SEARCHING
... please wait

Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Rio Rejo
[H-F]
PeruYanacocha MineERejo1- /02- /03- /03- /043512530330.70(1)*0.70(1)*0.70(12)3003001000(-)
NtimbaleBotswanaDepartment of Water AffairsW 2611/0404/0609/0605/073315330            
Las TunasArgentinaProvincia de CatamarcaF I WLas Tunas10102/0909/1002/1112/11332593056V(1)    2004008525(N)
MamakTurkeyDSI - State Hydraulic WorksFBağ1- /13- /13- /14- /143111830            
Puhulpola (part of Uma Oya Project)Sri LankaMinistry of Irrigation and Water Resources ManagementH IDulgolla Oya1- /11- /13- /18- /19351743040V(1) (1)* (12)3003009595(F)
ColoniaBrazilCERB (Companhia de Engenharia Ambienytal e Recursos Hídricos da Bahia)WColonia6209/15- /17- /1809/18211953034           
Tayabasan weir
[H-F]
PhilippinesWawa JV Co. Inc. (Prime Infrastructure Capital Inc and San Lorenzo Ruiz Builders and Developers Group)H I WTayabasan1- /20- /2105/2207/222411430 0.40(4')0.40
0.92
(3')0.92(1)*30030090120(F)
UluhanTurkeyDSI - State Hydraulic WorksIGök Creek1- /17- /20- /22- /243122830            
Ula ÇıtlıkTurkeyDSI - State Hydraulic WorksIBüyükdere1- /17- /22- /24- /262912530            

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Peru

Owner: Yanacocha Mine

Type: Hardfill

Purpose(s): Environmental

River: Rejo

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/02

Start of RCC: -/02

End of RCC: -/03

End of Project: -/04

Specifications

Height: 35 metres

Length: 125 metres

Volume of RCC: 30 m3x103

Total volume: 33 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.70Traditional concrete against formwork  [stepped face]
Downstream
SlopeType
0.70Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.70Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Photo coming soon

Full Dam Information

Details

Country: Botswana

Owner: Department of Water Affairs

Type: Gravity

Purpose(s): Water Supply

River: -

Reservoir capacity: 26 m3x106

Construction Dates

Start of Project: 11/04

Start of RCC: 11/04

End of RCC: 09/06

End of Project: 05/07

Specifications

Height: 33 metres

Length: 153 metres

Volume of RCC: 30 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Ntimbale completed
Ntimbale completed

Full Dam Information

Details

Country: Argentina

Owner: Provincia de Catamarca

Type: Gravity

Purpose(s): Flood Control / Irrigation / Water Supply

River: Las Tunas

Reservoir capacity: 101 m3x106

Construction Dates

Start of Project: 02/09

Start of RCC: 02/09

End of RCC: 02/11

End of Project: 12/11

Specifications

Height: 33 metres

Length: 259 metres

Volume of RCC: 30 m3x103

Total volume: 56 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
200400

Cementitious material

Cement (kg/m3)
85
Pozzolan (kg/m3)Pozzolan Type
25Natural pozzolan (ASTM Class N)
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Gravity

Purpose(s): Flood Control

River: Bağ

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/13

Start of RCC: -/13

End of RCC: -/14

End of Project: -/14

Specifications

Height: 31 metres

Length: 118 metres

Volume of RCC: 30 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Mamak completed
Mamak completed

Full Dam Information

Details

Country: Sri Lanka

Owner: Ministry of Irrigation and Water Resources Management

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Dulgolla Oya

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: -/18

End of Project: -/19

Specifications

Height: 35 metres

Length: 174 metres

Volume of RCC: 30 m3x103

Total volume: 40 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
 Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
 Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
95
Pozzolan (kg/m3)Pozzolan Type
95Low-lime flyash (ASTM Class F)
  
Puhulpola (part of Uma Oya Project) under construction
Puhulpola (part of Uma Oya Project) under construction

Full Dam Information

Details

Country: Brazil

Owner: CERB (Companhia de Engenharia Ambienytal e Recursos Hídricos da Bahia)

Type: Gravity

Purpose(s): Water Supply

River: Colonia

Reservoir capacity: 62 m3x106

Construction Dates

Start of Project: 09/15

Start of RCC: 09/15

End of RCC: -/18

End of Project: 09/18

Specifications

Height: 21 metres

Length: 195 metres

Volume of RCC: 30 m3x103

Total volume: 34 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Philippines

Owner: Wawa JV Co. Inc. (Prime Infrastructure Capital Inc and San Lorenzo Ruiz Builders and Developers Group)

Type: Hardfill

Purpose(s): Hydropower / Irrigation / Water Supply

River: Tayabasan

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/20

Start of RCC: -/20

End of RCC: 05/22

End of Project: 07/22

Specifications

Height: 24 metres

Length: 114 metres

Volume of RCC: 30 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.40RCC against formwork with external geomembrane (GEVR/GE-RCC)
Downstream
SlopeType
0.40RCC against formwork (GEVR/GE-RCC)
0.92 
Spillway
SlopeType
0.92Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
120Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Gravity

Purpose(s): Irrigation

River: Gök Creek

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/17

Start of RCC: -/17

End of RCC: -/22

End of Project: -/24

Specifications

Height: 31 metres

Length: 228 metres

Volume of RCC: 30 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Gravity

Purpose(s): Irrigation

River: Büyükdere

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/17

Start of RCC: -/17

End of RCC: -/24

End of Project: -/26

Specifications

Height: 29 metres

Length: 125 metres

Volume of RCC: 30 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates