Dam Search Results
- Dimensions
- Height: 96 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Qinglianxi | China | H | Meixi | 20 | - /00 | - /02 | - /04 | - /06 | 96 | 178 | ||||||||||||||
| Song Tranh 2 | Vietnam | EVN (Electrictie de Vietnam) | H | Song Tranh | 733 | 03/05 | 04/08 | 08/11 | 12/12 | 96 | 640 | 1032 | 1315 | V | (3') | 0.80 | (1) | 0.75 | (1) | 300 | 300 | 70 | 110 | (N) |
| Wudongde secondary dam | China | China Yangzi River Three Gorges Group | H | Jinsha (Yangtze) | 7400 | 04/18 | - /18 | - /19 | 06/19 | 96 | 163 | 466 | ||||||||||||
| Asuwagawa [A-G] | Japan | Ministry of Land, Infrastructure, Transport and Tourism | F | Heko | 29 | 07/06 | - /18 | - /24 | - /26 | 96 | ||||||||||||||
| Jiaoyan | China | H | Qingshui | 210 | 12/21 | - /23 | - /26 | - /27 | 96 | |||||||||||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Meixi
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/04
End of Project: -/06
Specifications
Height: 96 metres
Length: 178 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Vietnam
Owner: EVN (Electrictie de Vietnam)
Type: Gravity
Purpose(s): Hydropower
River: Song Tranh
Reservoir capacity: 733 m3x106
Construction Dates
Start of Project: 03/05
Start of RCC: 03/05
End of RCC: 08/11
End of Project: 12/12
Specifications
Height: 96 metres
Length: 640 metres
Volume of RCC: 1032 m3x103
Total volume: 1315 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 110 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: China Yangzi River Three Gorges Group
Type: Gravity
Purpose(s): Hydropower
River: Jinsha (Yangtze)
Reservoir capacity: 7400 m3x106
Construction Dates
Start of Project: 04/18
Start of RCC: 04/18
End of RCC: -/19
End of Project: 06/19
Specifications
Height: 96 metres
Length: 163 metres
Volume of RCC: 466 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: Ministry of Land, Infrastructure, Transport and Tourism
Type: Arch-Gravity
Purpose(s): Flood Control
River: Heko
Reservoir capacity: 29 m3x106
Construction Dates
Start of Project: 07/06
Start of RCC: 07/06
End of RCC: -/24
End of Project: -/26
Specifications
Height: 96 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Qingshui
Reservoir capacity: 210 m3x106
Construction Dates
Start of Project: 12/21
Start of RCC: 12/21
End of RCC: -/26
End of Project: -/27
Specifications
Height: 96 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates
