Dam Search Results
- Dimensions
- Height: 63 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Shuidong | China | Fujian Shuikou Power Generation Group | H N | Youxi | 108 | 04/91 | 11/92 | 10/93 | 12/95 | 63 | 197 | 126 | 184 | V | (7) | 0.75 | (10) | 0.75 | (1) | 300 | 300 | 50 | 90 | (F) |
| Jucazinho | Brazil | DNOCS (Departamento Nacional de Obras Contra a Secas) | F I R W | Capiibaribe | 204 | 07/96 | 11/96 | 10/98 | - /99 | 63 | 442 | 442 | 470 | V | (12) | 0.75 | (1)* | 0.75 | (1)* | 300 | 300 | 64 | 16 | (N) |
| Dona Francisca | Brazil | Dona Francisca Energértica SA | H | Jacuí | 335 | 08/98 | 06/99 | 10/00 | 12/00 | 63 | 670 | 485 | 503 | V | (1) | 0.75 | (3)* | 0.75 | (1)* | 300 | 300 | 72 | 18 | (N) |
| Xihe | China | Hanjiang Hydropower Development Ltd. | F H N | Han | 229 | 11/03 | 02/04 | 05/05 | 06/07 | 63 | 346 | 194 | 631 | (F) | ||||||||||
| Youshui | China | Chongqing Youshui River Hydropower Development Co. Ltd. | H | Youshui | 152 | - /05 | - /06 | - /07 | - /08 | 63 | 194 | |||||||||||||
| Bengoh | Malaysia | Public Works Department | W | Sungai Bengoh | 144 | 06/07 | 06/09 | 05/10 | - /12 | 63 | 267 | 130 | 172 | V | (3') | 0.80 | (3')* | 0.80 | (3')* | 300 | 3000 | 60 | 120 | (F) |
| Valsamiotis [H-F] | Greece | Crete Development Organisation | I | Valsamiotis | 6 | 10/05 | 05/07 | 12/10 | - /14 | 63 | 335 | 640 | 820 | 0.80 | (13) | 0.80 | (3) | 0.80 | (1)* | 300 | 300 | 60 | 0 | (-) |
| Longhuakou | China | Meng County Longhuakou Hydropower Co. Ltd. | Longhua | 30 | - /08 | - /09 | - /10 | - /10 | 63 | 353 | 414 | |||||||||||||
| Angostura | Chile | Colbún SA | H | BioBio | - /09 | - /11 | - /13 | - /14 | 63 | 125 | ||||||||||||||
| Ghiz Ghalek (formerly Dashte Palang) | Iran | Boushehr Regional Water Company | F I W | Dashte Palang | 151 | 07/13 | - /22 | - /26 | - /28 | 63 | 800 | 540 | 690 | |||||||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: China
Owner: Fujian Shuikou Power Generation Group
Type: Gravity
Purpose(s): Hydropower / Navigation
River: Youxi
Reservoir capacity: 108 m3x106
Construction Dates
Start of Project: 04/91
Start of RCC: 04/91
End of RCC: 10/93
End of Project: 12/95
Specifications
Height: 63 metres
Length: 197 metres
Volume of RCC: 126 m3x103
Total volume: 184 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 50 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 90 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: DNOCS (Departamento Nacional de Obras Contra a Secas)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Capiibaribe
Reservoir capacity: 204 m3x106
Construction Dates
Start of Project: 07/96
Start of RCC: 07/96
End of RCC: 10/98
End of Project: -/99
Specifications
Height: 63 metres
Length: 442 metres
Volume of RCC: 442 m3x103
Total volume: 470 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Dona Francisca Energértica SA
Type: Gravity
Purpose(s): Hydropower
River: Jacuí
Reservoir capacity: 335 m3x106
Construction Dates
Start of Project: 08/98
Start of RCC: 08/98
End of RCC: 10/00
End of Project: 12/00
Specifications
Height: 63 metres
Length: 670 metres
Volume of RCC: 485 m3x103
Total volume: 503 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 18 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: Hanjiang Hydropower Development Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation
River: Han
Reservoir capacity: 229 m3x106
Construction Dates
Start of Project: 11/03
Start of RCC: 11/03
End of RCC: 05/05
End of Project: 06/07
Specifications
Height: 63 metres
Length: 346 metres
Volume of RCC: 194 m3x103
Total volume: 631 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: Chongqing Youshui River Hydropower Development Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Youshui
Reservoir capacity: 152 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 63 metres
Length: 194 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Malaysia
Owner: Public Works Department
Type: Gravity
Purpose(s): Water Supply
River: Sungai Bengoh
Reservoir capacity: 144 m3x106
Construction Dates
Start of Project: 06/07
Start of RCC: 06/07
End of RCC: 05/10
End of Project: -/12
Specifications
Height: 63 metres
Length: 267 metres
Volume of RCC: 130 m3x103
Total volume: 172 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Low-lime flyash (ASTM Class F) |

Details
Country: Greece
Owner: Crete Development Organisation
Type: Hardfill
Purpose(s): Irrigation
River: Valsamiotis
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: 10/05
Start of RCC: 10/05
End of RCC: 12/10
End of Project: -/14
Specifications
Height: 63 metres
Length: 335 metres
Volume of RCC: 640 m3x103
Total volume: 820 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.80 | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: China
Owner: Meng County Longhuakou Hydropower Co. Ltd.
Type: Gravity
Purpose(s): unknown
River: Longhua
Reservoir capacity: 30 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/10
End of Project: -/10
Specifications
Height: 63 metres
Length: 353 metres
Volume of RCC: -
Total volume: 414 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Chile
Owner: Colbún SA
Type: Gravity
Purpose(s): Hydropower
River: BioBio
Reservoir capacity: -
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/13
End of Project: -/14
Specifications
Height: 63 metres
Length: 125 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Iran
Owner: Boushehr Regional Water Company
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Dashte Palang
Reservoir capacity: 151 m3x106
Construction Dates
Start of Project: 07/13
Start of RCC: 07/13
End of RCC: -/26
End of Project: -/28
Specifications
Height: 63 metres
Length: 800 metres
Volume of RCC: 540 m3x103
Total volume: 690 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates