Dam Search Results
- Reservoir Capacity: 2 m3x106
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Carroll E. Ecton (formerly Winchester) | USA | Winchester Municipal Utility | W | Upper Howard Creek | 2 | 06/84 | 08/84 | 11/84 | 01/85 | 23 | 363 | 24 | 27 | V | (6) | V 1.00 | (5) (17) | 1.00 | (1) | 300 | 300 | 104 | 0 | (-) |
| Grindstone Canyon | USA | Village of Ruidoso | W | Grindstone | 2 | 09/85 | 05/86 | 07/86 | 10/86 | 42 | 432 | 88 | 96 | V | (1) | 0.75 | (1)* | 0.75 | (1) | 300 | 300 | 76 | 0 | (-) |
| Los Morales | Spain | Confederación Hidrográfica del Tajo | W | Morales | 2 | 06/86 | 02/87 | 10/87 | 12/87 | 28 | 200 | 22 | 26 | V | (1) (3) | 0.75 | (3)* | 0.75 | (1) | 300 - 400 | 300 - 400 | 80 74 | 140 128 | (F) |
| Tirgu Jiu | Romania | Romanian Electricity Authority (RENAL) - Tirgu Jiu Branch | H | Jiu | 2 | 08/86 | 06/88 | 05/89 | 12/93 | 24 | 61 | 13 | 26 | (12) | (12) | ogee | (12) | 300 | 900 | 125 | 0 | (-) | ||
| Maroño | Spain | Diputación Foral de Alava | W | Izoria and Idas | 2 | 01/89 | 11/89 | 08/90 | 11/91 | 53 | 182 | 80 | 91 | 0.05 | (3) | V 0.75 | (3)* (3)* | 0.75 | (1)* | 300 | 300 | 80 65 | 160 170 | (F) |
| Maojiang [A] | China | Lanshan County Hydropower Bureau | H I | Xiang | 2 | - /92 | - /93 | - /94 | - /95 | 45 | 150 | 45 | (F) | |||||||||||
| Yoshida | Japan | Kagawa Prefecture | F W | Yoshida | 2 | 07/91 | 07/93 | 02/95 | 03/96 | 75 | 218 | 265 | 304 | V | (1) | 0.75 | (1) | 0.75 | (1) | 250 | 750 | 84 | 36 | (F) |
| do Peixe | Brazil | CPEE (Companhia Paulista de Energia Elétrica) | H | do Peixe | 2 | 02/96 | 12/96 | 12/97 | - /98 | 32 | 300 | 20 | 34 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 120 90 | 0 0 | (-) |
| Penn Forest | USA | Bethlehem Authority, City of Bethlehem | W | Wild Creek | 2 | 08/96 | 09/97 | 10/98 | 12/98 | 49 | 610 | 283 | 283 | V | (6) | 0.50 | (15) (7) | conduit | 300 | 300 | 58 | 41 | (F) | |
| Yangxishui Nº3 | China | Shaoguang Electricity Corporation Ltd | H | Yangxishui | 2 | 11/97 | 09/98 | 06/99 | 07/00 | 46 | 202 | 100 | 139 | V | (1) | V 0.75 | (1) (1)* | 0.70 | (12) | 300 | 300 | (F) | ||
| Peñas Blancas | Costa Rica | ICE (Instituto Costarricense de Electricidad) | H | Peñas Blancas | 2 | 04/00 | 07/01 | 01/02 | 07/02 | 48 | 211 | 120 | 170 | V | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 300 | 90 | 35 | (N) |
| Hunting Run | USA | Spotsylvania County | W | Hunting Run | 2 | 05/00 | 02/01 | 01/02 | 08/02 | 36 | 720 | 115 | 128 | V | (8) | (17) | (17) | 300 | 300 | 74 | 37 | (F) | ||
| Maobaguan [A] | China | Shaanxi Hanjiang Hydropower Development Co. Ltd. | H | Renhe | 2 | - /00 | - /02 | - /03 | - /04 | 66 | 120 | 81 | 106 | |||||||||||
| Huilong PSS - Lower dam | China | Henan Electric Power Corporation | H | Huilonggou | 2 | 06/01 | - /02 | 06/04 | - /05 | 54 | 175 | 88 | 105 | V | (3') | 0.75 | (3')* | 0.75 | (12) | 300 | 300 | (F) | ||
| Big Cherry | USA | Town of Big Stone Gap | W | South Fork, Powell River | 2 | 04/04 | 09/04 | 01/05 | 07/05 | 26 | 113 | 11 | 12 | 300 | 300 | 82 | 82 | (F) | ||||||
| São Bernardo | Brazil | CJ Energética S/A | H | Bernardo José | 2 | - /03 | - /04 | - /05 | - /06 | 21 | 120 | |||||||||||||
| Can Asujan [H-F] | Philippines | National Irrigation Administration | I | Can Asujan | 2 | 10/03 | - /04 | - /05 | - /05 | 42 | 135 | 75 | 85 | 0.60 | (8) | 0.60 | (7) | 0.60 | (1) | 170 | 170 | 100 | 0 | (-) |
| Duas Serras | Brazil | COMPESA (Companhia Pernambucana de Saneamento) | W | Duas Serras | 2 | - /05 | - /06 | - /07 | - /08 | 19 | 113 | 6 | 300 | 300 | ||||||||||
| Chbika | Morocco | Direction des Arrenagements Hydrauliques | I | Chbika | 2 | - /04 | - /06 | - /08 | - /09 | 24 | ||||||||||||||
| São Pedro | Brazil | São Pedro Energia S/A | H | Jacu Braço Norte | 2 | - /06 | - /07 | - /09 | - /10 | 30 | 140 | 22 | 35 | |||||||||||
| Mulungu do Morro | Brazil | EMBASA (Empresa Baiana de Aguas e Saneamento S/A) | I W | Tijuco | 2 | - /07 | - /08 | - /09 | 03/10 | 16 | 156 | 13 | ||||||||||||
| Ait Moulay Ahmed | Morocco | Direction des Aménagements Hydrauliques | I W | Ain Leuh | 2 | 10/09 | - /10 | 01/11 | 10/11 | 29 | 136 | 18 | 20 | V | (5) | 0.75 | (1)* | 0.75 | (1)* | 300 | 300 | 70 | 30 | (N) |
| Barra do Rio Chapéu | Brazil | Eletrosul Centrais Elétricas S/A | H W | Braço do Norte | 2 | - /12 | - /12 | - /13 | - /13 | 25 | 117 | |||||||||||||
| Fazenda | Brazil | ENEL Green Power Fazenda S.A. | H | dos Apiacás | 2 | - /12 | - /14 | - /15 | 09/16 | 21 | 503 | |||||||||||||
| Salto Apiacás | Brazil | ENEL Green Power Salto Apiacás S.A | H | dos Apiacás | 2 | - /12 | - /14 | - /15 | - /16 | 17 | 486 | |||||||||||||
| Akçakoca | Turkey | DSI - State Hydraulic Works | I W | Sarma | 2 | 01/13 | 05/15 | 10/16 | - /17 | 66 | 148 | 85 | 130 | 0.10 | (1) | 0.80 | (1) | 0.80 | (12) | 300 | ||||
| Cudi-Circip | Turkey | DSI - State Hydraulic Works | W | Circip | 2 | - /16 | - /17 | - /18 | - /19 | 30 | 213 | 48 | 59 | 0.10 | (1) | 0.80 | (1) | 0.80 | (12) | 300 | 1200 | 98 | 52 | |
| Germinal | Brazil | Companhia de Gestão dos Recursos Hídricos | W | Germinal | 2 | - /16 | - /18 | - /19 | 08/20 | 28 | 210 | |||||||||||||
| Dereçati | Turkey | DSI - State Hydraulic Works | I | Büyükdere | 2 | - /16 | - /18 | - /20 | - /21 | 51 | 174 | 110 | ||||||||||||
| Tekke Kavakli | Turkey | DSI - State Hydraulic Works | I W | Çat | 2 | - /19 | - /22 | - /24 | - /25 | 42 | 325 | 225 | ||||||||||||
| Zimari | Turkey | DSI - State Hydraulic Works | W | Zimari | 2 | - /18 | - /21 | - /25 | - /26 | 37 | 126 | 80 | ||||||||||||
| Heibaoshan [H-F] | China | Construction Headquarters of Heibaoshan Reservoir Project in Wanyuan City | I W | Dayan | 2 | - /22 | - /24 | - /26 | - /27 | 60 | ||||||||||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: USA
Owner: Winchester Municipal Utility
Type: Gravity
Purpose(s): Water Supply
River: Upper Howard Creek
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 06/84
Start of RCC: 06/84
End of RCC: 11/84
End of Project: 01/85
Specifications
Height: 23 metres
Length: 363 metres
Volume of RCC: 24 m3x103
Total volume: 27 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
| 1.00 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 1.00 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 104 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: USA
Owner: Village of Ruidoso
Type: Gravity
Purpose(s): Water Supply
River: Grindstone
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 09/85
Start of RCC: 09/85
End of RCC: 07/86
End of Project: 10/86
Specifications
Height: 42 metres
Length: 432 metres
Volume of RCC: 88 m3x103
Total volume: 96 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 76 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Spain
Owner: Confederación Hidrográfica del Tajo
Type: Gravity
Purpose(s): Water Supply
River: Morales
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 06/86
Start of RCC: 06/86
End of RCC: 10/87
End of Project: 12/87
Specifications
Height: 28 metres
Length: 200 metres
Volume of RCC: 22 m3x103
Total volume: 26 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 - | 300 - |
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 74 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 140 | Low-lime flyash (ASTM Class F) |
| 128 |

Details
Country: Romania
Owner: Romanian Electricity Authority (RENAL) - Tirgu Jiu Branch
Type: Gravity
Purpose(s): Hydropower
River: Jiu
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 08/86
Start of RCC: 08/86
End of RCC: 05/89
End of Project: 12/93
Specifications
Height: 24 metres
Length: 61 metres
Volume of RCC: 13 m3x103
Total volume: 26 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Spillway
| Slope | Type |
|---|---|
| ogee | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 900 |
Cementitious material
| Cement (kg/m3) |
|---|
| 125 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Spain
Owner: Diputación Foral de Alava
Type: Gravity
Purpose(s): Water Supply
River: Izoria and Idas
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 01/89
Start of RCC: 01/89
End of RCC: 08/90
End of Project: 11/91
Specifications
Height: 53 metres
Length: 182 metres
Volume of RCC: 80 m3x103
Total volume: 91 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.05 | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork [stepped face] |
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 160 | Low-lime flyash (ASTM Class F) |
| 170 |

Details
Country: China
Owner: Lanshan County Hydropower Bureau
Type: Thin Arch
Purpose(s): Hydropower / Irrigation
River: Xiang
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/92
Start of RCC: -/92
End of RCC: -/94
End of Project: -/95
Specifications
Height: 45 metres
Length: 150 metres
Volume of RCC: -
Total volume: 45 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: Japan
Owner: Kagawa Prefecture
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Yoshida
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 07/91
Start of RCC: 07/91
End of RCC: 02/95
End of Project: 03/96
Specifications
Height: 75 metres
Length: 218 metres
Volume of RCC: 265 m3x103
Total volume: 304 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: CPEE (Companhia Paulista de Energia Elétrica)
Type: Gravity
Purpose(s): Hydropower
River: do Peixe
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 02/96
Start of RCC: 02/96
End of RCC: 12/97
End of Project: -/98
Specifications
Height: 32 metres
Length: 300 metres
Volume of RCC: 20 m3x103
Total volume: 34 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 120 |
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |
| 0 |

Details
Country: USA
Owner: Bethlehem Authority, City of Bethlehem
Type: Gravity
Purpose(s): Water Supply
River: Wild Creek
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 08/96
Start of RCC: 08/96
End of RCC: 10/98
End of Project: 12/98
Specifications
Height: 49 metres
Length: 610 metres
Volume of RCC: 283 m3x103
Total volume: 283 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.50 | RCC supported by fill shoulders |
| RCC against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| conduit |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 58 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 41 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Shaoguang Electricity Corporation Ltd
Type: Gravity
Purpose(s): Hydropower
River: Yangxishui
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 11/97
Start of RCC: 11/97
End of RCC: 06/99
End of Project: 07/00
Specifications
Height: 46 metres
Length: 202 metres
Volume of RCC: 100 m3x103
Total volume: 139 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: Costa Rica
Owner: ICE (Instituto Costarricense de Electricidad)
Type: Gravity
Purpose(s): Hydropower
River: Peñas Blancas
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 04/00
Start of RCC: 04/00
End of RCC: 01/02
End of Project: 07/02
Specifications
Height: 48 metres
Length: 211 metres
Volume of RCC: 120 m3x103
Total volume: 170 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 35 | Natural pozzolan (ASTM Class N) |

Details
Country: USA
Owner: Spotsylvania County
Type: Gravity
Purpose(s): Water Supply
River: Hunting Run
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 05/00
Start of RCC: 05/00
End of RCC: 01/02
End of Project: 08/02
Specifications
Height: 36 metres
Length: 720 metres
Volume of RCC: 115 m3x103
Total volume: 128 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| Unformed face of RCC |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 74 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 37 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Shaanxi Hanjiang Hydropower Development Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Renhe
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/03
End of Project: -/04
Specifications
Height: 66 metres
Length: 120 metres
Volume of RCC: 81 m3x103
Total volume: 106 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Henan Electric Power Corporation
Type: Gravity
Purpose(s): Hydropower
River: Huilonggou
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 06/01
Start of RCC: 06/01
End of RCC: 06/04
End of Project: -/05
Specifications
Height: 54 metres
Length: 175 metres
Volume of RCC: 88 m3x103
Total volume: 105 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: USA
Owner: Town of Big Stone Gap
Type: Gravity
Purpose(s): Water Supply
River: South Fork, Powell River
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 04/04
Start of RCC: 04/04
End of RCC: 01/05
End of Project: 07/05
Specifications
Height: 26 metres
Length: 113 metres
Volume of RCC: 11 m3x103
Total volume: 12 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 82 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 82 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: CJ Energética S/A
Type: Gravity
Purpose(s): Hydropower
River: Bernardo José
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/05
End of Project: -/06
Specifications
Height: 21 metres
Length: 120 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Philippines
Owner: National Irrigation Administration
Type: Hardfill
Purpose(s): Irrigation
River: Can Asujan
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 10/03
Start of RCC: 10/03
End of RCC: -/05
End of Project: -/05
Specifications
Height: 42 metres
Length: 135 metres
Volume of RCC: 75 m3x103
Total volume: 85 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.60 | RCC against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.60 | RCC against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 0.60 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 170 | 170 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Brazil
Owner: COMPESA (Companhia Pernambucana de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: Duas Serras
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 19 metres
Length: 113 metres
Volume of RCC: 6 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Arrenagements Hydrauliques
Type: Gravity
Purpose(s): Irrigation
River: Chbika
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/08
End of Project: -/09
Specifications
Height: 24 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: São Pedro Energia S/A
Type: Gravity
Purpose(s): Hydropower
River: Jacu Braço Norte
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/09
End of Project: -/10
Specifications
Height: 30 metres
Length: 140 metres
Volume of RCC: 22 m3x103
Total volume: 35 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: EMBASA (Empresa Baiana de Aguas e Saneamento S/A)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Tijuco
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: 03/10
Specifications
Height: 16 metres
Length: 156 metres
Volume of RCC: 13 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Ain Leuh
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 10/09
Start of RCC: 10/09
End of RCC: 01/11
End of Project: 10/11
Specifications
Height: 29 metres
Length: 136 metres
Volume of RCC: 18 m3x103
Total volume: 20 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 30 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Eletrosul Centrais Elétricas S/A
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Braço do Norte
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/13
End of Project: -/13
Specifications
Height: 25 metres
Length: 117 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: ENEL Green Power Fazenda S.A.
Type: Gravity
Purpose(s): Hydropower
River: dos Apiacás
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/15
End of Project: 09/16
Specifications
Height: 21 metres
Length: 503 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: ENEL Green Power Salto Apiacás S.A
Type: Gravity
Purpose(s): Hydropower
River: dos Apiacás
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/15
End of Project: -/16
Specifications
Height: 17 metres
Length: 486 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Sarma
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 01/13
Start of RCC: 01/13
End of RCC: 10/16
End of Project: -/17
Specifications
Height: 66 metres
Length: 148 metres
Volume of RCC: 85 m3x103
Total volume: 130 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Water Supply
River: Circip
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/18
End of Project: -/19
Specifications
Height: 30 metres
Length: 213 metres
Volume of RCC: 48 m3x103
Total volume: 59 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 98 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 52 | |

Details
Country: Brazil
Owner: Companhia de Gestão dos Recursos Hídricos
Type: Gravity
Purpose(s): Water Supply
River: Germinal
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/19
End of Project: 08/20
Specifications
Height: 28 metres
Length: 210 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Büyükdere
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/20
End of Project: -/21
Specifications
Height: 51 metres
Length: 174 metres
Volume of RCC: 110 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Çat
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/19
Start of RCC: -/19
End of RCC: -/24
End of Project: -/25
Specifications
Height: 42 metres
Length: 325 metres
Volume of RCC: 225 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Water Supply
River: Zimari
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/25
End of Project: -/26
Specifications
Height: 37 metres
Length: 126 metres
Volume of RCC: -
Total volume: 80 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Construction Headquarters of Heibaoshan Reservoir Project in Wanyuan City
Type: Hardfill
Purpose(s): Irrigation / Water Supply
River: Dayan
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/22
Start of RCC: -/22
End of RCC: -/26
End of Project: -/27
Specifications
Height: 60 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates