Dam Search Results
- Dimensions
- Height: 59 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Mae Suai | Thailand | Royal Irrigation Department (RID) | I | Mae Suai | 73 | 11/99 | 10/00 | 01/02 | 07/02 | 59 | 340 | 300 | 350 | 0.15 | (15) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 70 | 80 to 100 | (F) |
| Tukahe | China | Datang International Power Generation Co. Ltd. | H | Lixian | 78 | 04/04 | 12/05 | - /06 | - /07 | 59 | 300 | 255 | 570 | V | (3') | (3') | (3') | 300 | 3000 | 65 93 | 110 113 | (S) | ||
| Santa Clara-BA | Brazil | Companhia Energetica Santa Clara | H | Mucuri | 151 | - /99 | - /01 | - /02 | - /03 | 59 | 242 | 520 | 600 | 300 | 300 | |||||||||
| Shaqian | China | HydroChina Co. | F H | Furong | 57 | 10/11 | - /12 | - /13 | - /13 | 59 | ||||||||||||||
| Lower Russei Chrum | Cambodia | Ministry of Mines and Energy | H | Russei Chrum | 62 | - /11 | - /12 | - /13 | - /14 | 59 | 325 | 170 | ||||||||||||
| Houay LaNge | Laos | Houay LaNge Power Co. Ltd. (JV of China-based Hebei Construction and Investment Group Co., Ltd (HCIG) and CS Energy (Laos)) | H | Houaylange | 14 | 02/18 | - /20 | - /22 | 05/23 | 59 | 174 | V | (3') | (3')* | (12) | |||||||||
| Aldegirmen | Turkey | DSI - State Hydraulic Works | I W | Akasya | 24 | - /17 | - /20 | - /23 | - /24 | 59 | 227 | 189 | V | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 300 | 55 | 45 | (F) | |
| Agios Georgios [H-F] | Greece | Terna Energiaki | H | Kapnitsorrema | 7 | 06/23 | 04/24 | 10/25 | 12/25 | 59 | 475 | 765 | 795 | 400 | 400 | |||||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Thailand
Owner: Royal Irrigation Department (RID)
Type: Gravity
Purpose(s): Irrigation
River: Mae Suai
Reservoir capacity: 73 m3x106
Construction Dates
Start of Project: 11/99
Start of RCC: 11/99
End of RCC: 01/02
End of Project: 07/02
Specifications
Height: 59 metres
Length: 340 metres
Volume of RCC: 300 m3x103
Total volume: 350 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.15 | RCC supported by fill shoulders |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 80 to | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Datang International Power Generation Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Lixian
Reservoir capacity: 78 m3x106
Construction Dates
Start of Project: 04/04
Start of RCC: 04/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 59 metres
Length: 300 metres
Volume of RCC: 255 m3x103
Total volume: 570 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| 93 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 110 | Ground-granulated blast-furnace slag |
| 113 |

Details
Country: Brazil
Owner: Companhia Energetica Santa Clara
Type: Gravity
Purpose(s): Hydropower
River: Mucuri
Reservoir capacity: 151 m3x106
Construction Dates
Start of Project: -/99
Start of RCC: -/99
End of RCC: -/02
End of Project: -/03
Specifications
Height: 59 metres
Length: 242 metres
Volume of RCC: 520 m3x103
Total volume: 600 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: HydroChina Co.
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Furong
Reservoir capacity: 57 m3x106
Construction Dates
Start of Project: 10/11
Start of RCC: 10/11
End of RCC: -/13
End of Project: -/13
Specifications
Height: 59 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Cambodia
Owner: Ministry of Mines and Energy
Type: Gravity
Purpose(s): Hydropower
River: Russei Chrum
Reservoir capacity: 62 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/13
End of Project: -/14
Specifications
Height: 59 metres
Length: 325 metres
Volume of RCC: 170 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Laos
Owner: Houay LaNge Power Co. Ltd. (JV of China-based Hebei Construction and Investment Group Co., Ltd (HCIG) and CS Energy (Laos))
Type: Gravity
Purpose(s): Hydropower
River: Houaylange
Reservoir capacity: 14 m3x106
Construction Dates
Start of Project: 02/18
Start of RCC: 02/18
End of RCC: -/22
End of Project: 05/23
Specifications
Height: 59 metres
Length: 174 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Akasya
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/23
End of Project: -/24
Specifications
Height: 59 metres
Length: 227 metres
Volume of RCC: -
Total volume: 189 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 45 | Low-lime flyash (ASTM Class F) |

Details
Country: Greece
Owner: Terna Energiaki
Type: Hardfill
Purpose(s): Hydropower
River: Kapnitsorrema
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: 06/23
Start of RCC: 06/23
End of RCC: 10/25
End of Project: 12/25
Specifications
Height: 59 metres
Length: 475 metres
Volume of RCC: 765 m3x103
Total volume: 795 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates