Dam Search Results
- Dimensions
- Height: 61 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Tianshenqiao Nº2 | China | China Southern Power Grid | F H | Nanpan | 116 | 01/84 | 04/87 | 06/90 | 12/92 | 61 | 471 | 143 | 284 | V | (1) | V 0.40 | (10) | ogee | (1) | 250 | 250 | 79 | 79 | (F) |
| Kamuro | Japan | Yamagata Prefecture | F W | Kaneyama | 7 | 07/86 | 07/88 | 10/90 | 08/93 | 61 | 257 | 136 | 307 | V 0.60 | (1) (1) | 0.75 | (1) | 0.75 | (1) | 150 - 200 | 500 | 96 | 24 | (F) |
| Guangzhou PSS- Lower dam | China | China Southern Power Grid | H | Liuxihe | 30 | 12/94 | 10/91 | 12/92 | 10/00 | 61 | 153 | 32 | 57 | V | (1) | 0.70 | (3)* | ogee 0.78 | (1) (1) | 300 | 300 | 62 | 108 | (F) |
| Huizhou PSS - Lower dam | China | China Southern Power Grid | H | Caitouhe | 30 | - /02 | - /03 | - /05 | - /11 | 61 | 420 | 235 | 242 | |||||||||||
| Liujiadong | China | Guangxi Water Conservancy and Electric Power Corporation | H | Gui | 26 | - /06 | - /07 | - /08 | - /08 | 61 | 166 | 127 | ||||||||||||
| Manduriacu | Ecuador | CELEC (Corporatión Eléctrica del Ecuador) | H | Mauduriacu | 10 | 12/11 | - /13 | - /14 | 03/15 | 61 | 245 | 114 | 0.25 | 0.75 | 0.75 | (N) | ||||||||
| Adigüzel II | Turkey | Peker Energy Inc | H | Büyük Menderes | 15 | - /12 | - /13 | - /14 | - /15 | 61 | 145 | 150 | ||||||||||||
| Tamalout [H-F] | Morocco | Direction des Aménagements Hydrauliques | F I W | Ansegmir | 50 | 10/10 | - /13 | - /17 | - /18 | 61 | 320 | 380 | 405 | 0.50 | (5) | 0.70 | (1)* | 0.70 | (1)* | 300 | 300 | 80 70 60 | 0 0 | (-) |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: China
Owner: China Southern Power Grid
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Nanpan
Reservoir capacity: 116 m3x106
Construction Dates
Start of Project: 01/84
Start of RCC: 01/84
End of RCC: 06/90
End of Project: 12/92
Specifications
Height: 61 metres
Length: 471 metres
Volume of RCC: 143 m3x103
Total volume: 284 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete blocks |
| 0.40 |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 250 |
Cementitious material
| Cement (kg/m3) |
|---|
| 79 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 79 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Yamagata Prefecture
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Kaneyama
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: 07/86
Start of RCC: 07/86
End of RCC: 10/90
End of Project: 08/93
Specifications
Height: 61 metres
Length: 257 metres
Volume of RCC: 136 m3x103
Total volume: 307 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.60 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 150 - | 500 |
| 200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 24 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: China Southern Power Grid
Type: Gravity
Purpose(s): Hydropower
River: Liuxihe
Reservoir capacity: 30 m3x106
Construction Dates
Start of Project: 12/94
Start of RCC: 12/94
End of RCC: 12/92
End of Project: 10/00
Specifications
Height: 61 metres
Length: 153 metres
Volume of RCC: 32 m3x103
Total volume: 57 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 62 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 108 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: China Southern Power Grid
Type: Gravity
Purpose(s): Hydropower
River: Caitouhe
Reservoir capacity: 30 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/05
End of Project: -/11
Specifications
Height: 61 metres
Length: 420 metres
Volume of RCC: 235 m3x103
Total volume: 242 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guangxi Water Conservancy and Electric Power Corporation
Type: Gravity
Purpose(s): Hydropower
River: Gui
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/08
End of Project: -/08
Specifications
Height: 61 metres
Length: 166 metres
Volume of RCC: -
Total volume: 127 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Ecuador
Owner: CELEC (Corporatión Eléctrica del Ecuador)
Type: Gravity
Purpose(s): Hydropower
River: Mauduriacu
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: 12/11
Start of RCC: 12/11
End of RCC: -/14
End of Project: 03/15
Specifications
Height: 61 metres
Length: 245 metres
Volume of RCC: 114 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.25 |
Downstream
| Slope | Type |
|---|---|
| 0.75 |
Spillway
| Slope | Type |
|---|---|
| 0.75 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Natural pozzolan (ASTM Class N) | |

Details
Country: Turkey
Owner: Peker Energy Inc
Type: Gravity
Purpose(s): Hydropower
River: Büyük Menderes
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/14
End of Project: -/15
Specifications
Height: 61 metres
Length: 145 metres
Volume of RCC: 150 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
River: Ansegmir
Reservoir capacity: 50 m3x106
Construction Dates
Start of Project: 10/10
Start of RCC: 10/10
End of RCC: -/17
End of Project: -/18
Specifications
Height: 61 metres
Length: 320 metres
Volume of RCC: 380 m3x103
Total volume: 405 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 70 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |
| 0 |

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates