Dam Search Results
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Nangankou | China | Dongqiao County | I | Zaoshui | 4 | - /69 | - /70 | - /71 | - /72 | 32 | 85 | |||||||||||||
| Langshan [A] | China | Dinggeniu | 33 | - /74 | - /76 | - /78 | - /79 | 41 | 173 | 36 | ||||||||||||||
| Liangsanping [A] | China | Sixian Water Resources Bureau | H | Leishui | 4 | - /79 | - /80 | - /81 | - /82 | 35 | 33 | 3 | 3 | |||||||||||
| Kengkou | China | Kengkou Reservoir Management Office | H W | Youxi | 27 | 11/84 | 11/85 | 04/86 | 11/86 | 57 | 123 | 43 | 62 | V | (9) | 0.75 | (10) | 0.75 | (13) | 250 & 500 | 250 & 500 | 60 60 | 120 80 | (F) |
| Gantangping | China | Hydropower Bureau, Lanshan County | H | Yonghe | 9 | - /84 | - /86 | - /88 | - /90 | 52 | 180 | 220 | (F) | |||||||||||
| Yuxi [A] | China | W | Yuxi | 1 | - /85 | - /87 | - /88 | - /89 | 38 | 102 | (F) | |||||||||||||
| Rongdi | China | Department of Water Resources & Hydropower, Guangxi Zhuang Autonomous Region | F H I | Dulanghe | 19 | 04/88 | 11/88 | 07/89 | 06/91 | 53 | 136 | 61 | 108 | V | (7) | 0.75 | (10) | 0.65 | (1) | 300 | 300 | 90 69 | 140 111 | (F) |
| Longmentan Nº1 | China | Dehua County, Fujian Province | H I W | Chanxi | 53 | 12/85 | 12/87 | 08/89 | 09/89 | 58 | 150 | 71 | 93 | V 0.30 | (12) (12) | 0.75 | (10) | 0.75 | (13) | 300 | 300 | 72 54 | 82 86 | (F) |
| Tongjiezi (with Niurixigou saddle dam) | China | Guodian Dadu River Basin Hydropower Development Co. | F H I N | Dadu | 200 | 01/85 | 10/88 | 12/89 | 10/94 | 88 | 1029 | 407 | 855 | V | (1) | 0.75 | (10) | 0.75 | (1) | 300 - 500 | 300 - 500 | 79 82 | 79 83 | (F) |
| Shangban | China | H | Wenchuanxi | 10 | - /87 | - /88 | - /89 | - /89 | 47 | 122 | 74 | |||||||||||||
| Tianshenqiao Nº2 | China | China Southern Power Grid | F H | Nanpan | 116 | 01/84 | 04/87 | 06/90 | 12/92 | 61 | 471 | 143 | 284 | V | (1) | V 0.40 | (10) | ogee | (1) | 250 | 250 | 79 | 79 | (F) |
| Maoeryan [A] | China | Shiqi | 33 | - /68 | - /88 | - /91 | - /93 | 35 | ||||||||||||||||
| Yantan | China | Datang Yantan Hydropower Co. Ltd. | F H N | Hongshui | 3350 | 03/85 | 02/89 | 03/92 | 12/95 | 110 | 525 | 626 | 905 | V | (1) | V 0.80 | (1) (1)* | ogee | (1) | 300 | 300 | 55 | 104 | (F) |
| Shuikou | China | Shuikou Hydropower Plant | F H N | Min | 2613 | 03/87 | 10/90 | 05/92 | 05/95 | 101 | 791 | 600 | 1710 | V | (1) | 0.73 | (1) | ogee | (1) | 200 - 330 | 200 - 330 | 60 70 | 110 90 | (F) |
| Wan’an | China | China Guodian Corporation | F H I N | Gan | 2216 | 11/84 | 12/90 | 12/92 | 06/94 | 68 | 1104 | 156 | 1480 | V | (1) | 0.80 | (1) | ogee | (1) | 300 | 300 | 65 | 105 | (F) |
| Guangzhou PSS- Lower dam | China | China Southern Power Grid | H | Liuxihe | 30 | 12/94 | 10/91 | 12/92 | 10/00 | 61 | 153 | 32 | 57 | V | (1) | 0.70 | (3)* | ogee 0.78 | (1) (1) | 300 | 300 | 62 | 108 | (F) |
| Guxian (GuhXiahn) | China | Yellow River Conservancy Commission | F H I | Luo | 1175 | - /78 | - /89 | - /92 | - /93 | 125 | 315 | |||||||||||||
| Jinjiang | China | Jinjiang Electric Co. | F H | Jinjianghe | 189 | 07/90 | 10/91 | 03/93 | 07/93 | 68 | 229 | 182 | 267 | V | (1) | 0.75 | (1) | 0.65 | (1) (1) | 300 | 3000 | 70 | 80 | (F) |
| Puding [A] | China | Guizhou Qianyuan Power Co. Ltd. | H I W | Sanchahe | 377 | 03/89 | 06/92 | 05/93 | 02/94 | 75 | 196 | 103 | 137 | V | (1) | 0.35 | (1) | ogee 0.35 | (1) (1) | 300 | 300 | 85 54 | 103 99 | (F) |
| Shuidong | China | Fujian Shuikou Power Generation Group | H N | Youxi | 108 | 04/91 | 11/92 | 10/93 | 12/95 | 63 | 197 | 126 | 184 | V | (7) | 0.75 | (10) | 0.75 | (1) | 300 | 300 | 50 | 90 | (F) |
| Daguangba | China | Hainan Provincial Electric Power Company (HEPCO) | H I W | Changhua | 1710 | 06/90 | 12/91 | 12/93 | 07/95 | 57 | 719 | 485 | 860 | V | (1) | 0.75 | (10) (3) | 0.75 | (1) | 300 | 300 | 55 | 96 | (F) |
| Suoshai | China | Guizhou Hongfeng Hydropower Plant | H | Sancha | 420 | - /89 | - /90 | - /93 | - /94 | 75 | 196 | 88 | ||||||||||||
| Shanzi | China | Lianjiang Water Conservancy Bureau | F H I W | Aojiang | 172 | 08/92 | 11/93 | 05/94 | 06/95 | 66 | 274 | 180 | 272 | V | (5) | 0.80 | (10) | 0.77 | (13) | 300 | 300 | 65 55 | 125 95 | (F) |
| Wenquanbao [A] | China | Wenquanbao Reservoir Management Office | F H I W | Tanghe | 7 | 10/91 | 10/92 | 06/94 | - /95 | 48 | 188 | 55 | 63 | V | (4) | 0.30 | (3) | ogee | (13) | 300 | 300 | 110 69 | 68 85 | (F) |
| Catou | China | Dongyuan County | H | Yinjiang | 1 | - /92 | - /93 | - /94 | - /94 | 35 | 115 | 223 | 0.90 | 0.90 | 0.90 | |||||||||
| Maojiang [A] | China | Lanshan County Hydropower Bureau | H I | Xiang | 2 | - /92 | - /93 | - /94 | - /95 | 45 | 150 | 45 | (F) | |||||||||||
| Sishanping [A] | China | Huangcen Reservoir Management Office | F H I | Leishui | 3 | - /92 | - /93 | - /94 | - /95 | 56 | 147 | 18 | (F) | |||||||||||
| Xibingxi [A-G] | China | Department of Electric Power, Lonyan City, Fujian Province | H W | Longshanxi | 9 | 08/93 | 12/94 | 07/95 | 10/95 | 64 | 93 | 25 | 33 | V 0.08 | (4) (4) | 0.65 | (3) | ogee 0.65 | (13) | 300 - 350 | 300 - 350 | 80 79 | 120 105 | (F) |
| Guanyinge (Kwan-in-Temple) | China | Guanyinge Reservoir Management Bureau | F H I W | Taizi | 2168 | 05/90 | 09/91 | 09/95 | 10/95 | 82 | 1040 | 1240 | 1876 | V 0.10 | (1) (1) | 0.70 | (1) | 0.70 | (1) | 270 - 280 | 750 | 91 | 39 | (F) |
| Shimantan | China | Department of Water Resources, Henan Province | F I W | Gunhe | 120 | 07/93 | 04/94 | 12/95 | 07/96 | 41 | 650 | 272 | 351 | V | (3') | 0.75 | (3)* | 0.75 | (1) | 300 | 300 | 98 51 | 98 107 | (F) |
| Shibanshui | China | Fengdu Water Resources Bureau | F H R | Longxihe | 105 | 12/92 | 04/94 | - /95 | - /96 | 84 | 445 | 335 | 564 | V | (3') | 0.65 | (1) | 0.65 | (13) | 300 | 1000 | 126 60 | 84 90 | (F) |
| Bailongtan | China | Guangxi-Guiguang Electric Power Development Co. Ltd. | H I N | Hongshuihe | 340 | 02/93 | 10/95 | 04/96 | 08/97 | 34 | 710 | 62 | 80 | V | (1) | 0.70 | (10)* | 0.70 | (5)* | 300 | 300 | 73 99 | 110 60 | (F) |
| Mantaicheng | China | Wangqing County Water Conservancy Bureau | H I | Gayahe | 10 | 08/92 | 01/93 | 12/96 | 08/97 | 37 | 337 | 78 | 100 | V | (1) | 0.75 | (10) | ogee 0.70 | (1) (1) | 300 | 1000 | 60 | 120 | (F) |
| Dahekou | China | Chongqing Wujiang Power Company | F H | Apengjiang | 115 | - /93 | - /94 | - /96 | - /97 | 85 | 149 | 33 | ||||||||||||
| Wanyao | China | Wanyao Reservoir Management Bureau | F H I W | Dahexi | 223 | 10/93 | 01/95 | 05/97 | 07/97 | 83 | 390 | 320 | 458 | V 0.20 | (1) (1) | 0.70 | (5) | 0.75 | (13) | 300 | 300 | 64 | 96 | (F) |
| Shuangxi | China | Department of Electricity, Dapu County, Guangdong Province | F H I W | Meixihe | 95 | 01/95 | 03/96 | 10/97 | 12/97 | 60 | 221 | 113 | 172 | V | (9) | 0.80 | (1) | 0.78 | (1) | 300 | 300 | 90 55 | 110 105 | (F) |
| Taolinkou | China | Department of Water Resources, Hebei Province | F H I R W | Qinglonghe | 859 | 11/92 | 12/94 | 12/97 | - /98 | 75 | 500 | 585 | 1350 | V 0.15 | (1) | 0.78 | (1) | ogee 0.65 | (1) (1) | 300 | 300 | 135 70 | 70 85 | (F) |
| Fengxiangxia [A] | China | Fengdu Hydropower Bureau | H | Huilonghe | 8 | - /93 | - /95 | - /97 | - /98 | 90 | 158 | 770 | 0.10 | 0.76 | 0.76 | |||||||||
| Yongxi Nº3 | China | Yongxi Hydroelectric Co. Ltd. | F H W | Dazhangxi | 68 | 05/96 | 10/97 | 10/98 | 09/99 | 87 | 198 | 170 | 255 | V | (3') | 0.73 | (10) | ogee 0.73 | (1) (1) | 280 | 3000 | 115 80 | 95 90 | (F) |
| Huatan | China | Ya’an Electricity Company | H | Yinghe | 8 | 01/96 | 06/96 | 12/98 | 05/99 | 85 | 173 | 240 | 290 | 0.20 | (1) | 0.80 | (1) | 0.80 | (1) | 300 - 400 | 300 - 400 | 78 74 | 95 90 | (F) |
| Changshun | China | Department of Water Resources, Hubei Province | H W | Yujiang | 68 | - /91 | 03/97 | 12/98 | 06/00 | 69 | 279 | 170 | 200 | V | (3') | 0.74 | (3) | 0.80 | (1) | 300 | 5000 | 134 72 | 89 48 | (F) |
| Waijin [A] | China | Fushan Power Station Management Bureau | H I | Nanxi | 7 | - /94 | - /96 | - /98 | - /99 | 47 | 235 | 240 | ||||||||||||
| Kengxiashan [A] | China | Wencheng County Kengxiashan Hydropower Development Co. Ltd. | H | Yuquanxi | 1 | - /96 | - /97 | - /98 | - /98 | 34 | 80 | |||||||||||||
| Fenhe Nº2 | China | Department of Water Resources, Shanxi Province | F H W | Fenhe | 130 | 11/96 | 08/98 | 03/99 | 06/00 | 87 | 350 | 362 | 448 | V 0.20 | (1) (1) | 0.75 | (5) | 0.75 | (1) | 300 | 3000 | 127 60 | 84 93 | (F) |
| Jiangya | China | Lishui Hydropower Development Co. Ltd. | F H I N W | Loushui | 1741 | 07/95 | 10/96 | 04/99 | - /01 | 131 | 368 | 1100 | 1310 | V | (3') | 0.80 | (3)* | ogee 0.80 | (13) | 300 | 3000 | 87 64 46 | 107 96 107 | (F) |
| Songyue (1st Stage) | China | Helong Electricity Corporation | F H I R W | Hailanhe | 21 | 09/97 | 01/98 | 04/99 | 09/99 | 29 | 271 | 44 | 77 | V | (1) | 0.73 | (10) | conduit | 300 | 2000 | 80 | 100 | (F) | |
| Yangxishui Nº3 | China | Shaoguang Electricity Corporation Ltd | H | Yangxishui | 2 | 11/97 | 09/98 | 06/99 | 07/00 | 46 | 202 | 100 | 139 | V | (1) | V 0.75 | (1) (1)* | 0.70 | (12) | 300 | 300 | (F) | ||
| Baishi | China | Department of Water Resources, Liaoning Province | F H I W | Dalinghe | 1645 | 09/96 | 04/97 | 09/99 | 12/00 | 49 | 513 | 111 | 603 | V 0.10 | (1) (1) | 0.70 | (1) | 0.76 | (1) | 300 | 300 | 72 | 58 | (F) |
| Hongpo [A-G] | China | Xishan Xingyu Water Resources Corporation | W | Qinggoushui | 3 | 10/97 | 07/98 | 11/99 | 12/99 | 55 | 244 | 71 | 77 | V | (3') | 0.50 | (1) | 0.50 | (1) | 300 | 3000 | 54 | 99 | (F) |
| Gaobazhou | China | Qingjiang Hydropower Development Corporation | F H N | Qingjiang | 536 | 05/97 | 11/98 | 04/00 | 01/01 | 57 | 440 | 210 | 940 | V | (9) | 0.75 | (1) | 0.75 | (1) | 300 | 300 | 123 86 | 100 86 | (F) |
| Dagangou | China | Ge'ermu Hydroelectric Responsibility Corporation Ltd. | H | Geermu | 9780 | - /96 | - /98 | - /00 | - /01 | 40 | ||||||||||||||
| Shankou Nº3 [A] | China | Shixing County Power Development Corporation | F H | Du’anshui (Chengjiang) | 48 | 09/99 | 02/00 | 01/01 | 03/01 | 57 | 179 | 90 | 119 | V | (3') | 0.75 | (3') | 0.80 | (1) | 330 | 3000 | 105 63 | 86 80 | (F) |
| Longshou Nº1 [A-G] | China | Department of Electricity, Gansu Province | H | Heihe | 13 | 04/99 | 03/00 | 06/01 | 09/01 | 80 | 258 | 187 | 210 | V 0.20 | (1) (1) | 0.75 | (1) | 0.75 | (1) | 300 | 3000 | 96 58 | 109 113 | (F) |
| Shimenzi [A] | China | Shimenzi Reservoir Engineering Management Office | H I W | Taxi | 80 | 06/98 | 06/99 | 06/01 | 10/01 | 110 | 176 | 188 | 211 | 0.142 V | (3') (3') | V 0.18 | (3) (3) | crest | (12) | 300 | 3000 | 93 62 | 110 110 | (F) |
| Dachaoshan | China | Department of Electricity, Yunnan Province | F H | Lancang (Mekong) | 89 | 10/97 | 12/98 | 10/01 | 07/02 | 115 | 481 | 757 | 1287 | V 0.20 | (3') | 0.70 | (10)* | 0.70 | (13) | 300 | 300 | 94 67 | 94 101 | (N) |
| Mianhuatan | China | Mianhuatan Hydroelectric Development Corporation | F H N W | Ting | 2035 | 04/98 | 12/98 | 11/01 | 04/02 | 111 | 302 | 500 | 615 | V | (9) | 0.75 | (3)* | 0.70 | (13) | 300 | 3000 | 82 59 48 | 100 88 88 | (F) |
| Yanwangbizi | China | Chaoyang Water Conservancy Bureau | F H I W | Daling | 217 | - /96 | - /97 | - /01 | - /02 | 35 | 383 | 87 | 220 | 64 | 118 | (F) | ||||||||
| Yushi | China | Yushi Reservoir Construction Management Bureau | F I W | Biliuhe | 89 | - /98 | - /99 | - /01 | - /02 | 50 | 267 | 218 | 233 | 70 | 70 | (F) | ||||||||
| Xiaoxihe | China | Department of Electricity, Feng Shun County | H I | Xiaoxihe | 5 | - /99 | - /00 | - /01 | - /02 | 62 | 103 | 47 | 66 | (F) | ||||||||||
| Shuangkengkou [A] | China | H | Xiaoxihe | 12 | - /99 | - /00 | - /01 | - /02 | 68 | |||||||||||||||
| Helong | China | Electricity Corporation, Yanji | H R W | Hailanhe | 30 | 11/98 | 08/99 | 01/02 | 12/02 | 30 | 244 | 43 | 89 | V | (1) | 0.75 | (10) | ogee | (10)* | 300 | 2000 | 113 | 113 | (F) |
| Shapai [A] | China | Sichuan Minjiang Hydropower Co. Ltd. | H | Caopohe | 18 | 06/97 | 03/00 | 05/02 | 04/03 | 132 | 230 | 380 | 392 | V 0.10 | (3') | 0.21 | (3) | crest 0.21 | (1) | 300 | 300 | 108 89 | 72 89 | (F) |
| Xiaoyangxi (and saddle dam) | China | Guizhou Province Electric Power Co. | W | Xia Oyangxi | 15 | 05/00 | 01/01 | 10/02 | 12/03 | 45 | 118 | 47 | 49 | V | (3') | 0.75 | (3')* | 0.75 | (12) | 350 | 3500 | 138 60 | 113 90 | (F) |
| Yangxishui Nº1 | China | Corporation of Energy Development, Ruyuan County, Guangdong Province | H I | Yangxi | 100 | 12/00 | 10/01 | 11/02 | 06/03 | 82 | 244 | 241 | 340 | V | (1) | V 0.75 | (1) (1)* | 0.70 | (12) | 300 | 300 | (F) | ||
| Nankengyuan [A] | China | Jiangning Nankengyuan Hydropower Development Co. Ltd. | H | Xiaoxihe | 1 | - /98 | - /00 | - /02 | - /03 | 34 | 114 | |||||||||||||
| Hengxi | China | H | Yangxi | 100 | - /99 | - /00 | - /02 | - /03 | 82 | |||||||||||||||
| Junxi II [A] | China | Longquan City Bureau of Hydropower | H | Junxi | 5 | - /00 | - /01 | - /02 | - /03 | 69 | 192 | |||||||||||||
| Wanmipo | China | Hunan Wuling Hydroelectric Development Corporation | H N | Youshui | 378 | 08/01 | 11/02 | 05/03 | 05/04 | 65 | 238 | 141 | 376 | V | (3') | 0.75 | (12) | ogee | (12) | 300 | 3000 | 86 68 | 103 83 | (F) |
| Linhekou [A] | China | Shaanxi Lan River Hydropower Development Corporation | H I | Lanhe | 147 | - /99 | 12/01 | 06/03 | - /04 | 100 | 311 | 229 | 293 | curve | (3') | curve | (3') | ogee | (1) | 300 | 3000 | 74 66 | 111 111 | (F) |
| Tizidong | China | Chongging Electricity Ltd. | H | Apeng | 25 | 08/01 | 10/02 | 10/03 | 11/03 | 56 | 193 | 72 | 161 | (12) | (12) | (12) | (F) | |||||||
| Huilong PSS - Upper dam | China | Henan Electric Power Corporation | H | Huilonggou | 1 | 06/01 | 11/02 | 11/03 | - /05 | 54 | 208 | 73 | 76 | V | (3') | 0.75 | (3') | none | 300 | 300 | (F) | |||
| Maobaguan [A] | China | Shaanxi Hanjiang Hydropower Development Co. Ltd. | H | Renhe | 2 | - /00 | - /02 | - /03 | - /04 | 66 | 120 | 81 | 106 | |||||||||||
| Shanggou [A] | China | Xifeng County Water Conservancy Bureau | W | Yangshui | 1 | - /01 | - /02 | - /03 | - /04 | 39 | 176 | |||||||||||||
| Wangkeng | China | Wang Keng Power Station Co. Ltd. | H | Tangkouxi | 15 | - /01 | - /02 | - /03 | - /04 | 56 | 159 | 38 | 40 | (F) | ||||||||||
| Liubo [A] | China | Anhui Hydropower Development Co. Ltd., | F H | Xipihe | 51 | - /02 | - /03 | - /03 | - /04 | 70 | 258 | 130 | 168 | (F) | ||||||||||
| Zhouning | China | Mindong Electromechanical Development Corporation | H | Muyangxi | 47 | - /02 | 04/03 | 03/04 | 06/04 | 73 | 206 | 159 | 199 | V | (3') | 0.72 | (3') | 0.70 | (12) | 300 | 300 | 67 50 | 100 92 | (F) |
| Huilong PSS - Lower dam | China | Henan Electric Power Corporation | H | Huilonggou | 2 | 06/01 | - /02 | 06/04 | - /05 | 54 | 175 | 88 | 105 | V | (3') | 0.75 | (3')* | 0.75 | (12) | 300 | 300 | (F) | ||
| Tongkou | China | Beichuan Bashu Tongkou River Development Corporation | H | Tongkou | 36 | 10/98 | - /02 | - /04 | - /04 | 72 | 198 | 300 | 352 | V | (1) | 1.10 | (1) | ogee | (1) | 300 | 300 | (F) | ||
| Pingban | China | Guangxi-Guiguan Electric Power Co. Ltd. | H | Nanpan | 278 | 12/01 | - /02 | - /04 | 07/05 | 62 | 396 | 150 | 700 | V | (3') | 0.70 | (3') | ogee | (12) | 300 | 300 | (F) | ||
| Xuanmiaoguan [A] | China | Yineng Co., Ltd. | 41 | - /00 | - /02 | - /04 | - /05 | 66 | 191 | 66 | ||||||||||||||
| Sanjiang [A] | China | Sanjianghe | 7 | - /02 | - /03 | - /04 | - /04 | 72 | 138 | 38 | ||||||||||||||
| Changtan [A] | China | Guangdong Shanneng group Co. | H | Tuwushui | 17 | - /03 | - /03 | - /04 | - /04 | 53 | 124 | 29 | ||||||||||||
| Yujiankou | China | Chongqing Yujiankou Hydropower Co. Ltd. | H | Long | 9 | 08/01 | - /03 | - /04 | - /05 | 50 | 156 | 118 | 147 | V | (3') | 0.70 | (3') | 0.85 | (1) | (F) | ||||
| Letan | China | Guangxi-Guiguan Electric Power Co. Ltd., | H I N | Xijiang | 950 | - /02 | - /03 | - /04 | - /05 | 66 | 586 | 50 | 210 | |||||||||||
| Yujianhe [A] | China | Guiyang Water Conservancy Bureau | F I W | Wu | 11 | - /02 | - /03 | - /04 | - /05 | 81 | 180 | 105 | 110 | 0.10 | 0.76 | 0.76 | ||||||||
| Xiakou [A] | China | Hubei Nanzhang Xiakou Electric Co. Ltd. | H | Juhe | 99 | - /02 | - /03 | - /04 | - /05 | 85 | 192 | 131 | ||||||||||||
| Jiemian Ataguia [H-F] | China | - /00 | - /02 | - /04 | - /06 | 16 | (F) | |||||||||||||||||
| Qinglianxi | China | H | Meixi | 20 | - /00 | - /02 | - /04 | - /06 | 96 | 178 | ||||||||||||||
| Zhaolaihe [A] | China | Changyang Electric Power Bureau | H I W | Duhu | 70 | 12/03 | 03/04 | 05/05 | 10/05 | 107 | 206 | 166 | 255 | curve | (3') | curve | (3') | (3') | 300 | 3000 | 84 126 | 126 103 | (F) | |
| Xihe | China | Hanjiang Hydropower Development Ltd. | F H N | Han | 229 | 11/03 | 02/04 | 05/05 | 06/07 | 63 | 346 | 194 | 631 | (F) | ||||||||||
| Suofengying | China | Guizhou-Wujiang Hydropower Development Co. Ltd. | F H I N W | Wu | 201 | 10/00 | 06/03 | 08/05 | 03/06 | 116 | 165 | 421 | 739 | V 0.25 | (3') (3') | 0.70 | (3') | 0.70 | (1) | 300 | 3000 | 64 | 95 | (F) |
| Changzhou | China | H | Xun | 56 | - /93 | - /02 | - /05 | - /07 | 56 | |||||||||||||||
| Xiaqiao [A] | China | Guangxi Longjiang Electric Power Corporation | H | Long | 49 | - /02 | - /03 | - /05 | - /06 | 68 | 167 | 172 | 226 | |||||||||||
| Huizhou PSS - Lower dam | China | China Southern Power Grid | H | Caitouhe | 30 | - /02 | - /03 | - /05 | - /11 | 61 | 420 | 235 | 242 | |||||||||||
| Tangkeng [A] | China | Qingtian Yongwen Hydropower Co. | H | Guxi | 12 | - /03 | - /04 | - /05 | - /05 | 66 | (12) | (12) | (12) | |||||||||||
| Xixi | China | Xixi Reservoir Development Co. Ltd. | F H I W | Daxi | 85 | - /03 | - /04 | - /05 | - /06 | 71 | 243 | 231 | 244 | (F) | ||||||||||
| Baise | China | Guangxi-Youjiang Hydraulic Development Co.Ltd. | F H I N W | You | 5660 | 10/01 | 12/02 | 04/06 | 12/06 | 130 | 720 | 1995 | 2672 | V | (9) | 0.80 | (1) | 0.80 | (1) | 300 | 3000 | 80 50 | 132 110 | (F) |
| Dahuashui [A] | China | Wujaing Qingshuihe Hydropower Development Co. Ltd. | F H | Qingshuihe | 276 | 12/03 | 04/05 | 11/06 | - /07 | 135 | 198 | 550 | 670 | curve | (3') | curve | (3') | (1) | 300 | 3000 | 81 94 | 81 94 | (F) | |
| Niuqiao [A] | China | Niu Qiao Reservoir Development Co. Ltd. | H | Qingtonghe | 26 | - /03 | - /05 | 12/06 | - /07 | 62 | 201 | 710 | ||||||||||||
| Qilitang [A] | China | H | Liuchi | 71 | - /03 | - /04 | - /06 | - /07 | 81 | |||||||||||||||
| Xinjiangshankou | China | H | Kaidu | - /97 | - /04 | - /06 | - /08 | 71 | ||||||||||||||||
| Baisha | China | China Huadian Corporation | F H | Wanan | 199 | - /04 | - /05 | - /06 | - /06 | 75 | 172 | 211 | 239 | |||||||||||
| Leidatan | China | Leidatan Corporation | H | Yingtaoyuangou | 94 | 03/03 | - /05 | - /06 | 06/07 | 84 | 202 | 240 | 340 | V | (3') | 0.70 | (3') | 0.70 | (1) | |||||
| Hongkou Ataguia [H-F] | China | - /04 | - /05 | - /06 | - /07 | 36 | ||||||||||||||||||
| Xiaoxi | China | Hunan Xiangtou Xinshao Youxi Hydropower Development Corporation Ltd. | H | Zishui | 168 | - /04 | - /05 | - /06 | - /07 | 47 | 268 | |||||||||||||
| Zhouba | China | Chengdu Haineng Power Co. Ltd. | F H | Mabianhe | 204 | - /04 | - /05 | - /06 | - /07 | 73 | 163 | 229 | 405 | V | (1) | 0.70 | (1) | 0.78 | (1) | 300 | 300 | 110 66 | 73 66 | (F) |
| Shaba [A] | China | Guizhou Zhongsui Energy Ltd. | H | Hongdu | 99 | - /04 | - /05 | - /06 | - /07 | 87 | 148 | 67 | 90 | |||||||||||
| Wuchuanshaba [A] | China | H | Wujiang | 9940 | - /04 | - /05 | - /06 | - /07 | 87 | |||||||||||||||
| Daxia | China | China Guodian Corporation | H I | Quan | 20 | - /04 | - /05 | - /06 | - /07 | 88 | 160 | 205 | ||||||||||||
| Zaoshi | China | Lishui Basin Hydraulic and Hydroelectric Development Corporation | F H N W | Dieshui | 1439 | - /04 | - /05 | - /06 | - /07 | 88 | 351 | 450 | 930 | V 0.25 | (3') | 0.80 | (3') | 0.75 | (1) | 300 | 3000 | 53 83 | 99 102 | (F) |
| Jupudu | China | Datang International Power Generation Co. Ltd. | H | Lixian (Black) | 174 | 11/04 | - /05 | - /06 | - /07 | 95 | 320 | 480 | 800 | V 0.20 | (3) | 0.80 | (3) | 0.80 | (3) | |||||
| Tukahe | China | Datang International Power Generation Co. Ltd. | H | Lixian | 78 | 04/04 | 12/05 | - /06 | - /07 | 59 | 300 | 255 | 570 | V | (3') | (3') | (3') | 300 | 3000 | 65 93 | 110 113 | (S) | ||
| Longqiao [A] | China | Lichuan City Yujaing Valley Hudropower Ltd. Hubei Province | H R | Yu | 26 | 12/05 | 03/06 | 02/07 | 05/07 | 95 | 156 | 135 | 160 | curve | (3') | curve | (3) | (3) | ||||||
| Huizhou PSS - Upper dam | China | China Southern Power Grid | H | Xiaojinhe | 30 | 10/04 | 12/05 | 05/07 | - /11 | 56 | 168 | 84 | 93 | V | (1) | 0.75 | (1) | 0.70 | (1) | 300 | 300 | 64 | 125 | (F) |
| Longtan (Stage 1) | China | Longtan Hydropower Development Co. Ltd. | F H N W | Hongshui | 16210 | 07/01 | 10/04 | 06/07 | 12/09 | 192 | 832 | 4623 | 7400 | V 0.25 | (3') | 0.70 | (3') | 0.68 | (12) | 300 | 300 | 99 86 | 121 109 | (F) |
| Hongkou | China | Fujian Hongkou Hydropower Co. Ltd. | H W | Huotong | 449 | - /03 | - /05 | - /07 | - /08 | 130 | 341 | 681 | 830 | |||||||||||
| Luojiaohe [A] | China | Guizhou Zhongshui Energy Co. Ltd. | H | Luojiao | 46 | - /05 | - /06 | - /07 | - /07 | 81 | 250 | 110 | ||||||||||||
| Baxiang Nº3 | China | Department of Electricity, Feng Shun County | H | Baxianghe | 8 | - /05 | - /06 | - /07 | - /08 | 44 | 207 | 63 | 83 | |||||||||||
| Tiecheng | China | Gansu Keyuan Electric Power Group Co. Ltd. | H | Datong | 1 | - /05 | - /06 | - /07 | - /08 | 44 | 143 | |||||||||||||
| Shihu | China | Zhouluo County Government | F I W | Lituohe | 58 | - /05 | - /06 | - /07 | - /08 | 56 | 193 | 162 | 354 | |||||||||||
| Yumen | China | Department of WaterResources, Henan Province | F H N | Luohe | 28 | - /05 | - /06 | - /07 | - /08 | 62 | 244 | 133 | 234 | |||||||||||
| Youshui | China | Chongqing Youshui River Hydropower Development Co. Ltd. | H | Youshui | 152 | - /05 | - /06 | - /07 | - /08 | 63 | 194 | |||||||||||||
| Qilinguan [A] | China | Nanhe Hydropower Development Ltd. | H | Nanhe | 14 | - /05 | - /06 | - /07 | - /08 | 77 | 140 | 45 | 55 | |||||||||||
| Manghekou | China | Jiyuan City Water Bureau | Menghe | 11 | - /05 | - /06 | - /07 | - /08 | 78 | 215 | 160 | 249 | ||||||||||||
| Bailianya [A] | China | Anhui Water Resources Development Co. Ltd. | F H I W | Dongpi | 480 | - /05 | - /06 | - /07 | 04/09 | 105 | 422 | 485 | 600 | V | (1) | 0.335 | (1) | 0.335 | (1) | 300 | 3000 | 72 56 | 108 84 | (F) |
| Nansha | China | Red River Hydropower Development Co. Ltd. | H | Honghe | 212 | 02/06 | - /07 | - /07 | 07/08 | 85 | ||||||||||||||
| Silin | China | Guizhou-Wujiang Hydropower Development Corporation | F H I N | Wujiang | 1593 | 11/05 | 11/06 | 03/08 | - /09 | 117 | 310 | 825 | 1100 | V | (1) | 0.70 | (1) | 0.70 | (1) | 66 89 | 100 109 | (F) | ||
| Weihou [A] | China | Xilin River Hydropower Development Co. Ltd. | H | Tuoniang | 133 | 03/05 | - /06 | 04/08 | - /09 | 82 | ||||||||||||||
| Guangzhao | China | Guizhou Qianyuan Power Co. Ltd. | H | Beipan | 3245 | 10/04 | 02/06 | 05/08 | - /09 | 201 | 412 | 2420 | 2800 | V 0.25 | (9) | 0.75 | (1) | 0.75 | (1) | 300 | 300 | 61 71 | 91 87 | (F) |
| Gelantan | China | Datang International Hydropower Generation Co. Ltd. | H | Lixian | 409 | 01/03 | 09/06 | 08/08 | - /09 | 113 | 466 | 903 | 1200 | V 0.20 | (3') | 0.75 | (3') | 0.75 | (1) | 77 93 | 77 93 | (S) | ||
| Jinghong | China | Huaneng Lancang River Hydropower Co. Ltd. | F H R | Lancang (Mekong) | 1139 | - /04 | - /05 | - /08 | - /09 | 108 | 705 | 848 | 3068 | V | (3) | 0.80 | (3) | (1) | 300 | 64 93 | 93 93 | (S) | ||
| Pengshui | China | Datang International Power Generation Co. Ltd. | H I | Changxi | 1465 | - /05 | - /06 | - /08 | - /09 | 117 | 326 | 608 | 1330 | V | (3') | 0.70 | (3') | 0.70 | (1) | 64 81 | 96 121 | (F) | ||
| Liujiadong | China | Guangxi Water Conservancy and Electric Power Corporation | H | Gui | 26 | - /06 | - /07 | - /08 | - /08 | 61 | 166 | 127 | ||||||||||||
| Shuhe | China | Datang Shaanxi Power Generation Co Ltd | H | Hanjiang | 176 | - /06 | - /07 | - /08 | - /09 | 72 | ||||||||||||||
| Qingxi [A] | China | Guizhou Qianyuan Power Co. Ltd. | H | Furong | 98 | - /06 | - /07 | - /08 | - /09 | 82 | 166 | 154 | ||||||||||||
| Nongling | China | Dehong Longjiang Hydropower Development Co. Ltd. | H | Long | 233 | - /06 | - /07 | - /08 | - /09 | 91 | 280 | 486 | ||||||||||||
| Shankou | China | Xinjiang Yili River Basin Development Authority | H | Tekes | 121 | 04/06 | - /07 | - /08 | - /09 | 50 | 496 | |||||||||||||
| Yunlonghe Nº3 [A] | China | Engshi Yuefeng Yunlong River Hydropower Development Co. Ltd. | H | Yunlong | 44 | 03/06 | 04/07 | 04/09 | - /11 | 139 | 119 | 182 | 207 | curve | (3') | curve | (3') | (3') | ||||||
| Yunkou [A] | China | Yujiang Hydropower Co. Ltd. | H | Wuni | 35 | 06/07 | 04/08 | 06/09 | - /12 | 119 | 152 | 200 | 205 | |||||||||||
| Wudu | China | Sichuan Wudu Water Conservancy and Hydropower Group Ltd. | F H I W | Fu | 572 | 10/04 | - /07 | - /09 | - /10 | 120 | 631 | 1151 | 1580 | V | (3') | 0.75 | (3') | 0.80 | (3') | (F) | ||||
| Huanghuazhai [A] | China | China Datang Corporation | H | Getu | 1748 | 07/06 | - /07 | - /09 | - /10 | 110 | 253 | 280 | 292 | 52 | 96 | (F) | ||||||||
| Tianhuaban [A] | China | Yunnan Dianneng Niulanjiang Hydropower Development Co. Ltd. | H | Niulan | 66 | 12/06 | - /07 | - /09 | - /10 | 113 | 160 | 182 | 360 | curve | (3') | curve | (3') | ogee | (3) | |||||
| Baishiya | China | Quifeng Water Supply Co. of Fangchenggang City | H I W | Xijiang | 26 | - /04 | - /07 | - /09 | - /12 | 74 | 190 | 230 | 240 | 0.75 | ||||||||||
| Chonghu’er | China | Xinjiang-Xinhua-Chonghuer Hydropower Development Co. Ltd. | H | Burgin | 85 | 10/06 | - /08 | - /09 | - /09 | 74 | 545 | 480 | ||||||||||||
| Xiaotianlong | China | Hongguo Water Resources Development Co. | W | Tuochang | 1 | - /07 | - /08 | - /09 | - /09 | 58 | 168 | 125 | ||||||||||||
| Maduhe [A] | China | Yichang Junwang Group Co. | H | Siyang | 33 | - /06 | - /08 | - /09 | - /10 | 100 | 185 | |||||||||||||
| Yangjiayuan [A] | China | Guizhou Tongzihe Hydropower Development Co. Ltd. | H W | Tongzhi | 78 | - /07 | - /08 | - /09 | - /10 | 68 | 153 | |||||||||||||
| Geliqiao | China | Wujiang Hydropower Development Corporation | H | Qingshuihe | 77 | 01/07 | 04/08 | - /09 | - /10 | 124 | 104 | 500 | ||||||||||||
| Wuyi | China | Dina | 99 | - /05 | - /07 | - /10 | - /12 | 103 | ||||||||||||||||
| Yongdingqiao | China | Liushahe | 17 | - /05 | - /07 | - /10 | - /12 | 123 | ||||||||||||||||
| Jin’anqiao | China | Hanergy, Yunnan Jinsha River Hydropower Co. Ltd. and Yunnan Investment and Development Co. Ltd. | H N R | Jinsha | 913 | 12/03 | 05/07 | - /10 | - /11 | 160 | 640 | 2400 | 4430 | V | (3) | 0.75 | (3) | 0.75 | (1) | 72 96 | 108 117 | (F) | ||
| Saizhu [A] | China | Yunnan Dianneng Group Holding Company | H | Xima | 3 | 04/06 | - /08 | - /10 | - /11 | 72 | 160 | 107 | 115 | curve | (3') | curve | (3') | (3) | ||||||
| Qianchang | China | Guodian Yunnan Power Co Ltd | H | Pudu | 22 | - /07 | - /08 | - /10 | - /11 | 81 | 148 | |||||||||||||
| Tiechuanqiao [A] | China | Yupaojiang | 25 | - /07 | - /08 | - /10 | - /11 | 95 | ||||||||||||||||
| Shidi | China | Chongqing Wujiang Power Company | H | Youshui | 163 | - /06 | - /08 | - /10 | - /12 | 30 | 214 | 260 | ||||||||||||
| Sanliping [A] | China | Hubei Energy Group Co. Ltd. | F H | Nanhe | 499 | - /07 | 05/08 | - /10 | - /11 | 133 | 285 | 390 | (1) | (1) | (1) | |||||||||
| Longhuakou | China | Meng County Longhuakou Hydropower Co. Ltd. | Longhua | 30 | - /08 | - /09 | - /10 | - /10 | 63 | 353 | 414 | |||||||||||||
| Naen [A] | China | Guangxi Water Conservancy and Electric Power Corporation | H | Baidu | 22 | - /06 | - /09 | - /10 | - /11 | 75 | 217 | |||||||||||||
| Luoboba [A] | China | Enshi Tianfa Electric Ltd. | F H R | Lengshui | 87 | - /07 | - /09 | - /10 | - /11 | 114 | 192 | 21 | 21 | (F) | ||||||||||
| Lechangxia | China | Department of Water Resources, Guandong Province | H I N | Bei | 374 | - /08 | - /09 | - /10 | - /11 | 85 | 256 | |||||||||||||
| Shiyazi | China | Guizhou Zhongshui Energy Co. Ltd. | H | Hongdu | 321 | - /07 | 04/08 | 12/11 | 12/11 | 135 | ||||||||||||||
| Gongguoqiao | China | Huaneng Lancang River Hydropower Co. Ltd. | H | Lancang (Mekong) | 316 | - /08 | - /09 | - /11 | 03/12 | 105 | 356 | 1067 | ||||||||||||
| Huhehaote (Hohhot) PSS - Upstream lower dam | China | Nei Mongol (Inner Mongolia) Electricity Corporation | H | Halasxinegou | 7 | - /07 | - /09 | - /11 | - /12 | 69 | 242 | 185 | 330 | |||||||||||
| Sanglang [A] | China | Sanglang | 15 | - /08 | - /09 | - /11 | - /12 | 90 | ||||||||||||||||
| Qinglong [A] | China | Enshi Mawei Valley Hydropower Development Co. Ltd. | H | Maweigou | 29 | 12/08 | - /09 | - /11 | - /12 | 140 | 116 | 212 | ||||||||||||
| Nabi | China | Baise WaCun Hydropower Development Co. | H | Xiyang | 57 | - /09 | - /10 | - /11 | - /11 | 69 | 247 | 289 | ||||||||||||
| Lianhuatai | China | Guodian Shaanxi Hydropower Development Co. | H | Dan | 95 | 02/09 | - /10 | - /11 | - /11 | 70 | 221 | 221 | ||||||||||||
| Lusixi | China | Lusi Reservoir Management Office | W | Lusixi | 33 | - /09 | - /10 | - /11 | - /12 | 39 | 140 | |||||||||||||
| Linxihe [A] | China | Hubei Huaqing Power Co. Ltd. | H | Loushui | 52 | - /08 | - /10 | - /11 | - /12 | 74 | 146 | |||||||||||||
| Madushan | China | Honghe Guangyuan Hydropwer and Madushan Development Co. Ltd. | H N W | Honghe | 552 | - /08 | - /09 | - /11 | - /12 | 108 | 353 | 987 | ||||||||||||
| A’hai | China | Yunnan Jinsha River Hydropower Co. Ltd. | F H I | Jinsha | 885 | - /08 | - /10 | - /11 | - /12 | 138 | 482 | 2707 | ||||||||||||
| Qingyanggou | China | Yumen Hongyuan Industrial Company | H | Sule | - /09 | - /10 | - /11 | - /12 | 64 | 147 | ||||||||||||||
| Dengke | China | Yunnan Baoshan Electric Co. Ltd. | H | Longjiang | 53 | - /09 | - /10 | - /11 | - /12 | 76 | 239 | |||||||||||||
| Longkaikou | China | Yunnan Jinsha River Hydropower Co. Ltd. | F H N R W | Jinsha | 558 | 08/07 | 09/08 | - /12 | - /13 | 119 | 768 | 2840 | 3853 | V | (3) | 0.75 | (3) | 300 | 3000 | 96 60 | 96 90 | (F) | ||
| Shankouyan [A] | China | Shankouyan Hydro Project Development Co. | H | Yuanhe | 105 | 11/07 | - /09 | - /12 | - /13 | 99 | 268 | 272 | ||||||||||||
| Shatuo | China | Wujiang Hydroelectric Development Corporation | F H N | Wu | 910 | 05/06 | - /10 | - /12 | - /13 | 101 | 631 | 1510 | 1980 | V 0.15 | (3') | 0.75 | (3') | 0.75 | (3) | 300 | 3000 | |||
| Dayuhyan [A] | China | Guizhou Water-investment Hydropower Development Co., Ltd | H | Masha | 61 | - /09 | - /10 | - /12 | - /13 | 81 | ||||||||||||||
| Milanhe | China | Milanhe | 41 | - /09 | - /10 | - /12 | - /13 | 83 | ||||||||||||||||
| Guandi | China | Yalong River Hydropower Development Co. Ltd. | H | Yalong | 760 | - /09 | - /10 | - /12 | - /13 | 168 | 516 | 2970 | 3020 | V 0.30 | 0.70 | 72 | 88 | (F) | ||||||
| Xunyang | China | Hanjiang | - /08 | - /10 | - /12 | - /14 | 58 | |||||||||||||||||
| Zhongqiao | China | Zunyi Water Conservancy Bureau | Ren | 99 | - /10 | - /11 | - /12 | - /12 | 60 | |||||||||||||||
| Nankanghe Nº2 [A] | China | Ximeng Fubian Hydropower Development Co. Ltd. | H | Nankang | 31 | - /10 | - /11 | - /12 | - /12 | 68 | 179 | |||||||||||||
| Kalashuke | China | Department of Water Resources, Xinjiang Province | F H W | E’erqisi | 2419 | - /07 | - /10 | - /13 | - /14 | 122 | 1489 | 2520 | 2890 | 0.75 | 0.75 | 300 | 3000 | (F) | ||||||
| Mamaya Nº1 | China | Guizhou Qianyuan Power Company | H | Beipan | 137 | - /08 | - /10 | - /13 | - /14 | 109 | 250 | 591 | ||||||||||||
| Luntan [A] | China | Luntan Hydraulic Engineering Co. Ltd. | H | Yangcunshui | 180 | 12/08 | - /10 | - /13 | - /14 | 90 | 218 | |||||||||||||
| Lizhou [A] | China | China Huadian Corporation | H W | Muli | 190 | - /09 | - /11 | - /13 | - /14 | 132 | 211 | |||||||||||||
| Chuanjiang | China | Chuanjiang | 98 | - /10 | - /11 | - /13 | - /14 | 83 | ||||||||||||||||
| Zhaizihe | China | Houhe | 119 | - /10 | - /11 | - /13 | - /14 | 93 | ||||||||||||||||
| Shannipo [A] | China | Guizhou Qianyuan Power Co. Ltd. | H | Beipan | 85 | - /09 | - /11 | - /13 | - /15 | 119 | 205 | 199 | 267 | curve | (3') | curve | (3) | ogee | (3) | |||||
| Shaqian | China | HydroChina Co. | F H | Furong | 57 | 10/11 | - /12 | - /13 | - /13 | 59 | ||||||||||||||
| Shuangfengsi | China | Chengde Shuangfengsi Project Bureau | H | Luanhe | 137 | - /11 | - /12 | - /13 | - /14 | 50 | 535 | 550 | ||||||||||||
| Hongling | China | Guodian Haikong Hongling water construction Co. Ltd. | H I W | Dabian | 662 | - /11 | - /12 | - /13 | - /14 | 92 | ||||||||||||||
| Huhehaote (Hohhot) PSS - Downstream lower dam | China | Nei Mongol (Inner Mongolia) Electricity Corporation | H | Halasxinegou | 7 | - /12 | - /12 | - /13 | - /14 | 58 | 308 | 205 | 717 | |||||||||||
| Guanyinyan | China | Datang Huarui Investment Group Ltd. | F H N R | Jinsha | 2263 | - /08 | 09/11 | 05/14 | - /16 | 159 | 1250 | 6473 | 9364 | V 0.10 | (3') | 0.75 | (3') | 0.75 | (1) | 300 | 53 | 99 | (F) | |
| Xiangjiaba | China | China Three Gorges Corporation | H | Jinsha | 52 | - /06 | - /10 | - /14 | - /16 | 162 | 909 | |||||||||||||
| Tongzilin | China | Yalongjiang Valley Hydropower Development | H | Yalong | 1 | - /08 | - /10 | - /14 | - /16 | 71 | ||||||||||||||
| Ludila | China | Yunnan Huadian Hydropower Co. Ltd. | H | Jingsha | 1718 | 01/07 | - /11 | - /14 | - /15 | 140 | 622 | 1920 | V 0.20 | 0.75 | ||||||||||
| Longtanzui [A] | China | H | Hanshuinanhe | 10 | - /10 | - /12 | - /14 | - /15 | 98 | 205 | ||||||||||||||
| Lijiahe [A] | China | Xian Water Affair Group | H | Bahe | 53 | - /11 | - /13 | - /14 | - /15 | 99 | 352 | 370 | 478 | |||||||||||
| Songyue (2nd Stage) | China | Helong Electricity Corporation | F H I R W | Hailanhe | 21 | - /12 | - /13 | - /14 | - /15 | 41 | 271 | V | (1) | 0.73 | (10) | conduit | 300 | 2000 | 80 | 100 | (F) | |||
| Daoliuhe [A] | China | Daoliu | 123 | - /12 | - /13 | - /14 | - /15 | 60 | 187 | |||||||||||||||
| Kahe | China | W | 20 | - /12 | - /13 | - /14 | - /15 | 72 | ||||||||||||||||
| Tuokou | China | China Power International Development | H | Yuan | 1384 | - /10 | - /12 | - /15 | - /16 | 82 | 649 | |||||||||||||
| Guoduo | China | Huaneng Guoduo Hydropower Co. Ltd. | H | Zha Qu | 80 | - /12 | - /13 | - /15 | - /16 | 83 | 236 | 550 | ||||||||||||
| Shuishimen [A] | China | Yunxi Shuishimen Reservoir Bureau | F H W | Tianhe | 37 | - /13 | - /14 | - /15 | - /16 | 86 | 150 | |||||||||||||
| Dayakou [A] | China | Guangdong Yuedian Group Co., Ltd | H | Nanpeng | 170 | - /13 | - /14 | - /15 | - /16 | 99 | 300 | 210 | ||||||||||||
| Xinchanghe | China | Xinchanghe | 14 | - /14 | - /14 | - /15 | - /16 | 57 | 145 | |||||||||||||||
| Xiaorongjiang | China | Guilin Dayu Water Conservancy, Infrastructure, Construction and Investment Co. Ltd. | H | Xiaorong | 163 | - /10 | - /13 | - /16 | - /17 | 90 | 255 | |||||||||||||
| Lianhua | China | Xiamen Water Resources Bureau | H | Lianhuaxi | 33 | - /10 | - /14 | - /16 | - /17 | 30 | 333 | |||||||||||||
| Hechuan | China | H | Jialingjiang | 11 | - /12 | - /14 | - /16 | - /17 | 51 | |||||||||||||||
| Lushi | China | H | Nujiang | 1288 | - /12 | - /14 | - /16 | - /18 | 165 | |||||||||||||||
| Guanchang | China | H I W | Qiduxi | 24 | - /14 | - /15 | - /16 | - /17 | 54 | 246 | ||||||||||||||
| Yunhe | China | H | Dangjiahe | 14 | - /14 | - /15 | - /16 | - /17 | 68 | 176 | ||||||||||||||
| Haokou | China | Datang Investment Group Ltd. | H | Furong (Pangu) | 90 | - /14 | - /15 | - /16 | - /17 | 85 | 211 | |||||||||||||
| Xiangbiling [A] | China | SPIC Guizhou Jinyuan Hydroelectirc Powerplant | H | Niulan | 263 | - /14 | - /15 | - /16 | - /17 | 136 | 459 | |||||||||||||
| Wanjiakouzi [A] | China | China Datang Corporation | H | Gexiang | 279 | - /09 | - /12 | - /17 | - /18 | 168 | 413 | 760 | 1020 | 66 | 100 | (F) | ||||||||
| Wunonglong | China | Huaneng Lancang River Hydropower Co. Ltd. | H | Lancang (Mekong) | 272 | 06/10 | - /15 | - /17 | - /18 | 138 | 247 | |||||||||||||
| Shangshui [A] | China | I W | 12 | - /13 | - /15 | - /17 | - /18 | 58 | 269 | |||||||||||||||
| Ximihe | China | H I W | Ximihe | 17 | - /14 | - /16 | - /17 | - /18 | 88 | 147 | ||||||||||||||
| Fendou | China | Muling Fendou Reservoir Construction office | F H I W | Mulenghe | 191 | - /15 | - /16 | - /17 | - /18 | 46 | 406 | |||||||||||||
| Xiahushan | China | F H I W | Dashahe | 196 | - /15 | - /16 | - /17 | - /18 | 74 | 296 | ||||||||||||||
| Wugachong [A] | China | H I W | Mabie | 99 | - /15 | - /16 | - /17 | - /18 | 108 | 182 | ||||||||||||||
| Huangdeng | China | Yunnan Huaneng Lancang River Hydropower Co.,Ltd. | H I R | Lancang (Mekong) | 1613 | 01/10 | 04/15 | 04/18 | 06/19 | 203 | 464 | 2753 | 3670 | (3') | (3') | (12) | 300 | 300 | 82 67 | 100 100 | (F) | |||
| Sanhekou [A-G] | China | Ziwuhe | 710 | - /14 | 10/16 | 12/18 | 06/19 | 142 | 472 | |||||||||||||||
| Dahuaqiao | China | Huaneng Lancang River Hydropower Co. Ltd. | H | Lancang (Mekong) | 262 | - /10 | - /13 | - /18 | - /19 | 107 | 232 | 112 | ||||||||||||
| Lidi | China | Huaneng Lancang River Hydropower Co. Ltd. | H | Lancang (Mekong) | 75 | - /10 | - /14 | - /18 | - /19 | 75 | 346 | 1100 | ||||||||||||
| Shangcun | China | W | Shangcunxi | 123 | - /11 | - /14 | - /18 | - /19 | 89 | 338 | ||||||||||||||
| Shoukoubao [H-F] | China | 10 | - /14 | - /16 | - /18 | - /19 | 62 | |||||||||||||||||
| Maojiahe [A] | China | China Power Investment Corporation | H | Qingshuihe | 13 | - /14 | - /16 | - /18 | - /19 | 75 | 166 | |||||||||||||
| Mandian | China | Mandian | 12340 | - /15 | - /16 | - /18 | - /19 | 78 | 231 | |||||||||||||||
| Mangshan | China | F H I W | Changlehe | 133 | - /15 | - /16 | - /18 | - /19 | 101 | 355 | ||||||||||||||
| Datengxia | China | Guangxi Datengxia Gorge Water Conservancy Development Co. .Ltd. | F H N W | Xijiang | 3479 | - /14 | - /16 | - /18 | 07/20 | 80 | 7100 | |||||||||||||
| Zhuangli | China | Zhuangli reservoir construction and management office | F H I W | Shizihe | 133 | - /15 | - /17 | - /18 | - /19 | 44 | 49 | |||||||||||||
| Houshan | China | Gouhe | 160 | - /16 | - /17 | - /18 | - /19 | 52 | ||||||||||||||||
| Pingzhai | China | H I W | Sanchahe | 1089 | - /13 | - /15 | - /19 | - /21 | 163 | |||||||||||||||
| Luojiu | China | H | 346 | - /15 | - /17 | - /19 | - /20 | 60 | ||||||||||||||||
| Wacun | China | H | Youjiang | 536 | - /15 | - /17 | - /19 | - /20 | 105 | 365 | ||||||||||||||
| Gaosheng | China | Yalong River Hydropower Development Co. Ltd. | H | Hongdu | 100 | - /16 | - /17 | - /19 | - /20 | 121 | ||||||||||||||
| Wudongde secondary dam | China | China Yangzi River Three Gorges Group | H | Jinsha (Yangtze) | 7400 | 04/18 | - /18 | - /19 | 06/19 | 96 | 163 | 466 | ||||||||||||
| Yunzhen | China | F I W | 96 | - /16 | - /19 | 03/20 | 01/21 | 76 | 173 | |||||||||||||||
| Maojun | China | Junshui | 117 | - /16 | - /18 | - /20 | - /21 | 76 | ||||||||||||||||
| Jinjigou [H-F] | China | Shigaoqiao | 11 | - /19 | - /19 | - /20 | - /20 | 33 | ||||||||||||||||
| Meizhou PSS - Upper dam | China | China Southern Power Grid | H | 41 | - /18 | - /19 | - /20 | - /21 | 60 | |||||||||||||||
| Meizhou PSS - Lower dam | China | China Southern Power Grid | H | 45 | - /18 | - /19 | - /20 | - /21 | 85 | |||||||||||||||
| Dagu | China | China Huadian Group Co. Ltd. | H | Yaluzangbu (Brahmaputra) | 55 | - /16 | 03/19 | 04/21 | - /23 | 118 | 385 | 937 | 1442 | 93 60 | 93 100 | |||||||||
| Yangjiang PSP - Upper dam | China | China Southern Power Grid Co. | H | Moyang | 18 | 01/17 | - /19 | 11/21 | 06/22 | 101 | 477 | 652 | 300 | 6000 | ||||||||||
| Hekou [A] | China | 37 | - /17 | - /19 | 12/21 | - /22 | 83 | 193 | ||||||||||||||||
| Fengman (new) | China | Northeast China Electric Power | H | Songhua | 10377 | - /13 | - /15 | - /21 | - /22 | 95 | 1068 | 2700 | ||||||||||||
| Xijiang [H-F] | China | 472 | - /16 | - /18 | - /21 | - /22 | 50 | |||||||||||||||||
| Maling [A] | China | H | 219 | - /16 | - /18 | - /21 | - /22 | 90 | ||||||||||||||||
| Huangzangsi | China | H | Heihe | 403 | - /16 | 08/18 | - /21 | - /22 | 123 | |||||||||||||||
| Kongzhai | China | H | Bala | 3 | - /17 | - /19 | - /21 | - /22 | 47 | |||||||||||||||
| Tuxikou [A] | China | F H | Qianhe | 160 | - /18 | - /19 | - /21 | - /22 | 132 | |||||||||||||||
| Huanglinxia | China | H W | Hanshui | 221 | 10/18 | - /20 | 11/22 | 07/23 | 70 | 349 | ||||||||||||||
| Fuzikou | China | Guilin Dayu Water Infrastructure Development Investment Co. Ltd. | F H | Lijiang | 188 | 11/11 | - /13 | - /22 | - /23 | 77 | 239 | 304 | ||||||||||||
| Dahe [A] | China | 44 | - /15 | - /17 | - /22 | - /23 | 105 | |||||||||||||||||
| Tuoba | China | Huaneng Lancang River Hydropower Co. Ltd. | H | Langcang (Mekong) | 1338 | - /15 | - /18 | - /22 | - /24 | 158 | 508 | 3600 | ||||||||||||
| Xiakoutang [A] | China | Lichuan City Yujiang Valley Hudropower Ltd. Hubei Province | F H | Yu | 55 | - /17 | - /19 | - /22 | - /22 | 70 | ||||||||||||||
| Yuwanghe | China | Guizhou Shuicheng Water-investment Co. Ltd. | I W | Yuwanghe | 11 | 09/16 | - /19 | - /22 | 11/23 | 50 | 157 | 106 | ||||||||||||
| Luoyuanhuokou | China | H | Ao | 297 | - /17 | - /19 | - /22 | - /23 | 91 | |||||||||||||||
| Tingzikou | China | Jialing River Tingzikou Water Resources and Hydropower Development Co. Ltd. | F H I N W | Jialing | 4067 | 11/09 | - /19 | - /22 | - /25 | 116 | 995 | |||||||||||||
| Wangjiazhou | China | Tuoxi | 21 | - /16 | - /20 | - /22 | - /23 | 62 | 310 | |||||||||||||||
| Guangshan | China | Large and medium sized Irrigation District Service Center of Qiannan Prefecture | I W | Qingshui | 1 | 04/20 | - /21 | - /22 | - /22 | 32 | 198 | V | (1) | V 1.00 | (1) (17) | none | (F) | |||||||
| Maiwan | China | Maiwan Water Conservancy | H I | Nandu | 615 | 04/20 | 03/22 | 05/24 | 07/25 | 79 | 377 | |||||||||||||
| Huokou | China | Department of Water Conservancy, Fujian Province | F H W | Aojiang | 297 | - /17 | - /21 | - /24 | - /25 | 91 | 338 | 300 | 663 | 0.10 | 0.76 | 0.76 | (F) | |||||||
| Tianjiaotan | China | I W | Beimen | 191 | 04/20 | 11/21 | - /24 | 08/25 | 52 | 295 | ||||||||||||||
| Quanzhou Bailai | China | F H W | 544 | 06/20 | 01/22 | - /24 | 12/25 | 106 | 596 | |||||||||||||||
| Lengshuihe [H-F] | China | 10 | - /20 | - /22 | - /24 | - /25 | 40 | |||||||||||||||||
| Dongyang [H-F] | China | Dongyanggou | 5 | 05/22 | - /23 | - /24 | - /25 | 67 | 136 | |||||||||||||||
| Daxingzhai | China | I W | Tong | 113 | 06/22 | 02/24 | 06/25 | - /26 | 69 | 288 | ||||||||||||||
| Fengshan | China | H | 104 | - /20 | - /22 | - /25 | - /25 | 90 | ||||||||||||||||
| Niulu | China | H I W | Niulushi | 66 | - /18 | - /22 | - /25 | - /26 | 80 | 391 | ||||||||||||||
| Gujun | China | Dazhou Major water works construction and management center | F H | Zhonhe | 128 | 12/20 | - /22 | - /25 | - /26 | 77 | ||||||||||||||
| Xiyin [H-F] | China | Qiuluxi | 28 | 10/21 | - /23 | - /25 | - /26 | 52 | 395 | 329 | 386 | |||||||||||||
| Shiziya | China | 6 | - /22 | - /23 | - /25 | - /26 | 64 | 274 | ||||||||||||||||
| Yunxiao PSP - Upper dam | China | China Nuclear (Guodian Zhangzhou) Energy | H | 21 | - /17 | - /22 | - /26 | - /27 | 68 | |||||||||||||||
| Guanyin | China | Guizhou Water Conservancy Investment Group Co, Ltd | H I W | Guanyinsi | 121 | 12/21 | - /23 | - /26 | - /27 | 109 | ||||||||||||||
| TB | China | H | Lancang (Mekong) | 10/21 | - /23 | - /26 | - /27 | 158 | ||||||||||||||||
| Jiaoyan | China | H | Qingshui | 210 | 12/21 | - /23 | - /26 | - /27 | 96 | |||||||||||||||
| Heibaoshan [H-F] | China | Construction Headquarters of Heibaoshan Reservoir Project in Wanyuan City | I W | Dayan | 2 | - /22 | - /24 | - /26 | - /27 | 60 | ||||||||||||||
| Qingyukou | China | F H W | Bahe | 141 | 04/22 | - /24 | - /28 | - /29 | 71 | |||||||||||||||
| Kala | China | Yalong River Hydropower Development Co. Ltd. | H | Yalong | 234 | 01/24 | 07/25 | - /28 | - /29 | 128 | 2560 | |||||||||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: China
Owner: Dongqiao County
Type: Gravity
Purpose(s): Irrigation
River: Zaoshui
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: -/69
Start of RCC: -/69
End of RCC: -/71
End of Project: -/72
Specifications
Height: 32 metres
Length: 85 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): unknown
River: Dinggeniu
Reservoir capacity: 33 m3x106
Construction Dates
Start of Project: -/74
Start of RCC: -/74
End of RCC: -/78
End of Project: -/79
Specifications
Height: 41 metres
Length: 173 metres
Volume of RCC: -
Total volume: 36 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Sixian Water Resources Bureau
Type: Thin Arch
Purpose(s): Hydropower
River: Leishui
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: -/79
Start of RCC: -/79
End of RCC: -/81
End of Project: -/82
Specifications
Height: 35 metres
Length: 33 metres
Volume of RCC: 3 m3x103
Total volume: 3 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Kengkou Reservoir Management Office
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Youxi
Reservoir capacity: 27 m3x106
Construction Dates
Start of Project: 11/84
Start of RCC: 11/84
End of RCC: 04/86
End of Project: 11/86
Specifications
Height: 57 metres
Length: 123 metres
Volume of RCC: 43 m3x103
Total volume: 62 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with hot poured membrane |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 & | 250 & |
| 500 | 500 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Low-lime flyash (ASTM Class F) |
| 80 |

Details
Country: China
Owner: Hydropower Bureau, Lanshan County
Type: Gravity
Purpose(s): Hydropower
River: Yonghe
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: -/84
Start of RCC: -/84
End of RCC: -/88
End of Project: -/90
Specifications
Height: 52 metres
Length: 180 metres
Volume of RCC: -
Total volume: 220 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Water Supply
River: Yuxi
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/85
Start of RCC: -/85
End of RCC: -/88
End of Project: -/89
Specifications
Height: 38 metres
Length: 102 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: Department of Water Resources & Hydropower, Guangxi Zhuang Autonomous Region
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation
River: Dulanghe
Reservoir capacity: 19 m3x106
Construction Dates
Start of Project: 04/88
Start of RCC: 04/88
End of RCC: 07/89
End of Project: 06/91
Specifications
Height: 53 metres
Length: 136 metres
Volume of RCC: 61 m3x103
Total volume: 108 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| 0.65 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| 69 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 140 | Low-lime flyash (ASTM Class F) |
| 111 |

Details
Country: China
Owner: Dehua County, Fujian Province
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Chanxi
Reservoir capacity: 53 m3x106
Construction Dates
Start of Project: 12/85
Start of RCC: 12/85
End of RCC: 08/89
End of Project: 09/89
Specifications
Height: 58 metres
Length: 150 metres
Volume of RCC: 71 m3x103
Total volume: 93 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced conventional concrete cast after RCC placement |
| 0.30 | Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| 54 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 82 | Low-lime flyash (ASTM Class F) |
| 86 |

Details
Country: China
Owner: Guodian Dadu River Basin Hydropower Development Co.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation
River: Dadu
Reservoir capacity: 200 m3x106
Construction Dates
Start of Project: 01/85
Start of RCC: 01/85
End of RCC: 12/89
End of Project: 10/94
Specifications
Height: 88 metres
Length: 1029 metres
Volume of RCC: 407 m3x103
Total volume: 855 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 - | 300 - |
| 500 | 500 |
Cementitious material
| Cement (kg/m3) |
|---|
| 79 |
| 82 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 79 | Low-lime flyash (ASTM Class F) |
| 83 |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Wenchuanxi
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: -/87
Start of RCC: -/87
End of RCC: -/89
End of Project: -/89
Specifications
Height: 47 metres
Length: 122 metres
Volume of RCC: -
Total volume: 74 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: China Southern Power Grid
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Nanpan
Reservoir capacity: 116 m3x106
Construction Dates
Start of Project: 01/84
Start of RCC: 01/84
End of RCC: 06/90
End of Project: 12/92
Specifications
Height: 61 metres
Length: 471 metres
Volume of RCC: 143 m3x103
Total volume: 284 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete blocks |
| 0.40 |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 250 |
Cementitious material
| Cement (kg/m3) |
|---|
| 79 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 79 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): unknown
River: Shiqi
Reservoir capacity: 33 m3x106
Construction Dates
Start of Project: -/68
Start of RCC: -/68
End of RCC: -/91
End of Project: -/93
Specifications
Height: 35 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Datang Yantan Hydropower Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation
River: Hongshui
Reservoir capacity: 3350 m3x106
Construction Dates
Start of Project: 03/85
Start of RCC: 03/85
End of RCC: 03/92
End of Project: 12/95
Specifications
Height: 110 metres
Length: 525 metres
Volume of RCC: 626 m3x103
Total volume: 905 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 104 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Shuikou Hydropower Plant
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation
River: Min
Reservoir capacity: 2613 m3x106
Construction Dates
Start of Project: 03/87
Start of RCC: 03/87
End of RCC: 05/92
End of Project: 05/95
Specifications
Height: 101 metres
Length: 791 metres
Volume of RCC: 600 m3x103
Total volume: 1710 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.73 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 200 - | 200 - |
| 330 | 330 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 110 | Low-lime flyash (ASTM Class F) |
| 90 |

Details
Country: China
Owner: China Guodian Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation
River: Gan
Reservoir capacity: 2216 m3x106
Construction Dates
Start of Project: 11/84
Start of RCC: 11/84
End of RCC: 12/92
End of Project: 06/94
Specifications
Height: 68 metres
Length: 1104 metres
Volume of RCC: 156 m3x103
Total volume: 1480 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 105 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: China Southern Power Grid
Type: Gravity
Purpose(s): Hydropower
River: Liuxihe
Reservoir capacity: 30 m3x106
Construction Dates
Start of Project: 12/94
Start of RCC: 12/94
End of RCC: 12/92
End of Project: 10/00
Specifications
Height: 61 metres
Length: 153 metres
Volume of RCC: 32 m3x103
Total volume: 57 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 62 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 108 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Yellow River Conservancy Commission
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation
River: Luo
Reservoir capacity: 1175 m3x106
Construction Dates
Start of Project: -/78
Start of RCC: -/78
End of RCC: -/92
End of Project: -/93
Specifications
Height: 125 metres
Length: 315 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Jinjiang Electric Co.
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Jinjianghe
Reservoir capacity: 189 m3x106
Construction Dates
Start of Project: 07/90
Start of RCC: 07/90
End of RCC: 03/93
End of Project: 07/93
Specifications
Height: 68 metres
Length: 229 metres
Volume of RCC: 182 m3x103
Total volume: 267 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.65 | Traditional concrete against formwork |
| Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 80 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Guizhou Qianyuan Power Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower / Irrigation / Water Supply
River: Sanchahe
Reservoir capacity: 377 m3x106
Construction Dates
Start of Project: 03/89
Start of RCC: 03/89
End of RCC: 05/93
End of Project: 02/94
Specifications
Height: 75 metres
Length: 196 metres
Volume of RCC: 103 m3x103
Total volume: 137 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.35 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
| 0.35 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| 54 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 103 | Low-lime flyash (ASTM Class F) |
| 99 |

Details
Country: China
Owner: Fujian Shuikou Power Generation Group
Type: Gravity
Purpose(s): Hydropower / Navigation
River: Youxi
Reservoir capacity: 108 m3x106
Construction Dates
Start of Project: 04/91
Start of RCC: 04/91
End of RCC: 10/93
End of Project: 12/95
Specifications
Height: 63 metres
Length: 197 metres
Volume of RCC: 126 m3x103
Total volume: 184 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 50 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 90 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Hainan Provincial Electric Power Company (HEPCO)
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Changhua
Reservoir capacity: 1710 m3x106
Construction Dates
Start of Project: 06/90
Start of RCC: 06/90
End of RCC: 12/93
End of Project: 07/95
Specifications
Height: 57 metres
Length: 719 metres
Volume of RCC: 485 m3x103
Total volume: 860 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against precast concrete blocks |
| RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 96 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Guizhou Hongfeng Hydropower Plant
Type: Gravity
Purpose(s): Hydropower
River: Sancha
Reservoir capacity: 420 m3x106
Construction Dates
Start of Project: -/89
Start of RCC: -/89
End of RCC: -/93
End of Project: -/94
Specifications
Height: 75 metres
Length: 196 metres
Volume of RCC: -
Total volume: 88 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Lianjiang Water Conservancy Bureau
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Aojiang
Reservoir capacity: 172 m3x106
Construction Dates
Start of Project: 08/92
Start of RCC: 08/92
End of RCC: 05/94
End of Project: 06/95
Specifications
Height: 66 metres
Length: 274 metres
Volume of RCC: 180 m3x103
Total volume: 272 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| 0.77 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 125 | Low-lime flyash (ASTM Class F) |
| 95 |

Details
Country: China
Owner: Wenquanbao Reservoir Management Office
Type: Thin Arch
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Tanghe
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: 10/91
Start of RCC: 10/91
End of RCC: 06/94
End of Project: -/95
Specifications
Height: 48 metres
Length: 188 metres
Volume of RCC: 55 m3x103
Total volume: 63 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork with external geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.30 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| ogee | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 110 |
| 69 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 68 | Low-lime flyash (ASTM Class F) |
| 85 |

Details
Country: China
Owner: Dongyuan County
Type: Gravity
Purpose(s): Hydropower
River: Yinjiang
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/92
Start of RCC: -/92
End of RCC: -/94
End of Project: -/94
Specifications
Height: 35 metres
Length: 115 metres
Volume of RCC: -
Total volume: 223 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.90 |
Downstream
| Slope | Type |
|---|---|
| 0.90 | [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.90 | [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Lanshan County Hydropower Bureau
Type: Thin Arch
Purpose(s): Hydropower / Irrigation
River: Xiang
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/92
Start of RCC: -/92
End of RCC: -/94
End of Project: -/95
Specifications
Height: 45 metres
Length: 150 metres
Volume of RCC: -
Total volume: 45 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: Huangcen Reservoir Management Office
Type: Thin Arch
Purpose(s): Flood Control / Hydropower / Irrigation
River: Leishui
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/92
Start of RCC: -/92
End of RCC: -/94
End of Project: -/95
Specifications
Height: 56 metres
Length: 147 metres
Volume of RCC: -
Total volume: 18 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: Department of Electric Power, Lonyan City, Fujian Province
Type: Arch-Gravity
Purpose(s): Hydropower / Water Supply
River: Longshanxi
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: 08/93
Start of RCC: 08/93
End of RCC: 07/95
End of Project: 10/95
Specifications
Height: 64 metres
Length: 93 metres
Volume of RCC: 25 m3x103
Total volume: 33 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork with external geomembrane |
| 0.08 | RCC against formwork with external geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.65 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| ogee | Reinforced concrete cast against precast units or slip-formed facing elements |
| 0.65 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 - | 300 - |
| 350 | 350 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 79 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Low-lime flyash (ASTM Class F) |
| 105 |

Details
Country: China
Owner: Guanyinge Reservoir Management Bureau
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Taizi
Reservoir capacity: 2168 m3x106
Construction Dates
Start of Project: 05/90
Start of RCC: 05/90
End of RCC: 09/95
End of Project: 10/95
Specifications
Height: 82 metres
Length: 1040 metres
Volume of RCC: 1240 m3x103
Total volume: 1876 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 270 - | 750 |
| 280 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Department of Water Resources, Henan Province
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Gunhe
Reservoir capacity: 120 m3x106
Construction Dates
Start of Project: 07/93
Start of RCC: 07/93
End of RCC: 12/95
End of Project: 07/96
Specifications
Height: 41 metres
Length: 650 metres
Volume of RCC: 272 m3x103
Total volume: 351 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 98 |
| 51 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 98 | Low-lime flyash (ASTM Class F) |
| 107 |

Details
Country: China
Owner: Fengdu Water Resources Bureau
Type: Gravity
Purpose(s): Flood Control / Hydropower / Recreation
River: Longxihe
Reservoir capacity: 105 m3x106
Construction Dates
Start of Project: 12/92
Start of RCC: 12/92
End of RCC: -/95
End of Project: -/96
Specifications
Height: 84 metres
Length: 445 metres
Volume of RCC: 335 m3x103
Total volume: 564 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.65 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.65 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 126 |
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 84 | Low-lime flyash (ASTM Class F) |
| 90 |

Details
Country: China
Owner: Guangxi-Guiguang Electric Power Development Co. Ltd.
Type: Gravity
Purpose(s): Hydropower / Irrigation / Navigation
River: Hongshuihe
Reservoir capacity: 340 m3x106
Construction Dates
Start of Project: 02/93
Start of RCC: 02/93
End of RCC: 04/96
End of Project: 08/97
Specifications
Height: 34 metres
Length: 710 metres
Volume of RCC: 62 m3x103
Total volume: 80 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against precast concrete blocks [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against precast concrete panels [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 73 |
| 99 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 110 | Low-lime flyash (ASTM Class F) |
| 60 |

Details
Country: China
Owner: Wangqing County Water Conservancy Bureau
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Gayahe
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: 08/92
Start of RCC: 08/92
End of RCC: 12/96
End of Project: 08/97
Specifications
Height: 37 metres
Length: 337 metres
Volume of RCC: 78 m3x103
Total volume: 100 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
| 0.70 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Chongqing Wujiang Power Company
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Apengjiang
Reservoir capacity: 115 m3x106
Construction Dates
Start of Project: -/93
Start of RCC: -/93
End of RCC: -/96
End of Project: -/97
Specifications
Height: 85 metres
Length: 149 metres
Volume of RCC: -
Total volume: 33 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Wanyao Reservoir Management Bureau
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Dahexi
Reservoir capacity: 223 m3x106
Construction Dates
Start of Project: 10/93
Start of RCC: 10/93
End of RCC: 05/97
End of Project: 07/97
Specifications
Height: 83 metres
Length: 390 metres
Volume of RCC: 320 m3x103
Total volume: 458 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.20 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 96 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Department of Electricity, Dapu County, Guangdong Province
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Meixihe
Reservoir capacity: 95 m3x106
Construction Dates
Start of Project: 01/95
Start of RCC: 01/95
End of RCC: 10/97
End of Project: 12/97
Specifications
Height: 60 metres
Length: 221 metres
Volume of RCC: 113 m3x103
Total volume: 172 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with hot poured membrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 110 | Low-lime flyash (ASTM Class F) |
| 105 |

Details
Country: China
Owner: Department of Water Resources, Hebei Province
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Recreation / Water Supply
River: Qinglonghe
Reservoir capacity: 859 m3x106
Construction Dates
Start of Project: 11/92
Start of RCC: 11/92
End of RCC: 12/97
End of Project: -/98
Specifications
Height: 75 metres
Length: 500 metres
Volume of RCC: 585 m3x103
Total volume: 1350 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.15 |
Downstream
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
| 0.65 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 135 |
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 70 | Low-lime flyash (ASTM Class F) |
| 85 |

Details
Country: China
Owner: Fengdu Hydropower Bureau
Type: Thin Arch
Purpose(s): Hydropower
River: Huilonghe
Reservoir capacity: 8 m3x106
Construction Dates
Start of Project: -/93
Start of RCC: -/93
End of RCC: -/97
End of Project: -/98
Specifications
Height: 90 metres
Length: 158 metres
Volume of RCC: -
Total volume: 770 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 |
Downstream
| Slope | Type |
|---|---|
| 0.76 |
Spillway
| Slope | Type |
|---|---|
| 0.76 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Yongxi Hydroelectric Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Dazhangxi
Reservoir capacity: 68 m3x106
Construction Dates
Start of Project: 05/96
Start of RCC: 05/96
End of RCC: 10/98
End of Project: 09/99
Specifications
Height: 87 metres
Length: 198 metres
Volume of RCC: 170 m3x103
Total volume: 255 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.73 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
| 0.73 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 280 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 115 |
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 95 | Low-lime flyash (ASTM Class F) |
| 90 |

Details
Country: China
Owner: Ya’an Electricity Company
Type: Gravity
Purpose(s): Hydropower
River: Yinghe
Reservoir capacity: 8 m3x106
Construction Dates
Start of Project: 01/96
Start of RCC: 01/96
End of RCC: 12/98
End of Project: 05/99
Specifications
Height: 85 metres
Length: 173 metres
Volume of RCC: 240 m3x103
Total volume: 290 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 - | 300 - |
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 78 |
| 74 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 95 | Low-lime flyash (ASTM Class F) |
| 90 |

Details
Country: China
Owner: Department of Water Resources, Hubei Province
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Yujiang
Reservoir capacity: 68 m3x106
Construction Dates
Start of Project: -/91
Start of RCC: -/91
End of RCC: 12/98
End of Project: 06/00
Specifications
Height: 69 metres
Length: 279 metres
Volume of RCC: 170 m3x103
Total volume: 200 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.74 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 5000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 134 |
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 89 | Low-lime flyash (ASTM Class F) |
| 48 |

Details
Country: China
Owner: Fushan Power Station Management Bureau
Type: Thin Arch
Purpose(s): Hydropower / Irrigation
River: Nanxi
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: -/94
Start of RCC: -/94
End of RCC: -/98
End of Project: -/99
Specifications
Height: 47 metres
Length: 235 metres
Volume of RCC: -
Total volume: 240 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Wencheng County Kengxiashan Hydropower Development Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Yuquanxi
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/96
Start of RCC: -/96
End of RCC: -/98
End of Project: -/98
Specifications
Height: 34 metres
Length: 80 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Department of Water Resources, Shanxi Province
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Fenhe
Reservoir capacity: 130 m3x106
Construction Dates
Start of Project: 11/96
Start of RCC: 11/96
End of RCC: 03/99
End of Project: 06/00
Specifications
Height: 87 metres
Length: 350 metres
Volume of RCC: 362 m3x103
Total volume: 448 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.20 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 127 |
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 84 | Low-lime flyash (ASTM Class F) |
| 93 |

Details
Country: China
Owner: Lishui Hydropower Development Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply
River: Loushui
Reservoir capacity: 1741 m3x106
Construction Dates
Start of Project: 07/95
Start of RCC: 07/95
End of RCC: 04/99
End of Project: -/01
Specifications
Height: 131 metres
Length: 368 metres
Volume of RCC: 1100 m3x103
Total volume: 1310 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| ogee | Reinforced concrete cast against precast units or slip-formed facing elements |
| 0.80 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 87 |
| 64 46 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 107 | Low-lime flyash (ASTM Class F) |
| 96 107 |

Details
Country: China
Owner: Helong Electricity Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Recreation / Water Supply
River: Hailanhe
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: 09/97
Start of RCC: 09/97
End of RCC: 04/99
End of Project: 09/99
Specifications
Height: 29 metres
Length: 271 metres
Volume of RCC: 44 m3x103
Total volume: 77 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.73 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| conduit |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 2000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Shaoguang Electricity Corporation Ltd
Type: Gravity
Purpose(s): Hydropower
River: Yangxishui
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 11/97
Start of RCC: 11/97
End of RCC: 06/99
End of Project: 07/00
Specifications
Height: 46 metres
Length: 202 metres
Volume of RCC: 100 m3x103
Total volume: 139 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: Department of Water Resources, Liaoning Province
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Dalinghe
Reservoir capacity: 1645 m3x106
Construction Dates
Start of Project: 09/96
Start of RCC: 09/96
End of RCC: 09/99
End of Project: 12/00
Specifications
Height: 49 metres
Length: 513 metres
Volume of RCC: 111 m3x103
Total volume: 603 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 58 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Xishan Xingyu Water Resources Corporation
Type: Arch-Gravity
Purpose(s): Water Supply
River: Qinggoushui
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 10/97
Start of RCC: 10/97
End of RCC: 11/99
End of Project: 12/99
Specifications
Height: 55 metres
Length: 244 metres
Volume of RCC: 71 m3x103
Total volume: 77 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 54 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 99 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Qingjiang Hydropower Development Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation
River: Qingjiang
Reservoir capacity: 536 m3x106
Construction Dates
Start of Project: 05/97
Start of RCC: 05/97
End of RCC: 04/00
End of Project: 01/01
Specifications
Height: 57 metres
Length: 440 metres
Volume of RCC: 210 m3x103
Total volume: 940 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with hot poured membrane |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 123 |
| 86 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |
| 86 |

Details
Country: China
Owner: Ge'ermu Hydroelectric Responsibility Corporation Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Geermu
Reservoir capacity: 9780 m3x106
Construction Dates
Start of Project: -/96
Start of RCC: -/96
End of RCC: -/00
End of Project: -/01
Specifications
Height: 40 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Shixing County Power Development Corporation
Type: Thin Arch
Purpose(s): Flood Control / Hydropower
River: Du’anshui (Chengjiang)
Reservoir capacity: 48 m3x106
Construction Dates
Start of Project: 09/99
Start of RCC: 09/99
End of RCC: 01/01
End of Project: 03/01
Specifications
Height: 57 metres
Length: 179 metres
Volume of RCC: 90 m3x103
Total volume: 119 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 330 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 105 |
| 63 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 86 | Low-lime flyash (ASTM Class F) |
| 80 |

Details
Country: China
Owner: Department of Electricity, Gansu Province
Type: Arch-Gravity
Purpose(s): Hydropower
River: Heihe
Reservoir capacity: 13 m3x106
Construction Dates
Start of Project: 04/99
Start of RCC: 04/99
End of RCC: 06/01
End of Project: 09/01
Specifications
Height: 80 metres
Length: 258 metres
Volume of RCC: 187 m3x103
Total volume: 210 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.20 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| 58 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 109 | Low-lime flyash (ASTM Class F) |
| 113 |

Details
Country: China
Owner: Shimenzi Reservoir Engineering Management Office
Type: Thin Arch
Purpose(s): Hydropower / Irrigation / Water Supply
River: Taxi
Reservoir capacity: 80 m3x106
Construction Dates
Start of Project: 06/98
Start of RCC: 06/98
End of RCC: 06/01
End of Project: 10/01
Specifications
Height: 110 metres
Length: 176 metres
Volume of RCC: 188 m3x103
Total volume: 211 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.142 | RCC against formwork (GEVR/GE-RCC) |
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork |
| 0.18 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| crest | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 93 |
| 62 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 110 | Low-lime flyash (ASTM Class F) |
| 110 |

Details
Country: China
Owner: Department of Electricity, Yunnan Province
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Lancang (Mekong)
Reservoir capacity: 89 m3x106
Construction Dates
Start of Project: 10/97
Start of RCC: 10/97
End of RCC: 10/01
End of Project: 07/02
Specifications
Height: 115 metres
Length: 481 metres
Volume of RCC: 757 m3x103
Total volume: 1287 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.20 |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against precast concrete blocks [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 94 |
| 67 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 94 | Natural pozzolan (ASTM Class N) |
| 101 |

Details
Country: China
Owner: Mianhuatan Hydroelectric Development Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Water Supply
River: Ting
Reservoir capacity: 2035 m3x106
Construction Dates
Start of Project: 04/98
Start of RCC: 04/98
End of RCC: 11/01
End of Project: 04/02
Specifications
Height: 111 metres
Length: 302 metres
Volume of RCC: 500 m3x103
Total volume: 615 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with hot poured membrane |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 82 |
| 59 48 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |
| 88 88 |

Details
Country: China
Owner: Chaoyang Water Conservancy Bureau
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Daling
Reservoir capacity: 217 m3x106
Construction Dates
Start of Project: -/96
Start of RCC: -/96
End of RCC: -/01
End of Project: -/02
Specifications
Height: 35 metres
Length: 383 metres
Volume of RCC: 87 m3x103
Total volume: 220 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 118 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Yushi Reservoir Construction Management Bureau
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Biliuhe
Reservoir capacity: 89 m3x106
Construction Dates
Start of Project: -/98
Start of RCC: -/98
End of RCC: -/01
End of Project: -/02
Specifications
Height: 50 metres
Length: 267 metres
Volume of RCC: 218 m3x103
Total volume: 233 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 70 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Department of Electricity, Feng Shun County
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Xiaoxihe
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: -/99
Start of RCC: -/99
End of RCC: -/01
End of Project: -/02
Specifications
Height: 62 metres
Length: 103 metres
Volume of RCC: 47 m3x103
Total volume: 66 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Xiaoxihe
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: -/99
Start of RCC: -/99
End of RCC: -/01
End of Project: -/02
Specifications
Height: 68 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Electricity Corporation, Yanji
Type: Gravity
Purpose(s): Hydropower / Recreation / Water Supply
River: Hailanhe
Reservoir capacity: 30 m3x106
Construction Dates
Start of Project: 11/98
Start of RCC: 11/98
End of RCC: 01/02
End of Project: 12/02
Specifications
Height: 30 metres
Length: 244 metres
Volume of RCC: 43 m3x103
Total volume: 89 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| ogee | RCC against precast concrete blocks [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 2000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 113 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 113 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Sichuan Minjiang Hydropower Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Caopohe
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: 06/97
Start of RCC: 06/97
End of RCC: 05/02
End of Project: 04/03
Specifications
Height: 132 metres
Length: 230 metres
Volume of RCC: 380 m3x103
Total volume: 392 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.10 |
Downstream
| Slope | Type |
|---|---|
| 0.21 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| crest | Traditional concrete against formwork |
| 0.21 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 108 |
| 89 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 72 | Low-lime flyash (ASTM Class F) |
| 89 |

Details
Country: China
Owner: Guizhou Province Electric Power Co.
Type: Gravity
Purpose(s): Water Supply
River: Xia Oyangxi
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: 05/00
Start of RCC: 05/00
End of RCC: 10/02
End of Project: 12/03
Specifications
Height: 45 metres
Length: 118 metres
Volume of RCC: 47 m3x103
Total volume: 49 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 350 | 3500 |
Cementitious material
| Cement (kg/m3) |
|---|
| 138 |
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 113 | Low-lime flyash (ASTM Class F) |
| 90 |

Details
Country: China
Owner: Corporation of Energy Development, Ruyuan County, Guangdong Province
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Yangxi
Reservoir capacity: 100 m3x106
Construction Dates
Start of Project: 12/00
Start of RCC: 12/00
End of RCC: 11/02
End of Project: 06/03
Specifications
Height: 82 metres
Length: 244 metres
Volume of RCC: 241 m3x103
Total volume: 340 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: Jiangning Nankengyuan Hydropower Development Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Xiaoxihe
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/98
Start of RCC: -/98
End of RCC: -/02
End of Project: -/03
Specifications
Height: 34 metres
Length: 114 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Yangxi
Reservoir capacity: 100 m3x106
Construction Dates
Start of Project: -/99
Start of RCC: -/99
End of RCC: -/02
End of Project: -/03
Specifications
Height: 82 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Longquan City Bureau of Hydropower
Type: Thin Arch
Purpose(s): Hydropower
River: Junxi
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/02
End of Project: -/03
Specifications
Height: 69 metres
Length: 192 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Hunan Wuling Hydroelectric Development Corporation
Type: Gravity
Purpose(s): Hydropower / Navigation
River: Youshui
Reservoir capacity: 378 m3x106
Construction Dates
Start of Project: 08/01
Start of RCC: 08/01
End of RCC: 05/03
End of Project: 05/04
Specifications
Height: 65 metres
Length: 238 metres
Volume of RCC: 141 m3x103
Total volume: 376 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Spillway
| Slope | Type |
|---|---|
| ogee | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 86 |
| 68 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 103 | Low-lime flyash (ASTM Class F) |
| 83 |

Details
Country: China
Owner: Shaanxi Lan River Hydropower Development Corporation
Type: Thin Arch
Purpose(s): Hydropower / Irrigation
River: Lanhe
Reservoir capacity: 147 m3x106
Construction Dates
Start of Project: -/99
Start of RCC: -/99
End of RCC: 06/03
End of Project: -/04
Specifications
Height: 100 metres
Length: 311 metres
Volume of RCC: 229 m3x103
Total volume: 293 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 74 |
| 66 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 111 | Low-lime flyash (ASTM Class F) |
| 111 |

Details
Country: China
Owner: Chongging Electricity Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Apeng
Reservoir capacity: 25 m3x106
Construction Dates
Start of Project: 08/01
Start of RCC: 08/01
End of RCC: 10/03
End of Project: 11/03
Specifications
Height: 56 metres
Length: 193 metres
Volume of RCC: 72 m3x103
Total volume: 161 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Spillway
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: Henan Electric Power Corporation
Type: Gravity
Purpose(s): Hydropower
River: Huilonggou
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 06/01
Start of RCC: 06/01
End of RCC: 11/03
End of Project: -/05
Specifications
Height: 54 metres
Length: 208 metres
Volume of RCC: 73 m3x103
Total volume: 76 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| none |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: Shaanxi Hanjiang Hydropower Development Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Renhe
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/03
End of Project: -/04
Specifications
Height: 66 metres
Length: 120 metres
Volume of RCC: 81 m3x103
Total volume: 106 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Xifeng County Water Conservancy Bureau
Type: Thin Arch
Purpose(s): Water Supply
River: Yangshui
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/01
Start of RCC: -/01
End of RCC: -/03
End of Project: -/04
Specifications
Height: 39 metres
Length: 176 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Wang Keng Power Station Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Tangkouxi
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: -/01
Start of RCC: -/01
End of RCC: -/03
End of Project: -/04
Specifications
Height: 56 metres
Length: 159 metres
Volume of RCC: 38 m3x103
Total volume: 40 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: Anhui Hydropower Development Co. Ltd.,
Type: Thin Arch
Purpose(s): Flood Control / Hydropower
River: Xipihe
Reservoir capacity: 51 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/03
End of Project: -/04
Specifications
Height: 70 metres
Length: 258 metres
Volume of RCC: 130 m3x103
Total volume: 168 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: Mindong Electromechanical Development Corporation
Type: Gravity
Purpose(s): Hydropower
River: Muyangxi
Reservoir capacity: 47 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: 03/04
End of Project: 06/04
Specifications
Height: 73 metres
Length: 206 metres
Volume of RCC: 159 m3x103
Total volume: 199 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.72 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 67 |
| 50 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |
| 92 |

Details
Country: China
Owner: Henan Electric Power Corporation
Type: Gravity
Purpose(s): Hydropower
River: Huilonggou
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 06/01
Start of RCC: 06/01
End of RCC: 06/04
End of Project: -/05
Specifications
Height: 54 metres
Length: 175 metres
Volume of RCC: 88 m3x103
Total volume: 105 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: Beichuan Bashu Tongkou River Development Corporation
Type: Gravity
Purpose(s): Hydropower
River: Tongkou
Reservoir capacity: 36 m3x106
Construction Dates
Start of Project: 10/98
Start of RCC: 10/98
End of RCC: -/04
End of Project: -/04
Specifications
Height: 72 metres
Length: 198 metres
Volume of RCC: 300 m3x103
Total volume: 352 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 1.10 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: Guangxi-Guiguan Electric Power Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Nanpan
Reservoir capacity: 278 m3x106
Construction Dates
Start of Project: 12/01
Start of RCC: 12/01
End of RCC: -/04
End of Project: 07/05
Specifications
Height: 62 metres
Length: 396 metres
Volume of RCC: 150 m3x103
Total volume: 700 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| ogee | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: Yineng Co., Ltd.
Type: Thin Arch
Purpose(s): unknown
River: -
Reservoir capacity: 41 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/04
End of Project: -/05
Specifications
Height: 66 metres
Length: 191 metres
Volume of RCC: -
Total volume: 66 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): unknown
River: Sanjianghe
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/04
End of Project: -/04
Specifications
Height: 72 metres
Length: 138 metres
Volume of RCC: -
Total volume: 38 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guangdong Shanneng group Co.
Type: Thin Arch
Purpose(s): Hydropower
River: Tuwushui
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/04
End of Project: -/04
Specifications
Height: 53 metres
Length: 124 metres
Volume of RCC: -
Total volume: 29 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Chongqing Yujiankou Hydropower Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Long
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: 08/01
Start of RCC: 08/01
End of RCC: -/04
End of Project: -/05
Specifications
Height: 50 metres
Length: 156 metres
Volume of RCC: 118 m3x103
Total volume: 147 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.85 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: Guangxi-Guiguan Electric Power Co. Ltd.,
Type: Gravity
Purpose(s): Hydropower / Irrigation / Navigation
River: Xijiang
Reservoir capacity: 950 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/04
End of Project: -/05
Specifications
Height: 66 metres
Length: 586 metres
Volume of RCC: 50 m3x103
Total volume: 210 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guiyang Water Conservancy Bureau
Type: Thin Arch
Purpose(s): Flood Control / Irrigation / Water Supply
River: Wu
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/04
End of Project: -/05
Specifications
Height: 81 metres
Length: 180 metres
Volume of RCC: 105 m3x103
Total volume: 110 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 |
Downstream
| Slope | Type |
|---|---|
| 0.76 |
Spillway
| Slope | Type |
|---|---|
| 0.76 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Hubei Nanzhang Xiakou Electric Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Juhe
Reservoir capacity: 99 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/04
End of Project: -/05
Specifications
Height: 85 metres
Length: 192 metres
Volume of RCC: -
Total volume: 131 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Hardfill
Purpose(s): unknown
River: -
Reservoir capacity: -
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/04
End of Project: -/06
Specifications
Height: 16 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Meixi
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/04
End of Project: -/06
Specifications
Height: 96 metres
Length: 178 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Changyang Electric Power Bureau
Type: Thin Arch
Purpose(s): Hydropower / Irrigation / Water Supply
River: Duhu
Reservoir capacity: 70 m3x106
Construction Dates
Start of Project: 12/03
Start of RCC: 12/03
End of RCC: 05/05
End of Project: 10/05
Specifications
Height: 107 metres
Length: 206 metres
Volume of RCC: 166 m3x103
Total volume: 255 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| 126 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 126 | Low-lime flyash (ASTM Class F) |
| 103 |

Details
Country: China
Owner: Hanjiang Hydropower Development Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation
River: Han
Reservoir capacity: 229 m3x106
Construction Dates
Start of Project: 11/03
Start of RCC: 11/03
End of RCC: 05/05
End of Project: 06/07
Specifications
Height: 63 metres
Length: 346 metres
Volume of RCC: 194 m3x103
Total volume: 631 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: Guizhou-Wujiang Hydropower Development Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply
River: Wu
Reservoir capacity: 201 m3x106
Construction Dates
Start of Project: 10/00
Start of RCC: 10/00
End of RCC: 08/05
End of Project: 03/06
Specifications
Height: 116 metres
Length: 165 metres
Volume of RCC: 421 m3x103
Total volume: 739 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.25 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 95 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Xun
Reservoir capacity: 56 m3x106
Construction Dates
Start of Project: -/93
Start of RCC: -/93
End of RCC: -/05
End of Project: -/07
Specifications
Height: 56 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guangxi Longjiang Electric Power Corporation
Type: Thin Arch
Purpose(s): Hydropower
River: Long
Reservoir capacity: 49 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/05
End of Project: -/06
Specifications
Height: 68 metres
Length: 167 metres
Volume of RCC: 172 m3x103
Total volume: 226 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: China Southern Power Grid
Type: Gravity
Purpose(s): Hydropower
River: Caitouhe
Reservoir capacity: 30 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/05
End of Project: -/11
Specifications
Height: 61 metres
Length: 420 metres
Volume of RCC: 235 m3x103
Total volume: 242 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Qingtian Yongwen Hydropower Co.
Type: Thin Arch
Purpose(s): Hydropower
River: Guxi
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/05
End of Project: -/05
Specifications
Height: 66 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Spillway
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Xixi Reservoir Development Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Daxi
Reservoir capacity: 85 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/05
End of Project: -/06
Specifications
Height: 71 metres
Length: 243 metres
Volume of RCC: 231 m3x103
Total volume: 244 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: Guangxi-Youjiang Hydraulic Development Co.Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply
River: You
Reservoir capacity: 5660 m3x106
Construction Dates
Start of Project: 10/01
Start of RCC: 10/01
End of RCC: 04/06
End of Project: 12/06
Specifications
Height: 130 metres
Length: 720 metres
Volume of RCC: 1995 m3x103
Total volume: 2672 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with hot poured membrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 50 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 132 | Low-lime flyash (ASTM Class F) |
| 110 |

Details
Country: China
Owner: Wujaing Qingshuihe Hydropower Development Co. Ltd.
Type: Thin Arch
Purpose(s): Flood Control / Hydropower
River: Qingshuihe
Reservoir capacity: 276 m3x106
Construction Dates
Start of Project: 12/03
Start of RCC: 12/03
End of RCC: 11/06
End of Project: -/07
Specifications
Height: 135 metres
Length: 198 metres
Volume of RCC: 550 m3x103
Total volume: 670 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 81 |
| 94 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 81 | Low-lime flyash (ASTM Class F) |
| 94 |

Details
Country: China
Owner: Niu Qiao Reservoir Development Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Qingtonghe
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: 12/06
End of Project: -/07
Specifications
Height: 62 metres
Length: 201 metres
Volume of RCC: -
Total volume: 710 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Liuchi
Reservoir capacity: 71 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/06
End of Project: -/07
Specifications
Height: 81 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Kaidu
Reservoir capacity: -
Construction Dates
Start of Project: -/97
Start of RCC: -/97
End of RCC: -/06
End of Project: -/08
Specifications
Height: 71 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: China Huadian Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Wanan
Reservoir capacity: 199 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/06
Specifications
Height: 75 metres
Length: 172 metres
Volume of RCC: 211 m3x103
Total volume: 239 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Leidatan Corporation
Type: Gravity
Purpose(s): Hydropower
River: Yingtaoyuangou
Reservoir capacity: 94 m3x106
Construction Dates
Start of Project: 03/03
Start of RCC: 03/03
End of RCC: -/06
End of Project: 06/07
Specifications
Height: 84 metres
Length: 202 metres
Volume of RCC: 240 m3x103
Total volume: 340 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Hardfill
Purpose(s): unknown
River: -
Reservoir capacity: -
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 36 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Hunan Xiangtou Xinshao Youxi Hydropower Development Corporation Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Zishui
Reservoir capacity: 168 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 47 metres
Length: 268 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Chengdu Haineng Power Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Mabianhe
Reservoir capacity: 204 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 73 metres
Length: 163 metres
Volume of RCC: 229 m3x103
Total volume: 405 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 110 |
| 66 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 73 | Low-lime flyash (ASTM Class F) |
| 66 |

Details
Country: China
Owner: Guizhou Zhongsui Energy Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Hongdu
Reservoir capacity: 99 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 87 metres
Length: 148 metres
Volume of RCC: 67 m3x103
Total volume: 90 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Wujiang
Reservoir capacity: 9940 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 87 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: China Guodian Corporation
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Quan
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 88 metres
Length: 160 metres
Volume of RCC: -
Total volume: 205 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Lishui Basin Hydraulic and Hydroelectric Development Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Water Supply
River: Dieshui
Reservoir capacity: 1439 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 88 metres
Length: 351 metres
Volume of RCC: 450 m3x103
Total volume: 930 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.25 |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 53 |
| 83 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 99 | Low-lime flyash (ASTM Class F) |
| 102 |

Details
Country: China
Owner: Datang International Power Generation Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Lixian (Black)
Reservoir capacity: 174 m3x106
Construction Dates
Start of Project: 11/04
Start of RCC: 11/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 95 metres
Length: 320 metres
Volume of RCC: 480 m3x103
Total volume: 800 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork |
| 0.20 |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Datang International Power Generation Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Lixian
Reservoir capacity: 78 m3x106
Construction Dates
Start of Project: 04/04
Start of RCC: 04/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 59 metres
Length: 300 metres
Volume of RCC: 255 m3x103
Total volume: 570 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| 93 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 110 | Ground-granulated blast-furnace slag |
| 113 |

Details
Country: China
Owner: Lichuan City Yujaing Valley Hudropower Ltd. Hubei Province
Type: Thin Arch
Purpose(s): Hydropower / Recreation
River: Yu
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: 12/05
Start of RCC: 12/05
End of RCC: 02/07
End of Project: 05/07
Specifications
Height: 95 metres
Length: 156 metres
Volume of RCC: 135 m3x103
Total volume: 160 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| curve | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| RCC against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: China Southern Power Grid
Type: Gravity
Purpose(s): Hydropower
River: Xiaojinhe
Reservoir capacity: 30 m3x106
Construction Dates
Start of Project: 10/04
Start of RCC: 10/04
End of RCC: 05/07
End of Project: -/11
Specifications
Height: 56 metres
Length: 168 metres
Volume of RCC: 84 m3x103
Total volume: 93 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 125 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Longtan Hydropower Development Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Water Supply
River: Hongshui
Reservoir capacity: 16210 m3x106
Construction Dates
Start of Project: 07/01
Start of RCC: 07/01
End of RCC: 06/07
End of Project: 12/09
Specifications
Height: 192 metres
Length: 832 metres
Volume of RCC: 4623 m3x103
Total volume: 7400 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.25 |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.68 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 99 |
| 86 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 121 | Low-lime flyash (ASTM Class F) |
| 109 |

Details
Country: China
Owner: Fujian Hongkou Hydropower Co. Ltd.
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Huotong
Reservoir capacity: 449 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/07
End of Project: -/08
Specifications
Height: 130 metres
Length: 341 metres
Volume of RCC: 681 m3x103
Total volume: 830 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guizhou Zhongshui Energy Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Luojiao
Reservoir capacity: 46 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/07
Specifications
Height: 81 metres
Length: 250 metres
Volume of RCC: -
Total volume: 110 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Department of Electricity, Feng Shun County
Type: Gravity
Purpose(s): Hydropower
River: Baxianghe
Reservoir capacity: 8 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 44 metres
Length: 207 metres
Volume of RCC: 63 m3x103
Total volume: 83 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Gansu Keyuan Electric Power Group Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Datong
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 44 metres
Length: 143 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Zhouluo County Government
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Lituohe
Reservoir capacity: 58 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 56 metres
Length: 193 metres
Volume of RCC: 162 m3x103
Total volume: 354 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Department of WaterResources, Henan Province
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation
River: Luohe
Reservoir capacity: 28 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 62 metres
Length: 244 metres
Volume of RCC: 133 m3x103
Total volume: 234 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Chongqing Youshui River Hydropower Development Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Youshui
Reservoir capacity: 152 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 63 metres
Length: 194 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Nanhe Hydropower Development Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Nanhe
Reservoir capacity: 14 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 77 metres
Length: 140 metres
Volume of RCC: 45 m3x103
Total volume: 55 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Jiyuan City Water Bureau
Type: Gravity
Purpose(s): unknown
River: Menghe
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 78 metres
Length: 215 metres
Volume of RCC: 160 m3x103
Total volume: 249 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Anhui Water Resources Development Co. Ltd.
Type: Thin Arch
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Dongpi
Reservoir capacity: 480 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: 04/09
Specifications
Height: 105 metres
Length: 422 metres
Volume of RCC: 485 m3x103
Total volume: 600 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.335 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.335 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| 56 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 108 | Low-lime flyash (ASTM Class F) |
| 84 |

Details
Country: China
Owner: Red River Hydropower Development Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Honghe
Reservoir capacity: 212 m3x106
Construction Dates
Start of Project: 02/06
Start of RCC: 02/06
End of RCC: -/07
End of Project: 07/08
Specifications
Height: 85 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guizhou-Wujiang Hydropower Development Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation
River: Wujiang
Reservoir capacity: 1593 m3x106
Construction Dates
Start of Project: 11/05
Start of RCC: 11/05
End of RCC: 03/08
End of Project: -/09
Specifications
Height: 117 metres
Length: 310 metres
Volume of RCC: 825 m3x103
Total volume: 1100 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 66 |
| 89 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |
| 109 |

Details
Country: China
Owner: Xilin River Hydropower Development Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Tuoniang
Reservoir capacity: 133 m3x106
Construction Dates
Start of Project: 03/05
Start of RCC: 03/05
End of RCC: 04/08
End of Project: -/09
Specifications
Height: 82 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guizhou Qianyuan Power Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Beipan
Reservoir capacity: 3245 m3x106
Construction Dates
Start of Project: 10/04
Start of RCC: 10/04
End of RCC: 05/08
End of Project: -/09
Specifications
Height: 201 metres
Length: 412 metres
Volume of RCC: 2420 m3x103
Total volume: 2800 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with hot poured membrane |
| 0.25 |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 61 |
| 71 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 91 | Low-lime flyash (ASTM Class F) |
| 87 |

Details
Country: China
Owner: Datang International Hydropower Generation Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Lixian
Reservoir capacity: 409 m3x106
Construction Dates
Start of Project: 01/03
Start of RCC: 01/03
End of RCC: 08/08
End of Project: -/09
Specifications
Height: 113 metres
Length: 466 metres
Volume of RCC: 903 m3x103
Total volume: 1200 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.20 |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 77 |
| 93 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 77 | Ground-granulated blast-furnace slag |
| 93 |

Details
Country: China
Owner: Huaneng Lancang River Hydropower Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Recreation
River: Lancang (Mekong)
Reservoir capacity: 1139 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/08
End of Project: -/09
Specifications
Height: 108 metres
Length: 705 metres
Volume of RCC: 848 m3x103
Total volume: 3068 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| 93 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 93 | Ground-granulated blast-furnace slag |
| 93 |

Details
Country: China
Owner: Datang International Power Generation Co. Ltd.
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Changxi
Reservoir capacity: 1465 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/08
End of Project: -/09
Specifications
Height: 117 metres
Length: 326 metres
Volume of RCC: 608 m3x103
Total volume: 1330 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| 81 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 96 | Low-lime flyash (ASTM Class F) |
| 121 |

Details
Country: China
Owner: Guangxi Water Conservancy and Electric Power Corporation
Type: Gravity
Purpose(s): Hydropower
River: Gui
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/08
End of Project: -/08
Specifications
Height: 61 metres
Length: 166 metres
Volume of RCC: -
Total volume: 127 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Datang Shaanxi Power Generation Co Ltd
Type: Gravity
Purpose(s): Hydropower
River: Hanjiang
Reservoir capacity: 176 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/08
End of Project: -/09
Specifications
Height: 72 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guizhou Qianyuan Power Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Furong
Reservoir capacity: 98 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/08
End of Project: -/09
Specifications
Height: 82 metres
Length: 166 metres
Volume of RCC: -
Total volume: 154 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Dehong Longjiang Hydropower Development Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Long
Reservoir capacity: 233 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/08
End of Project: -/09
Specifications
Height: 91 metres
Length: 280 metres
Volume of RCC: -
Total volume: 486 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Xinjiang Yili River Basin Development Authority
Type: Gravity
Purpose(s): Hydropower
River: Tekes
Reservoir capacity: 121 m3x106
Construction Dates
Start of Project: 04/06
Start of RCC: 04/06
End of RCC: -/08
End of Project: -/09
Specifications
Height: 50 metres
Length: 496 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Engshi Yuefeng Yunlong River Hydropower Development Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Yunlong
Reservoir capacity: 44 m3x106
Construction Dates
Start of Project: 03/06
Start of RCC: 03/06
End of RCC: 04/09
End of Project: -/11
Specifications
Height: 139 metres
Length: 119 metres
Volume of RCC: 182 m3x103
Total volume: 207 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Yujiang Hydropower Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Wuni
Reservoir capacity: 35 m3x106
Construction Dates
Start of Project: 06/07
Start of RCC: 06/07
End of RCC: 06/09
End of Project: -/12
Specifications
Height: 119 metres
Length: 152 metres
Volume of RCC: 200 m3x103
Total volume: 205 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Sichuan Wudu Water Conservancy and Hydropower Group Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Fu
Reservoir capacity: 572 m3x106
Construction Dates
Start of Project: 10/04
Start of RCC: 10/04
End of RCC: -/09
End of Project: -/10
Specifications
Height: 120 metres
Length: 631 metres
Volume of RCC: 1151 m3x103
Total volume: 1580 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: China Datang Corporation
Type: Thin Arch
Purpose(s): Hydropower
River: Getu
Reservoir capacity: 1748 m3x106
Construction Dates
Start of Project: 07/06
Start of RCC: 07/06
End of RCC: -/09
End of Project: -/10
Specifications
Height: 110 metres
Length: 253 metres
Volume of RCC: 280 m3x103
Total volume: 292 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 52 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 96 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Yunnan Dianneng Niulanjiang Hydropower Development Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Niulan
Reservoir capacity: 66 m3x106
Construction Dates
Start of Project: 12/06
Start of RCC: 12/06
End of RCC: -/09
End of Project: -/10
Specifications
Height: 113 metres
Length: 160 metres
Volume of RCC: 182 m3x103
Total volume: 360 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| ogee | RCC against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Quifeng Water Supply Co. of Fangchenggang City
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Xijiang
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/09
End of Project: -/12
Specifications
Height: 74 metres
Length: 190 metres
Volume of RCC: 230 m3x103
Total volume: 240 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
| 0.75 |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Xinjiang-Xinhua-Chonghuer Hydropower Development Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Burgin
Reservoir capacity: 85 m3x106
Construction Dates
Start of Project: 10/06
Start of RCC: 10/06
End of RCC: -/09
End of Project: -/09
Specifications
Height: 74 metres
Length: 545 metres
Volume of RCC: -
Total volume: 480 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Hongguo Water Resources Development Co.
Type: Gravity
Purpose(s): Water Supply
River: Tuochang
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: -/09
Specifications
Height: 58 metres
Length: 168 metres
Volume of RCC: -
Total volume: 125 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Yichang Junwang Group Co.
Type: Thin Arch
Purpose(s): Hydropower
River: Siyang
Reservoir capacity: 33 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/09
End of Project: -/10
Specifications
Height: 100 metres
Length: 185 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guizhou Tongzihe Hydropower Development Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower / Water Supply
River: Tongzhi
Reservoir capacity: 78 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: -/10
Specifications
Height: 68 metres
Length: 153 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Wujiang Hydropower Development Corporation
Type: Gravity
Purpose(s): Hydropower
River: Qingshuihe
Reservoir capacity: 77 m3x106
Construction Dates
Start of Project: 01/07
Start of RCC: 01/07
End of RCC: -/09
End of Project: -/10
Specifications
Height: 124 metres
Length: 104 metres
Volume of RCC: -
Total volume: 500 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): unknown
River: Dina
Reservoir capacity: 99 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/10
End of Project: -/12
Specifications
Height: 103 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): unknown
River: Liushahe
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/10
End of Project: -/12
Specifications
Height: 123 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Hanergy, Yunnan Jinsha River Hydropower Co. Ltd. and Yunnan Investment and Development Co. Ltd.
Type: Gravity
Purpose(s): Hydropower / Navigation / Recreation
River: Jinsha
Reservoir capacity: 913 m3x106
Construction Dates
Start of Project: 12/03
Start of RCC: 12/03
End of RCC: -/10
End of Project: -/11
Specifications
Height: 160 metres
Length: 640 metres
Volume of RCC: 2400 m3x103
Total volume: 4430 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| 96 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 108 | Low-lime flyash (ASTM Class F) |
| 117 |

Details
Country: China
Owner: Yunnan Dianneng Group Holding Company
Type: Thin Arch
Purpose(s): Hydropower
River: Xima
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 04/06
Start of RCC: 04/06
End of RCC: -/10
End of Project: -/11
Specifications
Height: 72 metres
Length: 160 metres
Volume of RCC: 107 m3x103
Total volume: 115 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| RCC against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guodian Yunnan Power Co Ltd
Type: Gravity
Purpose(s): Hydropower
River: Pudu
Reservoir capacity: 22 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/10
End of Project: -/11
Specifications
Height: 81 metres
Length: 148 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): unknown
River: Yupaojiang
Reservoir capacity: 25 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/10
End of Project: -/11
Specifications
Height: 95 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Chongqing Wujiang Power Company
Type: Gravity
Purpose(s): Hydropower
River: Youshui
Reservoir capacity: 163 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/10
End of Project: -/12
Specifications
Height: 30 metres
Length: 214 metres
Volume of RCC: -
Total volume: 260 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Hubei Energy Group Co. Ltd.
Type: Thin Arch
Purpose(s): Flood Control / Hydropower
River: Nanhe
Reservoir capacity: 499 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/10
End of Project: -/11
Specifications
Height: 133 metres
Length: 285 metres
Volume of RCC: -
Total volume: 390 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Meng County Longhuakou Hydropower Co. Ltd.
Type: Gravity
Purpose(s): unknown
River: Longhua
Reservoir capacity: 30 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/10
End of Project: -/10
Specifications
Height: 63 metres
Length: 353 metres
Volume of RCC: -
Total volume: 414 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guangxi Water Conservancy and Electric Power Corporation
Type: Thin Arch
Purpose(s): Hydropower
River: Baidu
Reservoir capacity: 22 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/10
End of Project: -/11
Specifications
Height: 75 metres
Length: 217 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Enshi Tianfa Electric Ltd.
Type: Thin Arch
Purpose(s): Flood Control / Hydropower / Recreation
River: Lengshui
Reservoir capacity: 87 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/10
End of Project: -/11
Specifications
Height: 114 metres
Length: 192 metres
Volume of RCC: 21 m3x103
Total volume: 21 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: Department of Water Resources, Guandong Province
Type: Gravity
Purpose(s): Hydropower / Irrigation / Navigation
River: Bei
Reservoir capacity: 374 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/10
End of Project: -/11
Specifications
Height: 85 metres
Length: 256 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guizhou Zhongshui Energy Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Hongdu
Reservoir capacity: 321 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: 12/11
End of Project: 12/11
Specifications
Height: 135 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Huaneng Lancang River Hydropower Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Lancang (Mekong)
Reservoir capacity: 316 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/11
End of Project: 03/12
Specifications
Height: 105 metres
Length: 356 metres
Volume of RCC: -
Total volume: 1067 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Nei Mongol (Inner Mongolia) Electricity Corporation
Type: Gravity
Purpose(s): Hydropower
River: Halasxinegou
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/11
End of Project: -/12
Specifications
Height: 69 metres
Length: 242 metres
Volume of RCC: 185 m3x103
Total volume: 330 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): unknown
River: Sanglang
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/11
End of Project: -/12
Specifications
Height: 90 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Enshi Mawei Valley Hydropower Development Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Maweigou
Reservoir capacity: 29 m3x106
Construction Dates
Start of Project: 12/08
Start of RCC: 12/08
End of RCC: -/11
End of Project: -/12
Specifications
Height: 140 metres
Length: 116 metres
Volume of RCC: -
Total volume: 212 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Baise WaCun Hydropower Development Co.
Type: Gravity
Purpose(s): Hydropower
River: Xiyang
Reservoir capacity: 57 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/11
Specifications
Height: 69 metres
Length: 247 metres
Volume of RCC: -
Total volume: 289 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guodian Shaanxi Hydropower Development Co.
Type: Gravity
Purpose(s): Hydropower
River: Dan
Reservoir capacity: 95 m3x106
Construction Dates
Start of Project: 02/09
Start of RCC: 02/09
End of RCC: -/11
End of Project: -/11
Specifications
Height: 70 metres
Length: 221 metres
Volume of RCC: -
Total volume: 221 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Lusi Reservoir Management Office
Type: Gravity
Purpose(s): Water Supply
River: Lusixi
Reservoir capacity: 33 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/12
Specifications
Height: 39 metres
Length: 140 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Hubei Huaqing Power Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Loushui
Reservoir capacity: 52 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/11
End of Project: -/12
Specifications
Height: 74 metres
Length: 146 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Honghe Guangyuan Hydropwer and Madushan Development Co. Ltd.
Type: Gravity
Purpose(s): Hydropower / Navigation / Water Supply
River: Honghe
Reservoir capacity: 552 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/11
End of Project: -/12
Specifications
Height: 108 metres
Length: 353 metres
Volume of RCC: -
Total volume: 987 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Yunnan Jinsha River Hydropower Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation
River: Jinsha
Reservoir capacity: 885 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/11
End of Project: -/12
Specifications
Height: 138 metres
Length: 482 metres
Volume of RCC: -
Total volume: 2707 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Yumen Hongyuan Industrial Company
Type: Gravity
Purpose(s): Hydropower
River: Sule
Reservoir capacity: -
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/12
Specifications
Height: 64 metres
Length: 147 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Yunnan Baoshan Electric Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Longjiang
Reservoir capacity: 53 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/12
Specifications
Height: 76 metres
Length: 239 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Yunnan Jinsha River Hydropower Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Recreation / Water Supply
River: Jinsha
Reservoir capacity: 558 m3x106
Construction Dates
Start of Project: 08/07
Start of RCC: 08/07
End of RCC: -/12
End of Project: -/13
Specifications
Height: 119 metres
Length: 768 metres
Volume of RCC: 2840 m3x103
Total volume: 3853 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 96 | Low-lime flyash (ASTM Class F) |
| 90 |

Details
Country: China
Owner: Shankouyan Hydro Project Development Co.
Type: Thin Arch
Purpose(s): Hydropower
River: Yuanhe
Reservoir capacity: 105 m3x106
Construction Dates
Start of Project: 11/07
Start of RCC: 11/07
End of RCC: -/12
End of Project: -/13
Specifications
Height: 99 metres
Length: 268 metres
Volume of RCC: -
Total volume: 272 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Wujiang Hydroelectric Development Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation
River: Wu
Reservoir capacity: 910 m3x106
Construction Dates
Start of Project: 05/06
Start of RCC: 05/06
End of RCC: -/12
End of Project: -/13
Specifications
Height: 101 metres
Length: 631 metres
Volume of RCC: 1510 m3x103
Total volume: 1980 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.15 |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guizhou Water-investment Hydropower Development Co., Ltd
Type: Thin Arch
Purpose(s): Hydropower
River: Masha
Reservoir capacity: 61 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/12
End of Project: -/13
Specifications
Height: 81 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): unknown
River: Milanhe
Reservoir capacity: 41 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/12
End of Project: -/13
Specifications
Height: 83 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Yalong River Hydropower Development Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Yalong
Reservoir capacity: 760 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/12
End of Project: -/13
Specifications
Height: 168 metres
Length: 516 metres
Volume of RCC: 2970 m3x103
Total volume: 3020 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | |
| 0.30 |
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
| 0.70 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 88 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): unknown
River: Hanjiang
Reservoir capacity: -
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/12
End of Project: -/14
Specifications
Height: 58 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Zunyi Water Conservancy Bureau
Type: Gravity
Purpose(s): unknown
River: Ren
Reservoir capacity: 99 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/12
End of Project: -/12
Specifications
Height: 60 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Ximeng Fubian Hydropower Development Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Nankang
Reservoir capacity: 31 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/12
End of Project: -/12
Specifications
Height: 68 metres
Length: 179 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Department of Water Resources, Xinjiang Province
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: E’erqisi
Reservoir capacity: 2419 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/13
End of Project: -/14
Specifications
Height: 122 metres
Length: 1489 metres
Volume of RCC: 2520 m3x103
Total volume: 2890 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
| 0.75 |
Spillway
| Slope | Type |
|---|---|
| 0.75 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: Guizhou Qianyuan Power Company
Type: Gravity
Purpose(s): Hydropower
River: Beipan
Reservoir capacity: 137 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/13
End of Project: -/14
Specifications
Height: 109 metres
Length: 250 metres
Volume of RCC: -
Total volume: 591 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Luntan Hydraulic Engineering Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Yangcunshui
Reservoir capacity: 180 m3x106
Construction Dates
Start of Project: 12/08
Start of RCC: 12/08
End of RCC: -/13
End of Project: -/14
Specifications
Height: 90 metres
Length: 218 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: China Huadian Corporation
Type: Thin Arch
Purpose(s): Hydropower / Water Supply
River: Muli
Reservoir capacity: 190 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/13
End of Project: -/14
Specifications
Height: 132 metres
Length: 211 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): unknown
River: Chuanjiang
Reservoir capacity: 98 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/13
End of Project: -/14
Specifications
Height: 83 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): unknown
River: Houhe
Reservoir capacity: 119 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/13
End of Project: -/14
Specifications
Height: 93 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guizhou Qianyuan Power Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Beipan
Reservoir capacity: 85 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/13
End of Project: -/15
Specifications
Height: 119 metres
Length: 205 metres
Volume of RCC: 199 m3x103
Total volume: 267 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| curve | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| ogee | RCC against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: HydroChina Co.
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Furong
Reservoir capacity: 57 m3x106
Construction Dates
Start of Project: 10/11
Start of RCC: 10/11
End of RCC: -/13
End of Project: -/13
Specifications
Height: 59 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Chengde Shuangfengsi Project Bureau
Type: Gravity
Purpose(s): Hydropower
River: Luanhe
Reservoir capacity: 137 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/13
End of Project: -/14
Specifications
Height: 50 metres
Length: 535 metres
Volume of RCC: -
Total volume: 550 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guodian Haikong Hongling water construction Co. Ltd.
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Dabian
Reservoir capacity: 662 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/13
End of Project: -/14
Specifications
Height: 92 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Nei Mongol (Inner Mongolia) Electricity Corporation
Type: Gravity
Purpose(s): Hydropower
River: Halasxinegou
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/13
End of Project: -/14
Specifications
Height: 58 metres
Length: 308 metres
Volume of RCC: 205 m3x103
Total volume: 717 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Datang Huarui Investment Group Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Recreation
River: Jinsha
Reservoir capacity: 2263 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: 05/14
End of Project: -/16
Specifications
Height: 159 metres
Length: 1250 metres
Volume of RCC: 6473 m3x103
Total volume: 9364 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.10 |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 53 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 99 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: China Three Gorges Corporation
Type: Gravity
Purpose(s): Hydropower
River: Jinsha
Reservoir capacity: 52 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/14
End of Project: -/16
Specifications
Height: 162 metres
Length: 909 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Yalongjiang Valley Hydropower Development
Type: Gravity
Purpose(s): Hydropower
River: Yalong
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/14
End of Project: -/16
Specifications
Height: 71 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Yunnan Huadian Hydropower Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Jingsha
Reservoir capacity: 1718 m3x106
Construction Dates
Start of Project: 01/07
Start of RCC: 01/07
End of RCC: -/14
End of Project: -/15
Specifications
Height: 140 metres
Length: 622 metres
Volume of RCC: -
Total volume: 1920 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | |
| 0.20 |
Downstream
| Slope | Type |
|---|---|
| 0.75 |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Hanshuinanhe
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/14
End of Project: -/15
Specifications
Height: 98 metres
Length: -
Volume of RCC: -
Total volume: 205 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Xian Water Affair Group
Type: Thin Arch
Purpose(s): Hydropower
River: Bahe
Reservoir capacity: 53 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/14
End of Project: -/15
Specifications
Height: 99 metres
Length: 352 metres
Volume of RCC: 370 m3x103
Total volume: 478 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Helong Electricity Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Recreation / Water Supply
River: Hailanhe
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/14
End of Project: -/15
Specifications
Height: 41 metres
Length: 271 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.73 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| conduit |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 2000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): unknown
River: Daoliu
Reservoir capacity: 123 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/14
End of Project: -/15
Specifications
Height: 60 metres
Length: 187 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/14
End of Project: -/15
Specifications
Height: 72 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: China Power International Development
Type: Gravity
Purpose(s): Hydropower
River: Yuan
Reservoir capacity: 1384 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/15
End of Project: -/16
Specifications
Height: 82 metres
Length: 649 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Huaneng Guoduo Hydropower Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Zha Qu
Reservoir capacity: 80 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/15
End of Project: -/16
Specifications
Height: 83 metres
Length: 236 metres
Volume of RCC: -
Total volume: 550 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Yunxi Shuishimen Reservoir Bureau
Type: Thin Arch
Purpose(s): Flood Control / Hydropower / Water Supply
River: Tianhe
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/15
End of Project: -/16
Specifications
Height: 86 metres
Length: -
Volume of RCC: -
Total volume: 150 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guangdong Yuedian Group Co., Ltd
Type: Thin Arch
Purpose(s): Hydropower
River: Nanpeng
Reservoir capacity: 170 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/15
End of Project: -/16
Specifications
Height: 99 metres
Length: 300 metres
Volume of RCC: -
Total volume: 210 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): unknown
River: Xinchanghe
Reservoir capacity: 14 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/15
End of Project: -/16
Specifications
Height: 57 metres
Length: 145 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guilin Dayu Water Conservancy, Infrastructure, Construction and Investment Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Xiaorong
Reservoir capacity: 163 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/16
End of Project: -/17
Specifications
Height: 90 metres
Length: 255 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Xiamen Water Resources Bureau
Type: Gravity
Purpose(s): Hydropower
River: Lianhuaxi
Reservoir capacity: 33 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/16
End of Project: -/17
Specifications
Height: 30 metres
Length: 333 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Jialingjiang
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/16
End of Project: -/17
Specifications
Height: 51 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Nujiang
Reservoir capacity: 1288 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/16
End of Project: -/18
Specifications
Height: 165 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Qiduxi
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/16
End of Project: -/17
Specifications
Height: 54 metres
Length: 246 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Dangjiahe
Reservoir capacity: 14 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/16
End of Project: -/17
Specifications
Height: 68 metres
Length: 176 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Datang Investment Group Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Furong (Pangu)
Reservoir capacity: 90 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/16
End of Project: -/17
Specifications
Height: 85 metres
Length: 211 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: SPIC Guizhou Jinyuan Hydroelectirc Powerplant
Type: Thin Arch
Purpose(s): Hydropower
River: Niulan
Reservoir capacity: 263 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/16
End of Project: -/17
Specifications
Height: 136 metres
Length: 459 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: China Datang Corporation
Type: Thin Arch
Purpose(s): Hydropower
River: Gexiang
Reservoir capacity: 279 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/17
End of Project: -/18
Specifications
Height: 168 metres
Length: 413 metres
Volume of RCC: 760 m3x103
Total volume: 1020 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 66 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Huaneng Lancang River Hydropower Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Lancang (Mekong)
Reservoir capacity: 272 m3x106
Construction Dates
Start of Project: 06/10
Start of RCC: 06/10
End of RCC: -/17
End of Project: -/18
Specifications
Height: 138 metres
Length: 247 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Irrigation / Water Supply
River: -
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/17
End of Project: -/18
Specifications
Height: 58 metres
Length: 269 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Ximihe
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/17
End of Project: -/18
Specifications
Height: 88 metres
Length: 147 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Muling Fendou Reservoir Construction office
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Mulenghe
Reservoir capacity: 191 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/17
End of Project: -/18
Specifications
Height: 46 metres
Length: 406 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Dashahe
Reservoir capacity: 196 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/17
End of Project: -/18
Specifications
Height: 74 metres
Length: 296 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower / Irrigation / Water Supply
River: Mabie
Reservoir capacity: 99 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/17
End of Project: -/18
Specifications
Height: 108 metres
Length: 182 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Yunnan Huaneng Lancang River Hydropower Co.,Ltd.
Type: Gravity
Purpose(s): Hydropower / Irrigation / Recreation
River: Lancang (Mekong)
Reservoir capacity: 1613 m3x106
Construction Dates
Start of Project: 01/10
Start of RCC: 01/10
End of RCC: 04/18
End of Project: 06/19
Specifications
Height: 203 metres
Length: 464 metres
Volume of RCC: 2753 m3x103
Total volume: 3670 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 82 |
| 67 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |
| 100 |

Details
Country: China
Owner: -
Type: Arch-Gravity
Purpose(s): unknown
River: Ziwuhe
Reservoir capacity: 710 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: 12/18
End of Project: 06/19
Specifications
Height: 142 metres
Length: 472 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Huaneng Lancang River Hydropower Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Lancang (Mekong)
Reservoir capacity: 262 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/18
End of Project: -/19
Specifications
Height: 107 metres
Length: 232 metres
Volume of RCC: -
Total volume: 112 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Huaneng Lancang River Hydropower Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Lancang (Mekong)
Reservoir capacity: 75 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/18
End of Project: -/19
Specifications
Height: 75 metres
Length: 346 metres
Volume of RCC: -
Total volume: 1100 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Shangcunxi
Reservoir capacity: 123 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/18
End of Project: -/19
Specifications
Height: 89 metres
Length: 338 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Hardfill
Purpose(s): unknown
River: -
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/18
End of Project: -/19
Specifications
Height: 62 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: China Power Investment Corporation
Type: Thin Arch
Purpose(s): Hydropower
River: Qingshuihe
Reservoir capacity: 13 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/18
End of Project: -/19
Specifications
Height: 75 metres
Length: 166 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): unknown
River: Mandian
Reservoir capacity: 12340 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/18
End of Project: -/19
Specifications
Height: 78 metres
Length: 231 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Changlehe
Reservoir capacity: 133 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/18
End of Project: -/19
Specifications
Height: 101 metres
Length: 355 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guangxi Datengxia Gorge Water Conservancy Development Co. .Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Water Supply
River: Xijiang
Reservoir capacity: 3479 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/18
End of Project: 07/20
Specifications
Height: 80 metres
Length: -
Volume of RCC: -
Total volume: 7100 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Zhuangli reservoir construction and management office
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Shizihe
Reservoir capacity: 133 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/18
End of Project: -/19
Specifications
Height: 44 metres
Length: 49 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): unknown
River: Gouhe
Reservoir capacity: 160 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/18
End of Project: -/19
Specifications
Height: 52 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Sanchahe
Reservoir capacity: 1089 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/19
End of Project: -/21
Specifications
Height: 163 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: 346 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/19
End of Project: -/20
Specifications
Height: 60 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Youjiang
Reservoir capacity: 536 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/19
End of Project: -/20
Specifications
Height: 105 metres
Length: 365 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Yalong River Hydropower Development Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Hongdu
Reservoir capacity: 100 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/19
End of Project: -/20
Specifications
Height: 121 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: China Yangzi River Three Gorges Group
Type: Gravity
Purpose(s): Hydropower
River: Jinsha (Yangtze)
Reservoir capacity: 7400 m3x106
Construction Dates
Start of Project: 04/18
Start of RCC: 04/18
End of RCC: -/19
End of Project: 06/19
Specifications
Height: 96 metres
Length: 163 metres
Volume of RCC: 466 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: -
Reservoir capacity: 96 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: 03/20
End of Project: 01/21
Specifications
Height: 76 metres
Length: 173 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): unknown
River: Junshui
Reservoir capacity: 117 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/20
End of Project: -/21
Specifications
Height: 76 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Hardfill
Purpose(s): unknown
River: Shigaoqiao
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: -/19
Start of RCC: -/19
End of RCC: -/20
End of Project: -/20
Specifications
Height: 33 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: China Southern Power Grid
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: 41 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/20
End of Project: -/21
Specifications
Height: 60 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: China Southern Power Grid
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: 45 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/20
End of Project: -/21
Specifications
Height: 85 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: China Huadian Group Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Yaluzangbu (Brahmaputra)
Reservoir capacity: 55 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: 04/21
End of Project: -/23
Specifications
Height: 118 metres
Length: 385 metres
Volume of RCC: 937 m3x103
Total volume: 1442 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 93 |
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 93 | |
| 100 |

Details
Country: China
Owner: China Southern Power Grid Co.
Type: Gravity
Purpose(s): Hydropower
River: Moyang
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: 01/17
Start of RCC: 01/17
End of RCC: 11/21
End of Project: 06/22
Specifications
Height: 101 metres
Length: 477 metres
Volume of RCC: -
Total volume: 652 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 6000 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): unknown
River: -
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: 12/21
End of Project: -/22
Specifications
Height: 83 metres
Length: 193 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Northeast China Electric Power
Type: Gravity
Purpose(s): Hydropower
River: Songhua
Reservoir capacity: 10377 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/21
End of Project: -/22
Specifications
Height: 95 metres
Length: 1068 metres
Volume of RCC: -
Total volume: 2700 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Hardfill
Purpose(s): unknown
River: -
Reservoir capacity: 472 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/21
End of Project: -/22
Specifications
Height: 50 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: -
Reservoir capacity: 219 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/21
End of Project: -/22
Specifications
Height: 90 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Heihe
Reservoir capacity: 403 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/21
End of Project: -/22
Specifications
Height: 123 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Bala
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/21
End of Project: -/22
Specifications
Height: 47 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Flood Control / Hydropower
River: Qianhe
Reservoir capacity: 160 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/21
End of Project: -/22
Specifications
Height: 132 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Hanshui
Reservoir capacity: 221 m3x106
Construction Dates
Start of Project: 10/18
Start of RCC: 10/18
End of RCC: 11/22
End of Project: 07/23
Specifications
Height: 70 metres
Length: 349 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guilin Dayu Water Infrastructure Development Investment Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Lijiang
Reservoir capacity: 188 m3x106
Construction Dates
Start of Project: 11/11
Start of RCC: 11/11
End of RCC: -/22
End of Project: -/23
Specifications
Height: 77 metres
Length: 239 metres
Volume of RCC: -
Total volume: 304 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): unknown
River: -
Reservoir capacity: 44 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/22
End of Project: -/23
Specifications
Height: 105 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Huaneng Lancang River Hydropower Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Langcang (Mekong)
Reservoir capacity: 1338 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/22
End of Project: -/24
Specifications
Height: 158 metres
Length: 508 metres
Volume of RCC: -
Total volume: 3600 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Lichuan City Yujiang Valley Hudropower Ltd. Hubei Province
Type: Thin Arch
Purpose(s): Flood Control / Hydropower
River: Yu
Reservoir capacity: 55 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/22
End of Project: -/22
Specifications
Height: 70 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guizhou Shuicheng Water-investment Co. Ltd.
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Yuwanghe
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: 09/16
Start of RCC: 09/16
End of RCC: -/22
End of Project: 11/23
Specifications
Height: 50 metres
Length: 157 metres
Volume of RCC: 106 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Ao
Reservoir capacity: 297 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/22
End of Project: -/23
Specifications
Height: 91 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Jialing River Tingzikou Water Resources and Hydropower Development Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply
River: Jialing
Reservoir capacity: 4067 m3x106
Construction Dates
Start of Project: 11/09
Start of RCC: 11/09
End of RCC: -/22
End of Project: -/25
Specifications
Height: 116 metres
Length: 995 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): unknown
River: Tuoxi
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/22
End of Project: -/23
Specifications
Height: 62 metres
Length: 310 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Large and medium sized Irrigation District Service Center of Qiannan Prefecture
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Qingshui
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 04/20
Start of RCC: 04/20
End of RCC: -/22
End of Project: -/22
Specifications
Height: 32 metres
Length: 198 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 1.00 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| none |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: Maiwan Water Conservancy
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Nandu
Reservoir capacity: 615 m3x106
Construction Dates
Start of Project: 04/20
Start of RCC: 04/20
End of RCC: 05/24
End of Project: 07/25
Specifications
Height: 79 metres
Length: 377 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Department of Water Conservancy, Fujian Province
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Aojiang
Reservoir capacity: 297 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/24
End of Project: -/25
Specifications
Height: 91 metres
Length: 338 metres
Volume of RCC: 300 m3x103
Total volume: 663 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 |
Downstream
| Slope | Type |
|---|---|
| 0.76 |
Spillway
| Slope | Type |
|---|---|
| 0.76 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Beimen
Reservoir capacity: 191 m3x106
Construction Dates
Start of Project: 04/20
Start of RCC: 04/20
End of RCC: -/24
End of Project: 08/25
Specifications
Height: 52 metres
Length: 295 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: -
Reservoir capacity: 544 m3x106
Construction Dates
Start of Project: 06/20
Start of RCC: 06/20
End of RCC: -/24
End of Project: 12/25
Specifications
Height: 106 metres
Length: 596 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Hardfill
Purpose(s): unknown
River: -
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: -/20
Start of RCC: -/20
End of RCC: -/24
End of Project: -/25
Specifications
Height: 40 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Hardfill
Purpose(s): unknown
River: Dongyanggou
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: 05/22
Start of RCC: 05/22
End of RCC: -/24
End of Project: -/25
Specifications
Height: 67 metres
Length: 136 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Tong
Reservoir capacity: 113 m3x106
Construction Dates
Start of Project: 06/22
Start of RCC: 06/22
End of RCC: 06/25
End of Project: -/26
Specifications
Height: 69 metres
Length: 288 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: 104 m3x106
Construction Dates
Start of Project: -/20
Start of RCC: -/20
End of RCC: -/25
End of Project: -/25
Specifications
Height: 90 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Niulushi
Reservoir capacity: 66 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/25
End of Project: -/26
Specifications
Height: 80 metres
Length: 391 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Dazhou Major water works construction and management center
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Zhonhe
Reservoir capacity: 128 m3x106
Construction Dates
Start of Project: 12/20
Start of RCC: 12/20
End of RCC: -/25
End of Project: -/26
Specifications
Height: 77 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Hardfill
Purpose(s): unknown
River: Qiuluxi
Reservoir capacity: 28 m3x106
Construction Dates
Start of Project: 10/21
Start of RCC: 10/21
End of RCC: -/25
End of Project: -/26
Specifications
Height: 52 metres
Length: 395 metres
Volume of RCC: 329 m3x103
Total volume: 386 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): unknown
River: -
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: -/22
Start of RCC: -/22
End of RCC: -/25
End of Project: -/26
Specifications
Height: 64 metres
Length: 274 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: China Nuclear (Guodian Zhangzhou) Energy
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/26
End of Project: -/27
Specifications
Height: 68 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guizhou Water Conservancy Investment Group Co, Ltd
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Guanyinsi
Reservoir capacity: 121 m3x106
Construction Dates
Start of Project: 12/21
Start of RCC: 12/21
End of RCC: -/26
End of Project: -/27
Specifications
Height: 109 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Lancang (Mekong)
Reservoir capacity: -
Construction Dates
Start of Project: 10/21
Start of RCC: 10/21
End of RCC: -/26
End of Project: -/27
Specifications
Height: 158 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Qingshui
Reservoir capacity: 210 m3x106
Construction Dates
Start of Project: 12/21
Start of RCC: 12/21
End of RCC: -/26
End of Project: -/27
Specifications
Height: 96 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Construction Headquarters of Heibaoshan Reservoir Project in Wanyuan City
Type: Hardfill
Purpose(s): Irrigation / Water Supply
River: Dayan
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/22
Start of RCC: -/22
End of RCC: -/26
End of Project: -/27
Specifications
Height: 60 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Bahe
Reservoir capacity: 141 m3x106
Construction Dates
Start of Project: 04/22
Start of RCC: 04/22
End of RCC: -/28
End of Project: -/29
Specifications
Height: 71 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Yalong River Hydropower Development Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Yalong
Reservoir capacity: 234 m3x106
Construction Dates
Start of Project: 01/24
Start of RCC: 01/24
End of RCC: -/28
End of Project: -/29
Specifications
Height: 128 metres
Length: -
Volume of RCC: -
Total volume: 2560 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates