SEARCHING
... please wait

Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
R'milTunisiaMinistre de l’AgricultureIR’mil4408/9910/0005/0111/011826064160V(15)0.90(16)0.90(12)*3003001000(-)
Yunlonghe Nº3
[A]
ChinaEngshi Yuefeng Yunlong River Hydropower Development Co. Ltd.HYunlong4403/0604/0704/09- /11139119182207curve(3')curve(3') (3')     
São Sebastião do AltoBrazilGeracao Hidroeletrica Rio Grande S/AHGrande44- /08- /09- /10- /11412105175           
ÇetintepeTurkeyDSI - State Hydraulic WorksHRobozik4409/08- /11- /12- /133917360640.10(1)0.80(1)*0.80(12)30012007763(N)
GhadrooniIranKerman Water AuthorityG I WGharanghou44- /08- /14- /19- /2044352106147           
Dahe
[A]
China 44- /15- /17- /22- /23105              
Beni Azimane
[H-F]
MoroccoDirection des Aménagements HydrauliquesF I WKert4401/2210/2201/2610/2670684800 0.50(1)*0.90(1)*0.90(1)*3003001000 

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Tunisia

Owner: Ministre de l’Agriculture

Type: Gravity

Purpose(s): Irrigation

River: R’mil

Reservoir capacity: 44 m3x106

Construction Dates

Start of Project: 08/99

Start of RCC: 08/99

End of RCC: 05/01

End of Project: 11/01

Specifications

Height: 18 metres

Length: 260 metres

Volume of RCC: 64 m3x103

Total volume: 160 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC supported by fill shoulders
Downstream
SlopeType
0.90Mechanically compacted unformed face of RCC
Spillway
SlopeType
0.90Reinforced conventional concrete cast after RCC placement  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
R'mil completed
R'mil completed

Full Dam Information

Details

Country: China

Owner: Engshi Yuefeng Yunlong River Hydropower Development Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Yunlong

Reservoir capacity: 44 m3x106

Construction Dates

Start of Project: 03/06

Start of RCC: 03/06

End of RCC: 04/09

End of Project: -/11

Specifications

Height: 139 metres

Length: 119 metres

Volume of RCC: 182 m3x103

Total volume: 207 m3x103

Construction Methods

Facings

Upstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
 RCC against formwork (GEVR/GE-RCC)

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Yunlonghe Nº3 completed
Yunlonghe Nº3 completed

Full Dam Information

Details

Country: Brazil

Owner: Geracao Hidroeletrica Rio Grande S/A

Type: Gravity

Purpose(s): Hydropower

River: Grande

Reservoir capacity: 44 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/10

End of Project: -/11

Specifications

Height: 41 metres

Length: 210 metres

Volume of RCC: 51 m3x103

Total volume: 75 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
São Sebastião do Alto completed
São Sebastião do Alto completed

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Gravity

Purpose(s): Hydropower

River: Robozik

Reservoir capacity: 44 m3x106

Construction Dates

Start of Project: 09/08

Start of RCC: 09/08

End of RCC: -/12

End of Project: -/13

Specifications

Height: 39 metres

Length: 173 metres

Volume of RCC: 60 m3x103

Total volume: 64 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3001200

Cementitious material

Cement (kg/m3)
77
Pozzolan (kg/m3)Pozzolan Type
63Natural pozzolan (ASTM Class N)
  
Çetintepe on Google Earth
Çetintepe on Google Earth

Full Dam Information

Details

Country: Iran

Owner: Kerman Water Authority

Type: Gravity

Purpose(s): Groundwater Recharge / Irrigation / Water Supply

River: Gharanghou

Reservoir capacity: 44 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/19

End of Project: -/20

Specifications

Height: 44 metres

Length: 352 metres

Volume of RCC: 106 m3x103

Total volume: 147 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Ghadrooni completed
Ghadrooni completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): unknown

River: -

Reservoir capacity: 44 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/22

End of Project: -/23

Specifications

Height: 105 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Morocco

Owner: Direction des Aménagements Hydrauliques

Type: Hardfill

Purpose(s): Flood Control / Irrigation / Water Supply

River: Kert

Reservoir capacity: 44 m3x106

Construction Dates

Start of Project: 01/22

Start of RCC: 01/22

End of RCC: 01/26

End of Project: 10/26

Specifications

Height: 70 metres

Length: 684 metres

Volume of RCC: 800 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.50Traditional concrete against formwork  [stepped face]
Downstream
SlopeType
0.90Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.90Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
0 
  
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates