Dam Search Results
- Reservoir Capacity: 120 m3x106
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Shimantan | China | Department of Water Resources, Henan Province | F I W | Gunhe | 120 | 07/93 | 04/94 | 12/95 | 07/96 | 41 | 650 | 272 | 351 | V | (3') | 0.75 | (3)* | 0.75 | (1) | 300 | 300 | 98 51 | 98 107 | (F) |
| Antacoto | Peru | Mantaro | 120 | - /98 | - /98 | - /99 | - /99 | 17 | 65 | (-) | ||||||||||||||
| Chalillo | Belize | Belize Electric Co. Ltd (BECOL) and A. Fortis Co., Canada | H | Macal | 120 | 07/03 | 03/04 | 10/05 | 12/06 | 68 | 425 | 180 | 210 | 0.20 | (1) | 0.75 | (3')* | 0.75 | (12) | 300 | 3600 | 105 | 0 | (N) |
| Boussiaba | Algeria | ANBT (Agence Nationale des Barrages et Transferts) | W | Boussiaba | 120 | 12/06 | 05/08 | 11/08 | 08/09 | 51 | 310 | 160 | 190 | V | (2) | (1)* | (1) | 300 | 300 | 112 | 28 | (F) | ||
| Upper Wawa [H-F] | Philippines | Wawa JV Co. Inc. (Prime Infrastructure Capital Inc and San Lorenzo Ruiz Builders and Developers Group) | W | Marikina | 120 | 06/21 | 01/23 | - /24 | - /25 | 87 | 439 | 1035 | 1043 | 0.60 | (3') | 0.80 | (3')* | 0.80 | (3')* | 300 | 3600 | 80 70 | 120 110 | (F) |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: China
Owner: Department of Water Resources, Henan Province
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Gunhe
Reservoir capacity: 120 m3x106
Construction Dates
Start of Project: 07/93
Start of RCC: 07/93
End of RCC: 12/95
End of Project: 07/96
Specifications
Height: 41 metres
Length: 650 metres
Volume of RCC: 272 m3x103
Total volume: 351 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 98 |
| 51 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 98 | Low-lime flyash (ASTM Class F) |
| 107 |

Details
Country: Peru
Owner: -
Type: Gravity
Purpose(s): unknown
River: Mantaro
Reservoir capacity: 120 m3x106
Construction Dates
Start of Project: -/98
Start of RCC: -/98
End of RCC: -/99
End of Project: -/99
Specifications
Height: 17 metres
Length: 65 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| No pozzolan used | |

Details
Country: Belize
Owner: Belize Electric Co. Ltd (BECOL) and A. Fortis Co., Canada
Type: Gravity
Purpose(s): Hydropower
River: Macal
Reservoir capacity: 120 m3x106
Construction Dates
Start of Project: 07/03
Start of RCC: 07/03
End of RCC: 10/05
End of Project: 12/06
Specifications
Height: 68 metres
Length: 425 metres
Volume of RCC: 180 m3x103
Total volume: 210 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3600 |
Cementitious material
| Cement (kg/m3) |
|---|
| 105 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | Natural pozzolan (ASTM Class N) |

Details
Country: Algeria
Owner: ANBT (Agence Nationale des Barrages et Transferts)
Type: Gravity
Purpose(s): Water Supply
River: Boussiaba
Reservoir capacity: 120 m3x106
Construction Dates
Start of Project: 12/06
Start of RCC: 12/06
End of RCC: 11/08
End of Project: 08/09
Specifications
Height: 51 metres
Length: 310 metres
Volume of RCC: 160 m3x103
Total volume: 190 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork with external geomembrane |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 112 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 28 | Low-lime flyash (ASTM Class F) |

Details
Country: Philippines
Owner: Wawa JV Co. Inc. (Prime Infrastructure Capital Inc and San Lorenzo Ruiz Builders and Developers Group)
Type: Hardfill
Purpose(s): Water Supply
River: Marikina
Reservoir capacity: 120 m3x106
Construction Dates
Start of Project: 06/21
Start of RCC: 06/21
End of RCC: -/24
End of Project: -/25
Specifications
Height: 87 metres
Length: 439 metres
Volume of RCC: 1035 m3x103
Total volume: 1043 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.60 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3600 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Low-lime flyash (ASTM Class F) |
| 110 |