Dam Search Results
- Dimensions
- Height: 46 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Stagecoach | USA | Upper Yampa Water Conservancy District, Steamboat Springs, Colorado | H I R W | Yampa | 42 | 08/87 | 06/88 | 07/88 | 11/88 | 46 | 116 | 34 | 39 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 71 | 71 | (F) |
| Sep | France | Syndicat Mixte pour l’Amenagement de la Haute Morge (SMAHM) | I | Sep | 5 | 04/93 | 09/93 | 01/94 | 03/94 | 46 | 145 | 49 | 58 | V | (11) | 0.72 | (16) | 0.72 | (3)* | 300 | 300 | 120 | (R) | |
| Yangxishui Nº3 | China | Shaoguang Electricity Corporation Ltd | H | Yangxishui | 2 | 11/97 | 09/98 | 06/99 | 07/00 | 46 | 202 | 100 | 139 | V | (1) | V 0.75 | (1) (1)* | 0.70 | (12) | 300 | 300 | (F) | ||
| Khan Khwar | Pakistan | WAPDA (Water and Power Development Authority) and CTGC (China Three Gorges Corp.) | H | Duber Khwar | 04/03 | - /06 | - /10 | 04/12 | 46 | 112 | ||||||||||||||
| Oltu Sivridere | Turkey | DSI - State Hydraulic Works | I | Limontozu | 1 | - /14 | - /15 | - /16 | - /17 | 46 | 63 | 269 | ||||||||||||
| Sanru [H-F] | Japan | Ministry of Land, Infrastructure, Transport and Tourism | F N W | Sanru | 50 | 08/14 | 09/15 | 10/17 | 03/19 | 46 | 350 | 375 | 500 | 0.80 | (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 | 80 | 0 | (-) |
| Fendou | China | Muling Fendou Reservoir Construction office | F H I W | Mulenghe | 191 | - /15 | - /16 | - /17 | - /18 | 46 | 406 | |||||||||||||
| Ulus Eldeş | Turkey | DSI - State Hydraulic Works | I W | Karakuz Creek | 1 | - /16 | - /20 | - /22 | - /23 | 46 | 125 | 38 | V 0.10 | (1) (1) | 0.80 | (1)* | 300 | 83 | 68 | (F) | ||||
| Lom Pangar | Cameroon | EDC (Electricity Development Corporation) | F H | Lom | 6000 | - /19 | 02/21 | 03/23 | 09/24 | 46 | 185 | 175 | 290 | V | (1) | 0.85 | (1) | 0.85 | (12) | 300 | 300 | 100 | 100 | (F) |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: USA
Owner: Upper Yampa Water Conservancy District, Steamboat Springs, Colorado
Type: Gravity
Purpose(s): Hydropower / Irrigation / Recreation / Water Supply
River: Yampa
Reservoir capacity: 42 m3x106
Construction Dates
Start of Project: 08/87
Start of RCC: 08/87
End of RCC: 07/88
End of Project: 11/88
Specifications
Height: 46 metres
Length: 116 metres
Volume of RCC: 34 m3x103
Total volume: 39 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 71 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 71 | Low-lime flyash (ASTM Class F) |

Details
Country: France
Owner: Syndicat Mixte pour l’Amenagement de la Haute Morge (SMAHM)
Type: Gravity
Purpose(s): Irrigation
River: Sep
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: 04/93
Start of RCC: 04/93
End of RCC: 01/94
End of Project: 03/94
Specifications
Height: 46 metres
Length: 145 metres
Volume of RCC: 49 m3x103
Total volume: 58 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced conventional concrete cast before RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.72 | Mechanically compacted unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.72 | RCC against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | ROLAC (mixture of flyash and slag with or without limestone fines) |

Details
Country: China
Owner: Shaoguang Electricity Corporation Ltd
Type: Gravity
Purpose(s): Hydropower
River: Yangxishui
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 11/97
Start of RCC: 11/97
End of RCC: 06/99
End of Project: 07/00
Specifications
Height: 46 metres
Length: 202 metres
Volume of RCC: 100 m3x103
Total volume: 139 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: Pakistan
Owner: WAPDA (Water and Power Development Authority) and CTGC (China Three Gorges Corp.)
Type: Gravity
Purpose(s): Hydropower
River: Duber Khwar
Reservoir capacity: -
Construction Dates
Start of Project: 04/03
Start of RCC: 04/03
End of RCC: -/10
End of Project: 04/12
Specifications
Height: 46 metres
Length: 112 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Limontozu
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/16
End of Project: -/17
Specifications
Height: 46 metres
Length: 63 metres
Volume of RCC: 269 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: Ministry of Land, Infrastructure, Transport and Tourism
Type: Hardfill
Purpose(s): Flood Control / Navigation / Water Supply
River: Sanru
Reservoir capacity: 50 m3x106
Construction Dates
Start of Project: 08/14
Start of RCC: 08/14
End of RCC: 10/17
End of Project: 03/19
Specifications
Height: 46 metres
Length: 350 metres
Volume of RCC: 375 m3x103
Total volume: 500 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: China
Owner: Muling Fendou Reservoir Construction office
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Mulenghe
Reservoir capacity: 191 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/17
End of Project: -/18
Specifications
Height: 46 metres
Length: 406 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Karakuz Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/22
End of Project: -/23
Specifications
Height: 46 metres
Length: 125 metres
Volume of RCC: 38 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 83 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 68 | Low-lime flyash (ASTM Class F) |

Details
Country: Cameroon
Owner: EDC (Electricity Development Corporation)
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Lom
Reservoir capacity: 6000 m3x106
Construction Dates
Start of Project: -/19
Start of RCC: -/19
End of RCC: 03/23
End of Project: 09/24
Specifications
Height: 46 metres
Length: 185 metres
Volume of RCC: 175 m3x103
Total volume: 290 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.85 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.85 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates