SEARCHING
... please wait

Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
GameleirasBrazilCODEVASFF I R WGameleiras14507/9012/9004/9105/91291502729V(1)   (1)*4004005213(-)
Songyue (1st Stage)ChinaHelong Electricity CorporationF H I R WHailanhe2109/9701/9804/9909/99292714477V(1)0.73(10)conduit 300200080100(F)
BertarelloBrazilCORSAN (Companhia Riograndense de Saneamento)WArroio Burati6- /9808/9807/99- /002921980115V(13) (12)* (12)*3003007218(N)
Genesee #2USAGenesee Water and Sanitation DistrictWBear Creek106/0611/0611/0610/072916824 V     300300   
Kasegawa auxiliary dam
[H-F]
JapanMinistry of Land, Infrastructure, Transport and TourismF H I WKase103/0810/0906/1009/102911652680.80(12)0.80(12)0.80(12)250750800(-)
São JoséBrazilIjui Energia S.A.HCarreiro188- /07- /09- /10- /1129790             
SfeissifMoroccoDirection des Aménagements HydrauliquesSafsaf20- /08- /09- /10- /1129   V(5)0.85(1)*0.85(1)*3003001200(-)
Ait Moulay AhmedMoroccoDirection des Aménagements HydrauliquesI WAin Leuh210/09- /1001/1110/11291361820V(5)0.75(1)*0.75(1)*3003007030(N)
João BorgesBrazilEletrosul Centrais Elétricas SAHCaveiras23- /12- /12- /1311/1329170             
Ula ÇıtlıkTurkeyDSI - State Hydraulic WorksIBüyükdere1- /17- /22- /24- /262912530            
ArraiasBrazilCELG/ElectronorteHArraias - /21- /23- /24- /2529560             

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Brazil

Owner: CODEVASF

Type: Gravity

Purpose(s): Flood Control / Irrigation / Recreation / Water Supply

River: Gameleiras

Reservoir capacity: 145 m3x106

Construction Dates

Start of Project: 07/90

Start of RCC: 07/90

End of RCC: 04/91

End of Project: 05/91

Specifications

Height: 29 metres

Length: 150 metres

Volume of RCC: 27 m3x103

Total volume: 29 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
    [stepped face]
Spillway
SlopeType
 Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
400400

Cementitious material

Cement (kg/m3)
52
Pozzolan (kg/m3)Pozzolan Type
13No pozzolan used
  
Gameleiras completed
Gameleiras completed

Full Dam Information

Details

Country: China

Owner: Helong Electricity Corporation

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Recreation / Water Supply

River: Hailanhe

Reservoir capacity: 21 m3x106

Construction Dates

Start of Project: 09/97

Start of RCC: 09/97

End of RCC: 04/99

End of Project: 09/99

Specifications

Height: 29 metres

Length: 271 metres

Volume of RCC: 44 m3x103

Total volume: 77 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.73RCC against precast concrete blocks
Spillway
SlopeType
conduit 

Placement

Layers (mm)Lifts (mm)
3002000

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
100Low-lime flyash (ASTM Class F)
  
Songyue (1st Stage) on Google Earth
Songyue (1st Stage) on Google Earth

Full Dam Information

Details

Country: Brazil

Owner: CORSAN (Companhia Riograndense de Saneamento)

Type: Gravity

Purpose(s): Water Supply

River: Arroio Burati

Reservoir capacity: 6 m3x106

Construction Dates

Start of Project: -/98

Start of RCC: -/98

End of RCC: 07/99

End of Project: -/00

Specifications

Height: 29 metres

Length: 219 metres

Volume of RCC: 80 m3x103

Total volume: 115 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalReinforced concrete cast against precast units or slip-formed facing elements
Downstream
SlopeType
 Reinforced conventional concrete cast after RCC placement  [stepped face]
Spillway
SlopeType
 Reinforced conventional concrete cast after RCC placement  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
72
Pozzolan (kg/m3)Pozzolan Type
18Natural pozzolan (ASTM Class N)
  
Bertarello on Google Earth
Bertarello on Google Earth

Full Dam Information

Details

Country: USA

Owner: Genesee Water and Sanitation District

Type: Gravity

Purpose(s): Water Supply

River: Bear Creek

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 06/06

Start of RCC: 06/06

End of RCC: 11/06

End of Project: 10/07

Specifications

Height: 29 metres

Length: 168 metres

Volume of RCC: 24 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Genesee #2 completed
Genesee #2 completed

Full Dam Information

Details

Country: Japan

Owner: Ministry of Land, Infrastructure, Transport and Tourism

Type: Hardfill

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Kase

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 03/08

Start of RCC: 03/08

End of RCC: 06/10

End of Project: 09/10

Specifications

Height: 29 metres

Length: 116 metres

Volume of RCC: 52 m3x103

Total volume: 68 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.80Reinforced conventional concrete cast after RCC placement
Downstream
SlopeType
0.80Reinforced conventional concrete cast after RCC placement
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Kasegawa auxiliary dam on Google Earth
Kasegawa auxiliary dam on Google Earth

Full Dam Information

Details

Country: Brazil

Owner: Ijui Energia S.A.

Type: Gravity

Purpose(s): Hydropower

River: Carreiro

Reservoir capacity: 188 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/10

End of Project: -/11

Specifications

Height: 29 metres

Length: 790 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
São José under construction
São José under construction

Full Dam Information

Details

Country: Morocco

Owner: Direction des Aménagements Hydrauliques

Type: Gravity

Purpose(s): unknown

River: Safsaf

Reservoir capacity: 20 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/10

End of Project: -/11

Specifications

Height: 29 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against precast concrete panels
Downstream
SlopeType
0.85Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.85Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
120
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Sfeissif completed
Sfeissif completed

Full Dam Information

Details

Country: Morocco

Owner: Direction des Aménagements Hydrauliques

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Ain Leuh

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 10/09

Start of RCC: 10/09

End of RCC: 01/11

End of Project: 10/11

Specifications

Height: 29 metres

Length: 136 metres

Volume of RCC: 18 m3x103

Total volume: 20 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against precast concrete panels
Downstream
SlopeType
0.75Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.75Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
30Natural pozzolan (ASTM Class N)
  
Ait Moulay Ahmed on Google Earth
Ait Moulay Ahmed on Google Earth

Full Dam Information

Details

Country: Brazil

Owner: Eletrosul Centrais Elétricas SA

Type: Gravity

Purpose(s): Hydropower

River: Caveiras

Reservoir capacity: 23 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/13

End of Project: 11/13

Specifications

Height: 29 metres

Length: 170 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
João Borges completed
João Borges completed

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Gravity

Purpose(s): Irrigation

River: Büyükdere

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/17

Start of RCC: -/17

End of RCC: -/24

End of Project: -/26

Specifications

Height: 29 metres

Length: 125 metres

Volume of RCC: 30 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: CELG/Electronorte

Type: Gravity

Purpose(s): Hydropower

River: Arraias

Reservoir capacity: -

Construction Dates

Start of Project: -/21

Start of RCC: -/21

End of RCC: -/24

End of Project: -/25

Specifications

Height: 29 metres

Length: 560 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Arraias on Google Earth
Arraias on Google Earth

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates