Dam Search Results
- Owner: COMPESA (Companhia Pernambucana de Saneamento)
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Machado | Brazil | COMPESA (Companhia Pernambucana de Saneamento) | H W | Riacho do Chorão | 15 | - /89 | - /90 | - /91 | - /92 | 42 | 360 | |||||||||||||
| Prata | Brazil | COMPESA (Companhia Pernambucana de Saneamento) | W | Capema | 40 | - /95 | - /96 | - /97 | - /98 | 20 | 405 | |||||||||||||
| Pedro Moura Junior (formerly Belo Jardim) | Brazil | COMPESA (Companhia Pernambucana de Saneamento) | W | Ipojuca (Gravata) | 37 | 05/95 | 09/96 | - /97 | - /98 | 34 | 470 | 113 | 125 | (1) | (1)* | (1)* | 300 | 300 | 64 | 16 | (N) | |||
| Tiúma | Brazil | COMPESA (Companhia Pernambucana de Saneamento) | W | Tiúma | 6 | - /99 | - /00 | 01/01 | 05/01 | 16 | 132 | |||||||||||||
| Pau Ferro | Brazil | COMPESA (Companhia Pernambucana de Saneamento) | W | - | 12 | - /00 | - /02 | - /04 | - /05 | 33 | 210 | |||||||||||||
| Duas Serras | Brazil | COMPESA (Companhia Pernambucana de Saneamento) | W | Duas Serras | 2 | - /05 | - /06 | - /07 | - /08 | 19 | 113 | 6 | 300 | 300 | ||||||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Brazil
Owner: COMPESA (Companhia Pernambucana de Saneamento)
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Riacho do Chorão
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: -/89
Start of RCC: -/89
End of RCC: -/91
End of Project: -/92
Specifications
Height: 42 metres
Length: 360 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: COMPESA (Companhia Pernambucana de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: Capema
Reservoir capacity: 40 m3x106
Construction Dates
Start of Project: -/95
Start of RCC: -/95
End of RCC: -/97
End of Project: -/98
Specifications
Height: 20 metres
Length: 405 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: COMPESA (Companhia Pernambucana de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: Ipojuca (Gravata)
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: 05/95
Start of RCC: 05/95
End of RCC: -/97
End of Project: -/98
Specifications
Height: 34 metres
Length: 470 metres
Volume of RCC: 113 m3x103
Total volume: 125 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: COMPESA (Companhia Pernambucana de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: Tiúma
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: -/99
Start of RCC: -/99
End of RCC: 01/01
End of Project: 05/01
Specifications
Height: 16 metres
Length: 132 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: COMPESA (Companhia Pernambucana de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/04
End of Project: -/05
Specifications
Height: 33 metres
Length: 210 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: COMPESA (Companhia Pernambucana de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: Duas Serras
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 19 metres
Length: 113 metres
Volume of RCC: 6 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Search again