Dam Search Results
- Dimensions
- Height: 51 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Canoas | Brazil | Companhia de Gestão dos Recursos Hídricos | I W | Riacho da Madeira | 69 | 07/93 | 08/94 | 05/95 | - /96 | 51 | 116 | 87 | 93 | 0.10 | (1) | 0.80 | (10)* | 0.80 | (1)* | 300 | 300 | 64 | 16 | (N) |
| Jauru | Brazil | Queiroz Galvão Energética SA (90%) and Cinco Estrelas Agropecuária e Participações Ltda (10%) | H | Jauru | 20 | - /00 | - /01 | - /02 | - /03 | 51 | ||||||||||||||
| Boussiaba | Algeria | ANBT (Agence Nationale des Barrages et Transferts) | W | Boussiaba | 120 | 12/06 | 05/08 | 11/08 | 08/09 | 51 | 310 | 160 | 190 | V | (2) | (1)* | (1) | 300 | 300 | 112 | 28 | (F) | ||
| Allai Khwar | Pakistan | WAPDA (Water and Power Development Authority) and CTGC (China Three Gorges Corp.) | H | Allai Khwar | 01/05 | - /09 | - /12 | 03/13 | 51 | 88 | ||||||||||||||
| Hechuan | China | H | Jialingjiang | 11 | - /12 | - /14 | - /16 | - /17 | 51 | |||||||||||||||
| Ouldjet Mellegue | Algeria | ANBT (Agence Nationale des Barrages et Transfert) | I W | Mellegue | 155 | 10/11 | - /13 | - /17 | - /18 | 51 | 900 | 245 | 320 | V | (1) | 0.80 | (1) | 0.80 | (1) | 300 | 300 | 110 | 0 | (-) |
| Balli | Turkey | DSI - State Hydraulic Works | H | Ortasu | 6 | - /08 | - /14 | - /18 | - /20 | 51 | 188 | 144 | 0.10 | (1) | 0.80 | (1) | 0.70 | (3') | 300 | 300 | 95 | 45 | (N) | |
| Dereçati | Turkey | DSI - State Hydraulic Works | I | Büyükdere | 2 | - /16 | - /18 | - /20 | - /21 | 51 | 174 | 110 | ||||||||||||
| Tersun | Turkey | DSI - State Hydraulic Works | I | Tersun | 9 | - /16 | - /20 | - /25 | - /26 | 51 | 236 | 205 | 0.05 | (1) | 0.80 | (1) | ||||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Brazil
Owner: Companhia de Gestão dos Recursos Hídricos
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Riacho da Madeira
Reservoir capacity: 69 m3x106
Construction Dates
Start of Project: 07/93
Start of RCC: 07/93
End of RCC: 05/95
End of Project: -/96
Specifications
Height: 51 metres
Length: 116 metres
Volume of RCC: 87 m3x103
Total volume: 93 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete blocks [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Queiroz Galvão Energética SA (90%) and Cinco Estrelas Agropecuária e Participações Ltda (10%)
Type: Gravity
Purpose(s): Hydropower
River: Jauru
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/02
End of Project: -/03
Specifications
Height: 51 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Algeria
Owner: ANBT (Agence Nationale des Barrages et Transferts)
Type: Gravity
Purpose(s): Water Supply
River: Boussiaba
Reservoir capacity: 120 m3x106
Construction Dates
Start of Project: 12/06
Start of RCC: 12/06
End of RCC: 11/08
End of Project: 08/09
Specifications
Height: 51 metres
Length: 310 metres
Volume of RCC: 160 m3x103
Total volume: 190 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork with external geomembrane |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 112 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 28 | Low-lime flyash (ASTM Class F) |

Details
Country: Pakistan
Owner: WAPDA (Water and Power Development Authority) and CTGC (China Three Gorges Corp.)
Type: Gravity
Purpose(s): Hydropower
River: Allai Khwar
Reservoir capacity: -
Construction Dates
Start of Project: 01/05
Start of RCC: 01/05
End of RCC: -/12
End of Project: 03/13
Specifications
Height: 51 metres
Length: 88 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Jialingjiang
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/16
End of Project: -/17
Specifications
Height: 51 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Algeria
Owner: ANBT (Agence Nationale des Barrages et Transfert)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Mellegue
Reservoir capacity: 155 m3x106
Construction Dates
Start of Project: 10/11
Start of RCC: 10/11
End of RCC: -/17
End of Project: -/18
Specifications
Height: 51 metres
Length: 900 metres
Volume of RCC: 245 m3x103
Total volume: 320 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 110 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower
River: Ortasu
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/18
End of Project: -/20
Specifications
Height: 51 metres
Length: 188 metres
Volume of RCC: 144 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 95 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 45 | Natural pozzolan (ASTM Class N) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Büyükdere
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/20
End of Project: -/21
Specifications
Height: 51 metres
Length: 174 metres
Volume of RCC: 110 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Tersun
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/25
End of Project: -/26
Specifications
Height: 51 metres
Length: 236 metres
Volume of RCC: 205 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.05 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates