SEARCHING
... please wait

Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
PindobaçuBrazilCERB (Companhia de Engenharia Ambiental e Recursos Hidricos da Bahia)I WItapicuru-aço17- /01- /03- /04- /05441917585      3003005614(N)
Baxiang Nº3ChinaDepartment of Electricity, Feng Shun CountyHBaxianghe8- /05- /06- /07- /08442076383           
TiechengChinaGansu Keyuan Electric Power Group Co. Ltd.HDatong1- /05- /06- /07- /0844143             
GoiandiraBrazilGoiás Sul Geração de Energia S.A.HVerissimo7608/07- /07- /0805/0944341  V 0.75 0.75      
Santo Antonio-RJBrazilEnergisa Geracão Rio Grande S/AHGrande17- /09- /10- /1102/124428581105           
OuagjditMoroccoDirection des Aménagements HydrauliquesI WAsif N Talaght1- /13- /15- /17- /1844              
ZhuangliChinaZhuangli reservoir construction and management officeF H I WShizihe133- /15- /17- /18- /194449             
GhadrooniIranKerman Water AuthorityG I WGharanghou44- /08- /14- /19- /2044352106147           
San JulianMexicoPeñolesWFuerte - /16- /19- /21- /2244240        300300   
Manavgat ÇardakTurkeyDSI - State Hydraulic WorksH ISağırın Çayı8- /17- /22- /23- /2444185540            
NwamitwaSouth AfricaDepartment of Water & SanitationWGroot Letaba - /17- /22- /25- /2644350170226           

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Brazil

Owner: CERB (Companhia de Engenharia Ambiental e Recursos Hidricos da Bahia)

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Itapicuru-aço

Reservoir capacity: 17 m3x106

Construction Dates

Start of Project: -/01

Start of RCC: -/01

End of RCC: -/04

End of Project: -/05

Specifications

Height: 44 metres

Length: 191 metres

Volume of RCC: 75 m3x103

Total volume: 85 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
56
Pozzolan (kg/m3)Pozzolan Type
14Natural pozzolan (ASTM Class N)
  
Pindobaçu completed
Pindobaçu completed

Full Dam Information

Details

Country: China

Owner: Department of Electricity, Feng Shun County

Type: Gravity

Purpose(s): Hydropower

River: Baxianghe

Reservoir capacity: 8 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/07

End of Project: -/08

Specifications

Height: 44 metres

Length: 207 metres

Volume of RCC: 63 m3x103

Total volume: 83 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Gansu Keyuan Electric Power Group Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Datong

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/07

End of Project: -/08

Specifications

Height: 44 metres

Length: 143 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Tiecheng on Google Earth
Tiecheng on Google Earth

Full Dam Information

Details

Country: Brazil

Owner: Goiás Sul Geração de Energia S.A.

Type: Gravity

Purpose(s): Hydropower

River: Verissimo

Reservoir capacity: 76 m3x106

Construction Dates

Start of Project: 08/07

Start of RCC: 08/07

End of RCC: -/08

End of Project: 05/09

Specifications

Height: 44 metres

Length: 341 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
0.75 
Spillway
SlopeType
0.75 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Goiandira completed
Goiandira completed

Full Dam Information

Details

Country: Brazil

Owner: Energisa Geracão Rio Grande S/A

Type: Gravity

Purpose(s): Hydropower

River: Grande

Reservoir capacity: 17 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/11

End of Project: 02/12

Specifications

Height: 44 metres

Length: 285 metres

Volume of RCC: 81 m3x103

Total volume: 105 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Santo Antonio-RJ completed
Santo Antonio-RJ completed

Full Dam Information

Details

Country: Morocco

Owner: Direction des Aménagements Hydrauliques

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Asif N Talaght

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/13

Start of RCC: -/13

End of RCC: -/17

End of Project: -/18

Specifications

Height: 44 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Ouagjdit completed
Ouagjdit completed

Full Dam Information

Details

Country: China

Owner: Zhuangli reservoir construction and management office

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Shizihe

Reservoir capacity: 133 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/18

End of Project: -/19

Specifications

Height: 44 metres

Length: 49 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Iran

Owner: Kerman Water Authority

Type: Gravity

Purpose(s): Groundwater Recharge / Irrigation / Water Supply

River: Gharanghou

Reservoir capacity: 44 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/19

End of Project: -/20

Specifications

Height: 44 metres

Length: 352 metres

Volume of RCC: 106 m3x103

Total volume: 147 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Ghadrooni completed
Ghadrooni completed

Full Dam Information

Details

Country: Mexico

Owner: Peñoles

Type: Gravity

Purpose(s): Water Supply

River: Fuerte

Reservoir capacity: -

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/21

End of Project: -/22

Specifications

Height: 44 metres

Length: 240 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
San Julian completed
San Julian completed

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Sağırın Çayı

Reservoir capacity: 8 m3x106

Construction Dates

Start of Project: -/17

Start of RCC: -/17

End of RCC: -/23

End of Project: -/24

Specifications

Height: 44 metres

Length: 185 metres

Volume of RCC: 540 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: South Africa

Owner: Department of Water & Sanitation

Type: Gravity

Purpose(s): Water Supply

River: Groot Letaba

Reservoir capacity: -

Construction Dates

Start of Project: -/17

Start of RCC: -/17

End of RCC: -/25

End of Project: -/26

Specifications

Height: 44 metres

Length: 350 metres

Volume of RCC: 170 m3x103

Total volume: 226 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates