Dam Search Results
- Dimensions
- Height: 41 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Langshan [A] | China | Dinggeniu | 33 | - /74 | - /76 | - /78 | - /79 | 41 | 173 | 36 | ||||||||||||||
| Shimantan | China | Department of Water Resources, Henan Province | F I W | Gunhe | 120 | 07/93 | 04/94 | 12/95 | 07/96 | 41 | 650 | 272 | 351 | V | (3') | 0.75 | (3)* | 0.75 | (1) | 300 | 300 | 98 51 | 98 107 | (F) |
| Guilman-Amorin | Brazil | Arcelor Mittal Brasil S.A. | H | Piracicaba | 12 | - /93 | - /95 | - /96 | 10/97 | 41 | 143 | 85 | 102 | 300 | 300 | 80 | 20 | (N) | ||||||
| Tie Hack | USA | City of Buffalo | W | South Fork Clear Creek | 3 | 05/96 | 10/96 | 08/97 | - /97 | 41 | 170 | 62 | 69 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 89 | 83 | (F) |
| São Sebastião do Alto | Brazil | Geracao Hidroeletrica Rio Grande S/A | H | Grande | 44 | - /08 | - /09 | - /10 | - /11 | 41 | 210 | 51 | 75 | |||||||||||
| Rizzanese | France | Electricité de France | H I | Rizzanese | 1 | - /09 | 04/11 | 02/12 | - /12 | 41 | 140 | 64 | 72 | V 1.00 | (6) (10) | V 0.80 | 0.80 | 300 | 300 | 80 | 0 | (-) | ||
| Duber Khwar | Pakistan | WAPDA (Water and Power Development Authority) and CTGC (China Three Gorges Corp.) | H | Duber Khwar | 06/03 | - /08 | - /12 | 01/14 | 41 | 202 | ||||||||||||||
| Songyue (2nd Stage) | China | Helong Electricity Corporation | F H I R W | Hailanhe | 21 | - /12 | - /13 | - /14 | - /15 | 41 | 271 | V | (1) | 0.73 | (10) | conduit | 300 | 2000 | 80 | 100 | (F) | |||
| Duck River | USA | Cullman Utilities Board | W | Duck | 31 | 01/14 | - /15 | 09/15 | - /16 | 41 | 90 | 121 | 128 | 0.10 | (1) (3) | (3')* | 1.00 | (1')* (3')* | 300 | 300 | 107 | 55 | (F) | |
| Las Cruces (formerly San Bartolo) | Panama | Corporacion de Energia del Istmo Ltd. S.A. | H | San Pablo | 39 | - /13 | - /14 | - /15 | - /16 | 41 | 371 | 77 | V | (3') | 0.85 | (3')* | 0.85 | (12) | 300 | 300 | 90 | 0 | (-) | |
| Senhora do Porto | Brazil | PCH Senhora do Porto S.A | H | Guanhães | 5 | - /14 | - /16 | - /17 | - /18 | 41 | 167 | |||||||||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): unknown
River: Dinggeniu
Reservoir capacity: 33 m3x106
Construction Dates
Start of Project: -/74
Start of RCC: -/74
End of RCC: -/78
End of Project: -/79
Specifications
Height: 41 metres
Length: 173 metres
Volume of RCC: -
Total volume: 36 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Department of Water Resources, Henan Province
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Gunhe
Reservoir capacity: 120 m3x106
Construction Dates
Start of Project: 07/93
Start of RCC: 07/93
End of RCC: 12/95
End of Project: 07/96
Specifications
Height: 41 metres
Length: 650 metres
Volume of RCC: 272 m3x103
Total volume: 351 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 98 |
| 51 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 98 | Low-lime flyash (ASTM Class F) |
| 107 |

Details
Country: Brazil
Owner: Arcelor Mittal Brasil S.A.
Type: Gravity
Purpose(s): Hydropower
River: Piracicaba
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: -/93
Start of RCC: -/93
End of RCC: -/96
End of Project: 10/97
Specifications
Height: 41 metres
Length: 143 metres
Volume of RCC: 85 m3x103
Total volume: 102 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 20 | Natural pozzolan (ASTM Class N) |

Details
Country: USA
Owner: City of Buffalo
Type: Gravity
Purpose(s): Water Supply
River: South Fork Clear Creek
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 05/96
Start of RCC: 05/96
End of RCC: 08/97
End of Project: -/97
Specifications
Height: 41 metres
Length: 170 metres
Volume of RCC: 62 m3x103
Total volume: 69 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 89 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 83 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: Geracao Hidroeletrica Rio Grande S/A
Type: Gravity
Purpose(s): Hydropower
River: Grande
Reservoir capacity: 44 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/10
End of Project: -/11
Specifications
Height: 41 metres
Length: 210 metres
Volume of RCC: 51 m3x103
Total volume: 75 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: France
Owner: Electricité de France
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Rizzanese
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: 02/12
End of Project: -/12
Specifications
Height: 41 metres
Length: 140 metres
Volume of RCC: 64 m3x103
Total volume: 72 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels with geomembrane |
| 1.00 | RCC against precast concrete blocks |
Downstream
| Slope | Type |
|---|---|
| Vertical | |
| 0.80 |
Spillway
| Slope | Type |
|---|---|
| 0.80 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Pakistan
Owner: WAPDA (Water and Power Development Authority) and CTGC (China Three Gorges Corp.)
Type: Gravity
Purpose(s): Hydropower
River: Duber Khwar
Reservoir capacity: -
Construction Dates
Start of Project: 06/03
Start of RCC: 06/03
End of RCC: -/12
End of Project: 01/14
Specifications
Height: 41 metres
Length: 202 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Helong Electricity Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Recreation / Water Supply
River: Hailanhe
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/14
End of Project: -/15
Specifications
Height: 41 metres
Length: 271 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.73 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| conduit |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 2000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Cullman Utilities Board
Type: Gravity
Purpose(s): Water Supply
River: Duck
Reservoir capacity: 31 m3x106
Construction Dates
Start of Project: 01/14
Start of RCC: 01/14
End of RCC: 09/15
End of Project: -/16
Specifications
Height: 41 metres
Length: 90 metres
Volume of RCC: 121 m3x103
Total volume: 128 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
| RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 1.00 | Traditional concrete against formwork (GEVR/GE-RCC) [stepped face] |
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 107 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 55 | Low-lime flyash (ASTM Class F) |

Details
Country: Panama
Owner: Corporacion de Energia del Istmo Ltd. S.A.
Type: Gravity
Purpose(s): Hydropower
River: San Pablo
Reservoir capacity: 39 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/15
End of Project: -/16
Specifications
Height: 41 metres
Length: 371 metres
Volume of RCC: 77 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.85 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.85 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Brazil
Owner: PCH Senhora do Porto S.A
Type: Gravity
Purpose(s): Hydropower
River: Guanhães
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/17
End of Project: -/18
Specifications
Height: 41 metres
Length: 167 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates