Dam Search Results
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Saco de Nova Olinda | Brazil | SRH (Secretaria de RecursosHidricos) | F I W | Gravata | 97 | 07/85 | 07/86 | 10/86 | 06/87 | 56 | 230 | 132 | 143 | V | (1) | 0.80 | (3)* | separate | 400 | 400 | 55 | 15 | (N) | |
| Caraibas - CEMIG | Brazil | CEMIG (Companhia Energetica de Minas Gerais) | F I | Caraibas | 10 | 04/90 | 07/90 | 09/90 | 02/91 | 26 | 160 | 18 | 22 | 0.10 | (1) | 0.80 | (3)* | 0.80 | (1)* | 300 | 300 | 70 | 20 | (N) |
| Gameleiras | Brazil | CODEVASF | F I R W | Gameleiras | 145 | 07/90 | 12/90 | 04/91 | 05/91 | 29 | 150 | 27 | 29 | V | (1) | (1)* | 400 | 400 | 52 | 13 | (-) | |||
| Machado | Brazil | COMPESA (Companhia Pernambucana de Saneamento) | H W | Riacho do Chorão | 15 | - /89 | - /90 | - /91 | - /92 | 42 | 360 | |||||||||||||
| Pelo Sinal | Brazil | SUPLAN/RN | W | Taperobá | 76 | 12/91 | - /92 | - /93 | - /94 | 34 | 296 | 69 | 89 | (1) | 300 | 300 | 64 | 16 | (-) | |||||
| Várzea Grande | Brazil | SUPLAN/PB | W | Picuí | 21 | 10/93 | 10/94 | 10/94 | - /95 | 31 | 135 | 27 | 28 | (1) | (3)* | 300 | 300 | 56 | 14 | (N) | ||||
| Cova da Mandioca | Brazil | CODEVASF (Companhia de Desenvolvimento dos Vales do Sao Francisco do Parnaiba) | I W | Cova da Mandioca | 126 | 01/93 | 09/93 | 12/94 | 12/94 | 32 | 342 | 75 | 79 | V | (1) | 0.75 | (3)* | 0.75 | (1)* | 400 | 400 | 64 | 16 | (-) |
| do Prata | Brazil | Companhia Pernambucana de Saceamento | W | da Prata | 42 | - /92 | 09/93 | 12/94 | - /95 | 26 | 405 | 61 | 75 | 300 | 300 | 80 | 0 | (-) | ||||||
| Canoas | Brazil | Companhia de Gestão dos Recursos Hídricos | I W | Riacho da Madeira | 69 | 07/93 | 08/94 | 05/95 | - /96 | 51 | 116 | 87 | 93 | 0.10 | (1) | 0.80 | (10)* | 0.80 | (1)* | 300 | 300 | 64 | 16 | (N) |
| Açude Acauã | Brazil | DNOCS (Departamento Nacional de Obras Contra a Seca) | F I W | Paraíba | 247 | - /93 | - /93 | - /95 | - /95 | 79 | 440 | 674 | 734 | (1) | (3)* | (1)* | 300 | 300 | 64 | 16 | (N) | |||
| Juba I | Brazil | Itamarati Norte S.A. (part of Brennand Energia) | H | Juba | - /93 | - /94 | - /95 | - /96 | 21 | 238 | 96 | 113 | 60 | 15 | (N) | |||||||||
| Juba II | Brazil | Itamarati Norte S.A. (part of Brennand Energia) | H | Juba | - /93 | - /94 | - /95 | - /96 | 21 | 238 | 105 | 113 | 60 | 15 | (N) | |||||||||
| Passagem de Trairas | Brazil | Secretaria de Meio Ambiente e dos Recursos Hídricos do Estado do Rio Grande do Norte | R W | Seridó | 50 | - /93 | - /94 | - /95 | - /96 | 26 | 458 | 27 | 28 | 64 | 16 | (N) | ||||||||
| Oeste | Brazil | Barragem Oeste - SDC | F | Itajai do Oeste | 100 | - /93 | - /94 | - /95 | - /96 | 30 | 367 | |||||||||||||
| Jordão | Brazil | COPEL (Companhia Paranense de Energia) | H | Jordão | 110 | 05/94 | 01/95 | 02/96 | 09/96 | 95 | 550 | 570 | 647 | V | (1) | 0.74 | (3)* | 0.74 | (12) | 400 | 400 | 60 | 15 | (N) |
| Derivação do Rio Jordão | Brazil | Copel Geração e Transmissão S.A. | H | Jordão | 110 | 05/94 | 01/95 | 03/96 | 12/97 | 73 | 560 | 576 | 665 | |||||||||||
| Guilman-Amorin | Brazil | Arcelor Mittal Brasil S.A. | H | Piracicaba | 12 | - /93 | - /95 | - /96 | 10/97 | 41 | 143 | 85 | 102 | 300 | 300 | 80 | 20 | (N) | ||||||
| do Peixe | Brazil | CPEE (Companhia Paulista de Energia Elétrica) | H | do Peixe | 2 | 02/96 | 12/96 | 12/97 | - /98 | 32 | 300 | 20 | 34 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 120 90 | 0 0 | (-) |
| Santa Clara-GO | Brazil | Saneamento de Goiás S/A | W | 129 | - /86 | - /95 | - /97 | - /97 | 47 | 129 | ||||||||||||||
| Prata | Brazil | COMPESA (Companhia Pernambucana de Saneamento) | W | Capema | 40 | - /95 | - /96 | - /97 | - /98 | 20 | 405 | |||||||||||||
| Pedro Moura Junior (formerly Belo Jardim) | Brazil | COMPESA (Companhia Pernambucana de Saneamento) | W | Ipojuca (Gravata) | 37 | 05/95 | 09/96 | - /97 | - /98 | 34 | 470 | 113 | 125 | (1) | (1)* | (1)* | 300 | 300 | 64 | 16 | (N) | |||
| Gov. José Richa (formerly Salto Caxias) | Brazil | COPEL (Companhia Paranense de Energia) Geração E Transmissão S.A. | H | Iguaçu | 3573 | 02/95 | 01/96 | 07/98 | 12/98 | 67 | 1083 | 912 | 1438 | V | (13) | 0.75 | (1)* | 0.75 | (12) | 300 | 300 | 80 | 20 | (F) |
| Val da Serra | Brazil | CORSAN (Companhia Riograndense de Saneamento) | W | Ibicui-Mirim | 24 | 07/97 | 11/97 | 07/98 | 11/98 | 37 | 675 | 69 | 95 | V | (13) | (12)* | (12)* | 300 | 300 | 90 | 30 | (F) | ||
| Jucazinho | Brazil | DNOCS (Departamento Nacional de Obras Contra a Secas) | F I R W | Capiibaribe | 204 | 07/96 | 11/96 | 10/98 | - /99 | 63 | 442 | 442 | 470 | V | (12) | 0.75 | (1)* | 0.75 | (1)* | 300 | 300 | 64 | 16 | (N) |
| Bertarello | Brazil | CORSAN (Companhia Riograndense de Saneamento) | W | Arroio Burati | 6 | - /98 | 08/98 | 07/99 | - /00 | 29 | 219 | 80 | 115 | V | (13) | (12)* | (12)* | 300 | 300 | 72 | 18 | (N) | ||
| Rosal | Brazil | Rosal Energia S.A. | H | Itabapoana | 17 | 04/98 | - /98 | 09/99 | - /00 | 37 | 212 | 45 | 75 | (1) | (3)* | (1)* | 300 | 300 | 45 | 55 | (S) | |||
| Ponto Novo | Brazil | CERB (Companhia de Engenharia Rural da Bahia) | I W | Itapicuru-açu | 39 | 05/98 | 07/98 | 12/99 | 02/00 | 26 | 266 | 90 | 105 | (1) | (3)* | (1) | 300 | 300 | 72 | 18 | (N) | |||
| Tucuruí - 2nd Phase | Brazil | Eletronorte SA | H | Tocantins | 45800 | 06/98 | 06/99 | 09/00 | 10/05 | 78 | 1541 | 288 | 1383 | (3) | (3)* | separate | 300 | 300 | 70 | 30 | (N) | |||
| Dona Francisca | Brazil | Dona Francisca Energértica SA | H | Jacuí | 335 | 08/98 | 06/99 | 10/00 | 12/00 | 63 | 670 | 485 | 503 | V | (1) | 0.75 | (3)* | 0.75 | (1)* | 300 | 300 | 72 | 18 | (N) |
| Santa Cruz do Apodi | Brazil | Secretaria Estadual do Meio Ambiente e Recursos Hídricos do Rio Grande do Norte | F I R W | Apodi | 600 | - /98 | - /99 | - /00 | 03/02 | 48 | 1660 | 1023 | 1120 | 300 | 300 | 80 | 0 | (-) | ||||||
| Tiúma | Brazil | COMPESA (Companhia Pernambucana de Saneamento) | W | Tiúma | 6 | - /99 | - /00 | 01/01 | 05/01 | 16 | 132 | |||||||||||||
| Cana Brava | Brazil | Companhia Energética Mercosul (of the Tractebel Group) | H | Tocantins | 2300 | 03/99 | 02/00 | 10/01 | 10/02 | 67 | 510 | 527 | 833 | (1) | (3)* | ogee | (1) | 300 | 300 | 40 | 50 | (S) | ||
| Castanhão | Brazil | DNOCS/Minas Gerais | F I R W | Congonhas | 6700 | 10/99 | - /00 | 12/01 | - /02 | 85 | 668 | 890 | 1030 | 300 | 300 | 85 | 0 | (-) | ||||||
| Lajeado (Luis Eduardo Magalhães) | Brazil | Investco (Tractebel) | H | Tocantins | 4982 | 07/98 | 06/01 | 12/01 | 12/02 | 43 | 2100 | 188 | 210 | 300 | 300 | 30 | 40 | (S) | ||||||
| Rivaldo de Carvalho | Brazil | Companhia de Gestão dos Recursos Hídricos | I W | Condado | 20 | - /95 | - /98 | - /01 | 12/02 | 18 | 270 | |||||||||||||
| Umari | Brazil | DNOCS (Departamento Nacional de Obras Contra a Seca) | F I R W | do Carmo | 293 | - /98 | - /99 | - /01 | - /01 | 42 | 2308 | 655 | 660 | (12) | 300 | 300 | 70 | 0 | (-) | |||||
| Funil | Brazil | Aliança Geração de Energia SA | H | Rio Grande | 285 | - /97 | - /99 | - /01 | 12/02 | 50 | ||||||||||||||
| Pedras Altas | Brazil | CERB (Companhia de Engenharia Rural da Bahia) | F I R W | Itapicuru-mirim | - /00 | - /00 | - /01 | - /01 | 24 | 1090 | 42 | 60 | 300 | 300 | 34 | 41 | (S) | |||||||
| Pirapama | Brazil | CAGEPE (Companhia Pernambucana de Saneamento) | W | Pirapama | 61 | - /00 | - /00 | - /01 | - /01 | 25 | 300 | 87 | 137 | (1) | 300 | 300 | 72 | 18 | (-) | |||||
| Estreito | Brazil | F I R W | Curimatá | 24 | - /97 | - /00 | - /01 | 11/02 | 26 | 300 | 12 | 14 | 300 | 300 | 64 | 16 | (N) | |||||||
| Camará | Brazil | Estado da Paraiba (Companhia de Aguas e Esgotus) | W | Riachäo | 27 | 05/00 | 09/01 | 06/02 | - /02 | 56 | 296 | V | (1) | 0.80 | (1)* | 300 | 300 | 80 | 0 | (-) | ||||
| Carnaúba | Brazil | Secretaria Recursos Hídricos | I W | Quixeré | 26 | - /01 | 02/02 | 11/02 | - /03 | 19 | 700 | 300 | 300 | 100 | 0 | (-) | ||||||||
| São Bento | Brazil | CASAN (Companhia Catarinense de Águas e Saneamento) | H | São Bento | 58 | - /99 | - /00 | - /02 | - /03 | 49 | 461 | V | 0.80 | 0.80 | ||||||||||
| Passo do Meio | Brazil | Energética Campos de Cima da Serra Ltda | H | das Antas | 27 | - /00 | - /01 | - /02 | 10/03 | 31 | 110 | |||||||||||||
| Ormeo Junqueira Botelho (formerly Cachoeira da Encoberta) | Brazil | Rio Glória Energética S.A. | H | Glória | 3 | - /99 | - /01 | - /02 | 12/03 | 49 | 218 | |||||||||||||
| Pedrinho 1 | Brazil | Energetica Rio Pedrinho Ltda.. | H | Pedrinho | 1 | - /99 | - /01 | - /02 | - /03 | 16 | 110 | |||||||||||||
| Itiquira I | Brazil | Itiquira Energética SA | H | Itiquira | - /00 | - /01 | - /02 | - /03 | 15 | 22 | ||||||||||||||
| Furquim [H-F] | Brazil | H | - /00 | - /01 | - /02 | - /03 | 18 | |||||||||||||||||
| Ribeirão Riacho Pasto Velho | Brazil | CERB (Companhia de Engenharia Ambiental e Recursos Hidricos da Bahia) | I W | Pasto Velho | 11 | - /00 | - /01 | - /02 | - /03 | 27 | ||||||||||||||
| Guaporé | Brazil | Tangará Energia S/A | H | Guaporé | 18 | - /00 | - /01 | - /02 | - /03 | 32 | 152 | 43 | ||||||||||||
| Jauru | Brazil | Queiroz Galvão Energética SA (90%) and Cinco Estrelas Agropecuária e Participações Ltda (10%) | H | Jauru | 20 | - /00 | - /01 | - /02 | - /03 | 51 | ||||||||||||||
| Pau Ferro | Brazil | COMPESA (Companhia Pernambucana de Saneamento) | W | - | 12 | - /00 | - /02 | - /04 | - /05 | 33 | 210 | |||||||||||||
| Monte Claro | Brazil | CERAN (Companhia Energética Rio das Antas) | H | das Antas | 23 | 04/02 | - /03 | - /04 | 12/04 | 25 | 180 | 35 | 66 | 60 | 15 | |||||||||
| João Leite Saneago | Brazil | SANEAGO (Saneamento de Goiás S.A.) | W | João Leite | 129 | 03/01 | 01/03 | - /04 | - /04 | 55 | 380 | 270 | 290 | 300 | 300 | 80 | 20 | (N) | ||||||
| Risoleta Neves (formerly Candonga) | Brazil | Alianca Geracao de Energia S.A. | H | Doce | 54 | 05/01 | - /03 | - /04 | 05/05 | 53 | 437 | 236 | 248 | 300 | 300 | 40 | 50 | (S) | ||||||
| Quixeramobim | Brazil | DNOCS (Departamento Nacional de Obras Contra as Secas) | W | Banabuiú | 54 | - /01 | - /03 | - /04 | - /05 | 19 | 290 | |||||||||||||
| Fundão | Brazil | ELEJOR - Centrais Elétricas do Rio Jordão | H | Jordao | 34 | - /01 | - /03 | - /04 | - /05 | 43 | 445 | 200 | 220 | 300 | 300 | 64 | 16 | (N) | ||||||
| Pindobaçu | Brazil | CERB (Companhia de Engenharia Ambiental e Recursos Hidricos da Bahia) | I W | Itapicuru-aço | 17 | - /01 | - /03 | - /04 | - /05 | 44 | 191 | 75 | 85 | 300 | 300 | 56 | 14 | (N) | ||||||
| Bandeira de Melo | Brazil | CERB (Companhia de Engenharia Ambiental e Recursos Hidricos da Bahia) | I W | Paraguaçu | 112 | - /02 | 09/03 | - /04 | - /05 | 19 | 320 | 75 | 85 | (1) | (1)* | (1)* | 300 | 300 | 56 | 14 | (N) | |||
| Santa Clara-PR | Brazil | Elejor Centrais Elétricas do Rio Jordåo S.A. | H | Jordåo | 431 | 11/02 | 12/03 | - /04 | 01/05 | 67 | 543 | 530 | 606 | (1) | (1) | (1)* | 300 | 300 | 40 | 50 | (S) | |||
| Barra Grande | Brazil | BAESA (JV of Alcoa, Companhia Paulista de Força e Luz (CPFL), Companhia Brasileira de Alumínio, Camargo Corrêa Cimentos and DME Energética) | H | Pelotas | 50000 | - /01 | - /02 | - /05 | - /06 | 85 | 665 | 1 | ||||||||||||
| Picada | Brazil | L.D.Q.S.P.E. Geracao de Energia e Participacoes Ltda. | H | do Peixe | 8 | - /02 | - /03 | - /05 | - /06 | 32 | 97 | |||||||||||||
| Cachoeira Grande | Brazil | EMBASA (Empresa Baiana de Aguas e Saneamento S.A.) | H I | Sapucaia | 5 | - /04 | - /04 | - /05 | - /05 | 16 | 207 | 15 | ||||||||||||
| Peixe Angical | Brazil | Enerpeixa S/A | H | Tocantins | 3 | 04/02 | - /04 | - /05 | 09/06 | 39 | 400 | 500 | 582 | 300 | 300 | 70 | 0 | (-) | ||||||
| São Bernardo | Brazil | CJ Energética S/A | H | Bernardo José | 2 | - /03 | - /04 | - /05 | - /06 | 21 | 120 | |||||||||||||
| Poço do Magro | Brazil | CODEVASF (Companhia de Desenvolvimento dos Vales do São Francisco e do Parnaíba) | W | Poço do Magro | 32 | - /03 | - /04 | - /05 | - /06 | 22 | 540 | 58 | 68 | 64 | 16 | (N) | ||||||||
| Artur Tavares de Melo (formerly Guararema) | Brazil | Usina Central Olho D'Água S/A | I W | Itambé | 21 | - /03 | - /04 | - /05 | - /06 | 30 | 306 | 50 | 300 | 300 | 80 | 0 | (-) | |||||||
| Flor do Sertão | Brazil | Maue Geradora | W | 05/05 | - /05 | - /06 | 10/06 | 19 | 245 | |||||||||||||||
| Esmeralda | Brazil | Esmeralda S.A. | H | Bernardo José | 1 | - /05 | - /05 | - /06 | - /06 | 19 | 212 | 15 | 27 | 64 | 16 | (N) | ||||||||
| Santa Laura | Brazil | Santa Laura S/A | H | Chapecozinho | 19 | - /04 | - /05 | - /06 | - /07 | 27 | 245 | 24 | 42 | |||||||||||
| Mosquitão | Brazil | Concessionária Mosquitão S/A | H | 19 | - /04 | - /05 | - /06 | - /07 | 32 | 236 | 57 | 76 | ||||||||||||
| Serra Preta | Brazil | EMBASA (Empresa Baiana de Aguas e Saneamento S/A) | W | Gaviãozinho | 5 | - /05 | - /05 | - /07 | - /08 | 34 | 154 | 44 | 51 | V | 0.80 | 0.80 | 80 | 20 | (N) | |||||
| Ludesa [H-F] | Brazil | CPFL Renovaveis | H | Chapecó | 142 | - /06 | - /06 | - /07 | 04/07 | 25 | 300 | 1.50 | 1.50 | 0.75 | ||||||||||
| Castro Alves | Brazil | CERAN (Companhia Energética Rio das Antas) | H | das Antas | 92 | - /05 | - /06 | - /07 | 02/08 | 48 | 350 | 240 | 322 | V | 0.77 | 0.77 | 60 | 15 | (N) | |||||
| Da Ilha (Rio da Prata) | Brazil | Da Ilha Energética S/A | H | das Antas | 16 | - /04 | - /06 | - /07 | 04/08 | 26 | 310 | 80 | 20 | |||||||||||
| Quatorze (XIV) de Julho | Brazil | CERAN (Companhia Energética Rio das Antas) | H | das Antas | 55 | - /05 | - /06 | - /07 | 10/08 | 37 | 281 | 75 | 212 | V | (1) | 0.77 | (1) | 0.77 | (1) | 75 | 15 | (N) | ||
| Duas Serras | Brazil | COMPESA (Companhia Pernambucana de Saneamento) | W | Duas Serras | 2 | - /05 | - /06 | - /07 | - /08 | 19 | 113 | 6 | 300 | 300 | ||||||||||
| Cotiporã | Brazil | Cotiporã Energetica S.A. | H | Carreiro | 4 | - /07 | - /07 | - /07 | - /07 | 16 | 196 | 21 | 41 | |||||||||||
| Plano Alto | Brazil | SPE Plano Alto Energia S/A | H | Irani | 13 | - /06 | - /07 | - /07 | 02/08 | 38 | 173 | 42 | 78 | V | 0.75 | 0.75 | 72 | 19 | (N) | |||||
| Jararaca | Brazil | Veneto Energética S/A | H | das Antas | 8 | - /06 | - /07 | - /07 | 04/08 | 25 | 219 | 31 | 61 | 72 | 18 | (N) | ||||||||
| Linha Emilia | Brazil | Linha Emília Energética S/A | H | Carreiro | 12 | - /06 | - /07 | - /07 | - /08 | 27 | 214 | 35 | 54 | |||||||||||
| Santa Rosa II | Brazil | Santa Rosa S/A | H | Grande | 7 | - /06 | - /06 | - /08 | - /08 | 31 | 172 | |||||||||||||
| Cachoeirão (Henrique Nunes Coutinho) | Brazil | Hidrelétrica Cachoeirão SA | H | Manhuaçu | - /07 | - /07 | - /08 | - /08 | 23 | 90 | ||||||||||||||
| Alto Irani [H-F] | Brazil | CPFL Renovaveis | H | Irani | 5 | - /07 | - /07 | - /08 | - /08 | 45 | 243 | 14 | 20 | 2.50 | 2 | 2 | ||||||||
| São Simão | Brazil | São Simão Energia S/A | H | Itapemirim Norte | 11 | - /06 | - /07 | - /08 | 02/09 | 56 | 187 | 92 | 115 | |||||||||||
| Major Gercino (formerly known as Angelina) | Brazil | Lumbrás Energética S.A. | H | Tijucas | 6 | - /07 | - /07 | - /08 | 03/09 | 45 | 178 | |||||||||||||
| Engenheiro Henrique Kotzian | Brazil | BME Energia SA | H | Ivaí | 9 | - /06 | - /07 | - /08 | 04/09 | 34 | 228 | 58 | 76 | |||||||||||
| Pedra do Garrafão | Brazil | H | Itabapoana | - /07 | - /07 | - /08 | 05/09 | 15 | 110 | |||||||||||||||
| Goiandira | Brazil | Goiás Sul Geração de Energia S.A. | H | Verissimo | 76 | 08/07 | - /07 | - /08 | 05/09 | 44 | 341 | V | 0.75 | 0.75 | ||||||||||
| Retiro Velho | Brazil | Retiro Velho Energetica S/A | H | da Prata | 69 | - /05 | - /07 | - /08 | - /09 | 42 | 56 | |||||||||||||
| Rodeio Bonito | Brazil | Velcan Energy Development Ltda. | H | Irani | 9 | - /06 | - /07 | - /08 | 01/10 | 32 | 223 | 59 | V | 0.85 | 0.85 | |||||||||
| Engenheiro Ernesto Jorge Dreher | Brazil | BME Energia | H | Ivaí | 4 | - /07 | - /08 | - /08 | 04/09 | 23 | 220 | 29 | 35 | 68 | 17 | (N) | ||||||||
| Salto-RS | Brazil | H | Caí | - /07 | - /07 | - /09 | - /09 | 42 | ||||||||||||||||
| Cristalandia | Brazil | EMBASA (Empresa Baiana de Aguas e Saneamento S.A) | W | de Contas | 17 | - /05 | - /07 | - /09 | 01/10 | 22 | 337 | 61 | 68 | |||||||||||
| São Pedro | Brazil | São Pedro Energia S/A | H | Jacu Braço Norte | 2 | - /06 | - /07 | - /09 | - /10 | 30 | 140 | 22 | 35 | |||||||||||
| Criúva | Brazil | Criúva Energética S/A | H | Lajeado Grange | 7 | - /08 | - /08 | - /09 | 12/09 | 25 | 246 | 80 | 95 | 72 | 18 | (N) | ||||||||
| Areia Branca | Brazil | Hidrelétrica Areia Branca S.A. (Tractebel Energia) | H | Manhuaçu | - /08 | - /08 | - /09 | - /09 | 28 | 257 | ||||||||||||||
| Palanquinho | Brazil | Serrana Energética S/A | H | das Antas | 6 | - /07 | - /08 | - /09 | 01/10 | 32 | 137 | 89 | 103 | 72 | 18 | (N) | ||||||||
| Mulungu do Morro | Brazil | EMBASA (Empresa Baiana de Aguas e Saneamento S/A) | I W | Tijuco | 2 | - /07 | - /08 | - /09 | 03/10 | 16 | 156 | 13 | ||||||||||||
| Poço do Marruáo | Brazil | Insituto de Desenvolvimento do Piauí | I W | Riacho do Jorge | 293 | - /07 | - /08 | - /09 | - /10 | 48 | 870 | 293 | 306 | |||||||||||
| Barra dos Coqueiros | Brazil | Gerdau Aços Longos | H W | Claro | 1 | 08/07 | - /08 | - /09 | 07/10 | 60 | 1670 | 172 | 282 | |||||||||||
| Piedade | Brazil | Piedade Usina Geradora de Energia S.A | H | Piedade | 18 | - /06 | - /08 | - /09 | 08/10 | 30 | 397 | |||||||||||||
| Serra do Facão | Brazil | Serra do Facão Energia S.A. (SEFAC) | H | Sao Marcos | 5199 | 02/07 | - /08 | - /09 | 10/10 | 92 | 326 | 610 | 742 | 300 | 300 | 72 | 18 | (N) | ||||||
| São Gonçalo (formerly Santa Bárbara) | Brazil | SPE São Gonçalo Energia S.A. | H | Santa Bárbara | 6 | - /07 | - /08 | - /09 | - /10 | 28 | 148 | 14 | 26 | V | 0.75 | 0.75 | 68 | 17 | (N) | |||||
| Caçu | Brazil | Gerdau SA | H | Claro | - /07 | - /08 | - /09 | - /10 | 40 | |||||||||||||||
| Arvoredo | Brazil | SPE Arvoredo Energia S.A. | H | Irani | 12 | - /08 | - /09 | - /09 | 04/10 | 39 | 259 | 53 | 81 | V | 0.75 | 0.75 | 80 | 20 | (N) | |||||
| Santa Clara-BA | Brazil | Companhia Energetica Santa Clara | H | Mucuri | 151 | - /99 | - /01 | - /02 | - /03 | 59 | 242 | 520 | 600 | 300 | 300 | |||||||||
| Gasparino | Brazil | CERB (Companhia de Engenharia Ambiental e Recursos Hídricos da Bahia) | W | Vaza-Barris | 49 | - /07 | - /08 | - /10 | 10/10 | 23 | 927 | 130 | ||||||||||||
| Rondon II | Brazil | Eletrogoes S/A. | H | Comemorqção | 478 | - /07 | - /08 | - /10 | - /11 | 19 | 460 | |||||||||||||
| Água Limpa | Brazil | Água Limpa Energia S/A | H | Palmeiras | 10 | - /08 | - /09 | - /10 | 12/10 | 38 | 98 | 42 | ||||||||||||
| Figueirópolis | Brazil | Companhia Hidroelétrica Figueirópolis | H | Jauru | 35 | - /08 | - /09 | - /10 | 12/10 | 16 | 170 | V | 0.43 | 0.75 | ||||||||||
| Porto Estrela | Brazil | H | Santo Antonio | 8 | - /08 | - /09 | - /10 | - /11 | 26 | |||||||||||||||
| Ibirama | Brazil | Ibirama Energética SA | H | 1 | - /09 | - /09 | - /10 | - /10 | 15 | 145 | ||||||||||||||
| Ninho da Águia | Brazil | CPFL Renovaveis | H | Santo Antônio | 1 | - /09 | - /09 | - /10 | - /10 | 15 | 94 | 14 | V | 0.75 | 0.75 | |||||||||
| Caju | Brazil | Energisa Geracão Rio Grande S/A | H | Rio Grande | 10 | - /09 | - /09 | - /10 | 03/11 | 38 | 222 | 66 | 82 | |||||||||||
| Pipoca | Brazil | Omega Engergia Renovávelo S/A | H | Manhuaçu | - /07 | - /09 | - /10 | 04/11 | 16 | 200 | (N) | |||||||||||||
| São José | Brazil | Ijui Energia S.A. | H | Carreiro | 188 | - /07 | - /09 | - /10 | - /11 | 29 | 790 | |||||||||||||
| Lavrinha | Brazil | BME | H | Paraiba do Sul | 12/07 | - /09 | - /10 | - /11 | 28 | 85 | ||||||||||||||
| Ingazeira (formerly San Antonio and Cachoeirinha) | Brazil | DNOCS (Departamento Nacional de Obras Contra a Seca) | F I W | Pajeú | 49 | - /08 | - /09 | - /10 | - /11 | 26 | 566 | 64 | 92 | |||||||||||
| São Sebastião do Alto | Brazil | Geracao Hidroeletrica Rio Grande S/A | H | Grande | 44 | - /08 | - /09 | - /10 | - /11 | 41 | 210 | 51 | 75 | |||||||||||
| Corrente Grande | Brazil | CPFL Renovaveis | H | Corrente Grande | 12 | - /10 | - /10 | - /10 | - /10 | 20 | 110 | V | 0.75 | 0.75 | ||||||||||
| Marco Balbo | Brazil | H | - /10 | - /10 | - /10 | - /10 | 30 | 42 | 73 | |||||||||||||||
| Gov. Jayme Canet Junior (formerly Antiga Mauá) | Brazil | Consorcio Energético Cruzeiro do Sul (Copel and Electrosul Centrais Eléctricas SA) | H | Tibagi | 2137 | - /09 | 01/10 | 05/11 | - /12 | 83 | 726 | 633 | 753 | V | (2) | 0.80 | (10) | 300 | 2400 | 60 | 15 | (N) | ||
| Boa Sorte | Brazil | Boa Sorte Energética S/A | H | Tijucas | 18 | - /07 | - /09 | - /11 | - /12 | 26 | ||||||||||||||
| Anta (with Simplicio) | Brazil | Centrais Eletricas Brasileiras sa Eletrobras | H | Paraiba do Sul | 114 | - /09 | - /10 | - /11 | 12/11 | 30 | 270 | 44 | 55 | |||||||||||
| Moínho | Brazil | Statkraft (Moinho S.A.) | H | Bernado José | 1 | - /09 | - /10 | - /11 | - /11 | 22 | 126 | 9 | 25 | 68 | 17 | (N) | ||||||||
| Autódromo | Brazil | Autódromo Energética S/A | H | Carreiro | 4 | - /10 | - /10 | - /11 | - /11 | 23 | 271 | 21 | 47 | 67 | 17 | (N) | ||||||||
| Boa Fé | Brazil | Boa Fé Energética S.A. | H | Carreiro | 5 | - /10 | - /10 | - /11 | - /11 | 26 | 198 | 32 | 58 | |||||||||||
| Santo Antonio-RJ | Brazil | Energisa Geracão Rio Grande S/A | H | Grande | 17 | - /09 | - /10 | - /11 | 02/12 | 44 | 285 | 81 | 105 | |||||||||||
| Santo Antonio-RO | Brazil | Santo Antônio Energia | H | Madeira | 2075 | - /08 | - /10 | - /11 | 03/12 | 25 | 3100 | 560 | 3086 | |||||||||||
| Dr Victor Baptista Adami (formerly Passos Maia) | Brazil | Passos Maia Energética S.A. (Statkraft, Adami & Madeiras) | H | Chapecó | 14 | - /09 | - /10 | - /11 | 09/12 | 34 | 66 | 72 | 18 | (N) | ||||||||||
| Ouro | Brazil | H | - /10 | - /10 | - /12 | - /12 | 16 | |||||||||||||||||
| Marrecas | Brazil | SAMAE (Serviço Autônomo Municipal de Água e Esgoto) | W | Marrecas | 33 | 03/10 | - /11 | - /12 | 12/12 | 35 | 430 | |||||||||||||
| Retiro | Brazil | CTG Brasil | H | Sapucai | 18 | - /10 | - /11 | - /12 | 07/13 | 15 | 482 | |||||||||||||
| Garibaldi | Brazil | Rio Canoas Energia S.A. | H | Canoas | 296 | - /10 | - /11 | - /12 | 09/13 | 42 | 517 | 264 | 382 | |||||||||||
| Toca do Tigre | Brazil | CJ Hydro - Geraçao de Energia S.A | H | Turvo | 6 | - /09 | - /11 | - /12 | - /13 | 22 | 237 | |||||||||||||
| Mamoeiro | Brazil | Companhia de Gestão dos Recursos Hídricos | I W | - | 21 | - /10 | - /11 | - /12 | - /13 | 28 | 310 | |||||||||||||
| Ivan Botelho I (fomerly Antiga Ponte) | Brazil | Centrais Hidrelétricas Grapon S/A | H | Pomba | 17 | - /10 | - /11 | - /12 | - /13 | 32 | 273 | |||||||||||||
| Pezzi | Brazil | Pezzi Energética S.A. | H | das Antas | 24 | - /11 | - /12 | - /12 | - /13 | 42 | 238 | 44 | 80 | 76 | 19 | (N) | ||||||||
| Serra dos Cavalinhos II | Brazil | Serra dos Cavalinhos II Energética S.A. | H | das Antas | 8 | - /11 | - /12 | - /12 | - /13 | 42 | 123 | 33 | 80 | 72 | 18 | (N) | ||||||||
| Rastro de Auto | Brazil | CERTEL | H | Forqueta | - /11 | - /11 | - /13 | - /13 | 23 | 190 | ||||||||||||||
| João Borges | Brazil | Eletrosul Centrais Elétricas SA | H | Caveiras | 23 | - /12 | - /12 | - /13 | 11/13 | 29 | 170 | |||||||||||||
| Barra do Rio Chapéu | Brazil | Eletrosul Centrais Elétricas S/A | H W | Braço do Norte | 2 | - /12 | - /12 | - /13 | - /13 | 25 | 117 | |||||||||||||
| Rondinha | Brazil | H | Chapecó | - /12 | - /12 | - /14 | - /14 | 20 | ||||||||||||||||
| Eduardo Campos (formerly Serro Azul) | Brazil | W | Una | 303 | - /12 | - /13 | - /14 | - /15 | 66 | 1015 | ||||||||||||||
| Teles Pires | Brazil | ANEEL (Agência Nacional de Energia Elétrica) | H | Teles Pires | 1 | 07/11 | - /13 | - /15 | 09/16 | 67 | 360 | 500 | 1020 | |||||||||||
| Mata Velha [H-F] | Brazil | CPFL Renovaveis | H | Preto | 38 | - /14 | - /14 | - /15 | 04/16 | 30 | 180 | 45 | 65 | 1.25 | 1.25 | 1.25 | ||||||||
| Fazenda | Brazil | ENEL Green Power Fazenda S.A. | H | dos Apiacás | 2 | - /12 | - /14 | - /15 | 09/16 | 21 | 503 | |||||||||||||
| Salto Apiacás | Brazil | ENEL Green Power Salto Apiacás S.A | H | dos Apiacás | 2 | - /12 | - /14 | - /15 | - /16 | 17 | 486 | |||||||||||||
| Jubinha I | Brazil | Itamarati Norte S.A. | H | Jubinha | 480 | - /15 | - /15 | - /15 | - /15 | 21 | 1540 | |||||||||||||
| Juba IV | Brazil | Itamarati Norte S.A. | H | Juba | 7 | - /15 | - /15 | - /15 | - /15 | 26 | 570 | |||||||||||||
| Belo Monte | Brazil | Norte Energia S.A. | H | Xingu | 5 | - /11 | - /13 | - /16 | - /20 | 74 | 680 | 63 | 2208 | V | 1.20 | separate | ||||||||
| Cacimba Nova | Brazil | Projeto Transposição das Águas do Rio São Francisco | I W | 3 | - /13 | - /14 | - /16 | - /16 | 18 | 196 | 52 | |||||||||||||
| Siriji (also know as Murupé) | Brazil | COMPESA (Companhia Pernambucana de Saneamento ) | I W | Siriji | 17 | - /13 | - /15 | - /16 | - /17 | 20 | 100 | |||||||||||||
| Serra dos Cavalinhos I | Brazil | Serra dos Cavalinhos I Energética S.A. | H | das Antas | 12 | - /13 | - /15 | - /16 | - /17 | 30 | 204 | |||||||||||||
| Sinop | Brazil | Companhia Energetica Sinop-CES | H | Teles Pires | - /14 | - /15 | - /17 | - /19 | 17 | |||||||||||||||
| Senhora do Porto | Brazil | PCH Senhora do Porto S.A | H | Guanhães | 5 | - /14 | - /16 | - /17 | - /18 | 41 | 167 | |||||||||||||
| São Roque | Brazil | São Roque Energética S.A. | H | Canoas | - /12 | - /14 | - /18 | - /19 | 68 | 151 | 100 | 583 | V | 0.75 | 0.75 | |||||||||
| Colonia | Brazil | CERB (Companhia de Engenharia Ambienytal e Recursos Hídricos da Bahia) | W | Colonia | 62 | 09/15 | - /17 | - /18 | 09/18 | 21 | 195 | 30 | 34 | |||||||||||
| Quebra Dentes | Brazil | Quevedos Energética S.A | H | Toropi | 3 | - /15 | - /17 | - /18 | - /19 | 23 | 206 | |||||||||||||
| Jacaré | Brazil | PCH Jacaré S.A. | H | Guanhães | 14 | - /15 | - /17 | - /18 | - /19 | 33 | 121 | |||||||||||||
| Itaocara | Brazil | Cemig Geração e Transmissão SA and Itaocara Energia Ltda | H | Paraiba do Sul | 1700 | 01/16 | - /17 | - /18 | - /19 | 50 | ||||||||||||||
| Barra das Águas | Brazil | PCH Águas do Rio Irani Energética SPE Ltda. | H | Irani | 11 | - /17 | 04/18 | 07/19 | - /20 | 34 | 235 | |||||||||||||
| Taquarembó | Brazil | Estado | W | Taquarembó | 05/08 | - /10 | - /19 | - /20 | 33 | 330 | ||||||||||||||
| Germinal | Brazil | Companhia de Gestão dos Recursos Hídricos | W | Germinal | 2 | - /16 | - /18 | - /19 | 08/20 | 28 | 210 | |||||||||||||
| Macacos | Brazil | Pesqueiro Energia S/A | H | Jaguariaiva | 1 | - /18 | - /18 | - /19 | - /20 | 16 | 217 | |||||||||||||
| Negreiros | Brazil | Ministério da Integração Nacional | W | dos Negreiros | 24 | - /17 | - /18 | - /19 | - /20 | 37 | 246 | 56 | ||||||||||||
| Miguillas | Brazil | - /17 | - /19 | - /20 | - /21 | 35 | ||||||||||||||||||
| Bela Vista | Brazil | Bela Vista Geracao de Energia S.A. | H | Chapim | 7 | - /00 | - /00 | - /00 | - /00 | 21 | 393 | |||||||||||||
| Cachoeira Cinco Veados | Brazil | Rincão dos Albinos Energética S.A. | H | Toropi | 13 | - /18 | - /19 | - /21 | 08/22 | 35 | 206 | |||||||||||||
| Rio do Peixe | Brazil | CPFL Energias Renovavies S.A. | H | do Peixe | - /18 | - /20 | - /21 | 07/22 | 32 | 300 | ||||||||||||||
| Oiticica | Brazil | Secretaria de Meio Ambiente e dos Recursos Hídricos do Estado do Rio Grande do Norte | I W | Piranhas | 556 | - /13 | - /15 | - /24 | 03/25 | 35 | 989 | |||||||||||||
| Arraias | Brazil | CELG/Electronorte | H | Arraias | - /21 | - /23 | - /24 | - /25 | 29 | 560 | ||||||||||||||
| Gatos | Brazil | SRHS (Secretaria de Recursos Hídricos e de Saneamento) | F W | Sem Nome | 6 | - /12 | - /13 | - /25 | - /26 | 38 | 325 | |||||||||||||
| Panelas II | Brazil | SRHS (Secretaria de Recursos Hídricos e de Saneamento) | W | Una | 17 | - /16 | - /17 | 06/26 | - /27 | 55 | 311 | |||||||||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Brazil
Owner: SRH (Secretaria de RecursosHidricos)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Gravata
Reservoir capacity: 97 m3x106
Construction Dates
Start of Project: 07/85
Start of RCC: 07/85
End of RCC: 10/86
End of Project: 06/87
Specifications
Height: 56 metres
Length: 230 metres
Volume of RCC: 132 m3x103
Total volume: 143 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: CEMIG (Companhia Energetica de Minas Gerais)
Type: Gravity
Purpose(s): Flood Control / Irrigation
River: Caraibas
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: 04/90
Start of RCC: 04/90
End of RCC: 09/90
End of Project: 02/91
Specifications
Height: 26 metres
Length: 160 metres
Volume of RCC: 18 m3x103
Total volume: 22 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 20 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: CODEVASF
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Gameleiras
Reservoir capacity: 145 m3x106
Construction Dates
Start of Project: 07/90
Start of RCC: 07/90
End of RCC: 04/91
End of Project: 05/91
Specifications
Height: 29 metres
Length: 150 metres
Volume of RCC: 27 m3x103
Total volume: 29 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 52 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 13 | No pozzolan used |

Details
Country: Brazil
Owner: COMPESA (Companhia Pernambucana de Saneamento)
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Riacho do Chorão
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: -/89
Start of RCC: -/89
End of RCC: -/91
End of Project: -/92
Specifications
Height: 42 metres
Length: 360 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: SUPLAN/RN
Type: Gravity
Purpose(s): Water Supply
River: Taperobá
Reservoir capacity: 76 m3x106
Construction Dates
Start of Project: 12/91
Start of RCC: 12/91
End of RCC: -/93
End of Project: -/94
Specifications
Height: 34 metres
Length: 296 metres
Volume of RCC: 69 m3x103
Total volume: 89 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | No pozzolan used |

Details
Country: Brazil
Owner: SUPLAN/PB
Type: Gravity
Purpose(s): Water Supply
River: Picuí
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: 10/93
Start of RCC: 10/93
End of RCC: 10/94
End of Project: -/95
Specifications
Height: 31 metres
Length: 135 metres
Volume of RCC: 27 m3x103
Total volume: 28 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 56 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 14 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: CODEVASF (Companhia de Desenvolvimento dos Vales do Sao Francisco do Parnaiba)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Cova da Mandioca
Reservoir capacity: 126 m3x106
Construction Dates
Start of Project: 01/93
Start of RCC: 01/93
End of RCC: 12/94
End of Project: 12/94
Specifications
Height: 32 metres
Length: 342 metres
Volume of RCC: 75 m3x103
Total volume: 79 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | No pozzolan used |

Details
Country: Brazil
Owner: Companhia Pernambucana de Saceamento
Type: Gravity
Purpose(s): Water Supply
River: da Prata
Reservoir capacity: 42 m3x106
Construction Dates
Start of Project: -/92
Start of RCC: -/92
End of RCC: 12/94
End of Project: -/95
Specifications
Height: 26 metres
Length: 405 metres
Volume of RCC: 61 m3x103
Total volume: 75 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
| [stepped face] |
Spillway
| Slope | Type |
|---|---|
| [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Brazil
Owner: Companhia de Gestão dos Recursos Hídricos
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Riacho da Madeira
Reservoir capacity: 69 m3x106
Construction Dates
Start of Project: 07/93
Start of RCC: 07/93
End of RCC: 05/95
End of Project: -/96
Specifications
Height: 51 metres
Length: 116 metres
Volume of RCC: 87 m3x103
Total volume: 93 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete blocks [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: DNOCS (Departamento Nacional de Obras Contra a Seca)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Paraíba
Reservoir capacity: 247 m3x106
Construction Dates
Start of Project: -/93
Start of RCC: -/93
End of RCC: -/95
End of Project: -/95
Specifications
Height: 79 metres
Length: 440 metres
Volume of RCC: 674 m3x103
Total volume: 734 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Itamarati Norte S.A. (part of Brennand Energia)
Type: Gravity
Purpose(s): Hydropower
River: Juba
Reservoir capacity: -
Construction Dates
Start of Project: -/93
Start of RCC: -/93
End of RCC: -/95
End of Project: -/96
Specifications
Height: 21 metres
Length: 238 metres
Volume of RCC: 96 m3x103
Total volume: 113 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Itamarati Norte S.A. (part of Brennand Energia)
Type: Gravity
Purpose(s): Hydropower
River: Juba
Reservoir capacity: -
Construction Dates
Start of Project: -/93
Start of RCC: -/93
End of RCC: -/95
End of Project: -/96
Specifications
Height: 21 metres
Length: 238 metres
Volume of RCC: 105 m3x103
Total volume: 113 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Secretaria de Meio Ambiente e dos Recursos Hídricos do Estado do Rio Grande do Norte
Type: Gravity
Purpose(s): Recreation / Water Supply
River: Seridó
Reservoir capacity: 50 m3x106
Construction Dates
Start of Project: -/93
Start of RCC: -/93
End of RCC: -/95
End of Project: -/96
Specifications
Height: 26 metres
Length: 458 metres
Volume of RCC: 27 m3x103
Total volume: 28 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Barragem Oeste - SDC
Type: Gravity
Purpose(s): Flood Control
River: Itajai do Oeste
Reservoir capacity: 100 m3x106
Construction Dates
Start of Project: -/93
Start of RCC: -/93
End of RCC: -/95
End of Project: -/96
Specifications
Height: 30 metres
Length: 367 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: COPEL (Companhia Paranense de Energia)
Type: Gravity
Purpose(s): Hydropower
River: Jordão
Reservoir capacity: 110 m3x106
Construction Dates
Start of Project: 05/94
Start of RCC: 05/94
End of RCC: 02/96
End of Project: 09/96
Specifications
Height: 95 metres
Length: 550 metres
Volume of RCC: 570 m3x103
Total volume: 647 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.74 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.74 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Copel Geração e Transmissão S.A.
Type: Gravity
Purpose(s): Hydropower
River: Jordão
Reservoir capacity: 110 m3x106
Construction Dates
Start of Project: 05/94
Start of RCC: 05/94
End of RCC: 03/96
End of Project: 12/97
Specifications
Height: 73 metres
Length: 560 metres
Volume of RCC: 576 m3x103
Total volume: 665 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Arcelor Mittal Brasil S.A.
Type: Gravity
Purpose(s): Hydropower
River: Piracicaba
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: -/93
Start of RCC: -/93
End of RCC: -/96
End of Project: 10/97
Specifications
Height: 41 metres
Length: 143 metres
Volume of RCC: 85 m3x103
Total volume: 102 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 20 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: CPEE (Companhia Paulista de Energia Elétrica)
Type: Gravity
Purpose(s): Hydropower
River: do Peixe
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 02/96
Start of RCC: 02/96
End of RCC: 12/97
End of Project: -/98
Specifications
Height: 32 metres
Length: 300 metres
Volume of RCC: 20 m3x103
Total volume: 34 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 120 |
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |
| 0 |

Details
Country: Brazil
Owner: Saneamento de Goiás S/A
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 129 m3x106
Construction Dates
Start of Project: -/86
Start of RCC: -/86
End of RCC: -/97
End of Project: -/97
Specifications
Height: 47 metres
Length: -
Volume of RCC: -
Total volume: 129 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: COMPESA (Companhia Pernambucana de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: Capema
Reservoir capacity: 40 m3x106
Construction Dates
Start of Project: -/95
Start of RCC: -/95
End of RCC: -/97
End of Project: -/98
Specifications
Height: 20 metres
Length: 405 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: COMPESA (Companhia Pernambucana de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: Ipojuca (Gravata)
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: 05/95
Start of RCC: 05/95
End of RCC: -/97
End of Project: -/98
Specifications
Height: 34 metres
Length: 470 metres
Volume of RCC: 113 m3x103
Total volume: 125 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: COPEL (Companhia Paranense de Energia) Geração E Transmissão S.A.
Type: Gravity
Purpose(s): Hydropower
River: Iguaçu
Reservoir capacity: 3573 m3x106
Construction Dates
Start of Project: 02/95
Start of RCC: 02/95
End of RCC: 07/98
End of Project: 12/98
Specifications
Height: 67 metres
Length: 1083 metres
Volume of RCC: 912 m3x103
Total volume: 1438 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 20 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: CORSAN (Companhia Riograndense de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: Ibicui-Mirim
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: 07/97
Start of RCC: 07/97
End of RCC: 07/98
End of Project: 11/98
Specifications
Height: 37 metres
Length: 675 metres
Volume of RCC: 69 m3x103
Total volume: 95 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 30 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: DNOCS (Departamento Nacional de Obras Contra a Secas)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Capiibaribe
Reservoir capacity: 204 m3x106
Construction Dates
Start of Project: 07/96
Start of RCC: 07/96
End of RCC: 10/98
End of Project: -/99
Specifications
Height: 63 metres
Length: 442 metres
Volume of RCC: 442 m3x103
Total volume: 470 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: CORSAN (Companhia Riograndense de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: Arroio Burati
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: -/98
Start of RCC: -/98
End of RCC: 07/99
End of Project: -/00
Specifications
Height: 29 metres
Length: 219 metres
Volume of RCC: 80 m3x103
Total volume: 115 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 18 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Rosal Energia S.A.
Type: Gravity
Purpose(s): Hydropower
River: Itabapoana
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: 04/98
Start of RCC: 04/98
End of RCC: 09/99
End of Project: -/00
Specifications
Height: 37 metres
Length: 212 metres
Volume of RCC: 45 m3x103
Total volume: 75 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 45 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 55 | Ground-granulated blast-furnace slag |

Details
Country: Brazil
Owner: CERB (Companhia de Engenharia Rural da Bahia)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Itapicuru-açu
Reservoir capacity: 39 m3x106
Construction Dates
Start of Project: 05/98
Start of RCC: 05/98
End of RCC: 12/99
End of Project: 02/00
Specifications
Height: 26 metres
Length: 266 metres
Volume of RCC: 90 m3x103
Total volume: 105 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 18 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Eletronorte SA
Type: Gravity
Purpose(s): Hydropower
River: Tocantins
Reservoir capacity: 45800 m3x106
Construction Dates
Start of Project: 06/98
Start of RCC: 06/98
End of RCC: 09/00
End of Project: 10/05
Specifications
Height: 78 metres
Length: 1541 metres
Volume of RCC: 288 m3x103
Total volume: 1383 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 30 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Dona Francisca Energértica SA
Type: Gravity
Purpose(s): Hydropower
River: Jacuí
Reservoir capacity: 335 m3x106
Construction Dates
Start of Project: 08/98
Start of RCC: 08/98
End of RCC: 10/00
End of Project: 12/00
Specifications
Height: 63 metres
Length: 670 metres
Volume of RCC: 485 m3x103
Total volume: 503 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 18 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Secretaria Estadual do Meio Ambiente e Recursos Hídricos do Rio Grande do Norte
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Apodi
Reservoir capacity: 600 m3x106
Construction Dates
Start of Project: -/98
Start of RCC: -/98
End of RCC: -/00
End of Project: 03/02
Specifications
Height: 48 metres
Length: 1660 metres
Volume of RCC: 1023 m3x103
Total volume: 1120 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Brazil
Owner: COMPESA (Companhia Pernambucana de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: Tiúma
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: -/99
Start of RCC: -/99
End of RCC: 01/01
End of Project: 05/01
Specifications
Height: 16 metres
Length: 132 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Companhia Energética Mercosul (of the Tractebel Group)
Type: Gravity
Purpose(s): Hydropower
River: Tocantins
Reservoir capacity: 2300 m3x106
Construction Dates
Start of Project: 03/99
Start of RCC: 03/99
End of RCC: 10/01
End of Project: 10/02
Specifications
Height: 67 metres
Length: 510 metres
Volume of RCC: 527 m3x103
Total volume: 833 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 40 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 50 | Ground-granulated blast-furnace slag |

Details
Country: Brazil
Owner: DNOCS/Minas Gerais
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Congonhas
Reservoir capacity: 6700 m3x106
Construction Dates
Start of Project: 10/99
Start of RCC: 10/99
End of RCC: 12/01
End of Project: -/02
Specifications
Height: 85 metres
Length: 668 metres
Volume of RCC: 890 m3x103
Total volume: 1030 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Brazil
Owner: Investco (Tractebel)
Type: Gravity
Purpose(s): Hydropower
River: Tocantins
Reservoir capacity: 4982 m3x106
Construction Dates
Start of Project: 07/98
Start of RCC: 07/98
End of RCC: 12/01
End of Project: 12/02
Specifications
Height: 43 metres
Length: 2100 metres
Volume of RCC: 188 m3x103
Total volume: 210 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 30 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 40 | Ground-granulated blast-furnace slag |

Details
Country: Brazil
Owner: Companhia de Gestão dos Recursos Hídricos
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Condado
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: -/95
Start of RCC: -/95
End of RCC: -/01
End of Project: 12/02
Specifications
Height: 18 metres
Length: 270 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: DNOCS (Departamento Nacional de Obras Contra a Seca)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: do Carmo
Reservoir capacity: 293 m3x106
Construction Dates
Start of Project: -/98
Start of RCC: -/98
End of RCC: -/01
End of Project: -/01
Specifications
Height: 42 metres
Length: 2308 metres
Volume of RCC: 655 m3x103
Total volume: 660 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Brazil
Owner: Aliança Geração de Energia SA
Type: Gravity
Purpose(s): Hydropower
River: Rio Grande
Reservoir capacity: 285 m3x106
Construction Dates
Start of Project: -/97
Start of RCC: -/97
End of RCC: -/01
End of Project: 12/02
Specifications
Height: 50 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: CERB (Companhia de Engenharia Rural da Bahia)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Itapicuru-mirim
Reservoir capacity: -
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/01
End of Project: -/01
Specifications
Height: 24 metres
Length: 1090 metres
Volume of RCC: 42 m3x103
Total volume: 60 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 34 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 41 | Ground-granulated blast-furnace slag |

Details
Country: Brazil
Owner: CAGEPE (Companhia Pernambucana de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: Pirapama
Reservoir capacity: 61 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/01
End of Project: -/01
Specifications
Height: 25 metres
Length: 300 metres
Volume of RCC: 87 m3x103
Total volume: 137 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 18 | No pozzolan used |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Curimatá
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: -/97
Start of RCC: -/97
End of RCC: -/01
End of Project: 11/02
Specifications
Height: 26 metres
Length: 300 metres
Volume of RCC: 12 m3x103
Total volume: 14 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Estado da Paraiba (Companhia de Aguas e Esgotus)
Type: Gravity
Purpose(s): Water Supply
River: Riachäo
Reservoir capacity: 27 m3x106
Construction Dates
Start of Project: 05/00
Start of RCC: 05/00
End of RCC: 06/02
End of Project: -/02
Specifications
Height: 56 metres
Length: 296 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Brazil
Owner: Secretaria Recursos Hídricos
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Quixeré
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: -/01
Start of RCC: -/01
End of RCC: 11/02
End of Project: -/03
Specifications
Height: 19 metres
Length: 700 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
| [stepped face] |
Spillway
| Slope | Type |
|---|---|
| [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Brazil
Owner: CASAN (Companhia Catarinense de Águas e Saneamento)
Type: Gravity
Purpose(s): Hydropower
River: São Bento
Reservoir capacity: 58 m3x106
Construction Dates
Start of Project: -/99
Start of RCC: -/99
End of RCC: -/02
End of Project: -/03
Specifications
Height: 49 metres
Length: 461 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.80 |
Spillway
| Slope | Type |
|---|---|
| 0.80 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Energética Campos de Cima da Serra Ltda
Type: Gravity
Purpose(s): Hydropower
River: das Antas
Reservoir capacity: 27 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/02
End of Project: 10/03
Specifications
Height: 31 metres
Length: 110 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Rio Glória Energética S.A.
Type: Gravity
Purpose(s): Hydropower
River: Glória
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/99
Start of RCC: -/99
End of RCC: -/02
End of Project: 12/03
Specifications
Height: 49 metres
Length: 218 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Energetica Rio Pedrinho Ltda..
Type: Gravity
Purpose(s): Hydropower
River: Pedrinho
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/99
Start of RCC: -/99
End of RCC: -/02
End of Project: -/03
Specifications
Height: 16 metres
Length: 110 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Itiquira Energética SA
Type: Gravity
Purpose(s): Hydropower
River: Itiquira
Reservoir capacity: -
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/02
End of Project: -/03
Specifications
Height: 15 metres
Length: -
Volume of RCC: 22 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: -
Type: Hardfill
Purpose(s): Hydropower
River: -
Reservoir capacity: -
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/02
End of Project: -/03
Specifications
Height: 18 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: CERB (Companhia de Engenharia Ambiental e Recursos Hidricos da Bahia)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Pasto Velho
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/02
End of Project: -/03
Specifications
Height: 27 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Tangará Energia S/A
Type: Gravity
Purpose(s): Hydropower
River: Guaporé
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/02
End of Project: -/03
Specifications
Height: 32 metres
Length: 152 metres
Volume of RCC: -
Total volume: 43 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Queiroz Galvão Energética SA (90%) and Cinco Estrelas Agropecuária e Participações Ltda (10%)
Type: Gravity
Purpose(s): Hydropower
River: Jauru
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/02
End of Project: -/03
Specifications
Height: 51 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: COMPESA (Companhia Pernambucana de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/04
End of Project: -/05
Specifications
Height: 33 metres
Length: 210 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: CERAN (Companhia Energética Rio das Antas)
Type: Gravity
Purpose(s): Hydropower
River: das Antas
Reservoir capacity: 23 m3x106
Construction Dates
Start of Project: 04/02
Start of RCC: 04/02
End of RCC: -/04
End of Project: 12/04
Specifications
Height: 25 metres
Length: 180 metres
Volume of RCC: 35 m3x103
Total volume: 66 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | |

Details
Country: Brazil
Owner: SANEAGO (Saneamento de Goiás S.A.)
Type: Gravity
Purpose(s): Water Supply
River: João Leite
Reservoir capacity: 129 m3x106
Construction Dates
Start of Project: 03/01
Start of RCC: 03/01
End of RCC: -/04
End of Project: -/04
Specifications
Height: 55 metres
Length: 380 metres
Volume of RCC: 270 m3x103
Total volume: 290 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 20 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Alianca Geracao de Energia S.A.
Type: Gravity
Purpose(s): Hydropower
River: Doce
Reservoir capacity: 54 m3x106
Construction Dates
Start of Project: 05/01
Start of RCC: 05/01
End of RCC: -/04
End of Project: 05/05
Specifications
Height: 53 metres
Length: 437 metres
Volume of RCC: 236 m3x103
Total volume: 248 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 40 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 50 | Ground-granulated blast-furnace slag |

Details
Country: Brazil
Owner: DNOCS (Departamento Nacional de Obras Contra as Secas)
Type: Gravity
Purpose(s): Water Supply
River: Banabuiú
Reservoir capacity: 54 m3x106
Construction Dates
Start of Project: -/01
Start of RCC: -/01
End of RCC: -/04
End of Project: -/05
Specifications
Height: 19 metres
Length: 290 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: ELEJOR - Centrais Elétricas do Rio Jordão
Type: Gravity
Purpose(s): Hydropower
River: Jordao
Reservoir capacity: 34 m3x106
Construction Dates
Start of Project: -/01
Start of RCC: -/01
End of RCC: -/04
End of Project: -/05
Specifications
Height: 43 metres
Length: 445 metres
Volume of RCC: 200 m3x103
Total volume: 220 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: CERB (Companhia de Engenharia Ambiental e Recursos Hidricos da Bahia)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Itapicuru-aço
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/01
Start of RCC: -/01
End of RCC: -/04
End of Project: -/05
Specifications
Height: 44 metres
Length: 191 metres
Volume of RCC: 75 m3x103
Total volume: 85 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 56 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 14 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: CERB (Companhia de Engenharia Ambiental e Recursos Hidricos da Bahia)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Paraguaçu
Reservoir capacity: 112 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/04
End of Project: -/05
Specifications
Height: 19 metres
Length: 320 metres
Volume of RCC: 75 m3x103
Total volume: 85 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 56 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 14 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Elejor Centrais Elétricas do Rio Jordåo S.A.
Type: Gravity
Purpose(s): Hydropower
River: Jordåo
Reservoir capacity: 431 m3x106
Construction Dates
Start of Project: 11/02
Start of RCC: 11/02
End of RCC: -/04
End of Project: 01/05
Specifications
Height: 67 metres
Length: 543 metres
Volume of RCC: 530 m3x103
Total volume: 606 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 40 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 50 | Ground-granulated blast-furnace slag |

Details
Country: Brazil
Owner: BAESA (JV of Alcoa, Companhia Paulista de Força e Luz (CPFL), Companhia Brasileira de Alumínio, Camargo Corrêa Cimentos and DME Energética)
Type: Gravity
Purpose(s): Hydropower
River: Pelotas
Reservoir capacity: 50000 m3x106
Construction Dates
Start of Project: -/01
Start of RCC: -/01
End of RCC: -/05
End of Project: -/06
Specifications
Height: 85 metres
Length: 665 metres
Volume of RCC: 1 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: L.D.Q.S.P.E. Geracao de Energia e Participacoes Ltda.
Type: Gravity
Purpose(s): Hydropower
River: do Peixe
Reservoir capacity: 8 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/05
End of Project: -/06
Specifications
Height: 32 metres
Length: 97 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: EMBASA (Empresa Baiana de Aguas e Saneamento S.A.)
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Sapucaia
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/05
End of Project: -/05
Specifications
Height: 16 metres
Length: 207 metres
Volume of RCC: 15 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Enerpeixa S/A
Type: Gravity
Purpose(s): Hydropower
River: Tocantins
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 04/02
Start of RCC: 04/02
End of RCC: -/05
End of Project: 09/06
Specifications
Height: 39 metres
Length: 400 metres
Volume of RCC: 500 m3x103
Total volume: 582 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Brazil
Owner: CJ Energética S/A
Type: Gravity
Purpose(s): Hydropower
River: Bernardo José
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/05
End of Project: -/06
Specifications
Height: 21 metres
Length: 120 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: CODEVASF (Companhia de Desenvolvimento dos Vales do São Francisco e do Parnaíba)
Type: Gravity
Purpose(s): Water Supply
River: Poço do Magro
Reservoir capacity: 32 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/05
End of Project: -/06
Specifications
Height: 22 metres
Length: 540 metres
Volume of RCC: 58 m3x103
Total volume: 68 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Usina Central Olho D'Água S/A
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Itambé
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/05
End of Project: -/06
Specifications
Height: 30 metres
Length: 306 metres
Volume of RCC: 50 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
| [stepped face] |
Spillway
| Slope | Type |
|---|---|
| [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Brazil
Owner: Maue Geradora
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: -
Construction Dates
Start of Project: 05/05
Start of RCC: 05/05
End of RCC: -/06
End of Project: 10/06
Specifications
Height: 19 metres
Length: 245 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Esmeralda S.A.
Type: Gravity
Purpose(s): Hydropower
River: Bernardo José
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/06
End of Project: -/06
Specifications
Height: 19 metres
Length: 212 metres
Volume of RCC: 15 m3x103
Total volume: 27 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Santa Laura S/A
Type: Gravity
Purpose(s): Hydropower
River: Chapecozinho
Reservoir capacity: 19 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 27 metres
Length: 245 metres
Volume of RCC: 24 m3x103
Total volume: 42 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Concessionária Mosquitão S/A
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: 19 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 32 metres
Length: 236 metres
Volume of RCC: 57 m3x103
Total volume: 76 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: EMBASA (Empresa Baiana de Aguas e Saneamento S/A)
Type: Gravity
Purpose(s): Water Supply
River: Gaviãozinho
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 34 metres
Length: 154 metres
Volume of RCC: 44 m3x103
Total volume: 51 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.80 |
Spillway
| Slope | Type |
|---|---|
| 0.80 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 20 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: CPFL Renovaveis
Type: Hardfill
Purpose(s): Hydropower
River: Chapecó
Reservoir capacity: 142 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/07
End of Project: 04/07
Specifications
Height: 25 metres
Length: 300 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 1.50 |
Downstream
| Slope | Type |
|---|---|
| 1.50 |
Spillway
| Slope | Type |
|---|---|
| 0.75 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: CERAN (Companhia Energética Rio das Antas)
Type: Gravity
Purpose(s): Hydropower
River: das Antas
Reservoir capacity: 92 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: 02/08
Specifications
Height: 48 metres
Length: 350 metres
Volume of RCC: 240 m3x103
Total volume: 322 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.77 |
Spillway
| Slope | Type |
|---|---|
| 0.77 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Da Ilha Energética S/A
Type: Gravity
Purpose(s): Hydropower
River: das Antas
Reservoir capacity: 16 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/07
End of Project: 04/08
Specifications
Height: 26 metres
Length: 310 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 20 | |

Details
Country: Brazil
Owner: CERAN (Companhia Energética Rio das Antas)
Type: Gravity
Purpose(s): Hydropower
River: das Antas
Reservoir capacity: 55 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: 10/08
Specifications
Height: 37 metres
Length: 281 metres
Volume of RCC: 75 m3x103
Total volume: 212 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.77 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.77 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: COMPESA (Companhia Pernambucana de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: Duas Serras
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 19 metres
Length: 113 metres
Volume of RCC: 6 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Cotiporã Energetica S.A.
Type: Gravity
Purpose(s): Hydropower
River: Carreiro
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/07
End of Project: -/07
Specifications
Height: 16 metres
Length: 196 metres
Volume of RCC: 21 m3x103
Total volume: 41 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: SPE Plano Alto Energia S/A
Type: Gravity
Purpose(s): Hydropower
River: Irani
Reservoir capacity: 13 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/07
End of Project: 02/08
Specifications
Height: 38 metres
Length: 173 metres
Volume of RCC: 42 m3x103
Total volume: 78 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.75 |
Spillway
| Slope | Type |
|---|---|
| 0.75 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 19 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Veneto Energética S/A
Type: Gravity
Purpose(s): Hydropower
River: das Antas
Reservoir capacity: 8 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/07
End of Project: 04/08
Specifications
Height: 25 metres
Length: 219 metres
Volume of RCC: 31 m3x103
Total volume: 61 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 18 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Linha Emília Energética S/A
Type: Gravity
Purpose(s): Hydropower
River: Carreiro
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/07
End of Project: -/08
Specifications
Height: 27 metres
Length: 214 metres
Volume of RCC: 35 m3x103
Total volume: 54 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Santa Rosa S/A
Type: Gravity
Purpose(s): Hydropower
River: Grande
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/08
End of Project: -/08
Specifications
Height: 31 metres
Length: 172 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Hidrelétrica Cachoeirão SA
Type: Gravity
Purpose(s): Hydropower
River: Manhuaçu
Reservoir capacity: -
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/08
End of Project: -/08
Specifications
Height: 23 metres
Length: 90 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: CPFL Renovaveis
Type: Hardfill
Purpose(s): Hydropower
River: Irani
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/08
End of Project: -/08
Specifications
Height: 45 metres
Length: 243 metres
Volume of RCC: 14 m3x103
Total volume: 20 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 2.50 |
Downstream
| Slope | Type |
|---|---|
| 2 |
Spillway
| Slope | Type |
|---|---|
| 2 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: São Simão Energia S/A
Type: Gravity
Purpose(s): Hydropower
River: Itapemirim Norte
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/08
End of Project: 02/09
Specifications
Height: 56 metres
Length: 187 metres
Volume of RCC: 92 m3x103
Total volume: 115 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Lumbrás Energética S.A.
Type: Gravity
Purpose(s): Hydropower
River: Tijucas
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/08
End of Project: 03/09
Specifications
Height: 45 metres
Length: 178 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: BME Energia SA
Type: Gravity
Purpose(s): Hydropower
River: Ivaí
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/08
End of Project: 04/09
Specifications
Height: 34 metres
Length: 228 metres
Volume of RCC: 58 m3x103
Total volume: 76 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Itabapoana
Reservoir capacity: -
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/08
End of Project: 05/09
Specifications
Height: 15 metres
Length: 110 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Goiás Sul Geração de Energia S.A.
Type: Gravity
Purpose(s): Hydropower
River: Verissimo
Reservoir capacity: 76 m3x106
Construction Dates
Start of Project: 08/07
Start of RCC: 08/07
End of RCC: -/08
End of Project: 05/09
Specifications
Height: 44 metres
Length: 341 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.75 |
Spillway
| Slope | Type |
|---|---|
| 0.75 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Retiro Velho Energetica S/A
Type: Gravity
Purpose(s): Hydropower
River: da Prata
Reservoir capacity: 69 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/08
End of Project: -/09
Specifications
Height: 42 metres
Length: 56 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Velcan Energy Development Ltda.
Type: Gravity
Purpose(s): Hydropower
River: Irani
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/08
End of Project: 01/10
Specifications
Height: 32 metres
Length: 223 metres
Volume of RCC: -
Total volume: 59 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.85 |
Spillway
| Slope | Type |
|---|---|
| 0.85 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: BME Energia
Type: Gravity
Purpose(s): Hydropower
River: Ivaí
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/08
End of Project: 04/09
Specifications
Height: 23 metres
Length: 220 metres
Volume of RCC: 29 m3x103
Total volume: 35 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 68 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 17 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Caí
Reservoir capacity: -
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: -/09
Specifications
Height: 42 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: EMBASA (Empresa Baiana de Aguas e Saneamento S.A)
Type: Gravity
Purpose(s): Water Supply
River: de Contas
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/09
End of Project: 01/10
Specifications
Height: 22 metres
Length: 337 metres
Volume of RCC: 61 m3x103
Total volume: 68 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: São Pedro Energia S/A
Type: Gravity
Purpose(s): Hydropower
River: Jacu Braço Norte
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/09
End of Project: -/10
Specifications
Height: 30 metres
Length: 140 metres
Volume of RCC: 22 m3x103
Total volume: 35 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Criúva Energética S/A
Type: Gravity
Purpose(s): Hydropower
River: Lajeado Grange
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/09
End of Project: 12/09
Specifications
Height: 25 metres
Length: 246 metres
Volume of RCC: 80 m3x103
Total volume: 95 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 18 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Hidrelétrica Areia Branca S.A. (Tractebel Energia)
Type: Gravity
Purpose(s): Hydropower
River: Manhuaçu
Reservoir capacity: -
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/09
End of Project: -/09
Specifications
Height: 28 metres
Length: 257 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Serrana Energética S/A
Type: Gravity
Purpose(s): Hydropower
River: das Antas
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: 01/10
Specifications
Height: 32 metres
Length: 137 metres
Volume of RCC: 89 m3x103
Total volume: 103 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 18 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: EMBASA (Empresa Baiana de Aguas e Saneamento S/A)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Tijuco
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: 03/10
Specifications
Height: 16 metres
Length: 156 metres
Volume of RCC: 13 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Insituto de Desenvolvimento do Piauí
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Riacho do Jorge
Reservoir capacity: 293 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: -/10
Specifications
Height: 48 metres
Length: 870 metres
Volume of RCC: 293 m3x103
Total volume: 306 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Gerdau Aços Longos
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Claro
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 08/07
Start of RCC: 08/07
End of RCC: -/09
End of Project: 07/10
Specifications
Height: 60 metres
Length: 1670 metres
Volume of RCC: 172 m3x103
Total volume: 282 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Piedade Usina Geradora de Energia S.A
Type: Gravity
Purpose(s): Hydropower
River: Piedade
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/09
End of Project: 08/10
Specifications
Height: 30 metres
Length: 397 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Serra do Facão Energia S.A. (SEFAC)
Type: Gravity
Purpose(s): Hydropower
River: Sao Marcos
Reservoir capacity: 5199 m3x106
Construction Dates
Start of Project: 02/07
Start of RCC: 02/07
End of RCC: -/09
End of Project: 10/10
Specifications
Height: 92 metres
Length: 326 metres
Volume of RCC: 610 m3x103
Total volume: 742 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 18 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: SPE São Gonçalo Energia S.A.
Type: Gravity
Purpose(s): Hydropower
River: Santa Bárbara
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: -/10
Specifications
Height: 28 metres
Length: 148 metres
Volume of RCC: 14 m3x103
Total volume: 26 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.75 |
Spillway
| Slope | Type |
|---|---|
| 0.75 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 68 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 17 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Gerdau SA
Type: Gravity
Purpose(s): Hydropower
River: Claro
Reservoir capacity: -
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: -/10
Specifications
Height: 40 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: SPE Arvoredo Energia S.A.
Type: Gravity
Purpose(s): Hydropower
River: Irani
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/09
End of Project: 04/10
Specifications
Height: 39 metres
Length: 259 metres
Volume of RCC: 53 m3x103
Total volume: 81 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.75 |
Spillway
| Slope | Type |
|---|---|
| 0.75 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 20 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Companhia Energetica Santa Clara
Type: Gravity
Purpose(s): Hydropower
River: Mucuri
Reservoir capacity: 151 m3x106
Construction Dates
Start of Project: -/99
Start of RCC: -/99
End of RCC: -/02
End of Project: -/03
Specifications
Height: 59 metres
Length: 242 metres
Volume of RCC: 520 m3x103
Total volume: 600 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: CERB (Companhia de Engenharia Ambiental e Recursos Hídricos da Bahia)
Type: Gravity
Purpose(s): Water Supply
River: Vaza-Barris
Reservoir capacity: 49 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/10
End of Project: 10/10
Specifications
Height: 23 metres
Length: 927 metres
Volume of RCC: -
Total volume: 130 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Eletrogoes S/A.
Type: Gravity
Purpose(s): Hydropower
River: Comemorqção
Reservoir capacity: 478 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/10
End of Project: -/11
Specifications
Height: 19 metres
Length: 460 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Água Limpa Energia S/A
Type: Gravity
Purpose(s): Hydropower
River: Palmeiras
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/10
End of Project: 12/10
Specifications
Height: 38 metres
Length: 98 metres
Volume of RCC: 42 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Companhia Hidroelétrica Figueirópolis
Type: Gravity
Purpose(s): Hydropower
River: Jauru
Reservoir capacity: 35 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/10
End of Project: 12/10
Specifications
Height: 16 metres
Length: 170 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.43 |
Spillway
| Slope | Type |
|---|---|
| 0.75 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Santo Antonio
Reservoir capacity: 8 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/10
End of Project: -/11
Specifications
Height: 26 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Ibirama Energética SA
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/10
End of Project: -/10
Specifications
Height: 15 metres
Length: 145 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: CPFL Renovaveis
Type: Gravity
Purpose(s): Hydropower
River: Santo Antônio
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/10
End of Project: -/10
Specifications
Height: 15 metres
Length: 94 metres
Volume of RCC: -
Total volume: 14 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.75 |
Spillway
| Slope | Type |
|---|---|
| 0.75 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Energisa Geracão Rio Grande S/A
Type: Gravity
Purpose(s): Hydropower
River: Rio Grande
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/10
End of Project: 03/11
Specifications
Height: 38 metres
Length: 222 metres
Volume of RCC: 66 m3x103
Total volume: 82 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Omega Engergia Renovávelo S/A
Type: Gravity
Purpose(s): Hydropower
River: Manhuaçu
Reservoir capacity: -
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/10
End of Project: 04/11
Specifications
Height: 16 metres
Length: 200 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Natural pozzolan (ASTM Class N) | |

Details
Country: Brazil
Owner: Ijui Energia S.A.
Type: Gravity
Purpose(s): Hydropower
River: Carreiro
Reservoir capacity: 188 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/10
End of Project: -/11
Specifications
Height: 29 metres
Length: 790 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: BME
Type: Gravity
Purpose(s): Hydropower
River: Paraiba do Sul
Reservoir capacity: -
Construction Dates
Start of Project: 12/07
Start of RCC: 12/07
End of RCC: -/10
End of Project: -/11
Specifications
Height: 28 metres
Length: -
Volume of RCC: 85 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: DNOCS (Departamento Nacional de Obras Contra a Seca)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Pajeú
Reservoir capacity: 49 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/10
End of Project: -/11
Specifications
Height: 26 metres
Length: 566 metres
Volume of RCC: 64 m3x103
Total volume: 92 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Geracao Hidroeletrica Rio Grande S/A
Type: Gravity
Purpose(s): Hydropower
River: Grande
Reservoir capacity: 44 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/10
End of Project: -/11
Specifications
Height: 41 metres
Length: 210 metres
Volume of RCC: 51 m3x103
Total volume: 75 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: CPFL Renovaveis
Type: Gravity
Purpose(s): Hydropower
River: Corrente Grande
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/10
End of Project: -/10
Specifications
Height: 20 metres
Length: 110 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.75 |
Spillway
| Slope | Type |
|---|---|
| 0.75 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: -
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/10
End of Project: -/10
Specifications
Height: 30 metres
Length: -
Volume of RCC: 42 m3x103
Total volume: 73 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Consorcio Energético Cruzeiro do Sul (Copel and Electrosul Centrais Eléctricas SA)
Type: Gravity
Purpose(s): Hydropower
River: Tibagi
Reservoir capacity: 2137 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: 05/11
End of Project: -/12
Specifications
Height: 83 metres
Length: 726 metres
Volume of RCC: 633 m3x103
Total volume: 753 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork with external geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 2400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Boa Sorte Energética S/A
Type: Gravity
Purpose(s): Hydropower
River: Tijucas
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/11
End of Project: -/12
Specifications
Height: 26 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Centrais Eletricas Brasileiras sa Eletrobras
Type: Gravity
Purpose(s): Hydropower
River: Paraiba do Sul
Reservoir capacity: 114 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: 12/11
Specifications
Height: 30 metres
Length: 270 metres
Volume of RCC: 44 m3x103
Total volume: 55 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Statkraft (Moinho S.A.)
Type: Gravity
Purpose(s): Hydropower
River: Bernado José
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/11
Specifications
Height: 22 metres
Length: 126 metres
Volume of RCC: 9 m3x103
Total volume: 25 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 68 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 17 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Autódromo Energética S/A
Type: Gravity
Purpose(s): Hydropower
River: Carreiro
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/11
End of Project: -/11
Specifications
Height: 23 metres
Length: 271 metres
Volume of RCC: 21 m3x103
Total volume: 47 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 67 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 17 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Boa Fé Energética S.A.
Type: Gravity
Purpose(s): Hydropower
River: Carreiro
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/11
End of Project: -/11
Specifications
Height: 26 metres
Length: 198 metres
Volume of RCC: 32 m3x103
Total volume: 58 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Energisa Geracão Rio Grande S/A
Type: Gravity
Purpose(s): Hydropower
River: Grande
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: 02/12
Specifications
Height: 44 metres
Length: 285 metres
Volume of RCC: 81 m3x103
Total volume: 105 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Santo Antônio Energia
Type: Gravity
Purpose(s): Hydropower
River: Madeira
Reservoir capacity: 2075 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/11
End of Project: 03/12
Specifications
Height: 25 metres
Length: 3100 metres
Volume of RCC: 560 m3x103
Total volume: 3086 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Passos Maia Energética S.A. (Statkraft, Adami & Madeiras)
Type: Gravity
Purpose(s): Hydropower
River: Chapecó
Reservoir capacity: 14 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: 09/12
Specifications
Height: 34 metres
Length: -
Volume of RCC: 66 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 18 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: -
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/12
End of Project: -/12
Specifications
Height: 16 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: SAMAE (Serviço Autônomo Municipal de Água e Esgoto)
Type: Gravity
Purpose(s): Water Supply
River: Marrecas
Reservoir capacity: 33 m3x106
Construction Dates
Start of Project: 03/10
Start of RCC: 03/10
End of RCC: -/12
End of Project: 12/12
Specifications
Height: 35 metres
Length: 430 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: CTG Brasil
Type: Gravity
Purpose(s): Hydropower
River: Sapucai
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/12
End of Project: 07/13
Specifications
Height: 15 metres
Length: 482 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Rio Canoas Energia S.A.
Type: Gravity
Purpose(s): Hydropower
River: Canoas
Reservoir capacity: 296 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/12
End of Project: 09/13
Specifications
Height: 42 metres
Length: 517 metres
Volume of RCC: 264 m3x103
Total volume: 382 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: CJ Hydro - Geraçao de Energia S.A
Type: Gravity
Purpose(s): Hydropower
River: Turvo
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/12
End of Project: -/13
Specifications
Height: 22 metres
Length: 237 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Companhia de Gestão dos Recursos Hídricos
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: -
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/12
End of Project: -/13
Specifications
Height: 28 metres
Length: 310 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Centrais Hidrelétricas Grapon S/A
Type: Gravity
Purpose(s): Hydropower
River: Pomba
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/12
End of Project: -/13
Specifications
Height: 32 metres
Length: 273 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Pezzi Energética S.A.
Type: Gravity
Purpose(s): Hydropower
River: das Antas
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/12
End of Project: -/13
Specifications
Height: 42 metres
Length: 238 metres
Volume of RCC: 44 m3x103
Total volume: 80 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 76 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 19 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Serra dos Cavalinhos II Energética S.A.
Type: Gravity
Purpose(s): Hydropower
River: das Antas
Reservoir capacity: 8 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/12
End of Project: -/13
Specifications
Height: 42 metres
Length: 123 metres
Volume of RCC: 33 m3x103
Total volume: 80 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 18 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: CERTEL
Type: Gravity
Purpose(s): Hydropower
River: Forqueta
Reservoir capacity: -
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/13
End of Project: -/13
Specifications
Height: 23 metres
Length: 190 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Eletrosul Centrais Elétricas SA
Type: Gravity
Purpose(s): Hydropower
River: Caveiras
Reservoir capacity: 23 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/13
End of Project: 11/13
Specifications
Height: 29 metres
Length: 170 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Eletrosul Centrais Elétricas S/A
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Braço do Norte
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/13
End of Project: -/13
Specifications
Height: 25 metres
Length: 117 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Chapecó
Reservoir capacity: -
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/14
End of Project: -/14
Specifications
Height: 20 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Una
Reservoir capacity: 303 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/14
End of Project: -/15
Specifications
Height: 66 metres
Length: 1015 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: ANEEL (Agência Nacional de Energia Elétrica)
Type: Gravity
Purpose(s): Hydropower
River: Teles Pires
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 07/11
Start of RCC: 07/11
End of RCC: -/15
End of Project: 09/16
Specifications
Height: 67 metres
Length: 360 metres
Volume of RCC: 500 m3x103
Total volume: 1020 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: CPFL Renovaveis
Type: Hardfill
Purpose(s): Hydropower
River: Preto
Reservoir capacity: 38 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/15
End of Project: 04/16
Specifications
Height: 30 metres
Length: 180 metres
Volume of RCC: 45 m3x103
Total volume: 65 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 1.25 |
Downstream
| Slope | Type |
|---|---|
| 1.25 |
Spillway
| Slope | Type |
|---|---|
| 1.25 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: ENEL Green Power Fazenda S.A.
Type: Gravity
Purpose(s): Hydropower
River: dos Apiacás
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/15
End of Project: 09/16
Specifications
Height: 21 metres
Length: 503 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: ENEL Green Power Salto Apiacás S.A
Type: Gravity
Purpose(s): Hydropower
River: dos Apiacás
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/15
End of Project: -/16
Specifications
Height: 17 metres
Length: 486 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Itamarati Norte S.A.
Type: Gravity
Purpose(s): Hydropower
River: Jubinha
Reservoir capacity: 480 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/15
End of Project: -/15
Specifications
Height: 21 metres
Length: 1540 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Itamarati Norte S.A.
Type: Gravity
Purpose(s): Hydropower
River: Juba
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/15
End of Project: -/15
Specifications
Height: 26 metres
Length: 570 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Norte Energia S.A.
Type: Gravity
Purpose(s): Hydropower
River: Xingu
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/16
End of Project: -/20
Specifications
Height: 74 metres
Length: 680 metres
Volume of RCC: 63 m3x103
Total volume: 2208 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 1.20 |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Projeto Transposição das Águas do Rio São Francisco
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: -
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/16
End of Project: -/16
Specifications
Height: 18 metres
Length: 196 metres
Volume of RCC: 52 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: COMPESA (Companhia Pernambucana de Saneamento )
Type: -
Purpose(s): Irrigation / Water Supply
River: Siriji
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/16
End of Project: -/17
Specifications
Height: 20 metres
Length: 100 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Serra dos Cavalinhos I Energética S.A.
Type: -
Purpose(s): Hydropower
River: das Antas
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/16
End of Project: -/17
Specifications
Height: 30 metres
Length: 204 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Companhia Energetica Sinop-CES
Type: Gravity
Purpose(s): Hydropower
River: Teles Pires
Reservoir capacity: -
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/17
End of Project: -/19
Specifications
Height: 17 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: PCH Senhora do Porto S.A
Type: Gravity
Purpose(s): Hydropower
River: Guanhães
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/17
End of Project: -/18
Specifications
Height: 41 metres
Length: 167 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: São Roque Energética S.A.
Type: Gravity
Purpose(s): Hydropower
River: Canoas
Reservoir capacity: -
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/18
End of Project: -/19
Specifications
Height: 68 metres
Length: 151 metres
Volume of RCC: 100 m3x103
Total volume: 583 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.75 |
Spillway
| Slope | Type |
|---|---|
| 0.75 | [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: CERB (Companhia de Engenharia Ambienytal e Recursos Hídricos da Bahia)
Type: Gravity
Purpose(s): Water Supply
River: Colonia
Reservoir capacity: 62 m3x106
Construction Dates
Start of Project: 09/15
Start of RCC: 09/15
End of RCC: -/18
End of Project: 09/18
Specifications
Height: 21 metres
Length: 195 metres
Volume of RCC: 30 m3x103
Total volume: 34 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Quevedos Energética S.A
Type: Gravity
Purpose(s): Hydropower
River: Toropi
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/18
End of Project: -/19
Specifications
Height: 23 metres
Length: 206 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: PCH Jacaré S.A.
Type: Gravity
Purpose(s): Hydropower
River: Guanhães
Reservoir capacity: 14 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/18
End of Project: -/19
Specifications
Height: 33 metres
Length: 121 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Cemig Geração e Transmissão SA and Itaocara Energia Ltda
Type: Gravity
Purpose(s): Hydropower
River: Paraiba do Sul
Reservoir capacity: 1700 m3x106
Construction Dates
Start of Project: 01/16
Start of RCC: 01/16
End of RCC: -/18
End of Project: -/19
Specifications
Height: 50 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: PCH Águas do Rio Irani Energética SPE Ltda.
Type: Gravity
Purpose(s): Hydropower
River: Irani
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: 07/19
End of Project: -/20
Specifications
Height: 34 metres
Length: 235 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Estado
Type: Gravity
Purpose(s): Water Supply
River: Taquarembó
Reservoir capacity: -
Construction Dates
Start of Project: 05/08
Start of RCC: 05/08
End of RCC: -/19
End of Project: -/20
Specifications
Height: 33 metres
Length: 330 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Companhia de Gestão dos Recursos Hídricos
Type: Gravity
Purpose(s): Water Supply
River: Germinal
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/19
End of Project: 08/20
Specifications
Height: 28 metres
Length: 210 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Pesqueiro Energia S/A
Type: Gravity
Purpose(s): Hydropower
River: Jaguariaiva
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/19
End of Project: -/20
Specifications
Height: 16 metres
Length: 217 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Ministério da Integração Nacional
Type: Gravity
Purpose(s): Water Supply
River: dos Negreiros
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/19
End of Project: -/20
Specifications
Height: 37 metres
Length: 246 metres
Volume of RCC: 56 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): unknown
River: -
Reservoir capacity: -
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/20
End of Project: -/21
Specifications
Height: 35 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Bela Vista Geracao de Energia S.A.
Type: Gravity
Purpose(s): Hydropower
River: Chapim
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/00
End of Project: -/00
Specifications
Height: 21 metres
Length: 393 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Rincão dos Albinos Energética S.A.
Type: Gravity
Purpose(s): Hydropower
River: Toropi
Reservoir capacity: 13 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/21
End of Project: 08/22
Specifications
Height: 35 metres
Length: 206 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: CPFL Energias Renovavies S.A.
Type: Gravity
Purpose(s): Hydropower
River: do Peixe
Reservoir capacity: -
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/21
End of Project: 07/22
Specifications
Height: 32 metres
Length: 300 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Secretaria de Meio Ambiente e dos Recursos Hídricos do Estado do Rio Grande do Norte
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Piranhas
Reservoir capacity: 556 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/24
End of Project: 03/25
Specifications
Height: 35 metres
Length: 989 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: CELG/Electronorte
Type: Gravity
Purpose(s): Hydropower
River: Arraias
Reservoir capacity: -
Construction Dates
Start of Project: -/21
Start of RCC: -/21
End of RCC: -/24
End of Project: -/25
Specifications
Height: 29 metres
Length: 560 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: SRHS (Secretaria de Recursos Hídricos e de Saneamento)
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Sem Nome
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/25
End of Project: -/26
Specifications
Height: 38 metres
Length: 325 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: SRHS (Secretaria de Recursos Hídricos e de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: Una
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: 06/26
End of Project: -/27
Specifications
Height: 55 metres
Length: 311 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates
