project: -/03

Start of RCC: -/03

End of RCC: 12/06

End of Project: -/07

Specifications

Height: 62 metres

Length: 201 metres

Volume of RCC: -

Total volume: 710 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower

River: Liuchi

Reservoir capacity: 71 m3x106

Construction Dates

Start of Project: -/03

Start of RCC: -/03

End of RCC: -/06

End of Project: -/07

Specifications

Height: 81 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Kaidu

Reservoir capacity: -

Construction Dates

Start of Project: -/97

Start of RCC: -/97

End of RCC: -/06

End of Project: -/08

Specifications

Height: 71 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: China Huadian Corporation

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Wanan

Reservoir capacity: 199 m3x106

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/06

End of Project: -/06

Specifications

Height: 75 metres

Length: 172 metres

Volume of RCC: 211 m3x103

Total volume: 239 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Baisha completed
Baisha completed

Full Dam Information

Details

Country: China

Owner: Leidatan Corporation

Type: Gravity

Purpose(s): Hydropower

River: Yingtaoyuangou

Reservoir capacity: 94 m3x106

Construction Dates

Start of Project: 03/03

Start of RCC: 03/03

End of RCC: -/06

End of Project: 06/07

Specifications

Height: 84 metres

Length: 202 metres

Volume of RCC: 240 m3x103

Total volume: 340 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.70Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Leidatan under construction
Leidatan under construction

Full Dam Information

Details

Country: China

Owner: -

Type: Hardfill

Purpose(s): unknown

River: -

Reservoir capacity: -

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/06

End of Project: -/07

Specifications

Height: 36 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Hunan Xiangtou Xinshao Youxi Hydropower Development Corporation Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Zishui

Reservoir capacity: 168 m3x106

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/06

End of Project: -/07

Specifications

Height: 47 metres

Length: 268 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Xiaoxi on Google Earth
Xiaoxi on Google Earth

Full Dam Information

Details

Country: China

Owner: Chengdu Haineng Power Co. Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Mabianhe

Reservoir capacity: 204 m3x106

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/06

End of Project: -/07

Specifications

Height: 73 metres

Length: 163 metres

Volume of RCC: 229 m3x103

Total volume: 405 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.70Traditional concrete against formwork
Spillway
SlopeType
0.78Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
110
66
Pozzolan (kg/m3)Pozzolan Type
73Low-lime flyash (ASTM Class F)
66 
Zhouba completed
Zhouba completed

Full Dam Information

Details

Country: China

Owner: Guizhou Zhongsui Energy Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Hongdu

Reservoir capacity: 99 m3x106

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/06

End of Project: -/07

Specifications

Height: 87 metres

Length: 148 metres

Volume of RCC: 67 m3x103

Total volume: 90 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Shaba completed
Shaba completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower

River: Wujiang

Reservoir capacity: 9940 m3x106

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/06

End of Project: -/07

Specifications

Height: 87 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: China Guodian Corporation

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Quan

Reservoir capacity: 20 m3x106

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/06

End of Project: -/07

Specifications

Height: 88 metres

Length: 160 metres

Volume of RCC: -

Total volume: 205 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Lishui Basin Hydraulic and Hydroelectric Development Corporation

Type: Gravity

Purpose(s): Flood Control / Hydropower / Navigation / Water Supply

River: Dieshui

Reservoir capacity: 1439 m3x106

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/06

End of Project: -/07

Specifications

Height: 88 metres

Length: 351 metres

Volume of RCC: 450 m3x103

Total volume: 930 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
0.25 
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
53
83
Pozzolan (kg/m3)Pozzolan Type
99Low-lime flyash (ASTM Class F)
102 
Zaoshi completed
Zaoshi completed

Full Dam Information

Details

Country: China

Owner: Datang International Power Generation Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Lixian (Black)

Reservoir capacity: 174 m3x106

Construction Dates

Start of Project: 11/04

Start of RCC: 11/04

End of RCC: -/06

End of Project: -/07

Specifications

Height: 95 metres

Length: 320 metres

Volume of RCC: 480 m3x103

Total volume: 800 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork
0.20 
Downstream
SlopeType
0.80RCC against formwork
Spillway
SlopeType
0.80RCC against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Jupudu completed
Jupudu completed

Full Dam Information

Details

Country: China

Owner: Datang International Power Generation Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Lixian

Reservoir capacity: 78 m3x106

Construction Dates

Start of Project: 04/04

Start of RCC: 04/04

End of RCC: -/06

End of Project: -/07

Specifications

Height: 59 metres

Length: 300 metres

Volume of RCC: 255 m3x103

Total volume: 570 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
 RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
 RCC against formwork (GEVR/GE-RCC)

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
65
93
Pozzolan (kg/m3)Pozzolan Type
110Ground-granulated blast-furnace slag
113 
Tukahe completed
Tukahe completed

Full Dam Information

Details

Country: China

Owner: Lichuan City Yujaing Valley Hudropower Ltd. Hubei Province

Type: Thin Arch

Purpose(s): Hydropower / Recreation

River: Yu

Reservoir capacity: 26 m3x106

Construction Dates

Start of Project: 12/05

Start of RCC: 12/05

End of RCC: 02/07

End of Project: 05/07

Specifications

Height: 95 metres

Length: 156 metres

Volume of RCC: 135 m3x103

Total volume: 160 m3x103

Construction Methods

Facings

Upstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
curveRCC against formwork
Spillway
SlopeType
 RCC against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: China Southern Power Grid

Type: Gravity

Purpose(s): Hydropower

River: Xiaojinhe

Reservoir capacity: 30 m3x106

Construction Dates

Start of Project: 10/04

Start of RCC: 10/04

End of RCC: 05/07

End of Project: -/11

Specifications

Height: 56 metres

Length: 168 metres

Volume of RCC: 84 m3x103

Total volume: 93 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork
Spillway
SlopeType
0.70Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
64
Pozzolan (kg/m3)Pozzolan Type
125Low-lime flyash (ASTM Class F)
  
Huizhou PSS - Upper dam on Google Earth
Huizhou PSS - Upper dam on Google Earth

Full Dam Information

Details

Country: China

Owner: Longtan Hydropower Development Co. Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Navigation / Water Supply

River: Hongshui

Reservoir capacity: 16210 m3x106

Construction Dates

Start of Project: 07/01

Start of RCC: 07/01

End of RCC: 06/07

End of Project: 12/09

Specifications

Height: 192 metres

Length: 832 metres

Volume of RCC: 4623 m3x103

Total volume: 7400 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
0.25 
Downstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.68Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
99
86
Pozzolan (kg/m3)Pozzolan Type
121Low-lime flyash (ASTM Class F)
109 
Longtan (Stage 1) completed
Longtan (Stage 1) completed

Full Dam Information

Details

Country: China

Owner: Fujian Hongkou Hydropower Co. Ltd.

Type: Gravity

Purpose(s): Hydropower / Water Supply

River: Huotong

Reservoir capacity: 449 m3x106

Construction Dates

Start of Project: -/03

Start of RCC: -/03

End of RCC: -/07

End of Project: -/08

Specifications

Height: 130 metres

Length: 341 metres

Volume of RCC: 681 m3x103

Total volume: 830 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Hongkou completed
Hongkou completed

Full Dam Information

Details

Country: China

Owner: Guizhou Zhongshui Energy Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Luojiao

Reservoir capacity: 46 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/07

End of Project: -/07

Specifications

Height: 81 metres

Length: 250 metres

Volume of RCC: -

Total volume: 110 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Luojiaohe on Google Earth
Luojiaohe on Google Earth

Full Dam Information

Details

Country: China

Owner: Department of Electricity, Feng Shun County

Type: Gravity

Purpose(s): Hydropower

River: Baxianghe

Reservoir capacity: 8 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/07

End of Project: -/08

Specifications

Height: 44 metres

Length: 207 metres

Volume of RCC: 63 m3x103

Total volume: 83 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Gansu Keyuan Electric Power Group Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Datong

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/07

End of Project: -/08

Specifications

Height: 44 metres

Length: 143 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Tiecheng on Google Earth
Tiecheng on Google Earth

Full Dam Information

Details

Country: China

Owner: Zhouluo County Government

Type: Gravity

Purpose(s): Flood Control / Irrigation / Water Supply

River: Lituohe

Reservoir capacity: 58 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/07

End of Project: -/08

Specifications

Height: 56 metres

Length: 193 metres

Volume of RCC: 162 m3x103

Total volume: 354 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Shihu completed
Shihu completed

Full Dam Information

Details

Country: China

Owner: Department of WaterResources, Henan Province

Type: Gravity

Purpose(s): Flood Control / Hydropower / Navigation

River: Luohe

Reservoir capacity: 28 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/07

End of Project: -/08

Specifications

Height: 62 metres

Length: 244 metres

Volume of RCC: 133 m3x103

Total volume: 234 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Chongqing Youshui River Hydropower Development Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Youshui

Reservoir capacity: 152 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/07

End of Project: -/08

Specifications

Height: 63 metres

Length: 194 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Youshui completed
Youshui completed

Full Dam Information

Details

Country: China

Owner: Nanhe Hydropower Development Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Nanhe

Reservoir capacity: 14 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/07

End of Project: -/08

Specifications

Height: 77 metres

Length: 140 metres

Volume of RCC: 45 m3x103

Total volume: 55 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Jiyuan City Water Bureau

Type: Gravity

Purpose(s): unknown

River: Menghe

Reservoir capacity: 11 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/07

End of Project: -/08

Specifications

Height: 78 metres

Length: 215 metres

Volume of RCC: 160 m3x103

Total volume: 249 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Manghekou completed
Manghekou completed

Full Dam Information

Details

Country: China

Owner: Anhui Water Resources Development Co. Ltd.

Type: Thin Arch

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Dongpi

Reservoir capacity: 480 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/07

End of Project: 04/09

Specifications

Height: 105 metres

Length: 422 metres

Volume of RCC: 485 m3x103

Total volume: 600 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.335Traditional concrete against formwork
Spillway
SlopeType
0.335Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
72
56
Pozzolan (kg/m3)Pozzolan Type
108Low-lime flyash (ASTM Class F)
84 
Bailianya completed
Bailianya completed

Full Dam Information

Details

Country: China

Owner: Red River Hydropower Development Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Honghe

Reservoir capacity: 212 m3x106

Construction Dates

Start of Project: 02/06

Start of RCC: 02/06

End of RCC: -/07

End of Project: 07/08

Specifications

Height: 85 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Nansha completed
Nansha completed

Full Dam Information

Details

Country: China

Owner: Guizhou-Wujiang Hydropower Development Corporation

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Navigation

River: Wujiang

Reservoir capacity: 1593 m3x106

Construction Dates

Start of Project: 11/05

Start of RCC: 11/05

End of RCC: 03/08

End of Project: -/09

Specifications

Height: 117 metres

Length: 310 metres

Volume of RCC: 825 m3x103

Total volume: 1100 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.70Traditional concrete against formwork
Spillway
SlopeType
0.70Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
66
89
Pozzolan (kg/m3)Pozzolan Type
100Low-lime flyash (ASTM Class F)
109 
Silin completed
Silin completed

Full Dam Information

Details

Country: China

Owner: Xilin River Hydropower Development Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Tuoniang

Reservoir capacity: 133 m3x106

Construction Dates

Start of Project: 03/05

Start of RCC: 03/05

End of RCC: 04/08

End of Project: -/09

Specifications

Height: 82 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Guizhou Qianyuan Power Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Beipan

Reservoir capacity: 3245 m3x106

Construction Dates

Start of Project: 10/04

Start of RCC: 10/04

End of RCC: 05/08

End of Project: -/09

Specifications

Height: 201 metres

Length: 412 metres

Volume of RCC: 2420 m3x103

Total volume: 2800 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against precast concrete panels with hot poured membrane
0.25 
Downstream
SlopeType
0.75Traditional concrete against formwork
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
61
71
Pozzolan (kg/m3)Pozzolan Type
91Low-lime flyash (ASTM Class F)
87 
Guangzhao completed
Guangzhao completed

Full Dam Information

Details

Country: China

Owner: Datang International Hydropower Generation Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Lixian

Reservoir capacity: 409 m3x106

Construction Dates

Start of Project: 01/03

Start of RCC: 01/03

End of RCC: 08/08

End of Project: -/09

Specifications

Height: 113 metres

Length: 466 metres

Volume of RCC: 903 m3x103

Total volume: 1200 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
0.20 
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
77
93
Pozzolan (kg/m3)Pozzolan Type
77Ground-granulated blast-furnace slag
93 
Gelantan completed
Gelantan completed

Full Dam Information

Details

Country: China

Owner: Huaneng Lancang River Hydropower Co. Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Recreation

River: Lancang (Mekong)

Reservoir capacity: 1139 m3x106

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/08

End of Project: -/09

Specifications

Height: 108 metres

Length: 705 metres

Volume of RCC: 848 m3x103

Total volume: 3068 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork
Downstream
SlopeType
0.80RCC against formwork
Spillway
SlopeType
 Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300 

Cementitious material

Cement (kg/m3)
64
93
Pozzolan (kg/m3)Pozzolan Type
93Ground-granulated blast-furnace slag
93 
Jinghong completed
Jinghong completed

Full Dam Information

Details

Country: China

Owner: Datang International Power Generation Co. Ltd.

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Changxi

Reservoir capacity: 1465 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/08

End of Project: -/09

Specifications

Height: 117 metres

Length: 326 metres

Volume of RCC: 608 m3x103

Total volume: 1330 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.70Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
64
81
Pozzolan (kg/m3)Pozzolan Type
96Low-lime flyash (ASTM Class F)
121 
Pengshui completed
Pengshui completed

Full Dam Information

Details

Country: China

Owner: Guangxi Water Conservancy and Electric Power Corporation

Type: Gravity

Purpose(s): Hydropower

River: Gui

Reservoir capacity: 26 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/08

End of Project: -/08

Specifications

Height: 61 metres

Length: 166 metres

Volume of RCC: -

Total volume: 127 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Datang Shaanxi Power Generation Co Ltd

Type: Gravity

Purpose(s): Hydropower

River: Hanjiang

Reservoir capacity: 176 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/08

End of Project: -/09

Specifications

Height: 72 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Shuhe completed
Shuhe completed

Full Dam Information

Details

Country: China

Owner: Guizhou Qianyuan Power Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Furong

Reservoir capacity: 98 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/08

End of Project: -/09

Specifications

Height: 82 metres

Length: 166 metres

Volume of RCC: -

Total volume: 154 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Qingxi completed
Qingxi completed

Full Dam Information

Details

Country: China

Owner: Dehong Longjiang Hydropower Development Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Long

Reservoir capacity: 233 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/08

End of Project: -/09

Specifications

Height: 91 metres

Length: 280 metres

Volume of RCC: -

Total volume: 486 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Nongling completed
Nongling completed

Full Dam Information

Details

Country: China

Owner: Xinjiang Yili River Basin Development Authority

Type: Gravity

Purpose(s): Hydropower

River: Tekes

Reservoir capacity: 121 m3x106

Construction Dates

Start of Project: 04/06

Start of RCC: 04/06

End of RCC: -/08

End of Project: -/09

Specifications

Height: 50 metres

Length: 496 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Shankou on Google Earth
Shankou on Google Earth

Full Dam Information

Details

Country: China

Owner: Engshi Yuefeng Yunlong River Hydropower Development Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Yunlong

Reservoir capacity: 44 m3x106

Construction Dates

Start of Project: 03/06

Start of RCC: 03/06

End of RCC: 04/09

End of Project: -/11

Specifications

Height: 139 metres

Length: 119 metres

Volume of RCC: 182 m3x103

Total volume: 207 m3x103

Construction Methods

Facings

Upstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
 RCC against formwork (GEVR/GE-RCC)

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Yunlonghe Nº3 completed
Yunlonghe Nº3 completed

Full Dam Information

Details

Country: China

Owner: Yujiang Hydropower Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Wuni

Reservoir capacity: 35 m3x106

Construction Dates

Start of Project: 06/07

Start of RCC: 06/07

End of RCC: 06/09

End of Project: -/12

Specifications

Height: 119 metres

Length: 152 metres

Volume of RCC: 200 m3x103

Total volume: 205 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Yunkou completed
Yunkou completed

Full Dam Information

Details

Country: China

Owner: Sichuan Wudu Water Conservancy and Hydropower Group Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Fu

Reservoir capacity: 572 m3x106

Construction Dates

Start of Project: 10/04

Start of RCC: 10/04

End of RCC: -/09

End of Project: -/10

Specifications

Height: 120 metres

Length: 631 metres

Volume of RCC: 1151 m3x103

Total volume: 1580 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Wudu completed
Wudu completed

Full Dam Information

Details

Country: China

Owner: China Datang Corporation

Type: Thin Arch

Purpose(s): Hydropower

River: Getu

Reservoir capacity: 1748 m3x106

Construction Dates

Start of Project: 07/06

Start of RCC: 07/06

End of RCC: -/09

End of Project: -/10

Specifications

Height: 110 metres

Length: 253 metres

Volume of RCC: 280 m3x103

Total volume: 292 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
52
Pozzolan (kg/m3)Pozzolan Type
96Low-lime flyash (ASTM Class F)
  
Huanghuazhai completed
Huanghuazhai completed

Full Dam Information

Details

Country: China

Owner: Yunnan Dianneng Niulanjiang Hydropower Development Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Niulan

Reservoir capacity: 66 m3x106

Construction Dates

Start of Project: 12/06

Start of RCC: 12/06

End of RCC: -/09

End of Project: -/10

Specifications

Height: 113 metres

Length: 160 metres

Volume of RCC: 182 m3x103

Total volume: 360 m3x103

Construction Methods

Facings

Upstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
ogeeRCC against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Tianhuaban completed
Tianhuaban completed

Full Dam Information

Details

Country: China

Owner: Quifeng Water Supply Co. of Fangchenggang City

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Xijiang

Reservoir capacity: 26 m3x106

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/09

End of Project: -/12

Specifications

Height: 74 metres

Length: 190 metres

Volume of RCC: 230 m3x103

Total volume: 240 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
0.75 
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Baishiya completed
Baishiya completed

Full Dam Information

Details

Country: China

Owner: Xinjiang-Xinhua-Chonghuer Hydropower Development Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Burgin

Reservoir capacity: 85 m3x106

Construction Dates

Start of Project: 10/06

Start of RCC: 10/06

End of RCC: -/09

End of Project: -/09

Specifications

Height: 74 metres

Length: 545 metres

Volume of RCC: -

Total volume: 480 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Chonghu’er completed
Chonghu’er completed

Full Dam Information

Details

Country: China

Owner: Hongguo Water Resources Development Co.

Type: Gravity

Purpose(s): Water Supply

River: Tuochang

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/09

End of Project: -/09

Specifications

Height: 58 metres

Length: 168 metres

Volume of RCC: -

Total volume: 125 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Xiaotianlong completed
Xiaotianlong completed

Full Dam Information

Details

Country: China

Owner: Yichang Junwang Group Co.

Type: Thin Arch

Purpose(s): Hydropower

River: Siyang

Reservoir capacity: 33 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/09

End of Project: -/10

Specifications

Height: 100 metres

Length: 185 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Maduhe completed
Maduhe completed

Full Dam Information

Details

Country: China

Owner: Guizhou Tongzihe Hydropower Development Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower / Water Supply

River: Tongzhi

Reservoir capacity: 78 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/09

End of Project: -/10

Specifications

Height: 68 metres

Length: 153 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Yangjiayuan completed
Yangjiayuan completed

Full Dam Information

Details

Country: China

Owner: Wujiang Hydropower Development Corporation

Type: Gravity

Purpose(s): Hydropower

River: Qingshuihe

Reservoir capacity: 77 m3x106

Construction Dates

Start of Project: 01/07

Start of RCC: 01/07

End of RCC: -/09

End of Project: -/10

Specifications

Height: 124 metres

Length: 104 metres

Volume of RCC: -

Total volume: 500 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Geliqiao completed
Geliqiao completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): unknown

River: Dina

Reservoir capacity: 99 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/10

End of Project: -/12

Specifications

Height: 103 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Wuyi completed
Wuyi completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): unknown

River: Liushahe

Reservoir capacity: 17 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/10

End of Project: -/12

Specifications

Height: 123 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Yongdingqiao completed
Yongdingqiao completed

Full Dam Information

Details

Country: China

Owner: Hanergy, Yunnan Jinsha River Hydropower Co. Ltd. and Yunnan Investment and Development Co. Ltd.

Type: Gravity

Purpose(s): Hydropower / Navigation / Recreation

River: Jinsha

Reservoir capacity: 913 m3x106

Construction Dates

Start of Project: 12/03

Start of RCC: 12/03

End of RCC: -/10

End of Project: -/11

Specifications

Height: 160 metres

Length: 640 metres

Volume of RCC: 2400 m3x103

Total volume: 4430 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork
Downstream
SlopeType
0.75RCC against formwork
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
72
96
Pozzolan (kg/m3)Pozzolan Type
108Low-lime flyash (ASTM Class F)
117 
Jin’anqiao completed
Jin’anqiao completed

Full Dam Information

Details

Country: China

Owner: Yunnan Dianneng Group Holding Company

Type: Thin Arch

Purpose(s): Hydropower

River: Xima

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: 04/06

Start of RCC: 04/06

End of RCC: -/10

End of Project: -/11

Specifications

Height: 72 metres

Length: 160 metres

Volume of RCC: 107 m3x103

Total volume: 115 m3x103

Construction Methods

Facings

Upstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
 RCC against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Saizhu completed
Saizhu completed

Full Dam Information

Details

Country: China

Owner: Guodian Yunnan Power Co Ltd

Type: Gravity

Purpose(s): Hydropower

River: Pudu

Reservoir capacity: 22 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/10

End of Project: -/11

Specifications

Height: 81 metres

Length: 148 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Qianchang on Google Earth
Qianchang on Google Earth

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): unknown

River: Yupaojiang

Reservoir capacity: 25 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/10

End of Project: -/11

Specifications

Height: 95 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Tiechuanqiao under construction
Tiechuanqiao under construction

Full Dam Information

Details

Country: China

Owner: Chongqing Wujiang Power Company

Type: Gravity

Purpose(s): Hydropower

River: Youshui

Reservoir capacity: 163 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/10

End of Project: -/12

Specifications

Height: 30 metres

Length: 214 metres

Volume of RCC: -

Total volume: 260 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Shidi on Google Earth
Shidi on Google Earth

Full Dam Information

Details

Country: China

Owner: Hubei Energy Group Co. Ltd.

Type: Thin Arch

Purpose(s): Flood Control / Hydropower

River: Nanhe

Reservoir capacity: 499 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/10

End of Project: -/11

Specifications

Height: 133 metres

Length: 285 metres

Volume of RCC: -

Total volume: 390 m3x103

Construction Methods

Facings

Upstream
SlopeType
 Traditional concrete against formwork
Downstream
SlopeType
 Traditional concrete against formwork
Spillway
SlopeType
 Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Sanliping completed
Sanliping completed

Full Dam Information

Details

Country: China

Owner: Meng County Longhuakou Hydropower Co. Ltd.

Type: Gravity

Purpose(s): unknown

River: Longhua

Reservoir capacity: 30 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/10

End of Project: -/10

Specifications

Height: 63 metres

Length: 353 metres

Volume of RCC: -

Total volume: 414 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Longhuakou completed
Longhuakou completed

Full Dam Information

Details

Country: China

Owner: Guangxi Water Conservancy and Electric Power Corporation

Type: Thin Arch

Purpose(s): Hydropower

River: Baidu

Reservoir capacity: 22 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/10

End of Project: -/11

Specifications

Height: 75 metres

Length: 217 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Enshi Tianfa Electric Ltd.

Type: Thin Arch

Purpose(s): Flood Control / Hydropower / Recreation

River: Lengshui

Reservoir capacity: 87 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/10

End of Project: -/11

Specifications

Height: 114 metres

Length: 192 metres

Volume of RCC: 21 m3x103

Total volume: 21 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Luoboba completed
Luoboba completed

Full Dam Information

Details

Country: China

Owner: Department of Water Resources, Guandong Province

Type: Gravity

Purpose(s): Hydropower / Irrigation / Navigation

River: Bei

Reservoir capacity: 374 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/10

End of Project: -/11

Specifications

Height: 85 metres

Length: 256 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Lechangxia completed
Lechangxia completed

Full Dam Information

Details

Country: China

Owner: Guizhou Zhongshui Energy Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Hongdu

Reservoir capacity: 321 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: 12/11

End of Project: 12/11

Specifications

Height: 135 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Shiyazi completed
Shiyazi completed

Full Dam Information

Details

Country: China

Owner: Huaneng Lancang River Hydropower Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Lancang (Mekong)

Reservoir capacity: 316 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/11

End of Project: 03/12

Specifications

Height: 105 metres

Length: 356 metres

Volume of RCC: -

Total volume: 1067 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Gongguoqiao completed
Gongguoqiao completed

Full Dam Information

Details

Country: China

Owner: Nei Mongol (Inner Mongolia) Electricity Corporation

Type: Gravity

Purpose(s): Hydropower

River: Halasxinegou

Reservoir capacity: 7 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/11

End of Project: -/12

Specifications

Height: 69 metres

Length: 242 metres

Volume of RCC: 185 m3x103

Total volume: 330 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Huhehaote (Hohhot) PSS - Upstream lower dam on Google Earth
Huhehaote (Hohhot) PSS - Upstream lower dam on Google Earth

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): unknown

River: Sanglang

Reservoir capacity: 15 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/11

End of Project: -/12

Specifications

Height: 90 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Sanglang on Google Earth
Sanglang on Google Earth

Full Dam Information

Details

Country: China

Owner: Enshi Mawei Valley Hydropower Development Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Maweigou

Reservoir capacity: 29 m3x106

Construction Dates

Start of Project: 12/08

Start of RCC: 12/08

End of RCC: -/11

End of Project: -/12

Specifications

Height: 140 metres

Length: 116 metres

Volume of RCC: -

Total volume: 212 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Qinglong completed
Qinglong completed

Full Dam Information

Details

Country: China

Owner: Baise WaCun Hydropower Development Co.

Type: Gravity

Purpose(s): Hydropower

River: Xiyang

Reservoir capacity: 57 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/11

End of Project: -/11

Specifications

Height: 69 metres

Length: 247 metres

Volume of RCC: -

Total volume: 289 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Nabi completed
Nabi completed

Full Dam Information

Details

Country: China

Owner: Guodian Shaanxi Hydropower Development Co.

Type: Gravity

Purpose(s): Hydropower

River: Dan

Reservoir capacity: 95 m3x106

Construction Dates

Start of Project: 02/09

Start of RCC: 02/09

End of RCC: -/11

End of Project: -/11

Specifications

Height: 70 metres

Length: 221 metres

Volume of RCC: -

Total volume: 221 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Lianhuatai completed
Lianhuatai completed

Full Dam Information

Details

Country: China

Owner: Lusi Reservoir Management Office

Type: Gravity

Purpose(s): Water Supply

River: Lusixi

Reservoir capacity: 33 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/11

End of Project: -/12

Specifications

Height: 39 metres

Length: 140 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Lusixi on Google Earth
Lusixi on Google Earth

Full Dam Information

Details

Country: China

Owner: Hubei Huaqing Power Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Loushui

Reservoir capacity: 52 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/11

End of Project: -/12

Specifications

Height: 74 metres

Length: 146 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Honghe Guangyuan Hydropwer and Madushan Development Co. Ltd.

Type: Gravity

Purpose(s): Hydropower / Navigation / Water Supply

River: Honghe

Reservoir capacity: 552 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/11

End of Project: -/12

Specifications

Height: 108 metres

Length: 353 metres

Volume of RCC: -

Total volume: 987 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Madushan completed
Madushan completed

Full Dam Information

Details

Country: China

Owner: Yunnan Jinsha River Hydropower Co. Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation

River: Jinsha

Reservoir capacity: 885 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/11

End of Project: -/12

Specifications

Height: 138 metres

Length: 482 metres

Volume of RCC: -

Total volume: 2707 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
A’hai completed
A’hai completed

Full Dam Information

Details

Country: China

Owner: Yumen Hongyuan Industrial Company

Type: Gravity

Purpose(s): Hydropower

River: Sule

Reservoir capacity: -

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/11

End of Project: -/12

Specifications

Height: 64 metres

Length: 147 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Qingyanggou completed
Qingyanggou completed

Full Dam Information

Details

Country: China

Owner: Yunnan Baoshan Electric Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Longjiang

Reservoir capacity: 53 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/11

End of Project: -/12

Specifications

Height: 76 metres

Length: 239 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Dengke completed
Dengke completed

Full Dam Information

Details

Country: China

Owner: Yunnan Jinsha River Hydropower Co. Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Navigation / Recreation / Water Supply

River: Jinsha

Reservoir capacity: 558 m3x106

Construction Dates

Start of Project: 08/07

Start of RCC: 08/07

End of RCC: -/12

End of Project: -/13

Specifications

Height: 119 metres

Length: 768 metres

Volume of RCC: 2840 m3x103

Total volume: 3853 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork
Downstream
SlopeType
0.75RCC against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
96
60
Pozzolan (kg/m3)Pozzolan Type
96Low-lime flyash (ASTM Class F)
90 
Longkaikou completed
Longkaikou completed

Full Dam Information

Details

Country: China

Owner: Shankouyan Hydro Project Development Co.

Type: Thin Arch

Purpose(s): Hydropower

River: Yuanhe

Reservoir capacity: 105 m3x106

Construction Dates

Start of Project: 11/07

Start of RCC: 11/07

End of RCC: -/12

End of Project: -/13

Specifications

Height: 99 metres

Length: 268 metres

Volume of RCC: -

Total volume: 272 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Shankouyan completed
Shankouyan completed

Full Dam Information

Details

Country: China

Owner: Wujiang Hydroelectric Development Corporation

Type: Gravity

Purpose(s): Flood Control / Hydropower / Navigation

River: Wu

Reservoir capacity: 910 m3x106

Construction Dates

Start of Project: 05/06

Start of RCC: 05/06

End of RCC: -/12

End of Project: -/13

Specifications

Height: 101 metres

Length: 631 metres

Volume of RCC: 1510 m3x103

Total volume: 1980 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
0.15 
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.75RCC against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Shatuo completed
Shatuo completed

Full Dam Information

Details

Country: China

Owner: Guizhou Water-investment Hydropower Development Co., Ltd

Type: Thin Arch

Purpose(s): Hydropower

River: Masha

Reservoir capacity: 61 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/12

End of Project: -/13

Specifications

Height: 81 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): unknown

River: Milanhe

Reservoir capacity: 41 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/12

End of Project: -/13

Specifications

Height: 83 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Yalong River Hydropower Development Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Yalong

Reservoir capacity: 760 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/12

End of Project: -/13

Specifications

Height: 168 metres

Length: 516 metres

Volume of RCC: 2970 m3x103

Total volume: 3020 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
0.30 
Downstream
SlopeType
  
Spillway
SlopeType
0.70 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
72
Pozzolan (kg/m3)Pozzolan Type
88Low-lime flyash (ASTM Class F)
  
Guandi completed
Guandi completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): unknown

River: Hanjiang

Reservoir capacity: -

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/12

End of Project: -/14

Specifications

Height: 58 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Xunyang completed
Xunyang completed

Full Dam Information

Details

Country: China

Owner: Zunyi Water Conservancy Bureau

Type: Gravity

Purpose(s): unknown

River: Ren

Reservoir capacity: 99 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/12

End of Project: -/12

Specifications

Height: 60 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Zhongqiao completed
Zhongqiao completed

Full Dam Information

Details

Country: China

Owner: Ximeng Fubian Hydropower Development Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Nankang

Reservoir capacity: 31 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/12

End of Project: -/12

Specifications

Height: 68 metres

Length: 179 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Nankanghe Nº2 on Google Earth
Nankanghe Nº2 on Google Earth

Full Dam Information

Details

Country: China

Owner: Department of Water Resources, Xinjiang Province

Type: Gravity

Purpose(s): Flood Control / Hydropower / Water Supply

River: E’erqisi

Reservoir capacity: 2419 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/13

End of Project: -/14

Specifications

Height: 122 metres

Length: 1489 metres

Volume of RCC: 2520 m3x103

Total volume: 2890 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
0.75 
Spillway
SlopeType
0.75 

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Kalashuke completed
Kalashuke completed

Full Dam Information

Details

Country: China

Owner: Guizhou Qianyuan Power Company

Type: Gravity

Purpose(s): Hydropower

River: Beipan

Reservoir capacity: 137 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/13

End of Project: -/14

Specifications

Height: 109 metres

Length: 250 metres

Volume of RCC: -

Total volume: 591 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Mamaya Nº1 completed
Mamaya Nº1 completed

Full Dam Information

Details

Country: China

Owner: Luntan Hydraulic Engineering Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Yangcunshui

Reservoir capacity: 180 m3x106

Construction Dates

Start of Project: 12/08

Start of RCC: 12/08

End of RCC: -/13

End of Project: -/14

Specifications

Height: 90 metres

Length: 218 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: China Huadian Corporation

Type: Thin Arch

Purpose(s): Hydropower / Water Supply

River: Muli

Reservoir capacity: 190 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/13

End of Project: -/14

Specifications

Height: 132 metres

Length: 211 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Lizhou completed
Lizhou completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): unknown

River: Chuanjiang

Reservoir capacity: 98 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/13

End of Project: -/14

Specifications

Height: 83 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Chuanjiang on Google Earth
Chuanjiang on Google Earth

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): unknown

River: Houhe

Reservoir capacity: 119 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/13

End of Project: -/14

Specifications

Height: 93 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Guizhou Qianyuan Power Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Beipan

Reservoir capacity: 85 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/13

End of Project: -/15

Specifications

Height: 119 metres

Length: 205 metres

Volume of RCC: 199 m3x103

Total volume: 267 m3x103

Construction Methods

Facings

Upstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
curveRCC against formwork
Spillway
SlopeType
ogeeRCC against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Shannipo completed
Shannipo completed

Full Dam Information

Details

Country: China

Owner: HydroChina Co.

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Furong

Reservoir capacity: 57 m3x106

Construction Dates

Start of Project: 10/11

Start of RCC: 10/11

End of RCC: -/13

End of Project: -/13

Specifications

Height: 59 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Shaqian completed
Shaqian completed

Full Dam Information

Details

Country: China

Owner: Chengde Shuangfengsi Project Bureau

Type: Gravity

Purpose(s): Hydropower

River: Luanhe

Reservoir capacity: 137 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: -/13

End of Project: -/14

Specifications

Height: 50 metres

Length: 535 metres

Volume of RCC: -

Total volume: 550 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Guodian Haikong Hongling water construction Co. Ltd.

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Dabian

Reservoir capacity: 662 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: -/13

End of Project: -/14

Specifications

Height: 92 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Nei Mongol (Inner Mongolia) Electricity Corporation

Type: Gravity

Purpose(s): Hydropower

River: Halasxinegou

Reservoir capacity: 7 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/13

End of Project: -/14

Specifications

Height: 58 metres

Length: 308 metres

Volume of RCC: 205 m3x103

Total volume: 717 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Huhehaote (Hohhot) PSS - Downstream lower dam under construction
Huhehaote (Hohhot) PSS - Downstream lower dam under construction

Full Dam Information

Details

Country: China

Owner: Datang Huarui Investment Group Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Navigation / Recreation

River: Jinsha

Reservoir capacity: 2263 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: 05/14

End of Project: -/16

Specifications

Height: 159 metres

Length: 1250 metres

Volume of RCC: 6473 m3x103

Total volume: 9364 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
0.10 
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300 

Cementitious material

Cement (kg/m3)
53
Pozzolan (kg/m3)Pozzolan Type
99Low-lime flyash (ASTM Class F)
  
Guanyinyan completed
Guanyinyan completed

Full Dam Information

Details

Country: China

Owner: China Three Gorges Corporation

Type: Gravity

Purpose(s): Hydropower

River: Jinsha

Reservoir capacity: 52 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/14

End of Project: -/16

Specifications

Height: 162 metres

Length: 909 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Xiangjiaba completed
Xiangjiaba completed

Full Dam Information

Details

Country: China

Owner: Yalongjiang Valley Hydropower Development

Type: Gravity

Purpose(s): Hydropower

River: Yalong

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/14

End of Project: -/16

Specifications

Height: 71 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Tongzilin completed
Tongzilin completed

Full Dam Information

Details

Country: China

Owner: Yunnan Huadian Hydropower Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Jingsha

Reservoir capacity: 1718 m3x106

Construction Dates

Start of Project: 01/07

Start of RCC: 01/07

End of RCC: -/14

End of Project: -/15

Specifications

Height: 140 metres

Length: 622 metres

Volume of RCC: -

Total volume: 1920 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
0.20 
Downstream
SlopeType
0.75 
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Ludila completed
Ludila completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower

River: Hanshuinanhe

Reservoir capacity: 10 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/14

End of Project: -/15

Specifications

Height: 98 metres

Length: -

Volume of RCC: -

Total volume: 205 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Xian Water Affair Group

Type: Thin Arch

Purpose(s): Hydropower

River: Bahe

Reservoir capacity: 53 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: -/14

End of Project: -/15

Specifications

Height: 99 metres

Length: 352 metres

Volume of RCC: 370 m3x103

Total volume: 478 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Helong Electricity Corporation

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Recreation / Water Supply

River: Hailanhe

Reservoir capacity: 21 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/14

End of Project: -/15

Specifications

Height: 41 metres

Length: 271 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.73RCC against precast concrete blocks
Spillway
SlopeType
conduit 

Placement

Layers (mm)Lifts (mm)
3002000

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
100Low-lime flyash (ASTM Class F)
  
Songyue (2nd Stage) on Google Earth
Songyue (2nd Stage) on Google Earth

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): unknown

River: Daoliu

Reservoir capacity: 123 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/14

End of Project: -/15

Specifications

Height: 60 metres

Length: 187 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: -

Reservoir capacity: 20 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/14

End of Project: -/15

Specifications

Height: 72 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: China Power International Development

Type: Gravity

Purpose(s): Hydropower

River: Yuan

Reservoir capacity: 1384 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/15

End of Project: -/16

Specifications

Height: 82 metres

Length: 649 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Huaneng Guoduo Hydropower Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Zha Qu

Reservoir capacity: 80 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/15

End of Project: -/16

Specifications

Height: 83 metres

Length: 236 metres

Volume of RCC: -

Total volume: 550 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Guoduo completed
Guoduo completed

Full Dam Information

Details

Country: China

Owner: Yunxi Shuishimen Reservoir Bureau

Type: Thin Arch

Purpose(s): Flood Control / Hydropower / Water Supply

River: Tianhe

Reservoir capacity: 37 m3x106

Construction Dates

Start of Project: -/13

Start of RCC: -/13

End of RCC: -/15

End of Project: -/16

Specifications

Height: 86 metres

Length: -

Volume of RCC: -

Total volume: 150 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Guangdong Yuedian Group Co., Ltd

Type: Thin Arch

Purpose(s): Hydropower

River: Nanpeng

Reservoir capacity: 170 m3x106

Construction Dates

Start of Project: -/13

Start of RCC: -/13

End of RCC: -/15

End of Project: -/16

Specifications

Height: 99 metres

Length: 300 metres

Volume of RCC: -

Total volume: 210 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Dayakou on Google Earth
Dayakou on Google Earth

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): unknown

River: Xinchanghe

Reservoir capacity: 14 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/15

End of Project: -/16

Specifications

Height: 57 metres

Length: 145 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Guilin Dayu Water Conservancy, Infrastructure, Construction and Investment Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Xiaorong

Reservoir capacity: 163 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/16

End of Project: -/17

Specifications

Height: 90 metres

Length: 255 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Xiaorongjiang completed
Xiaorongjiang completed

Full Dam Information

Details

Country: China

Owner: Xiamen Water Resources Bureau

Type: Gravity

Purpose(s): Hydropower

River: Lianhuaxi

Reservoir capacity: 33 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/16

End of Project: -/17

Specifications

Height: 30 metres

Length: 333 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Lianhua on Google Earth
Lianhua on Google Earth

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Jialingjiang

Reservoir capacity: 11 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/16

End of Project: -/17

Specifications

Height: 51 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Nujiang

Reservoir capacity: 1288 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/16

End of Project: -/18

Specifications

Height: 165 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Qiduxi

Reservoir capacity: 24 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/16

End of Project: -/17

Specifications

Height: 54 metres

Length: 246 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Dangjiahe

Reservoir capacity: 14 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/16

End of Project: -/17

Specifications

Height: 68 metres

Length: 176 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Datang Investment Group Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Furong (Pangu)

Reservoir capacity: 90 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/16

End of Project: -/17

Specifications

Height: 85 metres

Length: 211 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Haokou on Google Earth
Haokou on Google Earth

Full Dam Information

Details

Country: China

Owner: SPIC Guizhou Jinyuan Hydroelectirc Powerplant

Type: Thin Arch

Purpose(s): Hydropower

River: Niulan

Reservoir capacity: 263 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/16

End of Project: -/17

Specifications

Height: 136 metres

Length: 459 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Xiangbiling on Google Earth
Xiangbiling on Google Earth

Full Dam Information

Details

Country: China

Owner: China Datang Corporation

Type: Thin Arch

Purpose(s): Hydropower

River: Gexiang

Reservoir capacity: 279 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/17

End of Project: -/18

Specifications

Height: 168 metres

Length: 413 metres

Volume of RCC: 760 m3x103

Total volume: 1020 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
66
Pozzolan (kg/m3)Pozzolan Type
100Low-lime flyash (ASTM Class F)
  
Wanjiakouzi completed
Wanjiakouzi completed

Full Dam Information

Details

Country: China

Owner: Huaneng Lancang River Hydropower Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Lancang (Mekong)

Reservoir capacity: 272 m3x106

Construction Dates

Start of Project: 06/10

Start of RCC: 06/10

End of RCC: -/17

End of Project: -/18

Specifications

Height: 138 metres

Length: 247 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Wunonglong completed
Wunonglong completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Irrigation / Water Supply

River: -

Reservoir capacity: 12 m3x106

Construction Dates

Start of Project: -/13

Start of RCC: -/13

End of RCC: -/17

End of Project: -/18

Specifications

Height: 58 metres

Length: 269 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Ximihe

Reservoir capacity: 17 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/17

End of Project: -/18

Specifications

Height: 88 metres

Length: 147 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Ximihe on Google Earth
Ximihe on Google Earth

Full Dam Information

Details

Country: China

Owner: Muling Fendou Reservoir Construction office

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Mulenghe

Reservoir capacity: 191 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/17

End of Project: -/18

Specifications

Height: 46 metres

Length: 406 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Dashahe

Reservoir capacity: 196 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/17

End of Project: -/18

Specifications

Height: 74 metres

Length: 296 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower / Irrigation / Water Supply

River: Mabie

Reservoir capacity: 99 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/17

End of Project: -/18

Specifications

Height: 108 metres

Length: 182 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Yunnan Huaneng Lancang River Hydropower Co.,Ltd.

Type: Gravity

Purpose(s): Hydropower / Irrigation / Recreation

River: Lancang (Mekong)

Reservoir capacity: 1613 m3x106

Construction Dates

Start of Project: 01/10

Start of RCC: 01/10

End of RCC: 04/18

End of Project: 06/19

Specifications

Height: 203 metres

Length: 464 metres

Volume of RCC: 2753 m3x103

Total volume: 3670 m3x103

Construction Methods

Facings

Upstream
SlopeType
 RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
 RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
 Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
82
67
Pozzolan (kg/m3)Pozzolan Type
100Low-lime flyash (ASTM Class F)
100 
Huangdeng completed
Huangdeng completed

Full Dam Information

Details

Country: China

Owner: -

Type: Arch-Gravity

Purpose(s): unknown

River: Ziwuhe

Reservoir capacity: 710 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: 12/18

End of Project: 06/19

Specifications

Height: 142 metres

Length: 472 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Huaneng Lancang River Hydropower Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Lancang (Mekong)

Reservoir capacity: 262 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/18

End of Project: -/19

Specifications

Height: 107 metres

Length: 232 metres

Volume of RCC: -

Total volume: 112 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Dahuaqiao completed
Dahuaqiao completed

Full Dam Information

Details

Country: China

Owner: Huaneng Lancang River Hydropower Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Lancang (Mekong)

Reservoir capacity: 75 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/18

End of Project: -/19

Specifications

Height: 75 metres

Length: 346 metres

Volume of RCC: -

Total volume: 1100 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Lidi completed
Lidi completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Shangcunxi

Reservoir capacity: 123 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: -/18

End of Project: -/19

Specifications

Height: 89 metres

Length: 338 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Hardfill

Purpose(s): unknown

River: -

Reservoir capacity: 10 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/18

End of Project: -/19

Specifications

Height: 62 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: China Power Investment Corporation

Type: Thin Arch

Purpose(s): Hydropower

River: Qingshuihe

Reservoir capacity: 13 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/18

End of Project: -/19

Specifications

Height: 75 metres

Length: 166 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Maojiahe completed
Maojiahe completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): unknown

River: Mandian

Reservoir capacity: 12340 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/18

End of Project: -/19

Specifications

Height: 78 metres

Length: 231 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Changlehe

Reservoir capacity: 133 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/18

End of Project: -/19

Specifications

Height: 101 metres

Length: 355 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Guangxi Datengxia Gorge Water Conservancy Development Co. .Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Navigation / Water Supply

River: Xijiang

Reservoir capacity: 3479 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/18

End of Project: 07/20

Specifications

Height: 80 metres

Length: -

Volume of RCC: -

Total volume: 7100 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Datengxia completed
Datengxia completed

Full Dam Information

Details

Country: China

Owner: Zhuangli reservoir construction and management office

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Shizihe

Reservoir capacity: 133 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/18

End of Project: -/19

Specifications

Height: 44 metres

Length: 49 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): unknown

River: Gouhe

Reservoir capacity: 160 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/18

End of Project: -/19

Specifications

Height: 52 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Sanchahe

Reservoir capacity: 1089 m3x106

Construction Dates

Start of Project: -/13

Start of RCC: -/13

End of RCC: -/19

End of Project: -/21

Specifications

Height: 163 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Pingzhai on Google Earth
Pingzhai on Google Earth

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: -

Reservoir capacity: 346 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/19

End of Project: -/20

Specifications

Height: 60 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Youjiang

Reservoir capacity: 536 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/19

End of Project: -/20

Specifications

Height: 105 metres

Length: 365 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Wacun completed
Wacun completed

Full Dam Information

Details

Country: China

Owner: Yalong River Hydropower Development Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Hongdu

Reservoir capacity: 100 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/19

End of Project: -/20

Specifications

Height: 121 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Gaosheng on Google Earth
Gaosheng on Google Earth

Full Dam Information

Details

Country: China

Owner: China Yangzi River Three Gorges Group

Type: Gravity

Purpose(s): Hydropower

River: Jinsha (Yangtze)

Reservoir capacity: 7400 m3x106

Construction Dates

Start of Project: 04/18

Start of RCC: 04/18

End of RCC: -/19

End of Project: 06/19

Specifications

Height: 96 metres

Length: 163 metres

Volume of RCC: 466 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Wudongde secondary dam on Google Earth
Wudongde secondary dam on Google Earth

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Flood Control / Irrigation / Water Supply

River: -

Reservoir capacity: 96 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: 03/20

End of Project: 01/21

Specifications

Height: 76 metres

Length: 173 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): unknown

River: Junshui

Reservoir capacity: 117 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/20

End of Project: -/21

Specifications

Height: 76 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Hardfill

Purpose(s): unknown

River: Shigaoqiao

Reservoir capacity: 11 m3x106

Construction Dates

Start of Project: -/19

Start of RCC: -/19

End of RCC: -/20

End of Project: -/20

Specifications

Height: 33 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: China Southern Power Grid

Type: Gravity

Purpose(s): Hydropower

River: -

Reservoir capacity: 41 m3x106

Construction Dates

Start of Project: -/18

Start of RCC: -/18

End of RCC: -/20

End of Project: -/21

Specifications

Height: 60 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: China Southern Power Grid

Type: Gravity

Purpose(s): Hydropower

River: -

Reservoir capacity: 45 m3x106

Construction Dates

Start of Project: -/18

Start of RCC: -/18

End of RCC: -/20

End of Project: -/21

Specifications

Height: 85 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: China Huadian Group Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Yaluzangbu (Brahmaputra)

Reservoir capacity: 55 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: 04/21

End of Project: -/23

Specifications

Height: 118 metres

Length: 385 metres

Volume of RCC: 937 m3x103

Total volume: 1442 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
93
60
Pozzolan (kg/m3)Pozzolan Type
93 
100 
Dagu completed
Dagu completed

Full Dam Information

Details

Country: China

Owner: China Southern Power Grid Co.

Type: Gravity

Purpose(s): Hydropower

River: Moyang

Reservoir capacity: 18 m3x106

Construction Dates

Start of Project: 01/17

Start of RCC: 01/17

End of RCC: 11/21

End of Project: 06/22

Specifications

Height: 101 metres

Length: 477 metres

Volume of RCC: -

Total volume: 652 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
3006000

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): unknown

River: -

Reservoir capacity: 37 m3x106

Construction Dates

Start of Project: -/17

Start of RCC: -/17

End of RCC: 12/21

End of Project: -/22

Specifications

Height: 83 metres

Length: 193 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Northeast China Electric Power

Type: Gravity

Purpose(s): Hydropower

River: Songhua

Reservoir capacity: 10377 m3x106

Construction Dates

Start of Project: -/13

Start of RCC: -/13

End of RCC: -/21

End of Project: -/22

Specifications

Height: 95 metres

Length: 1068 metres

Volume of RCC: -

Total volume: 2700 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Fengman (new) completed
Fengman (new) completed

Full Dam Information

Details

Country: China

Owner: -

Type: Hardfill

Purpose(s): unknown

River: -

Reservoir capacity: 472 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/21

End of Project: -/22

Specifications

Height: 50 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower

River: -

Reservoir capacity: 219 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/21

End of Project: -/22

Specifications

Height: 90 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Heihe

Reservoir capacity: 403 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/21

End of Project: -/22

Specifications

Height: 123 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Bala

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: -/17

Start of RCC: -/17

End of RCC: -/21

End of Project: -/22

Specifications

Height: 47 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Flood Control / Hydropower

River: Qianhe

Reservoir capacity: 160 m3x106

Construction Dates

Start of Project: -/18

Start of RCC: -/18

End of RCC: -/21

End of Project: -/22

Specifications

Height: 132 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower / Water Supply

River: Hanshui

Reservoir capacity: 221 m3x106

Construction Dates

Start of Project: 10/18

Start of RCC: 10/18

End of RCC: 11/22

End of Project: 07/23

Specifications

Height: 70 metres

Length: 349 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Guilin Dayu Water Infrastructure Development Investment Co. Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Lijiang

Reservoir capacity: 188 m3x106

Construction Dates

Start of Project: 11/11

Start of RCC: 11/11

End of RCC: -/22

End of Project: -/23

Specifications

Height: 77 metres

Length: 239 metres

Volume of RCC: -

Total volume: 304 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Fuzikou under construction
Fuzikou under construction

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): unknown

River: -

Reservoir capacity: 44 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/22

End of Project: -/23

Specifications

Height: 105 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Huaneng Lancang River Hydropower Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Langcang (Mekong)

Reservoir capacity: 1338 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/22

End of Project: -/24

Specifications

Height: 158 metres

Length: 508 metres

Volume of RCC: -

Total volume: 3600 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Tuoba completed
Tuoba completed

Full Dam Information

Details

Country: China

Owner: Lichuan City Yujiang Valley Hudropower Ltd. Hubei Province

Type: Thin Arch

Purpose(s): Flood Control / Hydropower

River: Yu

Reservoir capacity: 55 m3x106

Construction Dates

Start of Project: -/17

Start of RCC: -/17

End of RCC: -/22

End of Project: -/22

Specifications

Height: 70 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Guizhou Shuicheng Water-investment Co. Ltd.

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Yuwanghe

Reservoir capacity: 11 m3x106

Construction Dates

Start of Project: 09/16

Start of RCC: 09/16

End of RCC: -/22

End of Project: 11/23

Specifications

Height: 50 metres

Length: 157 metres

Volume of RCC: 106 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Ao

Reservoir capacity: 297 m3x106

Construction Dates

Start of Project: -/17

Start of RCC: -/17

End of RCC: -/22

End of Project: -/23

Specifications

Height: 91 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Jialing River Tingzikou Water Resources and Hydropower Development Co. Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply

River: Jialing

Reservoir capacity: 4067 m3x106

Construction Dates

Start of Project: 11/09

Start of RCC: 11/09

End of RCC: -/22

End of Project: -/25

Specifications

Height: 116 metres

Length: 995 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Tingzikou completed
Tingzikou completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): unknown

River: Tuoxi

Reservoir capacity: 21 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/22

End of Project: -/23

Specifications

Height: 62 metres

Length: 310 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Large and medium sized Irrigation District Service Center of Qiannan Prefecture

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Qingshui

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 04/20

Start of RCC: 04/20

End of RCC: -/22

End of Project: -/22

Specifications

Height: 32 metres

Length: 198 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
VerticalTraditional concrete against formwork
1.00Unformed face of RCC
Spillway
SlopeType
none 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Maiwan Water Conservancy

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Nandu

Reservoir capacity: 615 m3x106

Construction Dates

Start of Project: 04/20

Start of RCC: 04/20

End of RCC: 05/24

End of Project: 07/25

Specifications

Height: 79 metres

Length: 377 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Department of Water Conservancy, Fujian Province

Type: Gravity

Purpose(s): Flood Control / Hydropower / Water Supply

River: Aojiang

Reservoir capacity: 297 m3x106

Construction Dates

Start of Project: -/17

Start of RCC: -/17

End of RCC: -/24

End of Project: -/25

Specifications

Height: 91 metres

Length: 338 metres

Volume of RCC: 300 m3x103

Total volume: 663 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10 
Downstream
SlopeType
0.76 
Spillway
SlopeType
0.76 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Beimen

Reservoir capacity: 191 m3x106

Construction Dates

Start of Project: 04/20

Start of RCC: 04/20

End of RCC: -/24

End of Project: 08/25

Specifications

Height: 52 metres

Length: 295 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Flood Control / Hydropower / Water Supply

River: -

Reservoir capacity: 544 m3x106

Construction Dates

Start of Project: 06/20

Start of RCC: 06/20

End of RCC: -/24

End of Project: 12/25

Specifications

Height: 106 metres

Length: 596 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Hardfill

Purpose(s): unknown

River: -

Reservoir capacity: 10 m3x106

Construction Dates

Start of Project: -/20

Start of RCC: -/20

End of RCC: -/24

End of Project: -/25

Specifications

Height: 40 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Hardfill

Purpose(s): unknown

River: Dongyanggou

Reservoir capacity: 5 m3x106

Construction Dates

Start of Project: 05/22

Start of RCC: 05/22

End of RCC: -/24

End of Project: -/25

Specifications

Height: 67 metres

Length: 136 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Tong

Reservoir capacity: 113 m3x106

Construction Dates

Start of Project: 06/22

Start of RCC: 06/22

End of RCC: 06/25

End of Project: -/26

Specifications

Height: 69 metres

Length: 288 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Daxingzhai completed
Daxingzhai completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: -

Reservoir capacity: 104 m3x106

Construction Dates

Start of Project: -/20

Start of RCC: -/20

End of RCC: -/25

End of Project: -/25

Specifications

Height: 90 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Niulushi

Reservoir capacity: 66 m3x106

Construction Dates

Start of Project: -/18

Start of RCC: -/18

End of RCC: -/25

End of Project: -/26

Specifications

Height: 80 metres

Length: 391 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Dazhou Major water works construction and management center

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Zhonhe

Reservoir capacity: 128 m3x106

Construction Dates

Start of Project: 12/20

Start of RCC: 12/20

End of RCC: -/25

End of Project: -/26

Specifications

Height: 77 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Hardfill

Purpose(s): unknown

River: Qiuluxi

Reservoir capacity: 28 m3x106

Construction Dates

Start of Project: 10/21

Start of RCC: 10/21

End of RCC: -/25

End of Project: -/26

Specifications

Height: 52 metres

Length: 395 metres

Volume of RCC: 329 m3x103

Total volume: 386 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): unknown

River: -

Reservoir capacity: 6 m3x106

Construction Dates

Start of Project: -/22

Start of RCC: -/22

End of RCC: -/25

End of Project: -/26

Specifications

Height: 64 metres

Length: 274 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: China Nuclear (Guodian Zhangzhou) Energy

Type: Gravity

Purpose(s): Hydropower

River: -

Reservoir capacity: 21 m3x106

Construction Dates

Start of Project: -/17

Start of RCC: -/17

End of RCC: -/26

End of Project: -/27

Specifications

Height: 68 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Guizhou Water Conservancy Investment Group Co, Ltd

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Guanyinsi

Reservoir capacity: 121 m3x106

Construction Dates

Start of Project: 12/21

Start of RCC: 12/21

End of RCC: -/26

End of Project: -/27

Specifications

Height: 109 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Lancang (Mekong)

Reservoir capacity: -

Construction Dates

Start of Project: 10/21

Start of RCC: 10/21

End of RCC: -/26

End of Project: -/27

Specifications

Height: 158 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Qingshui

Reservoir capacity: 210 m3x106

Construction Dates

Start of Project: 12/21

Start of RCC: 12/21

End of RCC: -/26

End of Project: -/27

Specifications

Height: 96 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Construction Headquarters of Heibaoshan Reservoir Project in Wanyuan City

Type: Hardfill

Purpose(s): Irrigation / Water Supply

River: Dayan

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/22

Start of RCC: -/22

End of RCC: -/26

End of Project: -/27

Specifications

Height: 60 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Flood Control / Hydropower / Water Supply

River: Bahe

Reservoir capacity: 141 m3x106

Construction Dates

Start of Project: 04/22

Start of RCC: 04/22

End of RCC: -/28

End of Project: -/29

Specifications

Height: 71 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Yalong River Hydropower Development Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Yalong

Reservoir capacity: 234 m3x106

Construction Dates

Start of Project: 01/24

Start of RCC: 01/24

End of RCC: -/28

End of Project: -/29

Specifications

Height: 128 metres

Length: -

Volume of RCC: -

Total volume: 2560 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates