Dam Search Results
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Knellpoort [A-G] | South Africa | Department of Water & Sanitation | W | Rietspruit | 137 | 04/88 | 05/88 | 11/88 | 09/89 | 50 | 200 | 45 | 59 | V | (1) | 0.60 | (1)* | 0.60 | (1)* | 250 | 250 | 61 | 142 | (F) |
| Wolwedans [A-G] | South Africa | Department of Water & Sanitation | W | Great Brak | 24 | 11/87 | 10/88 | 10/89 | 11/90 | 70 | 268 | 180 | 210 | V | (1) | 0.50 | (1)* | 0.50 | (1)* | 250 | 250 | 58 | 136 | (F) |
| Xibingxi [A-G] | China | Department of Electric Power, Lonyan City, Fujian Province | H W | Longshanxi | 9 | 08/93 | 12/94 | 07/95 | 10/95 | 64 | 93 | 25 | 33 | V 0.08 | (4) (4) | 0.65 | (3) | ogee 0.65 | (13) | 300 - 350 | 300 - 350 | 80 79 | 120 105 | (F) |
| Hongpo [A-G] | China | Xishan Xingyu Water Resources Corporation | W | Qinggoushui | 3 | 10/97 | 07/98 | 11/99 | 12/99 | 55 | 244 | 71 | 77 | V | (3') | 0.50 | (1) | 0.50 | (1) | 300 | 3000 | 54 | 99 | (F) |
| Longshou Nº1 [A-G] | China | Department of Electricity, Gansu Province | H | Heihe | 13 | 04/99 | 03/00 | 06/01 | 09/01 | 80 | 258 | 187 | 210 | V 0.20 | (1) (1) | 0.75 | (1) | 0.75 | (1) | 300 | 3000 | 96 58 | 109 113 | (F) |
| Changuinola 1 [A-G] | Panama | AES (Allied Energy Systems Co.) Panama SRL | H | Changuinola | 347 | 04/07 | 12/09 | 04/11 | 10/11 | 105 | 595 | 884 | 910 | V | (3') | 0.50 0.70 | (3')* (3')* | 0.50 | (12) | 300 | 300 | 70 65 | 145 150 | (F) |
| Gomal Zam [A-G] | Pakistan | WAPDA (Water and Power Development Authority) | F H I | Gomal | 1424 | 07/02 | 08/07 | 09/11 | 06/13 | 133 | 231 | 390 | 474 | V | 0.60 | 0.60 | 300 | 3000 to 4000 | 91 | 91 | (F) | |||
| Portugues [A-G] | USA | US Army Corps of Engineers, Jacksonville and Department of Natural Resources of Puerto Rico | F | Portugues | 20 | 04/08 | 01/11 | 05/12 | 12/13 | 67 | 375 | 270 | 310 | V | (3') | 0.35 | (3')* | 0.35 | (1) | 300 | 300 | 114 | 51 | (F) |
| Kotanli II [A-G] | Turkey | EBD En. Ür. ve Tic. A.S. | H | Kura | 20 | 10/12 | 05/14 | 04/15 | 11/15 | 70 | 250 | 248 | 252 | 0.15 | (3) | 0.70 | (3')* | 0.70 | (12) | 300 | 300 | 85 | 130 | (N) |
| Tabellout [A-G] | Algeria | ANBT (Agence Nationale des Barrages et Transfert) | I W | Djen Djen | 294 | 03/10 | 03/13 | 08/15 | 12/15 | 121 | 366 | 975 | (12) | (12) | (12)* | 300 | 300 | 85 | 45 | (S) | ||||
| Köroglu Kotanli 1 [A-G] | Turkey | EBD Enerji Üretim. ve Tic. A.S. | H | Kura | 73 | 03/15 | 06/15 | 02/17 | 04/17 | 100 | 404 | 640 | 680 | V | (3') | 0.60 | (3')* | 0.60 | (12) | 300 | 300 | 85 | 130 | (N) |
| Sanhekou [A-G] | China | Ziwuhe | 710 | - /14 | 10/16 | 12/18 | 06/19 | 142 | 472 | |||||||||||||||
| Arenal I-II [A-G] | Honduras | Energias Limpias del Yaguala SA de CV | H | Yaguala | 72 | 01/18 | 04/19 | 11/20 | 01/21 | 93 | 273 | 249 | 305 | 0.04 | (3') | 0.40 0.67 | (3') (3') | 0.40 | (13) | |||||
| Chame Shir [A-G] | Iran | Iran Water & Power Resources Development Company (IWPC) | F H I W | Zohreh | 2300 | - /11 | - /16 | - /22 | 07/23 | 151 | 680 | 1100 | 1200 | V | 0.70 | 300 | 300 | 160 | 0 | (-) | ||||
| Asuwagawa [A-G] | Japan | Ministry of Land, Infrastructure, Transport and Tourism | F | Heko | 29 | 07/06 | - /18 | - /24 | - /26 | 96 | ||||||||||||||
| Gross Dam Raise [A-G] | USA | Denver Water | W | South Boulder Creek | 147 | 04/22 | 04/24 | 11/25 | 12/26 | 144 | 610 | 568 | 300 | 300 | ||||||||||
| El-Janneh [A-G] | Lebanon | EBML | H I W | Ibrahim (Abraham) | 38 | - /15 | 02/20 | - /25 | - /26 | 162 | 350 | 1450 | 300 | 300 | ||||||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: South Africa
Owner: Department of Water & Sanitation
Type: Arch-Gravity
Purpose(s): Water Supply
River: Rietspruit
Reservoir capacity: 137 m3x106
Construction Dates
Start of Project: 04/88
Start of RCC: 04/88
End of RCC: 11/88
End of Project: 09/89
Specifications
Height: 50 metres
Length: 200 metres
Volume of RCC: 45 m3x103
Total volume: 59 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.60 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.60 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 250 |
Cementitious material
| Cement (kg/m3) |
|---|
| 61 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 142 | Low-lime flyash (ASTM Class F) |

Details
Country: South Africa
Owner: Department of Water & Sanitation
Type: Arch-Gravity
Purpose(s): Water Supply
River: Great Brak
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: 11/87
Start of RCC: 11/87
End of RCC: 10/89
End of Project: 11/90
Specifications
Height: 70 metres
Length: 268 metres
Volume of RCC: 180 m3x103
Total volume: 210 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 250 |
Cementitious material
| Cement (kg/m3) |
|---|
| 58 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 136 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Department of Electric Power, Lonyan City, Fujian Province
Type: Arch-Gravity
Purpose(s): Hydropower / Water Supply
River: Longshanxi
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: 08/93
Start of RCC: 08/93
End of RCC: 07/95
End of Project: 10/95
Specifications
Height: 64 metres
Length: 93 metres
Volume of RCC: 25 m3x103
Total volume: 33 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork with external geomembrane |
| 0.08 | RCC against formwork with external geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.65 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| ogee | Reinforced concrete cast against precast units or slip-formed facing elements |
| 0.65 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 - | 300 - |
| 350 | 350 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 79 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Low-lime flyash (ASTM Class F) |
| 105 |

Details
Country: China
Owner: Xishan Xingyu Water Resources Corporation
Type: Arch-Gravity
Purpose(s): Water Supply
River: Qinggoushui
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 10/97
Start of RCC: 10/97
End of RCC: 11/99
End of Project: 12/99
Specifications
Height: 55 metres
Length: 244 metres
Volume of RCC: 71 m3x103
Total volume: 77 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 54 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 99 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Department of Electricity, Gansu Province
Type: Arch-Gravity
Purpose(s): Hydropower
River: Heihe
Reservoir capacity: 13 m3x106
Construction Dates
Start of Project: 04/99
Start of RCC: 04/99
End of RCC: 06/01
End of Project: 09/01
Specifications
Height: 80 metres
Length: 258 metres
Volume of RCC: 187 m3x103
Total volume: 210 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.20 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| 58 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 109 | Low-lime flyash (ASTM Class F) |
| 113 |

Details
Country: Panama
Owner: AES (Allied Energy Systems Co.) Panama SRL
Type: Arch-Gravity
Purpose(s): Hydropower
River: Changuinola
Reservoir capacity: 347 m3x106
Construction Dates
Start of Project: 04/07
Start of RCC: 04/07
End of RCC: 04/11
End of Project: 10/11
Specifications
Height: 105 metres
Length: 595 metres
Volume of RCC: 884 m3x103
Total volume: 910 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.50 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
| 0.70 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.50 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 145 | Low-lime flyash (ASTM Class F) |
| 150 |

Details
Country: Pakistan
Owner: WAPDA (Water and Power Development Authority)
Type: Arch-Gravity
Purpose(s): Flood Control / Hydropower / Irrigation
River: Gomal
Reservoir capacity: 1424 m3x106
Construction Dates
Start of Project: 07/02
Start of RCC: 07/02
End of RCC: 09/11
End of Project: 06/13
Specifications
Height: 133 metres
Length: 231 metres
Volume of RCC: 390 m3x103
Total volume: 474 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.60 |
Spillway
| Slope | Type |
|---|---|
| 0.60 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 to |
| 4000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 91 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: US Army Corps of Engineers, Jacksonville and Department of Natural Resources of Puerto Rico
Type: Arch-Gravity
Purpose(s): Flood Control
River: Portugues
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: 04/08
Start of RCC: 04/08
End of RCC: 05/12
End of Project: 12/13
Specifications
Height: 67 metres
Length: 375 metres
Volume of RCC: 270 m3x103
Total volume: 310 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.35 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.35 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 114 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 51 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: EBD En. Ür. ve Tic. A.S.
Type: Arch-Gravity
Purpose(s): Hydropower
River: Kura
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: 10/12
Start of RCC: 10/12
End of RCC: 04/15
End of Project: 11/15
Specifications
Height: 70 metres
Length: 250 metres
Volume of RCC: 248 m3x103
Total volume: 252 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.15 | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 130 | Natural pozzolan (ASTM Class N) |

Details
Country: Algeria
Owner: ANBT (Agence Nationale des Barrages et Transfert)
Type: Arch-Gravity
Purpose(s): Irrigation / Water Supply
River: Djen Djen
Reservoir capacity: 294 m3x106
Construction Dates
Start of Project: 03/10
Start of RCC: 03/10
End of RCC: 08/15
End of Project: 12/15
Specifications
Height: 121 metres
Length: 366 metres
Volume of RCC: 975 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Spillway
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 45 | Ground-granulated blast-furnace slag |

Details
Country: Turkey
Owner: EBD Enerji Üretim. ve Tic. A.S.
Type: Arch-Gravity
Purpose(s): Hydropower
River: Kura
Reservoir capacity: 73 m3x106
Construction Dates
Start of Project: 03/15
Start of RCC: 03/15
End of RCC: 02/17
End of Project: 04/17
Specifications
Height: 100 metres
Length: 404 metres
Volume of RCC: 640 m3x103
Total volume: 680 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.60 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.60 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 130 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: -
Type: Arch-Gravity
Purpose(s): unknown
River: Ziwuhe
Reservoir capacity: 710 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: 12/18
End of Project: 06/19
Specifications
Height: 142 metres
Length: 472 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Honduras
Owner: Energias Limpias del Yaguala SA de CV
Type: Arch-Gravity
Purpose(s): Hydropower
River: Yaguala
Reservoir capacity: 72 m3x106
Construction Dates
Start of Project: 01/18
Start of RCC: 01/18
End of RCC: 11/20
End of Project: 01/21
Specifications
Height: 93 metres
Length: 273 metres
Volume of RCC: 249 m3x103
Total volume: 305 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.04 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.40 | RCC against formwork (GEVR/GE-RCC) |
| 0.67 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.40 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Iran
Owner: Iran Water & Power Resources Development Company (IWPC)
Type: Arch-Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Zohreh
Reservoir capacity: 2300 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/22
End of Project: 07/23
Specifications
Height: 151 metres
Length: 680 metres
Volume of RCC: 1100 m3x103
Total volume: 1200 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.70 |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 160 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Japan
Owner: Ministry of Land, Infrastructure, Transport and Tourism
Type: Arch-Gravity
Purpose(s): Flood Control
River: Heko
Reservoir capacity: 29 m3x106
Construction Dates
Start of Project: 07/06
Start of RCC: 07/06
End of RCC: -/24
End of Project: -/26
Specifications
Height: 96 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: USA
Owner: Denver Water
Type: Arch-Gravity
Purpose(s): Water Supply
River: South Boulder Creek
Reservoir capacity: 147 m3x106
Construction Dates
Start of Project: 04/22
Start of RCC: 04/22
End of RCC: 11/25
End of Project: 12/26
Specifications
Height: 144 metres
Length: 610 metres
Volume of RCC: 568 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Lebanon
Owner: EBML
Type: Arch-Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Ibrahim (Abraham)
Reservoir capacity: 38 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/25
End of Project: -/26
Specifications
Height: 162 metres
Length: 350 metres
Volume of RCC: 1450 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates