Dam Search Results
- Dimensions
- Height: 121 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Koudiat Acerdoune [H-F] | Algeria | ANBT (Agence Nationale des Barrages et Transfert) | I W | Wadi Isser | 800 | 11/02 | 05/06 | 06/08 | 09/08 | 121 | 492 | 1650 | 1850 | 0.65 | (1)* | 0.65 | (1)* | 0.65 | (1)* | 300 to 400 | 300 to 400 | 77 | 87 | (F) |
| Tabellout [A-G] | Algeria | ANBT (Agence Nationale des Barrages et Transfert) | I W | Djen Djen | 294 | 03/10 | 03/13 | 08/15 | 12/15 | 121 | 366 | 975 | (12) | (12) | (12)* | 300 | 300 | 85 | 45 | (S) | ||||
| Gaosheng | China | Yalong River Hydropower Development Co. Ltd. | H | Hongdu | 100 | - /16 | - /17 | - /19 | - /20 | 121 | ||||||||||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Algeria
Owner: ANBT (Agence Nationale des Barrages et Transfert)
Type: Hardfill
Purpose(s): Irrigation / Water Supply
River: Wadi Isser
Reservoir capacity: 800 m3x106
Construction Dates
Start of Project: 11/02
Start of RCC: 11/02
End of RCC: 06/08
End of Project: 09/08
Specifications
Height: 121 metres
Length: 492 metres
Volume of RCC: 1650 m3x103
Total volume: 1850 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.65 | Traditional concrete against formwork [stepped face] |
Downstream
| Slope | Type |
|---|---|
| 0.65 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.65 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 to | 300 to |
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 77 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 87 | Low-lime flyash (ASTM Class F) |

Details
Country: Algeria
Owner: ANBT (Agence Nationale des Barrages et Transfert)
Type: Arch-Gravity
Purpose(s): Irrigation / Water Supply
River: Djen Djen
Reservoir capacity: 294 m3x106
Construction Dates
Start of Project: 03/10
Start of RCC: 03/10
End of RCC: 08/15
End of Project: 12/15
Specifications
Height: 121 metres
Length: 366 metres
Volume of RCC: 975 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Spillway
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 45 | Ground-granulated blast-furnace slag |

Details
Country: China
Owner: Yalong River Hydropower Development Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Hongdu
Reservoir capacity: 100 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/19
End of Project: -/20
Specifications
Height: 121 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|