Dam Search Results
- Owner: EVN (Electrictie de Vietnam)
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Pleikrong | Vietnam | EVN (Electrictie de Vietnam) | H | Po Ko | 1048 | 11/05 | 02/05 | 12/06 | - /07 | 65 | 495 | 326 | 450 | V | (1) | 0.80 | (1) | 0.80 | (1) | 300 | 300 | 80 | 210 | (N) |
| A Vuong | Vietnam | EVN (Electrictie de Vietnam) | H | Vugia Thubon | 340 | 08/03 | 01/06 | 10/07 | 11/08 | 83 | 240 | 260 | 350 | V | (1) | 0.80 | (1) | 1.00 | (1) | 300 | 300 | 90 | 150 | (N) |
| Se San 4 | Vietnam | EVN (Electrictie de Vietnam) | H | Poko | 54 | 12/04 | 03/05 | - /08 | - /09 | 74 | 834 | 753 | 1300 | V | (1) | 0.80 | (1) | 0.80 | (1) | 300 | 300 | 80 | 160 | (N) |
| Ban Ve | Vietnam | EVN (Electrictie de Vietnam) | H | Ca | 1500 | 08/04 | 02/07 | 10/10 | 12/11 | 136 | 480 | 1520 | 1750 | v 0.30 | (3') | 0.85 | (3')* | 0.80 | (12) | 300 | 300 | 80 | 120 | (N) |
| Dong Nai 3 | Vietnam | EVN (Electrictie de Vietnam) | F H | Dong Nai | 1690 | 12/04 | 05/08 | 12/10 | 10/11 | 108 | 594 | 1138 | 1235 | V | (1) | 0.75 | (1)* | 0.75 | (1) | 300 | 300 | 75 | 0 | (-) |
| Dong Nai 4 | Vietnam | EVN (Electrictie de Vietnam) | H | Dong Nai | 337 | 12/04 | 03/09 | 06/11 | - /12 | 128 | 481 | 1305 | 1370 | V | (1) | 0.80 | (1)* | 0.80 | (1) | 300 | 300 | 85 | 115 | (N) |
| Song Tranh 2 | Vietnam | EVN (Electrictie de Vietnam) | H | Song Tranh | 733 | 03/05 | 04/08 | 08/11 | 12/12 | 96 | 640 | 1032 | 1315 | V | (3') | 0.80 | (1) | 0.75 | (1) | 300 | 300 | 70 | 110 | (N) |
| Ban Chat | Vietnam | EVN (Electrictie de Vietnam) | H | Nam Mu | 2138 | 01/06 | 08/09 | 08/12 | 12/13 | 130 | 425 | 1600 | 2 | V | (3') | 0.80 | (3')* | separate | 300 | 300 | 60 | 160 | (F) | |
| Song Bung 4 | Vietnam | EVN (Electrictie de Vietnam) | H | Vu Gia | 511 | 09/10 | 06/12 | 04/14 | 01/15 | 114 | 345 | 963 | 1170 | V 0.40 | 0.80 | (3')* | 300 | 3000 | 80 60 | 120 140 | (N) & (F) | |||
| Lai Chau | Vietnam | EVN (Electrictie de Vietnam) | H | Song Da (Black River) | 1215 | 06/10 | 03/13 | 05/15 | 07/17 | 131 | 620 | 1884 | 2500 | V | (3') | 0.75 | (3')* | 0.75 | (12) | 300 | 300 | 60 | 160 | (F) |
| Trung Son | Vietnam | EVN (Electrictie de Vietnam) | F H | Ma | 349 | 11/12 | 04/14 | 08/16 | 02/17 | 88 | 498 | 770 | 1140 | V 0.35 | (3') (3')* | 0.65 | (3')* | 0.65 | (12) | 300 | 300 | 60 70 | 140 150 | (N) |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Vietnam
Owner: EVN (Electrictie de Vietnam)
Type: Gravity
Purpose(s): Hydropower
River: Po Ko
Reservoir capacity: 1048 m3x106
Construction Dates
Start of Project: 11/05
Start of RCC: 11/05
End of RCC: 12/06
End of Project: -/07
Specifications
Height: 65 metres
Length: 495 metres
Volume of RCC: 326 m3x103
Total volume: 450 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 210 | Natural pozzolan (ASTM Class N) |

Details
Country: Vietnam
Owner: EVN (Electrictie de Vietnam)
Type: Gravity
Purpose(s): Hydropower
River: Vugia Thubon
Reservoir capacity: 340 m3x106
Construction Dates
Start of Project: 08/03
Start of RCC: 08/03
End of RCC: 10/07
End of Project: 11/08
Specifications
Height: 83 metres
Length: 240 metres
Volume of RCC: 260 m3x103
Total volume: 350 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 1.00 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 150 | Natural pozzolan (ASTM Class N) |

Details
Country: Vietnam
Owner: EVN (Electrictie de Vietnam)
Type: Gravity
Purpose(s): Hydropower
River: Poko
Reservoir capacity: 54 m3x106
Construction Dates
Start of Project: 12/04
Start of RCC: 12/04
End of RCC: -/08
End of Project: -/09
Specifications
Height: 74 metres
Length: 834 metres
Volume of RCC: 753 m3x103
Total volume: 1300 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 160 | Natural pozzolan (ASTM Class N) |

Details
Country: Vietnam
Owner: EVN (Electrictie de Vietnam)
Type: Gravity
Purpose(s): Hydropower
River: Ca
Reservoir capacity: 1500 m3x106
Construction Dates
Start of Project: 08/04
Start of RCC: 08/04
End of RCC: 10/10
End of Project: 12/11
Specifications
Height: 136 metres
Length: 480 metres
Volume of RCC: 1520 m3x103
Total volume: 1750 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| v | RCC against formwork (GEVR/GE-RCC) |
| 0.30 |
Downstream
| Slope | Type |
|---|---|
| 0.85 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Natural pozzolan (ASTM Class N) |

Details
Country: Vietnam
Owner: EVN (Electrictie de Vietnam)
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Dong Nai
Reservoir capacity: 1690 m3x106
Construction Dates
Start of Project: 12/04
Start of RCC: 12/04
End of RCC: 12/10
End of Project: 10/11
Specifications
Height: 108 metres
Length: 594 metres
Volume of RCC: 1138 m3x103
Total volume: 1235 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Vietnam
Owner: EVN (Electrictie de Vietnam)
Type: Gravity
Purpose(s): Hydropower
River: Dong Nai
Reservoir capacity: 337 m3x106
Construction Dates
Start of Project: 12/04
Start of RCC: 12/04
End of RCC: 06/11
End of Project: -/12
Specifications
Height: 128 metres
Length: 481 metres
Volume of RCC: 1305 m3x103
Total volume: 1370 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 115 | Natural pozzolan (ASTM Class N) |

Details
Country: Vietnam
Owner: EVN (Electrictie de Vietnam)
Type: Gravity
Purpose(s): Hydropower
River: Song Tranh
Reservoir capacity: 733 m3x106
Construction Dates
Start of Project: 03/05
Start of RCC: 03/05
End of RCC: 08/11
End of Project: 12/12
Specifications
Height: 96 metres
Length: 640 metres
Volume of RCC: 1032 m3x103
Total volume: 1315 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 110 | Natural pozzolan (ASTM Class N) |

Details
Country: Vietnam
Owner: EVN (Electrictie de Vietnam)
Type: Gravity
Purpose(s): Hydropower
River: Nam Mu
Reservoir capacity: 2138 m3x106
Construction Dates
Start of Project: 01/06
Start of RCC: 01/06
End of RCC: 08/12
End of Project: 12/13
Specifications
Height: 130 metres
Length: 425 metres
Volume of RCC: 1600 m3x103
Total volume: 2 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 160 | Low-lime flyash (ASTM Class F) |

Details
Country: Vietnam
Owner: EVN (Electrictie de Vietnam)
Type: Gravity
Purpose(s): Hydropower
River: Vu Gia
Reservoir capacity: 511 m3x106
Construction Dates
Start of Project: 09/10
Start of RCC: 09/10
End of RCC: 04/14
End of Project: 01/15
Specifications
Height: 114 metres
Length: 345 metres
Volume of RCC: 963 m3x103
Total volume: 1170 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | |
| 0.40 |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Natural pozzolan (ASTM Class N) & |
| 140 | Low-lime flyash (ASTM Class F) |

Details
Country: Vietnam
Owner: EVN (Electrictie de Vietnam)
Type: Gravity
Purpose(s): Hydropower
River: Song Da (Black River)
Reservoir capacity: 1215 m3x106
Construction Dates
Start of Project: 06/10
Start of RCC: 06/10
End of RCC: 05/15
End of Project: 07/17
Specifications
Height: 131 metres
Length: 620 metres
Volume of RCC: 1884 m3x103
Total volume: 2500 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 160 | Low-lime flyash (ASTM Class F) |

Details
Country: Vietnam
Owner: EVN (Electrictie de Vietnam)
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Ma
Reservoir capacity: 349 m3x106
Construction Dates
Start of Project: 11/12
Start of RCC: 11/12
End of RCC: 08/16
End of Project: 02/17
Specifications
Height: 88 metres
Length: 498 metres
Volume of RCC: 770 m3x103
Total volume: 1140 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.35 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Downstream
| Slope | Type |
|---|---|
| 0.65 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.65 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 140 | Natural pozzolan (ASTM Class N) |
| 150 |