Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
ConcepciónHondurasServicio Autonomo Nacional Acueductos y Acantarillados (SANAA)WSan Jose3512/8812/8906/9008/90686942702900.075(2)0.80(3)*0.80(1)*4004006515(N)
Wan’anChinaChina Guodian CorporationF H I NGan221611/8412/9012/9206/946811041561480V(1)0.80(1)ogee(1)30030065105(F)
JinjiangChinaJinjiang Electric Co.F HJinjianghe18907/9010/9103/9307/9368229182267V(1)0.75(1)0.65(1)
(1)
30030007080(F)
Shuangkengkou
[A]
ChinaHXiaoxihe12- /99- /00- /01- /0268              
ChalilloBelizeBelize Electric Co. Ltd (BECOL) and A. Fortis Co., CanadaHMacal12007/0303/0410/0512/06684251802100.20(1)0.75(3')*0.75(12)30036001050(N)
Xiaqiao
[A]
ChinaGuangxi Longjiang Electric Power CorporationHLong49- /02- /03- /05- /0668167172226           
Yangjiayuan
[A]
ChinaGuizhou Tongzihe Hydropower Development Co. Ltd.H WTongzhi78- /07- /08- /09- /1068153             
MengeTurkeyEnerjisa En. Ut. A.S.HGöksu5105/0908/1010/1112/11683043493840.25(1)0.80(3')*0.80(12)3003008040(F)
Nankanghe Nº2
[A]
ChinaXimeng Fubian Hydropower Development Co. Ltd.HNankang31- /10- /11- /12- /1268179             
YunheChinaHDangjiahe14- /14- /15- /16- /1768176             
São RoqueBrazilSão Roque Energética S.A.HCanoas - /12- /14- /18- /1968151100583V 0.75 0.75      
Mellègue Amont
[H-F]
TunisiaMinistère de l’AgricultureH IOued Mellègue195- /16- /17- /19- /20684305005600.60 0.60 0.60   900(-)
Sidi Abdellah
[H-F]
MoroccoDirection des Aménagements HydrauliquesF I WOuaar1004/10- /13- /20- /20683705806100.50(1)0.70(1)*0.70(1)*30030080
100
0
0
(-)
Dong MitVietnamHSong An Lao9002/1907/1908/2106/2268378353456           
ToudghaMoroccoDirection des Aménagements HydrauliquesF I WToudgha3311/17- /19- /21- /2268   V(1)0.90(1)*0.90(1)*     
Yunxiao PSP - Upper damChinaChina Nuclear (Guodian Zhangzhou) EnergyH 21- /17- /22- /26- /2768              

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Honduras

Owner: Servicio Autonomo Nacional Acueductos y Acantarillados (SANAA)

Type: Gravity

Purpose(s): Water Supply

River: San Jose

Reservoir capacity: 35 m3x106

Construction Dates

Start of Project: 12/88

Start of RCC: 12/88

End of RCC: 06/90

End of Project: 08/90

Specifications

Height: 68 metres

Length: 694 metres

Volume of RCC: 270 m3x103

Total volume: 290 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.075Traditional concrete against formwork with external geomembrane
Downstream
SlopeType
0.80RCC against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
400400

Cementitious material

Cement (kg/m3)
65
Pozzolan (kg/m3)Pozzolan Type
15Natural pozzolan (ASTM Class N)
  
Concepción completed
Concepción completed

Full Dam Information

Details

Country: China

Owner: China Guodian Corporation

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Navigation

River: Gan

Reservoir capacity: 2216 m3x106

Construction Dates

Start of Project: 11/84

Start of RCC: 11/84

End of RCC: 12/92

End of Project: 06/94

Specifications

Height: 68 metres

Length: 1104 metres

Volume of RCC: 156 m3x103

Total volume: 1480 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
ogeeTraditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
65
Pozzolan (kg/m3)Pozzolan Type
105Low-lime flyash (ASTM Class F)
  
Wan’an completed
Wan’an completed

Full Dam Information

Details

Country: China

Owner: Jinjiang Electric Co.

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Jinjianghe

Reservoir capacity: 189 m3x106

Construction Dates

Start of Project: 07/90

Start of RCC: 07/90

End of RCC: 03/93

End of Project: 07/93

Specifications

Height: 68 metres

Length: 229 metres

Volume of RCC: 182 m3x103

Total volume: 267 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork
Spillway
SlopeType
0.65Traditional concrete against formwork
 Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
80Low-lime flyash (ASTM Class F)
  
Jinjiang completed
Jinjiang completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower

River: Xiaoxihe

Reservoir capacity: 12 m3x106

Construction Dates

Start of Project: -/99

Start of RCC: -/99

End of RCC: -/01

End of Project: -/02

Specifications

Height: 68 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Belize

Owner: Belize Electric Co. Ltd (BECOL) and A. Fortis Co., Canada

Type: Gravity

Purpose(s): Hydropower

River: Macal

Reservoir capacity: 120 m3x106

Construction Dates

Start of Project: 07/03

Start of RCC: 07/03

End of RCC: 10/05

End of Project: 12/06

Specifications

Height: 68 metres

Length: 425 metres

Volume of RCC: 180 m3x103

Total volume: 210 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.20Traditional concrete against formwork
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3003600

Cementitious material

Cement (kg/m3)
105
Pozzolan (kg/m3)Pozzolan Type
0Natural pozzolan (ASTM Class N)
  
Chalillo completed
Chalillo completed

Full Dam Information

Details

Country: China

Owner: Guangxi Longjiang Electric Power Corporation

Type: Thin Arch

Purpose(s): Hydropower

River: Long

Reservoir capacity: 49 m3x106

Construction Dates

Start of Project: -/02

Start of RCC: -/02

End of RCC: -/05

End of Project: -/06

Specifications

Height: 68 metres

Length: 167 metres

Volume of RCC: 172 m3x103

Total volume: 226 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Xiaqiao completed
Xiaqiao completed

Full Dam Information

Details

Country: China

Owner: Guizhou Tongzihe Hydropower Development Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower / Water Supply

River: Tongzhi

Reservoir capacity: 78 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/09

End of Project: -/10

Specifications

Height: 68 metres

Length: 153 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Yangjiayuan completed
Yangjiayuan completed

Full Dam Information

Details

Country: Turkey

Owner: Enerjisa En. Ut. A.S.

Type: Gravity

Purpose(s): Hydropower

River: Göksu

Reservoir capacity: 51 m3x106

Construction Dates

Start of Project: 05/09

Start of RCC: 05/09

End of RCC: 10/11

End of Project: 12/11

Specifications

Height: 68 metres

Length: 304 metres

Volume of RCC: 349 m3x103

Total volume: 384 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.25Traditional concrete against formwork
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
40Low-lime flyash (ASTM Class F)
  
Menge completed
Menge completed

Full Dam Information

Details

Country: China

Owner: Ximeng Fubian Hydropower Development Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Nankang

Reservoir capacity: 31 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/12

End of Project: -/12

Specifications

Height: 68 metres

Length: 179 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Nankanghe Nº2 on Google Earth
Nankanghe Nº2 on Google Earth

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Dangjiahe

Reservoir capacity: 14 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/16

End of Project: -/17

Specifications

Height: 68 metres

Length: 176 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: São Roque Energética S.A.

Type: Gravity

Purpose(s): Hydropower

River: Canoas

Reservoir capacity: -

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/18

End of Project: -/19

Specifications

Height: 68 metres

Length: 151 metres

Volume of RCC: 100 m3x103

Total volume: 583 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
0.75 
Spillway
SlopeType
0.75   [stepped face]

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
São Roque on Google Earth
São Roque on Google Earth

Full Dam Information

Details

Country: Tunisia

Owner: Ministère de l’Agriculture

Type: Hardfill

Purpose(s): Hydropower / Irrigation

River: Oued Mellègue

Reservoir capacity: 195 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/19

End of Project: -/20

Specifications

Height: 68 metres

Length: 430 metres

Volume of RCC: 500 m3x103

Total volume: 560 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.60 
Downstream
SlopeType
0.60 
Spillway
SlopeType
0.60 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Photo coming soon

Full Dam Information

Details

Country: Morocco

Owner: Direction des Aménagements Hydrauliques

Type: Hardfill

Purpose(s): Flood Control / Irrigation / Water Supply

River: Ouaar

Reservoir capacity: 10 m3x106

Construction Dates

Start of Project: 04/10

Start of RCC: 04/10

End of RCC: -/20

End of Project: -/20

Specifications

Height: 68 metres

Length: 370 metres

Volume of RCC: 580 m3x103

Total volume: 610 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.50Traditional concrete against formwork
Downstream
SlopeType
0.70Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.70Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
100
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
0 
Photo coming soon

Full Dam Information

Details

Country: Vietnam

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Song An Lao

Reservoir capacity: 90 m3x106

Construction Dates

Start of Project: 02/19

Start of RCC: 02/19

End of RCC: 08/21

End of Project: 06/22

Specifications

Height: 68 metres

Length: 378 metres

Volume of RCC: 353 m3x103

Total volume: 456 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Morocco

Owner: Direction des Aménagements Hydrauliques

Type: Gravity

Purpose(s): Flood Control / Irrigation / Water Supply

River: Toudgha

Reservoir capacity: 33 m3x106

Construction Dates

Start of Project: 11/17

Start of RCC: 11/17

End of RCC: -/21

End of Project: -/22

Specifications

Height: 68 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.90Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.90Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: China Nuclear (Guodian Zhangzhou) Energy

Type: Gravity

Purpose(s): Hydropower

River: -

Reservoir capacity: 21 m3x106

Construction Dates

Start of Project: -/17

Start of RCC: -/17

End of RCC: -/26

End of Project: -/27

Specifications

Height: 68 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates