Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Los MoralesSpainConfederación Hidrográfica del TajoWMorales206/8602/8710/8712/87282002226V(1)
(3)
0.75(3)*0.75(1)300 -
400
300 -
400
80
74
140
128
(F)
Knellpoort
[A-G]
South AfricaDepartment of Water & SanitationWRietspruit 13704/8805/8811/8809/89502004559V(1)0.60(1)*0.60(1)*25025061142(F)
La Touche PoupardFranceCAEDSIChambon1508/9304/9408/9412/94362003446V(1)0.75(3)*0.75(1)*300300 115(R)
North Fork Hughes RiverUSAUSDA Natural Resources Conservation ServiceF R WNorth Fork Hughes River148007/9903/0107/01- /01262006565V(8)0.80(10)0.80(1)30030059
107
59
65
(F)
TaishirMongoliaMinistry of EnergyH I WZabkhan93002/0505/0606/0712/0760200210250V(2)0.72(1)*0.72(12)*333333750(-)
PipocaBrazilOmega Engergia Renovávelo S/AHManhuaçu - /07- /09- /1004/1116200            (N)
Göktas 1
[H-F]
TurkeyBereket EnergyHZamanti10904/1103/1303/15- /161332007499000.30
1.00
(1)
(1)
0.60
1.00
(1)
(1)*
0.75(12)3003005050(F)
Cheekeye Fan Debris BarrierCanadaMatteus West and Squamish NationFCheekye 10/23- /25- /2610/262520055            

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Spain

Owner: Confederación Hidrográfica del Tajo

Type: Gravity

Purpose(s): Water Supply

River: Morales

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 06/86

Start of RCC: 06/86

End of RCC: 10/87

End of Project: 12/87

Specifications

Height: 28 metres

Length: 200 metres

Volume of RCC: 22 m3x103

Total volume: 26 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
 RCC against formwork
Downstream
SlopeType
0.75RCC against formwork  [stepped face]
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300  -300  -
400400

Cementitious material

Cement (kg/m3)
80
74
Pozzolan (kg/m3)Pozzolan Type
140Low-lime flyash (ASTM Class F)
128 
Los Morales completed
Los Morales completed

Full Dam Information

Details

Country: South Africa

Owner: Department of Water & Sanitation

Type: Arch-Gravity

Purpose(s): Water Supply

River: Rietspruit

Reservoir capacity: 137 m3x106

Construction Dates

Start of Project: 04/88

Start of RCC: 04/88

End of RCC: 11/88

End of Project: 09/89

Specifications

Height: 50 metres

Length: 200 metres

Volume of RCC: 45 m3x103

Total volume: 59 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.60Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.60Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
250250

Cementitious material

Cement (kg/m3)
61
Pozzolan (kg/m3)Pozzolan Type
142Low-lime flyash (ASTM Class F)
  
Knellpoort completed
Knellpoort completed

Full Dam Information

Details

Country: France

Owner: CAEDS

Type: Gravity

Purpose(s): Irrigation

River: Chambon

Reservoir capacity: 15 m3x106

Construction Dates

Start of Project: 08/93

Start of RCC: 08/93

End of RCC: 08/94

End of Project: 12/94

Specifications

Height: 36 metres

Length: 200 metres

Volume of RCC: 34 m3x103

Total volume: 46 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75RCC against formwork  [stepped face]
Spillway
SlopeType
0.75Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
115ROLAC (mixture of flyash and slag with or without limestone fines)
  
La Touche Poupard completed
La Touche Poupard completed

Full Dam Information

Details

Country: USA

Owner: USDA Natural Resources Conservation Service

Type: Gravity

Purpose(s): Flood Control / Recreation / Water Supply

River: North Fork Hughes River

Reservoir capacity: 1480 m3x106

Construction Dates

Start of Project: 07/99

Start of RCC: 07/99

End of RCC: 07/01

End of Project: -/01

Specifications

Height: 26 metres

Length: 200 metres

Volume of RCC: 65 m3x103

Total volume: 65 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against precast concrete panels with geomembrane
Downstream
SlopeType
0.80RCC against precast concrete blocks
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
59
107
Pozzolan (kg/m3)Pozzolan Type
59Low-lime flyash (ASTM Class F)
65 
North Fork Hughes River completed
North Fork Hughes River completed

Full Dam Information

Details

Country: Mongolia

Owner: Ministry of Energy

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Zabkhan

Reservoir capacity: 930 m3x106

Construction Dates

Start of Project: 02/05

Start of RCC: 02/05

End of RCC: 06/07

End of Project: 12/07

Specifications

Height: 60 metres

Length: 200 metres

Volume of RCC: 210 m3x103

Total volume: 250 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork with external geomembrane
Downstream
SlopeType
0.72Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.72Reinforced conventional concrete cast after RCC placement  [stepped face]

Placement

Layers (mm)Lifts (mm)
333333

Cementitious material

Cement (kg/m3)
75
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Taishir completed
Taishir completed

Full Dam Information

Details

Country: Brazil

Owner: Omega Engergia Renovávelo S/A

Type: Gravity

Purpose(s): Hydropower

River: Manhuaçu

Reservoir capacity: -

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/10

End of Project: 04/11

Specifications

Height: 16 metres

Length: 200 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Natural pozzolan (ASTM Class N)
  
Pipoca completed
Pipoca completed

Full Dam Information

Details

Country: Turkey

Owner: Bereket Energy

Type: Hardfill

Purpose(s): Hydropower

River: Zamanti

Reservoir capacity: 109 m3x106

Construction Dates

Start of Project: 04/11

Start of RCC: 04/11

End of RCC: 03/15

End of Project: -/16

Specifications

Height: 133 metres

Length: 200 metres

Volume of RCC: 749 m3x103

Total volume: 900 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.30Traditional concrete against formwork
1.00Traditional concrete against formwork
Downstream
SlopeType
0.60Traditional concrete against formwork
1.00Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
50
Pozzolan (kg/m3)Pozzolan Type
50Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Canada

Owner: Matteus West and Squamish Nation

Type: Gravity

Purpose(s): Flood Control

River: Cheekye

Reservoir capacity: -

Construction Dates

Start of Project: 10/23

Start of RCC: 10/23

End of RCC: -/26

End of Project: 10/26

Specifications

Height: 25 metres

Length: 200 metres

Volume of RCC: 55 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Cheekeye Fan Debris Barrier on Google Earth
Cheekeye Fan Debris Barrier on Google Earth

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates