SEARCHING
... please wait

Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Tucuruí - 2nd PhaseBrazilEletronorte SAHTocantins4580006/9806/9909/0010/057815412881383 (3) (3)*separate 3003007030(N)
JaginIranHormozgan Water AuthorityF I WJagin30012/0105/0405/0509/0778220232382V
0.30
(3')
(3')*
0.75(3')*0.75(12)300300105
160
90
90
(N)
ManghekouChinaJiyuan City Water BureauMenghe11- /05- /06- /07- /0878215160249           
ToppuJapanHokkaido PrefectureF I WToppu3607/0206/0510/0803/1478309440530V
0.80
(1)
(1)
0.80(1)0.80(1)25010008436(F)
NarasTurkeyDSI - State Hydraulic WorksF IManavgat104- /1012/1201/1405/14784486206770.15(1)0.80(1)*0.80(12)30030011090(N)
BeyyurduTurkeyDSI - State Hydraulic WorksHBembo809/08- /13- /16- /17781761862090.10(1)0.80(1)*0.80(12)300120010080(N)
Minas San FranciscoEcuadorCelec Ererjubones CpHJubones14- /12- /14- /1708/1878209        300300   
MandianChinaMandian12340- /15- /16- /18- /1978231             
Shah wa ArüsAfghanistanMinistry of Energy and WaterF H I WShakardar10- /12- /13- /1904/2178303270337V
0.20
(1)0.80(1)*0.80(1)30030010545(N)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Brazil

Owner: Eletronorte SA

Type: Gravity

Purpose(s): Hydropower

River: Tocantins

Reservoir capacity: 45800 m3x106

Construction Dates

Start of Project: 06/98

Start of RCC: 06/98

End of RCC: 09/00

End of Project: 10/05

Specifications

Height: 78 metres

Length: 1541 metres

Volume of RCC: 288 m3x103

Total volume: 1383 m3x103

Construction Methods

Facings

Upstream
SlopeType
 RCC against formwork
Downstream
SlopeType
 RCC against formwork  [stepped face]
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
30Natural pozzolan (ASTM Class N)
  
Tucuruí - 2nd Phase completed
Tucuruí - 2nd Phase completed

Full Dam Information

Details

Country: Iran

Owner: Hormozgan Water Authority

Type: Gravity

Purpose(s): Flood Control / Irrigation / Water Supply

River: Jagin

Reservoir capacity: 300 m3x106

Construction Dates

Start of Project: 12/01

Start of RCC: 12/01

End of RCC: 05/05

End of Project: 09/07

Specifications

Height: 78 metres

Length: 220 metres

Volume of RCC: 232 m3x103

Total volume: 382 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
0.30RCC against formwork (GEVR/GE-RCC)  [stepped face]
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
105
160
Pozzolan (kg/m3)Pozzolan Type
90Natural pozzolan (ASTM Class N)
90 
Jagin completed
Jagin completed

Full Dam Information

Details

Country: China

Owner: Jiyuan City Water Bureau

Type: Gravity

Purpose(s): unknown

River: Menghe

Reservoir capacity: 11 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/07

End of Project: -/08

Specifications

Height: 78 metres

Length: 215 metres

Volume of RCC: 160 m3x103

Total volume: 249 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Manghekou completed
Manghekou completed

Full Dam Information

Details

Country: Japan

Owner: Hokkaido Prefecture

Type: Gravity

Purpose(s): Flood Control / Irrigation / Water Supply

River: Toppu

Reservoir capacity: 36 m3x106

Construction Dates

Start of Project: 07/02

Start of RCC: 07/02

End of RCC: 10/08

End of Project: 03/14

Specifications

Height: 78 metres

Length: 309 metres

Volume of RCC: 440 m3x103

Total volume: 530 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.80Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
2501000

Cementitious material

Cement (kg/m3)
84
Pozzolan (kg/m3)Pozzolan Type
36Low-lime flyash (ASTM Class F)
  
Toppu completed
Toppu completed

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Gravity

Purpose(s): Flood Control / Irrigation

River: Manavgat

Reservoir capacity: 104 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: 01/14

End of Project: 05/14

Specifications

Height: 78 metres

Length: 448 metres

Volume of RCC: 620 m3x103

Total volume: 677 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.15Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
110
Pozzolan (kg/m3)Pozzolan Type
90Natural pozzolan (ASTM Class N)
  
Naras completed
Naras completed

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Gravity

Purpose(s): Hydropower

River: Bembo

Reservoir capacity: 8 m3x106

Construction Dates

Start of Project: 09/08

Start of RCC: 09/08

End of RCC: -/16

End of Project: -/17

Specifications

Height: 78 metres

Length: 176 metres

Volume of RCC: 186 m3x103

Total volume: 209 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3001200

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
80Natural pozzolan (ASTM Class N)
  
Beyyurdu under construction
Beyyurdu under construction

Full Dam Information

Details

Country: Ecuador

Owner: Celec Ererjubones Cp

Type: Gravity

Purpose(s): Hydropower

River: Jubones

Reservoir capacity: 14 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/17

End of Project: 08/18

Specifications

Height: 78 metres

Length: 209 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Minas San Francisco completed
Minas San Francisco completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): unknown

River: Mandian

Reservoir capacity: 12340 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/18

End of Project: -/19

Specifications

Height: 78 metres

Length: 231 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Afghanistan

Owner: Ministry of Energy and Water

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Shakardar

Reservoir capacity: 10 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/19

End of Project: 04/21

Specifications

Height: 78 metres

Length: 303 metres

Volume of RCC: 270 m3x103

Total volume: 337 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.20 
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
105
Pozzolan (kg/m3)Pozzolan Type
45Natural pozzolan (ASTM Class N)
  
Shah wa Arüs on Google Earth