Dam Search Results
- Purposes: Flood Control
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Bukhtarma | Kazakhstan | Ministry of Energy | F H | Irtysh | 31 | 05/55 | 09/57 | 10/61 | 12/63 | 90 | 450 | 587 | 988 | V | (10) | 0.80 | (3) | 0.80 | (3) | 300 | 1200 | 135 | 80 | (F) |
| Shimajigawa | Japan | Ministry of Construction | F I W | Shimaji | 21 | 09/76 | 10/78 | 04/80 | 03/81 | 89 | 240 | 165 | 317 | V 0.30 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 150 to 200 | 500 700 | 84 | 36 | (F) |
| Willow Creek | USA | US Army Corps of Engineers | F R | Willow Creek | 17 | 11/81 | 04/82 | 09/82 | 04/83 | 52 | 543 | 331 | 331 | V | (7) | 0.80 | (17) | 0.80 | (17) | 300 | 300 | 47 | 19 | (F) |
| Middle Fork | USA | Exxon Company, Houston, Texas | F W | Middle Fork | 1 | 05/84 | 07/84 | 09/84 | 11/84 | 38 | 125 | 42 | 43 | V | (1) | 0.80 | (1)* | conduit | 300 | 300 | 66 | 0 | (-) | |
| Galesville | USA | Douglas County | F I R W | Cow Creek | 52 | 07/84 | 05/85 | 08/85 | 10/85 | 50 | 290 | 161 | 171 | V | (1) | 0.80 | (17) | 0.80 | (17) | 300 | 300 | 53 | 51 | (F) |
| Tamagawa | Japan | Ministry of Construction | F H I W | Tama | 254 | 08/80 | 09/83 | 07/86 | 12/90 | 100 | 441 | 772 | 1150 | V 0.60 | (1) (1) | 0.81 | (1) | 0.81 | (1) | 150 - 200 | 750 1000 | 91 | 39 | (F) |
| Saco de Nova Olinda | Brazil | SRH (Secretaria de RecursosHidricos) | F I W | Gravata | 97 | 07/85 | 07/86 | 10/86 | 06/87 | 56 | 230 | 132 | 143 | V | (1) | 0.80 | (3)* | separate | 400 | 400 | 55 | 15 | (N) | |
| La Manzanilla | Mexico | CNA (Comisión Nacional del Agua) | F | Ibarrilla | 1 | 11/86 | 01/87 | 05/87 | 07/87 | 36 | 150 | 20 | 30 | V 0.15 | (5) (5) | V 0.80 | (5) (17) | 0.80 | (12) | 300 | 300 | 135 | 135 | (F) |
| Lower Chase Creek | USA | Phelps Dodge Morenci Inc & Sumitomo Metal Mining | F | Lower Chase Creek | 1 | 03/87 | 05/87 | 06/87 | 07/87 | 27 | 122 | 14 | 22 | V | (1) | 0.70 | (1)* | 0.70 | (1)* | 300 | 300 | 64 | 40 | (F) |
| Les Olivettes | France | Département de l’Herault | F | La Peyne | 4 | 08/86 | 12/86 | 10/87 | 03/88 | 36 | 255 | 80 | 85 | V | (1) | 0.75 | (16) | 0.75 | (1)* | 300 | 300 | 130 | (R) | |
| Mano | Japan | Fukushima Prefecture | F H W | Mano | 36 | 12/83 | 04/85 | 01/88 | 03/90 | 69 | 239 | 104 | 219 | V | (1) | 0.80 | (1) | 0.80 | (1) | 180 | 500 | 96 | 24 | (F) |
| Shiramizugawa | Japan | Yamagata Prefecture | F I | Shiromizu | 5 | 10/84 | 10/85 | 06/88 | 04/90 | 55 | 367 | 142 | 314 | V | (1) | 0.80 | (1) | 0.80 | (1) | 150 - 200 | 500 | 96 | 24 | (F) |
| Asahi Ogawa | Japan | Toyama Prefecture | F H | Ogawa | 5 | 03/83 | 05/86 | 06/88 | 06/90 | 84 | 260 | 268 | 361 | V 0.90 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 180 | 500 | 96 | 24 | (F) |
| Nunome | Japan | Water Resources Development Public Corporation | F W | Nunome | 17 | 05/86 | 01/88 | 10/88 | 12/89 | 72 | 322 | 110 | 330 | V 0.40 | (1) (1) | 0.76 | (1) | 0.76 | (1) | 250 | 750 | 78 | 42 | (F) |
| Los Canchales | Spain | Confederación Hidrográfica del Guadiana | F W | Lácara | 15 | 05/88 | 07/88 | 11/88 | 01/89 | 32 | 240 | 25 | 54 | V | (3) | 0.50 0.80 | (3)* (3)* | 0.50 | (1)* | 250 | 250 | 84 70 | 156 145 | (F) |
| Rongdi | China | Department of Water Resources & Hydropower, Guangxi Zhuang Autonomous Region | F H I | Dulanghe | 19 | 04/88 | 11/88 | 07/89 | 06/91 | 53 | 136 | 61 | 108 | V | (7) | 0.75 | (10) | 0.65 | (1) | 300 | 300 | 90 69 | 140 111 | (F) |
| Wright’s Retarding Basin | Australia | Australian Capital Territory Government | F | Point Hut Creek | 1 | 01/89 | 06/89 | 08/89 | 10/89 | 18 | 86 | 9 | 9 | V | (7) | 1.00 | (16) | 1.00 | (13) | 300 | 300 | 145 | 73 | (F) |
| Tongjiezi (with Niurixigou saddle dam) | China | Guodian Dadu River Basin Hydropower Development Co. | F H I N | Dadu | 200 | 01/85 | 10/88 | 12/89 | 10/94 | 88 | 1029 | 407 | 855 | V | (1) | 0.75 | (10) | 0.75 | (1) | 300 - 500 | 300 - 500 | 79 82 | 79 83 | (F) |
| Pirika | Japan | Hokkaido Development Bureau | F H I | Shirobeshit-oshibetsu | 18 | 10/82 | - /88 | - /89 | 10/91 | 40 | 755 | 163 | 360 | V 0.80 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 | 84 | 36 | (F) |
| Dodairagawa | Japan | Gunma Prefecture | F W | Kabura | 5 | 03/86 | 06/88 | 01/90 | 03/92 | 70 | 300 | 167 | 350 | V 0.40 | (1) (1) | 0.75 | (1) | 0.75 | (1) | 180 | 500 | 96 | 24 | (F) |
| Tianshenqiao Nº2 | China | China Southern Power Grid | F H | Nanpan | 116 | 01/84 | 04/87 | 06/90 | 12/92 | 61 | 471 | 143 | 284 | V | (1) | V 0.40 | (10) | ogee | (1) | 250 | 250 | 79 | 79 | (F) |
| Caraibas - CEMIG | Brazil | CEMIG (Companhia Energetica de Minas Gerais) | F I | Caraibas | 10 | 04/90 | 07/90 | 09/90 | 02/91 | 26 | 160 | 18 | 22 | 0.10 | (1) | 0.80 | (3)* | 0.80 | (1)* | 300 | 300 | 70 | 20 | (N) |
| Asari | Japan | Hokkaido Prefecture | F W | Asari | 9 | 07/86 | 10/87 | 09/90 | 03/93 | 74 | 390 | 259 | 517 | V 0.30 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 180 | 500 | 96 | 24 | (F) |
| Aoulouz | Morocco | Direction des Aménagements Hydrauliques | F G I | Souss | 110 | 03/88 | 11/89 | 09/90 | 11/91 | 79 | 476 | 680 | 850 | V | (1) | 0.85 | (1)* | 0.85 | (1) | 500 | 500 | 84 63 | 36 27 | (M) |
| Kamuro | Japan | Yamagata Prefecture | F W | Kaneyama | 7 | 07/86 | 07/88 | 10/90 | 08/93 | 61 | 257 | 136 | 307 | V 0.60 | (1) (1) | 0.75 | (1) | 0.75 | (1) | 150 - 200 | 500 | 96 | 24 | (F) |
| Gameleiras | Brazil | CODEVASF | F I R W | Gameleiras | 145 | 07/90 | 12/90 | 04/91 | 05/91 | 29 | 150 | 27 | 29 | V | (1) | (1)* | 400 | 400 | 52 | 13 | (-) | |||
| Cuchillo Negro | USA | City of Truth or Consequences | F | Cuchillo Negro | 10/89 | 03/90 | 05/91 | 07/91 | 50 | 186 | 75 | 82 | V | (7) | 0.90 | (17) | separate | 300 | 300 | 77 | 59 | (F) | ||
| Sakaigawa | Japan | Toyama Prefecture | F H I W | Sakai | 60 | 03/85 | - /87 | 07/91 | 01/93 | 115 | 298 | 373 | 713 | V 0.80 | (1) (1) | 0.78 | (1) | 0.78 | (1) | 180 | 750 | 84 | 36 | (F) |
| Belén-Cagüela | Spain | Junta de Andalucia | F | Belén | 1 | 03/91 | 06/91 | 10/91 | 10/91 | 31 | 160 | 24 | 29 | 0.05 | (3) | 0.75 | (3)* | 0.75 | (3)* | 300 | 300 | 73 | 109 | (F) |
| Belén-Gato | Spain | Junta de Andalucia | F | Belén | 1 | 07/91 | 09/91 | 11/91 | 11/91 | 34 | 158 | 36 | 41 | 0.05 | (3) | 0.75 | (3)* | 0.75 | (3)* | 300 | 300 | 73 | 109 | (F) |
| Caballar I | Spain | Junta de Andalucia | F | Belén | 1 | 09/91 | 09/91 | 12/91 | 12/91 | 16 | 98 | 6 | 7 | 0.05 | (3) | 0.75 | (3)* | 0.75 | (3)* | 300 | 300 | 73 | 109 | (F) |
| Amatisteros III | Spain | Junta de Andalucia | F | Belén | 1 | - /91 | 09/91 | 12/91 | - /92 | 15 | 75 | 4 | 5 | V | (3) | 0.75 | (3)* | 0.75 | (3) | 300 | 300 | 73 | 109 | (F) |
| Belén-Flores | Spain | Junta de Andalucia | F | Belén | 1 | 09/91 | 11/91 | 01/92 | 01/92 | 28 | 87 | 10 | 12 | 0.05 | (3) | 0.75 | (3)* | 0.75 | (3)* | 300 | 300 | 73 | 109 | (F) |
| Yantan | China | Datang Yantan Hydropower Co. Ltd. | F H N | Hongshui | 3350 | 03/85 | 02/89 | 03/92 | 12/95 | 110 | 525 | 626 | 905 | V | (1) | V 0.80 | (1) (1)* | ogee | (1) | 300 | 300 | 55 | 104 | (F) |
| Shuikou | China | Shuikou Hydropower Plant | F H N | Min | 2613 | 03/87 | 10/90 | 05/92 | 05/95 | 101 | 791 | 600 | 1710 | V | (1) | 0.73 | (1) | ogee | (1) | 200 - 330 | 200 - 330 | 60 70 | 110 90 | (F) |
| Jim Wilson (formerly Town Wash Detention) | USA | Town of Mesquite, Nevada | F | Town Wash | 01/92 | 03/92 | 05/92 | 06/92 | 18 | 264 | 43 | 45 | V | (14) | 1.50 | (3) | 1.50 | (3)* (17)* | 200 | 200 | 107 | 71 | (F) | |
| Zintel Canyon | USA | City of Kennewick, Washington | F | Zintel | 3 | 03/92 | 07/92 | 10/92 | 12/92 | 39 | 158 | 54 | 55 | V | (7) | 0.85 | (17) | 0.85 | (17) | 300 | 300 | 74 | 0 | (-) |
| Ryumon | Japan | Ministry of Construction | F I W | Sakoma | 42 | 09/87 | 03/90 | 11/92 | 03/97 | 100 | 378 | 521 | 836 | V 0.30 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 150 - 200 | 750 - 1000 | 91 | 39 | (F) |
| Wan’an | China | China Guodian Corporation | F H I N | Gan | 2216 | 11/84 | 12/90 | 12/92 | 06/94 | 68 | 1104 | 156 | 1480 | V | (1) | 0.80 | (1) | ogee | (1) | 300 | 300 | 65 | 105 | (F) |
| Trigomil | Mexico | CNA (Comisión Nacional del Agua) | F I | Ayuguila | 324 | 12/86 | 02/91 | 12/92 | 12/93 | 107 | 250 | 362 | 681 | V 0.24 | (5) | V 0.80 | (5) (17) | 0.80 | (1) | 300 | 300 | 148 | 47 | (F) |
| Guxian (GuhXiahn) | China | Yellow River Conservancy Commission | F H I | Luo | 1175 | - /78 | - /89 | - /92 | - /93 | 125 | 315 | |||||||||||||
| Hattabara | Japan | Ministry of Construction | F W | Ashida | 60 | 08/88 | - /89 | - /92 | 03/98 | 85 | 325 | 228 | 500 | V 0.20 | (1) (1) | 0.75 | (1) | 0.75 | (1) | 150 - 200 | 750 | 84 | 36 | (F) |
| Jinjiang | China | Jinjiang Electric Co. | F H | Jinjianghe | 189 | 07/90 | 10/91 | 03/93 | 07/93 | 68 | 229 | 182 | 267 | V | (1) | 0.75 | (1) | 0.65 | (1) (1) | 300 | 3000 | 70 | 80 | (F) |
| Tsugawa | Japan | Okayama Prefecture | F H W | Kamo | 6 | 10/89 | 10/91 | 07/93 | 03/94 | 76 | 228 | 222 | 342 | V 0.60 | (1) (1) | 0.76 | (1) | 0.76 | (1) | 250 | 750 | 96 | 24 | (F) |
| Kodama | Japan | Fukushima Prefecture | F W | Kodama | 14 | 10/89 | 05/91 | 12/93 | 03/97 | 102 | 280 | 358 | 570 | V 0.20 | (1) (1) | 0.76 | (1) | 0.76 | (1) | 250 | 750 | 91 | 36 | (S) |
| La Cantache (formerly Villaumur) | France | Conseil Departemental d'Ille-et-Vilaine | F | Le Cantache | 7 | 07/93 | 10/93 | 12/93 | 03/94 | 16 | 147 | 11 | 15 | V | (11) | 0.75 | (1)* | 0.75 | (1)* | 300 | 300 | 90 | (R) | |
| Vinoramas | Mexico | CNA (Comisión Nacional del Agua)/Estado de Sinaloa | F I | El Bledal | 102 | 10/91 | 04/93 | 12/93 | 01/94 | 50 | 807 | 117 | 184 | V | (5) | 0.80 | (3)* | 0.80 | (13) | 300 | 300 | 100 | 100 | (M) |
| Miyatoko | Japan | Miyagi Prefecture | F W | Miyatoko | 5 | 06/89 | 06/90 | 12/93 | 01/97 | 48 | 256 | 172 | 280 | 0.60 | (1) | 0.80 | (1) | 0.80 | (1) | 180 | 500 | 96 | 24 | (F) |
| Hinata | Japan | Iwate Prefecture | F | Kasshi | 6 | 12/90 | 11/92 | 05/94 | 03/98 | 57 | 290 | 113 | 232 | V | (1) | 0.75 | (1) | 0.75 | (1) | 180 - 250 | 750 | 84 | 36 | (F) |
| Shanzi | China | Lianjiang Water Conservancy Bureau | F H I W | Aojiang | 172 | 08/92 | 11/93 | 05/94 | 06/95 | 66 | 274 | 180 | 272 | V | (5) | 0.80 | (10) | 0.77 | (13) | 300 | 300 | 65 55 | 125 95 | (F) |
| San Lazaro | Mexico | CNA (Comisión Nacional del Agua) | F G W | San Lazaro | 11 | 10/85 | 04/94 | 06/94 | 07/94 | 37 | 176 | 35 | 53 | V 0.20 | (5) | 0.80 | (3)* | 0.80 | (13) | 300 | 300 | 100 90 | 220 220 | (M) |
| Wenquanbao [A] | China | Wenquanbao Reservoir Management Office | F H I W | Tanghe | 7 | 10/91 | 10/92 | 06/94 | - /95 | 48 | 188 | 55 | 63 | V | (4) | 0.30 | (3) | ogee | (13) | 300 | 300 | 110 69 | 68 85 | (F) |
| San Rafael | Mexico | CFE (Comisión Federal de Electricidad) | F H | Santiago | 26 | 11/93 | 05/94 | 07/94 | 07/94 | 48 | 176 | 81 | 110 | V | (5) | 0.66 0.80 | (3)* | separate | 300 | 300 | 90 | 130 | (N) | |
| Sishanping [A] | China | Huangcen Reservoir Management Office | F H I | Leishui | 3 | - /92 | - /93 | - /94 | - /95 | 56 | 147 | 18 | (F) | |||||||||||
| Miyagase | Japan | Ministry of Construction | F H W | Nakatsu | 193 | 11/87 | 11/91 | 02/95 | 03/01 | 156 | 400 | 1537 | 2060 | 0.20 0.60 | (1) (1) | 0.625 | (1) | 0.625 | (1) | 150 - 200 | 750 | 91 | 39 | (F) |
| Yoshida | Japan | Kagawa Prefecture | F W | Yoshida | 2 | 07/91 | 07/93 | 02/95 | 03/96 | 75 | 218 | 265 | 304 | V | (1) | 0.75 | (1) | 0.75 | (1) | 250 | 750 | 84 | 36 | (F) |
| Chiya | Japan | Okayama Prefecture | F H W | Takahashi | 28 | 03/89 | 09/92 | 04/95 | 03/98 | 98 | 259 | 396 | 670 | V | (1) | 0.77 | (1) | 0.77 | (1) | 250 | 750 | 91 | 39 | (F) |
| Ohmatsugawa | Japan | Akita Prefecture | F H W | Matsu | 12 | 07/90 | 10/92 | 06/95 | 09/96 | 65 | 296 | 141 | 294 | V 0.70 | (1) (1) | 0.76 | (1) | 0.76 | (1) | 250 | 750 | 91 | 39 | (F) |
| Guanyinge (Kwan-in-Temple) | China | Guanyinge Reservoir Management Bureau | F H I W | Taizi | 2168 | 05/90 | 09/91 | 09/95 | 10/95 | 82 | 1040 | 1240 | 1876 | V 0.10 | (1) (1) | 0.70 | (1) | 0.70 | (1) | 270 - 280 | 750 | 91 | 39 | (F) |
| Satsunaigawa | Japan | Hokkaido Development Bureau | F H I W | Satsunai | 54 | 02/87 | 04/91 | 10/95 | 03/99 | 114 | 300 | 536 | 770 | 0.40 | (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 | 78 | 42 | (S) |
| Shiokawa | Japan | Yamanashi Prefecture | F I W | Shio | 12 | 05/93 | 08/93 | 11/95 | 03/99 | 79 | 225 | 299 | 388 | 0.10 0.70 | (1) (1) | 0.76 | (1) | 0.76 | (1) | 250 | 750 | 96 | 24 | (F) |
| Urayama | Japan | Water Resources Development Public Corporation | F H W | Urayama | 58 | 03/90 | 12/92 | 12/95 | 03/99 | 156 | 372 | 1294 | 1750 | V 0.65 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 1000 | 91 | 39 | (F) |
| Shimantan | China | Department of Water Resources, Henan Province | F I W | Gunhe | 120 | 07/93 | 04/94 | 12/95 | 07/96 | 41 | 650 | 272 | 351 | V | (3') | 0.75 | (3)* | 0.75 | (1) | 300 | 300 | 98 51 | 98 107 | (F) |
| Shibanshui | China | Fengdu Water Resources Bureau | F H R | Longxihe | 105 | 12/92 | 04/94 | - /95 | - /96 | 84 | 445 | 335 | 564 | V | (3') | 0.65 | (1) | 0.65 | (13) | 300 | 1000 | 126 60 | 84 90 | (F) |
| Açude Acauã | Brazil | DNOCS (Departamento Nacional de Obras Contra a Seca) | F I W | Paraíba | 247 | - /93 | - /93 | - /95 | - /95 | 79 | 440 | 674 | 734 | (1) | (3)* | (1)* | 300 | 300 | 64 | 16 | (N) | |||
| Oeste | Brazil | Barragem Oeste - SDC | F | Itajai do Oeste | 100 | - /93 | - /94 | - /95 | - /96 | 30 | 367 | |||||||||||||
| Loyalty Road flood retarding basin | Australia | Upper Parramatta River Catchment Trust | F | Darling Mills Creek | 06/95 | 12/95 | 04/96 | 08/96 | 30 | 111 | 20 | 22 | V | (7) | 0.80 | (7) | 0.80 | (7) | 300 | 300 | 50 | 30 | (S) | |
| Shimagawa | Japan | Gunma Prefecture | F W | Shima | 9 | 03/91 | - /94 | 05/96 | 03/98 | 90 | 330 | 390 | 516 | V 0.50 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 | 84 | 36 | (F) |
| Hiyoshi | Japan | Water Resources Development Public Corporation | F H W | Katsura | 66 | - /83 | 10/94 | 07/96 | 03/98 | 70 | 438 | 440 | 670 | V 0.80 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 1000 | 84 77 | 36 33 | (F) |
| Boqueron | Spain | Confederación Hidrográfica del Segura | F | Rambla del Boqueron | 13 | 10/94 | 02/96 | 08/96 | 12/97 | 58 | 290 | 137 | 145 | 0.05 | (3') | 0.73 | (3') | 0.73 | (3')* | 300 | 300 | 55 | 130 | (F) |
| Dahekou | China | Chongqing Wujiang Power Company | F H | Apengjiang | 115 | - /93 | - /94 | - /96 | - /97 | 85 | 149 | 33 | ||||||||||||
| Tomisato | Japan | Water Resources Development Public Corporation | F I W | Douzan | 53 | 02/92 | - /95 | 02/97 | 03/00 | 111 | 250 | 355 | 510 | V | (1) | 0.76 | (1) | 0.76 | (1) | 250 | 750 1000 | 84 72 | 36 48 | (F) |
| Wanyao | China | Wanyao Reservoir Management Bureau | F H I W | Dahexi | 223 | 10/93 | 01/95 | 05/97 | 07/97 | 83 | 390 | 320 | 458 | V 0.20 | (1) (1) | 0.70 | (5) | 0.75 | (13) | 300 | 300 | 64 | 96 | (F) |
| Queiles y Val | Spain | Confederación Hidrográfica del Ebro | F | Val | 25 | 01/93 | 10/95 | 05/97 | 12/98 | 82 | 375 | 480 | 520 | V 0.33 | (1) (1) | 0.80 | (5) | 0.80 | (1) | 300 | 300 | 80 | 145 | (F) |
| Takisato | Japan | Hokkaido Development Bureau | F H I W | Sorachi | 108 | 10/90 | - /93 | 07/97 | 06/00 | 50 | 445 | 327 | 455 | 0.06 | (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 | 84 | 36 | (F) |
| Qedusizi (formerly Mount Pleasant) | South Africa | Department of Water & Sanitation | F | Klip | 128 | 04/94 | 03/95 | 08/97 | 03/98 | 28 | 490 | 78 | 156 | V | (1) | V 0.70 | (1) (1)* | 0.70 | (1)* | 250 | 250 | 46 | 108 | (S) |
| Shuangxi | China | Department of Electricity, Dapu County, Guangdong Province | F H I W | Meixihe | 95 | 01/95 | 03/96 | 10/97 | 12/97 | 60 | 221 | 113 | 172 | V | (9) | 0.80 | (1) | 0.78 | (1) | 300 | 300 | 90 55 | 110 105 | (F) |
| Taolinkou | China | Department of Water Resources, Hebei Province | F H I R W | Qinglonghe | 859 | 11/92 | 12/94 | 12/97 | - /98 | 75 | 500 | 585 | 1350 | V 0.15 | (1) | 0.78 | (1) | ogee 0.65 | (1) (1) | 300 | 300 | 135 70 | 70 85 | (F) |
| Contraembalse de Moncion [H-F] | Dominican Republic | INDRHI (Instiuto Nacional de Recursos Hidráulicos de la República Dominicana) | F H I | Mao | 8 | 07/95 | 02/96 | 03/98 | 06/98 | 28 | 254 | 130 | 155 | 0.70 | (1) | 0.67 | (1)* | 0.80 | (1)* | 300 | 300 | 80 | 0 | (-) |
| Hayachine | Japan | Iwate Prefecture | F H I W | Hienuki | 17 | 03/93 | 10/95 | 06/98 | 03/00 | 74 | 333 | 141 | 333 | V 0.20 | (1) (1) | 0.76 | (1) | 0.76 | (1) | 250 | 750 | 84 | 36 | (F) |
| Gassan | Japan | Ministry of Construction | F H I W | Bonji | 65 | 08/88 | 06/94 | 10/98 | 03/01 | 123 | 393 | 731 | 1160 | V | (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 1000 | 91 | 39 | (F) |
| Yongxi Nº3 | China | Yongxi Hydroelectric Co. Ltd. | F H W | Dazhangxi | 68 | 05/96 | 10/97 | 10/98 | 09/99 | 87 | 198 | 170 | 255 | V | (3') | 0.73 | (10) | ogee 0.73 | (1) (1) | 280 | 3000 | 115 80 | 95 90 | (F) |
| Jucazinho | Brazil | DNOCS (Departamento Nacional de Obras Contra a Secas) | F I R W | Capiibaribe | 204 | 07/96 | 11/96 | 10/98 | - /99 | 63 | 442 | 442 | 470 | V | (12) | 0.75 | (1)* | 0.75 | (1)* | 300 | 300 | 64 | 16 | (N) |
| Fenhe Nº2 | China | Department of Water Resources, Shanxi Province | F H W | Fenhe | 130 | 11/96 | 08/98 | 03/99 | 06/00 | 87 | 350 | 362 | 448 | V 0.20 | (1) (1) | 0.75 | (5) | 0.75 | (1) | 300 | 3000 | 127 60 | 84 93 | (F) |
| Jiangya | China | Lishui Hydropower Development Co. Ltd. | F H I N W | Loushui | 1741 | 07/95 | 10/96 | 04/99 | - /01 | 131 | 368 | 1100 | 1310 | V | (3') | 0.80 | (3)* | ogee 0.80 | (13) | 300 | 3000 | 87 64 46 | 107 96 107 | (F) |
| Songyue (1st Stage) | China | Helong Electricity Corporation | F H I R W | Hailanhe | 21 | 09/97 | 01/98 | 04/99 | 09/99 | 29 | 271 | 44 | 77 | V | (1) | 0.73 | (10) | conduit | 300 | 2000 | 80 | 100 | (F) | |
| Baishi | China | Department of Water Resources, Liaoning Province | F H I W | Dalinghe | 1645 | 09/96 | 04/97 | 09/99 | 12/00 | 49 | 513 | 111 | 603 | V 0.10 | (1) (1) | 0.70 | (1) | 0.76 | (1) | 300 | 300 | 72 | 58 | (F) |
| Barnard Creek Canyon Debris Dam | USA | Davis County Flood Control | F | Barnard Creek | 08/99 | 11/99 | 11/99 | 01/00 | 18 | 46 | 3 | 3 | V | () | 0.75 | ()* | 0.75 | ()* | 300 | 300 | 108 | 84 | (F) | |
| Kubusugawa | Japan | Toyama Prefecture | F H I W | Kubusu | 10 | 03/93 | 04/98 | - /99 | 10/02 | 95 | 253 | 364 | 469 | V 0.40 | (1) (1) | 0.78 | (1) | 0.78 | (1) | 250 | 750 | 84 | 36 | (F) |
| Bullard Creek | USA | Natural Resources Conservation Service | F | Bullard Creek | 1 | 10/98 | 08/99 | - /99 | - /99 | 16 | 110 | 7 | 7 | V | (3) | V 0.75 | (3)* | 0.75 | (3)* | 300 | 300 | 148 | 44 | (F) |
| Ohnagami | Japan | Simane Prefecture | F I W | Sutu | 19 | 03/93 | 04/98 | 04/00 | 03/03 | 72 | 334 | 284 | 362 | V 0.25 | (1) (1) | 0.79 | (1) | 0.79 | (1) | 250 | 750 | 84 | 36 | (F) |
| Gaobazhou | China | Qingjiang Hydropower Development Corporation | F H N | Qingjiang | 536 | 05/97 | 11/98 | 04/00 | 01/01 | 57 | 440 | 210 | 940 | V | (9) | 0.75 | (1) | 0.75 | (1) | 300 | 300 | 123 86 | 100 86 | (F) |
| Origawa | Japan | Ministry of Land, Infrastructure & Transport | F N | Ori | 15 | 02/93 | 11/96 | 07/00 | 03/04 | 114 | 331 | 673 | 742 | V 0.60 | (1) (1) | 0.77 | (1) | 0.77 | (1) | 250 | 750 | 91 | 39 | (F) |
| Karkheh (Pie Pol) | Iran | Khuzestan Water & Energy Authority | F H | Karkeh | 40 | 02/98 | 07/99 | 07/00 | - /01 | 34 | 350 | 130 | 270 | (12) | (12) | ogee | (12) | 300 | 300 | 97 | 33 | (-) | ||
| Pajarito Canyon | USA | US Department of Energy (Los Alamos Lab.)/US Army Corps of Engineers | F | Pajarito | 8 | 06/00 | 07/00 | 08/00 | 09/00 | 36 | 112 | 48 | 48 | V | (15) | 1.00 | (17) | conduit | 300 | 300 | 148 | 0 | (-) | |
| Santa Cruz do Apodi | Brazil | Secretaria Estadual do Meio Ambiente e Recursos Hídricos do Rio Grande do Norte | F I R W | Apodi | 600 | - /98 | - /99 | - /00 | 03/02 | 48 | 1660 | 1023 | 1120 | 300 | 300 | 80 | 0 | (-) | ||||||
| Shankou Nº3 [A] | China | Shixing County Power Development Corporation | F H | Du’anshui (Chengjiang) | 48 | 09/99 | 02/00 | 01/01 | 03/01 | 57 | 179 | 90 | 119 | V | (3') | 0.75 | (3') | 0.80 | (1) | 330 | 3000 | 105 63 | 86 80 | (F) |
| North Fork Hughes River | USA | USDA Natural Resources Conservation Service | F R W | North Fork Hughes River | 1480 | 07/99 | 03/01 | 07/01 | - /01 | 26 | 200 | 65 | 65 | V | (8) | 0.80 | (10) | 0.80 | (1) | 300 | 300 | 59 107 | 59 65 | (F) |
| Chubetsu | Japan | Ministry of Land, Infrastructure and Transport | F H I W | Chubetu | 93 | 03/94 | 09/97 | 08/01 | 03/04 | 86 | 290 | 523 | 1007 | V 0.80 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 1000 | 84 | 36 | (F) |
| Dachaoshan | China | Department of Electricity, Yunnan Province | F H | Lancang (Mekong) | 89 | 10/97 | 12/98 | 10/01 | 07/02 | 115 | 481 | 757 | 1287 | V 0.20 | (3') | 0.70 | (10)* | 0.70 | (13) | 300 | 300 | 94 67 | 94 101 | (N) |
| Mianhuatan | China | Mianhuatan Hydroelectric Development Corporation | F H N W | Ting | 2035 | 04/98 | 12/98 | 11/01 | 04/02 | 111 | 302 | 500 | 615 | V | (9) | 0.75 | (3)* | 0.70 | (13) | 300 | 3000 | 82 59 48 | 100 88 88 | (F) |
| Fukuchiyama | Japan | Fukuoka Prefecture | F N W | Fukuti | 3 | 10/98 | - /99 | 12/01 | 03/03 | 65 | 255 | 115 | 201 | V | (1) | 0.78 | (1) | 0.78 | (1) | 250 | 750 | 84 | 36 | (F) |
| Castanhão | Brazil | DNOCS/Minas Gerais | F I R W | Congonhas | 6700 | 10/99 | - /00 | 12/01 | - /02 | 85 | 668 | 890 | 1030 | 300 | 300 | 85 | 0 | (-) | ||||||
| Yanwangbizi | China | Chaoyang Water Conservancy Bureau | F H I W | Daling | 217 | - /96 | - /97 | - /01 | - /02 | 35 | 383 | 87 | 220 | 64 | 118 | (F) | ||||||||
| Umari | Brazil | DNOCS (Departamento Nacional de Obras Contra a Seca) | F I R W | do Carmo | 293 | - /98 | - /99 | - /01 | - /01 | 42 | 2308 | 655 | 660 | (12) | 300 | 300 | 70 | 0 | (-) | |||||
| Yushi | China | Yushi Reservoir Construction Management Bureau | F I W | Biliuhe | 89 | - /98 | - /99 | - /01 | - /02 | 50 | 267 | 218 | 233 | 70 | 70 | (F) | ||||||||
| Pedras Altas | Brazil | CERB (Companhia de Engenharia Rural da Bahia) | F I R W | Itapicuru-mirim | - /00 | - /00 | - /01 | - /01 | 24 | 1090 | 42 | 60 | 300 | 300 | 34 | 41 | (S) | |||||||
| Estreito | Brazil | F I R W | Curimatá | 24 | - /97 | - /00 | - /01 | 11/02 | 26 | 300 | 12 | 14 | 300 | 300 | 64 | 16 | (N) | |||||||
| Kutani | Japan | Isikawa Prefecture | F W | Daishoji | 25 | 12/96 | 04/00 | 07/02 | 03/06 | 76 | 280 | 188 | 360 | V 0.80 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 | 84 | 36 | (F) |
| Koyama | Japan | Ibaraki Prefecture | F I W | Ohkita | 17 | 11/94 | 05/00 | 12/02 | 03/05 | 65 | 462 | 270 | 531 | V | (1) | 0.78 | (1) | 0.78 | (1) | 250 | 750 | 84 | 36 | (S) |
| Takizawa | Japan | Japan Water Agency | F N W | Nakatu | 63 | 03/99 | 10/01 | 06/03 | 03/07 | 139 | 424 | 810 | 1670 | 0.15 0.70 | (1) (1) | 0.72 | (1) | 0.72 | (1) | 250 | 1000 | 84 72 | 36 48 | (F) |
| Bureyskaya | Russia | RusHydro | F H | Bureya | 21000 | 01/76 | 01/85 | - /03 | - /09 | 139 | 810 | 709 | 3538 | V | (1) | 0.70 | (1) | 0.70 | (1) | 300 - 500 | 300 - 500 | 95 to 110 | 25 to 30 | (N) |
| Liubo [A] | China | Anhui Hydropower Development Co. Ltd., | F H | Xipihe | 51 | - /02 | - /03 | - /03 | - /04 | 70 | 258 | 130 | 168 | (F) | ||||||||||
| Rompepicos en Corral des Palmas | Mexico | Secretaria de Desarrollo Urbano Y Obras Publicas, Gobierno Del Estado de Nuevo Leon | F | Santa Catarina | 100 | - /02 | 03/03 | - /03 | - /04 | 109 | 250 | 380 | 400 | V | (8) | V 0.85 | (5) (17)* | 0.85 | (12) | 300 | 300 | 65 | 35 | (F) |
| Pedrógão | Portugal | EDIA (Empresa de Desenvolvimento e Infra-Estruturas do Alqueva) | F H I | Guadiana | 106 | 08/02 | 02/04 | 08/04 | - /05 | 43 | 448 | 172 | 392 | V | (3') | 0.80 | (3')* | 0.80 | (12)* | 300 | 300 | 55 | 165 | (F) |
| Tamesna (formerly Boukerkour) | Morocco | Direction des Aménagements Hydrauliques | F I W | Zamrine | 56 | 05/03 | 04/04 | 09/04 | 05/05 | 69 | 220 | 190 | 215 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 100 | 0 | (N) |
| Yujianhe [A] | China | Guiyang Water Conservancy Bureau | F I W | Wu | 11 | - /02 | - /03 | - /04 | - /05 | 81 | 180 | 105 | 110 | 0.10 | 0.76 | 0.76 | ||||||||
| Hassan II (formerly Sidi Said) | Morocco | Direction des Aménagements Hydrauliques | F I W | Moulouya | 400 | 02/01 | 03/03 | 04/05 | 03/06 | 115 | 577 | 590 | 690 | V | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 65 80 | 15 20 | (N) |
| Jagin | Iran | Hormozgan Water Authority | F I W | Jagin | 300 | 12/01 | 05/04 | 05/05 | 09/07 | 78 | 220 | 232 | 382 | V 0.30 | (3') (3')* | 0.75 | (3')* | 0.75 | (12) | 300 | 300 | 105 160 | 90 90 | (N) |
| Xihe | China | Hanjiang Hydropower Development Ltd. | F H N | Han | 229 | 11/03 | 02/04 | 05/05 | 06/07 | 63 | 346 | 194 | 631 | (F) | ||||||||||
| Suofengying | China | Guizhou-Wujiang Hydropower Development Co. Ltd. | F H I N W | Wu | 201 | 10/00 | 06/03 | 08/05 | 03/06 | 116 | 165 | 421 | 739 | V 0.25 | (3') (3') | 0.70 | (3') | 0.70 | (1) | 300 | 3000 | 64 | 95 | (F) |
| Kido | Japan | Fukushima Prefecture | F I N W | Kido | 19 | 10/00 | 06/03 | 08/05 | 03/08 | 94 | 350 | 291 | 501 | V 0.10 | (1) (1) | 0.78 | (1) | 0.78 | (1) | 250 | 750 1000 | 84 | 36 | (F) |
| Paradise (formerly Burnett River) | Australia | Sunwater | F I | Burnett | 300 | 11/03 | 06/04 | 09/05 | 11/05 | 50 | 940 | 400 | 400 | V | (8) | 0.64 | (3)* | 0.64 | (1)* | 310 | 310 | 63 | 0 | (-) |
| Xixi | China | Xixi Reservoir Development Co. Ltd. | F H I W | Daxi | 85 | - /03 | - /04 | - /05 | - /06 | 71 | 243 | 231 | 244 | (F) | ||||||||||
| Baise | China | Guangxi-Youjiang Hydraulic Development Co.Ltd. | F H I N W | You | 5660 | 10/01 | 12/02 | 04/06 | 12/06 | 130 | 720 | 1995 | 2672 | V | (9) | 0.80 | (1) | 0.80 | (1) | 300 | 3000 | 80 50 | 132 110 | (F) |
| Nagai | Japan | Ministry of Land, Infrastructure and Transport | F H N W | Okitamano | 51 | 03/00 | 10/02 | 11/06 | 03/11 | 126 | 381 | 703 | 1200 | V 0.50 | (1) (1) | 0.73 | (1) | 0.73 | (1) | 250 | 1000 | 91 | 39 | (F) |
| Dahuashui [A] | China | Wujaing Qingshuihe Hydropower Development Co. Ltd. | F H | Qingshuihe | 276 | 12/03 | 04/05 | 11/06 | - /07 | 135 | 198 | 550 | 670 | curve | (3') | curve | (3') | (1) | 300 | 3000 | 81 94 | 81 94 | (F) | |
| El Guapo spillway [H-F] | Venezuela | MARN (Ministerio del Ambiente y los Recursos Naturales) | F I W | El Guapo | 141 | 08/05 | 04/06 | 12/06 | 08/07 | 50 | 138 | 320 | 342 | 0.60 | (1) | 0.85 | (17) | 1.80 | (1) | 300 | 300 | 75 | 0 | (-) |
| Baisha | China | China Huadian Corporation | F H | Wanan | 199 | - /04 | - /05 | - /06 | - /06 | 75 | 172 | 211 | 239 | |||||||||||
| Zhouba | China | Chengdu Haineng Power Co. Ltd. | F H | Mabianhe | 204 | - /04 | - /05 | - /06 | - /07 | 73 | 163 | 229 | 405 | V | (1) | 0.70 | (1) | 0.78 | (1) | 300 | 300 | 110 66 | 73 66 | (F) |
| Zaoshi | China | Lishui Basin Hydraulic and Hydroelectric Development Corporation | F H N W | Dieshui | 1439 | - /04 | - /05 | - /06 | - /07 | 88 | 351 | 450 | 930 | V 0.25 | (3') | 0.80 | (3') | 0.75 | (1) | 300 | 3000 | 53 83 | 99 102 | (F) |
| Longtan (Stage 1) | China | Longtan Hydropower Development Co. Ltd. | F H N W | Hongshui | 16210 | 07/01 | 10/04 | 06/07 | 12/09 | 192 | 832 | 4623 | 7400 | V 0.25 | (3') | 0.70 | (3') | 0.68 | (12) | 300 | 300 | 99 86 | 121 109 | (F) |
| Tanger-Med (formerly R’Mel) | Morocco | Direction des Aménagements Hydrauliques | F W | R’Mel | 25 | 05/05 | 06/06 | 06/07 | 10/07 | 80 | 250 | 230 | 243 | V | (11) | 0.75 | (1)* | 0.75 | (1) | 300 | 3000 | 100 90 | 0 0 | (-) |
| North Para | Australia | Gawler River Flood Plain Management Authority | F | North Para | 1 | 11/06 | 06/07 | 09/07 | - /07 | 33 | 206 | 50 | 50 | V | (3') | (3')* | (3')* | 300 | 300 | 60 | 160 | (F) | ||
| Dinh Binh | Vietnam | Ministry of Agriculture and Rural Development (MARD) | F H I W | Kon | 226 | 05/04 | 08/05 | 12/07 | 12/08 | 55 | 571 | 183 | 430 | V | (11) | 0.75 | (3')* | ogee | (12) | 300 | 900 | 70 126 | 175 141 | (F) |
| Shihu | China | Zhouluo County Government | F I W | Lituohe | 58 | - /05 | - /06 | - /07 | - /08 | 56 | 193 | 162 | 354 | |||||||||||
| Yumen | China | Department of WaterResources, Henan Province | F H N | Luohe | 28 | - /05 | - /06 | - /07 | - /08 | 62 | 244 | 133 | 234 | |||||||||||
| Bailianya [A] | China | Anhui Water Resources Development Co. Ltd. | F H I W | Dongpi | 480 | - /05 | - /06 | - /07 | 04/09 | 105 | 422 | 485 | 600 | V | (1) | 0.335 | (1) | 0.335 | (1) | 300 | 3000 | 72 56 | 108 84 | (F) |
| Lurberria | France | Agglomeration Sud Pays Basque | F | Nivelle | 4 | - /06 | - /07 | - /07 | - /08 | 22 | 168 | 190 | ||||||||||||
| Silin | China | Guizhou-Wujiang Hydropower Development Corporation | F H I N | Wujiang | 1593 | 11/05 | 11/06 | 03/08 | - /09 | 117 | 310 | 825 | 1100 | V | (1) | 0.70 | (1) | 0.70 | (1) | 66 89 | 100 109 | (F) | ||
| Toppu | Japan | Hokkaido Prefecture | F I W | Toppu | 36 | 07/02 | 06/05 | 10/08 | 03/14 | 78 | 309 | 440 | 530 | V 0.80 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 250 | 1000 | 84 | 36 | (F) |
| Jinghong | China | Huaneng Lancang River Hydropower Co. Ltd. | F H R | Lancang (Mekong) | 1139 | - /04 | - /05 | - /08 | - /09 | 108 | 705 | 848 | 3068 | V | (3) | 0.80 | (3) | (1) | 300 | 64 93 | 93 93 | (S) | ||
| Big Bear Creek | USA | Tennessee Valley Authority | F W | Bear Creek | 47 | 01/08 | 10/08 | 05/09 | 06/09 | 27 | 292 | 60 | 69 | V | (1) | 0.80 | (1)* | 300 | 300 | 77 | 77 | (F) | ||
| Kasegawa | Japan | Ministry of Land, Infrastructure, Transport and Tourism | F H I W | Kase | 71 | 02/05 | 10/07 | 06/09 | 03/12 | 99 | 456 | 830 | 948 | V 0.60 | (1) (1) | 0.75 | (1) | 0.75 | (1) | 250 | 1000 | 84 | 36 | (F) |
| Saf-Saf [H-F] | Algeria | ANBT (Agence Nationale des Barrages et Transfert) | F I W | Saf-Saf | 18 | 03/06 | - /08 | 10/09 | 03/11 | 36 | 270 | 120 | 175 | 0.70 | (12) | 0.70 | (7) | 0.70 | (12) | 300 | 300 | 120 | 0 | (-) |
| Deep Creek Nº5D | USA | Yadkin County and NRCS | F W | Deep Creek | 15 | 12/08 | 04/09 | 12/09 | 07/10 | 22 | 226 | 39 | 45 | V | (3') | 0.80 | (3')* | 0.80 | (1)* | 300 | 300 | 89 | 89 | (F) |
| Wudu | China | Sichuan Wudu Water Conservancy and Hydropower Group Ltd. | F H I W | Fu | 572 | 10/04 | - /07 | - /09 | - /10 | 120 | 631 | 1151 | 1580 | V | (3') | 0.75 | (3') | 0.80 | (3') | (F) | ||||
| Damad | Saudi Arabia | Ministry of Water and Energy of the Kingdom of Saudi Arabia | F I W | Jawrah | 33 | 05/06 | - /08 | - /09 | 05/10 | 52 | 592 | 207 | 384 | 300 - 500 | 1000 - 1500 | |||||||||
| Sehb el Merga | Morocco | Direction des Aménagements Hydrauliques | F I W | Sehb el Merga | 7 | 06/07 | - /08 | - /09 | - /10 | 37 | 480 | 85 | 95 | V | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 65 | 25 | (N) |
| Adnan Mendres (formerly Çine) | Turkey | DSI - State Hydraulic Works | F H I W | Çine | 350 | 12/95 | 11/04 | 04/10 | 10/11 | 137 | 300 | 1560 | 1650 | 0.10 0.20 | (7') | 0.85 | (7') | 0.85 | (7') | 300 | 300 | 85 75 | 105 95 | (F) |
| Kasegawa auxiliary dam [H-F] | Japan | Ministry of Land, Infrastructure, Transport and Tourism | F H I W | Kase | 1 | 03/08 | 10/09 | 06/10 | 09/10 | 29 | 116 | 52 | 68 | 0.80 | (12) | 0.80 | (12) | 0.80 | (12) | 250 | 750 | 80 | 0 | (-) |
| Son La | Vietnam | EVN (Electricté de Vietnam) | F H | Song Da (Black river) | 9260 | 04/04 | 01/08 | 08/10 | 12/12 | 138 | 962 | 2677 | 4800 | V | (3') | 0.73 | (3')* | separate | 300 | 300 | 60 | 160 | (F) | |
| Tobetsu [H-F] | Japan | Hokkaido Prefecture | F I W | Tobetsu | 75 | 10/08 | 06/09 | 09/10 | 10/12 | 52 | 432 | 665 | 803 | 0.80 | (5) | 0.80 | (5) | 0.80 | (1) | 250 | 750 | 100 80 60 | 0 0 | (-) |
| Çamlica III [H-F] | Turkey | Akfen Energy | F H | Zamanti | 1 | 04/08 | 04/10 | 12/10 | 04/11 | 52 | 186 | 160 | 182 | 0.70 | (7) | 0.70 | (1)* | 0.70 | (12) | 300 | 300 | 88 | 37 | (F) |
| Dong Nai 3 | Vietnam | EVN (Electrictie de Vietnam) | F H | Dong Nai | 1690 | 12/04 | 05/08 | 12/10 | 10/11 | 108 | 594 | 1138 | 1235 | V | (1) | 0.75 | (1)* | 0.75 | (1) | 300 | 300 | 75 | 0 | (-) |
| Sanliping [A] | China | Hubei Energy Group Co. Ltd. | F H | Nanhe | 499 | - /07 | 05/08 | - /10 | - /11 | 133 | 285 | 390 | (1) | (1) | (1) | |||||||||
| Luoboba [A] | China | Enshi Tianfa Electric Ltd. | F H R | Lengshui | 87 | - /07 | - /09 | - /10 | - /11 | 114 | 192 | 21 | 21 | (F) | ||||||||||
| Ingazeira (formerly San Antonio and Cachoeirinha) | Brazil | DNOCS (Departamento Nacional de Obras Contra a Seca) | F I W | Pajeú | 49 | - /08 | - /09 | - /10 | - /11 | 26 | 566 | 64 | 92 | |||||||||||
| Las Tunas | Argentina | Provincia de Catamarca | F I W | Las Tunas | 101 | 02/09 | 09/10 | 02/11 | 12/11 | 33 | 259 | 30 | 56 | V | (1) | 200 | 400 | 85 | 25 | (N) | ||||
| Okukubi (Kin) [H-F] | Japan | Okinawa General Bureau, Cabinet Office, Japan | F I W | Okukubi | 79 | 03/09 | 11/10 | 03/11 | 07/11 | 39 | 461 | 339 | 430 | 0.80 | (5) | 0.80 | (5) | 0.80 | (5) | 300 | 750 | 80 | 0 | (-) |
| Yunishigawa | Japan | Ministry of Land, Infrastructure, Transport and Tourism | F I W | Yunishi | 75 | 08/08 | 09/09 | 05/11 | 09/12 | 119 | 320 | 967 | 1053 | V 0.60 | (1) | 0.78 | (1) | 0.78 | (1) | 250 | 1000 | 91 | 39 | (F) |
| El Maleh Amont | Morocco | Direction des Aménagements Hydrauliques | F | Maleh | 35 | 01/07 | 09/07 | 06/11 | 10/12 | 49 | 174 | 100 | 140 | 0.20 | (5) | 0.60 | (5) | 0.60 | (5) | 300 | 300 | 120 | 0 | (-) |
| Gomal Zam [A-G] | Pakistan | WAPDA (Water and Power Development Authority) | F H I | Gomal | 1424 | 07/02 | 08/07 | 09/11 | 06/13 | 133 | 231 | 390 | 474 | V | 0.60 | 0.60 | 300 | 3000 to 4000 | 91 | 91 | (F) | |||
| Yubari Syuparo | Japan | Ministry of Land, Infrastructure and Transport | F H I W | Yubari | 427 | 11/03 | 10/09 | 09/11 | 03/15 | 111 | 390 | 584 | 940 | V 0.80 | (1) (1) | 0.82 | (1) | 0.82 | (1) | 250 | 750 & 1000 | 91 | 39 | (F) |
| Thornton Gap (Tollway) | USA | MWRDGC (Metropolitan Water Reclamation District of Greater Chicago) | F | - | 1 | 02/10 | 06/11 | 09/11 | 11/11 | 35 | 69 | 25 | 25 | V | (3') | (3')* | 300 | 300 | 48 | 79 | (F) | |||
| A’hai | China | Yunnan Jinsha River Hydropower Co. Ltd. | F H I | Jinsha | 885 | - /08 | - /10 | - /11 | - /12 | 138 | 482 | 2707 | ||||||||||||
| Portugues [A-G] | USA | US Army Corps of Engineers, Jacksonville and Department of Natural Resources of Puerto Rico | F | Portugues | 20 | 04/08 | 01/11 | 05/12 | 12/13 | 67 | 375 | 270 | 310 | V | (3') | 0.35 | (3')* | 0.35 | (1) | 300 | 300 | 114 | 51 | (F) |
| Dry Comal Creek | USA | Comal County, Texas | F | Dry Comal Creek | 4 | 10/11 | 03/12 | 08/12 | 12/12 | 26 | 457 | 62 | 67 | V | (3') | 0.80 | (3)* | 0.80 | (1) | 300 | 300 | 60 | 100 | (C) |
| Longkaikou | China | Yunnan Jinsha River Hydropower Co. Ltd. | F H N R W | Jinsha | 558 | 08/07 | 09/08 | - /12 | - /13 | 119 | 768 | 2840 | 3853 | V | (3) | 0.75 | (3) | 300 | 3000 | 96 60 | 96 90 | (F) | ||
| Shatuo | China | Wujiang Hydroelectric Development Corporation | F H N | Wu | 910 | 05/06 | - /10 | - /12 | - /13 | 101 | 631 | 1510 | 1980 | V 0.15 | (3') | 0.75 | (3') | 0.75 | (3) | 300 | 3000 | |||
| Kalashuke | China | Department of Water Resources, Xinjiang Province | F H W | E’erqisi | 2419 | - /07 | - /10 | - /13 | - /14 | 122 | 1489 | 2520 | 2890 | 0.75 | 0.75 | 300 | 3000 | (F) | ||||||
| Sultan Moulay Ali Cherif (formely Tiouine) | Morocco | Direction des Aménagements Hydrauliques | F I W | Iriri | 270 | 05/10 | - /11 | - /13 | - /13 | 90 | 202 | 270 | 380 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 100 | 0 | (-) | ||
| Shaqian | China | HydroChina Co. | F H | Furong | 57 | 10/11 | - /12 | - /13 | - /13 | 59 | ||||||||||||||
| Naras | Turkey | DSI - State Hydraulic Works | F I | Manavgat | 104 | - /10 | 12/12 | 01/14 | 05/14 | 78 | 448 | 620 | 677 | 0.15 | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 300 | 110 | 90 | (N) |
| Cheshmeh Ashegh | Iran | Fars Water Authority | F I W | Cheshmeh Ashegh | 62 | 06/10 | 10/11 | 05/14 | 03/17 | 60 | 375 | 130 | 250 | (1) | (1)* | (12) | 300 | 600 - 900 | 120 | 80 | (N) | |||
| Guanyinyan | China | Datang Huarui Investment Group Ltd. | F H N R | Jinsha | 2263 | - /08 | 09/11 | 05/14 | - /16 | 159 | 1250 | 6473 | 9364 | V 0.10 | (3') | 0.75 | (3') | 0.75 | (1) | 300 | 53 | 99 | (F) | |
| Wadi Umti [H-F] | Oman | Ministry of Rural Municipalities and Water Resources | F | Wadi Umti | 1 | 04/13 | 11/13 | 07/14 | 07/14 | 16 | 145 | 34 | 58 | 0.70 | (12) | 0.70 | (12) | 0.70 | (12) | 300 | 300 | 60 | 0 | (-) |
| Hantangang | South Korea | Kwater (Korean Water Resources Corporation) | F I W | Hantan | 270 | 02/09 | 07/10 | 07/14 | 12/14 | 84 | 690 | 650 | 709 | V | (1) | (1) | (1) | 250 | 750 | 91 | 39 | (F) | ||
| Tsugaru | Japan | Ministry of Land, Infrastructure, Transport and Tourism | F H I | Iwaki | 141 | 10/08 | 05/10 | 08/14 | 03/16 | 97 | 342 | 500 | 717 | V 1.00 | (1) (1) | 0.74 | (1) | 0.74 | (1) | 250 | 1000 | 91 | 39 | (F) |
| Mamak | Turkey | DSI - State Hydraulic Works | F | Bağ | 1 | - /13 | - /13 | - /14 | - /14 | 31 | 118 | 30 | ||||||||||||
| Songyue (2nd Stage) | China | Helong Electricity Corporation | F H I R W | Hailanhe | 21 | - /12 | - /13 | - /14 | - /15 | 41 | 271 | V | (1) | 0.73 | (10) | conduit | 300 | 2000 | 80 | 100 | (F) | |||
| Gokayama | Japan | Fukuoka Prefecture | F N W | Naka | 40 | 06/12 | 06/14 | 07/15 | 03/18 | 103 | 556 | 634 | 935 | V 1.00 | (1) (1) | 0.76 | (1) | 0.76 | (1) | 250 | 1000 | 104 | 26 | (F) |
| Rkiza | Morocco | Direction des Aménagements Hydrauliques | F I W | Rkiza | 17 | - /12 | - /13 | - /15 | - /15 | 26 | 500 | 55 | 60 | V | (5) | 0.85 | (1)* | 0.85 | (1)* | |||||
| Nam Khan 3 | Laos | EDL (Electricite du Laos) | F H W | Nam Khan | 249 | 12/12 | - /14 | - /15 | 06/16 | 67 | 154 | 125 | 145 | |||||||||||
| Shuishimen [A] | China | Yunxi Shuishimen Reservoir Bureau | F H W | Tianhe | 37 | - /13 | - /14 | - /15 | - /16 | 86 | 150 | |||||||||||||
| Apporo [H-F] | Japan | Hokkaido Prefecture | F I W | Atsuma | 106 | 10/14 | 06/15 | 06/16 | 03/18 | 47 | 516 | 354 | 490 | 0.80 | (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 | 80 | 0 | (-) |
| Trung Son | Vietnam | EVN (Electrictie de Vietnam) | F H | Ma | 349 | 11/12 | 04/14 | 08/16 | 02/17 | 88 | 498 | 770 | 1140 | V 0.35 | (3') (3')* | 0.65 | (3')* | 0.65 | (12) | 300 | 300 | 60 70 | 140 150 | (N) |
| Okshtuni | Albania | Diteko Sh.p.k | F H | Okshtuni | 7 | 08/15 | 03/17 | 10/17 | 02/18 | 65 | 253 | 141 | 194 | V 0.15 | (12) | 0.90 | (12)* | 0.90 | (12)* | 300 | 300 | 115 | 0 | (-) |
| Sanru [H-F] | Japan | Ministry of Land, Infrastructure, Transport and Tourism | F N W | Sanru | 50 | 08/14 | 09/15 | 10/17 | 03/19 | 46 | 350 | 375 | 500 | 0.80 | (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 | 80 | 0 | (-) |
| Tamalout [H-F] | Morocco | Direction des Aménagements Hydrauliques | F I W | Ansegmir | 50 | 10/10 | - /13 | - /17 | - /18 | 61 | 320 | 380 | 405 | 0.50 | (5) | 0.70 | (1)* | 0.70 | (1)* | 300 | 300 | 80 70 60 | 0 0 | (-) |
| Ouljet Es Soltane [H-F] | Morocco | Direction des Aménagements Hydrauliques | F I W | Beht | 510 | 05/10 | - /14 | - /17 | - /18 | 98 | 383 | 900 | 930 | 0.50 | (1) | 0.70 | (1)* | 0.70 | (1)* | 300 | 300 | 55 | 25 | (N) |
| Fendou | China | Muling Fendou Reservoir Construction office | F H I W | Mulenghe | 191 | - /15 | - /16 | - /17 | - /18 | 46 | 406 | |||||||||||||
| Xiahushan | China | F H I W | Dashahe | 196 | - /15 | - /16 | - /17 | - /18 | 74 | 296 | ||||||||||||||
| Irahara | Japan | Fukuoka Prefecture | F W | Harai | 29 | 07/14 | 07/15 | 03/18 | 03/19 | 81 | 295 | 372 | 419 | V 0.60 | (1) (1) | 0.77 | (1) | 0.77 | (1) | 250 | 1000 | 84 | 36 | (F) |
| Javeh [H-F] | Iran | Iran Water & Power Resources Development Company (IWPC) | F I | Javeh Roud | 95 | 03/09 | 07/11 | - /18 | 07/19 | 86 | 301 | 680 | 750 | 0.90 | (3') | 1.20 | (3')* | 1.20 | (12) | 300 | 300 | 94 | 31 | (N) |
| Mangshan | China | F H I W | Changlehe | 133 | - /15 | - /16 | - /18 | - /19 | 101 | 355 | ||||||||||||||
| Datengxia | China | Guangxi Datengxia Gorge Water Conservancy Development Co. .Ltd. | F H N W | Xijiang | 3479 | - /14 | - /16 | - /18 | 07/20 | 80 | 7100 | |||||||||||||
| Zhuangli | China | Zhuangli reservoir construction and management office | F H I W | Shizihe | 133 | - /15 | - /17 | - /18 | - /19 | 44 | 49 | |||||||||||||
| Yamba | Japan | Ministry of Land, Infrastructure, Transport and Tourism | F H I N W | Agatsuma | 108 | 08/14 | 05/17 | 05/19 | 10/19 | 116 | 291 | 575 | 911 | 0.15 | (1) | 0.80 | (1) | 0.08 | (1) | 250 | 1000 | 91 | 39 | (F) |
| Biratori | Japan | Ministry of Land, Infrastructure, Transport and Tourism | F H I N W | Nukapira | 46 | - /73 | - /87 | - /19 | - /21 | 57 | 600 | 180 | V | (1) | 0.78 | (1) | 0.78 | (1) | ||||||
| Shah wa Arüs | Afghanistan | Ministry of Energy and Water | F H I W | Shakardar | 10 | - /12 | - /13 | - /19 | 04/21 | 78 | 303 | 270 | 337 | V 0.20 | (1) | 0.80 | (1)* | 0.80 | (1) | 300 | 300 | 105 | 45 | (N) |
| Los Pilares (Bicentennial) | Mexico | CNA (Comisión Nacional del Agua) | F I W | Mayo | 478 | 02/14 | - /16 | - /19 | 08/20 | 73 | 232 | 600 | 300 | 300 | ||||||||||
| Yunzhen | China | F I W | 96 | - /16 | - /19 | 03/20 | 01/21 | 76 | 173 | |||||||||||||||
| Zungeru | Nigeria | Federal Ministry of Power, Nigeria | F H | Kaduna | 11400 | 09/13 | 01/18 | 08/20 | 10/21 | 101 | 1090 | 1920 | 2400 | V | (3') | 0.75 | (3')* | 0.75 | (12) | 300 | 300 | 59 69 94 | 76 69 76 | (F) |
| Sidi Abdellah [H-F] | Morocco | Direction des Aménagements Hydrauliques | F I W | Ouaar | 10 | 04/10 | - /13 | - /20 | - /20 | 68 | 370 | 580 | 610 | 0.50 | (1) | 0.70 | (1)* | 0.70 | (1)* | 300 | 300 | 80 100 | 0 0 | (-) |
| Yanagawa | Japan | Iwate Prefecture | F H W | Yana | 19 | 12/14 | - /17 | - /20 | 03/21 | 77 | 243 | 213 | ||||||||||||
| Center Hill Auxiliary Backup Dam | USA | US Army Corps of Engineers - Nashville District | F H R W | Caney Fork | 940 | - /17 | - /19 | - /20 | - /21 | 40 | 293 | 99 | 122 | V | (1) | V 0.83 | (1)* | 0.83 | (1)* | 300 | 300 | 93 | 93 | (F) |
| Agdez | Morocco | Direction des Aménagements Hydrauliques | F I W | Daraa | 247 | 05/16 | 03/19 | 09/21 | 06/22 | 110 | 317 | 833 | 993 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | (N) | ||||
| Kaddoussa | Morocco | Direction des Aménagements Hydrauliques | F I W | Guir | 220 | - /16 | - /18 | - /21 | - /21 | 62 | 271 | 180 | 210 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | (N) | ||
| Tiddas | Morocco | Direction des Aménagements Hydrauliques | F I W | Bou Regreg | 507 | - /16 | - /18 | - /21 | - /22 | 106 | 345 | 900 | 1 | V | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | |||
| Toudgha | Morocco | Direction des Aménagements Hydrauliques | F I W | Toudgha | 33 | 11/17 | - /19 | - /21 | - /22 | 68 | V | (1) | 0.90 | (1)* | 0.90 | (1)* | ||||||||
| Tuxikou [A] | China | F H | Qianhe | 160 | - /18 | - /19 | - /21 | - /22 | 132 | |||||||||||||||
| Kabagawa | Japan | Kagawa Prefecture | F W | Kaba | 11 | 10/14 | 11/16 | 05/22 | 09/24 | 89 | 266 | 242 | 448 | V 0.40 | (1) (1) | 0.77 | (1) | 0.77 | (1) | 250 | 1000 | 91 | 39 | (F) |
| Fask | Morocco | Direction des Aménagements Hydrauliques | F I W | Assayad | 79 | 07/17 | 01/19 | 12/22 | 07/23 | 77 | 830 | 1400 | 0.10 | (1) | 0.80 | (1) | 0.80 | (1) | 300 | 300 | (N) | |||
| Fuzikou | China | Guilin Dayu Water Infrastructure Development Investment Co. Ltd. | F H | Lijiang | 188 | 11/11 | - /13 | - /22 | - /23 | 77 | 239 | 304 | ||||||||||||
| Chame Shir [A-G] | Iran | Iran Water & Power Resources Development Company (IWPC) | F H I W | Zohreh | 2300 | - /11 | - /16 | - /22 | 07/23 | 151 | 680 | 1100 | 1200 | V | 0.70 | 300 | 300 | 160 | 0 | (-) | ||||
| Baghan | Iran | Boushehr Water Authority | F I W | Baghan | 32 | - /14 | - /18 | - /22 | - /25 | 58 | 311 | 220 | ||||||||||||
| Xiakoutang [A] | China | Lichuan City Yujiang Valley Hudropower Ltd. Hubei Province | F H | Yu | 55 | - /17 | - /19 | - /22 | - /22 | 70 | ||||||||||||||
| Tingzikou | China | Jialing River Tingzikou Water Resources and Hydropower Development Co. Ltd. | F H I N W | Jialing | 4067 | 11/09 | - /19 | - /22 | - /25 | 116 | 995 | |||||||||||||
| Lom Pangar | Cameroon | EDC (Electricity Development Corporation) | F H | Lom | 6000 | - /19 | 02/21 | 03/23 | 09/24 | 46 | 185 | 175 | 290 | V | (1) | 0.85 | (1) | 0.85 | (12) | 300 | 300 | 100 | 100 | (F) |
| Bursa Uludag | Turkey | DSI - State Hydraulic Works | F W | Kirkpinarlar | 1 | 10/21 | 01/22 | 08/23 | 10/23 | 28 | 168 | 60 | ||||||||||||
| Hirase | Japan | F H W | Nishiki | 30 | - /10 | - /16 | - /23 | - /24 | 73 | 300 | 340 | |||||||||||||
| Aso Tateno | Japan | F | Shirakawa | 10 | - /18 | - /20 | - /23 | 02/24 | 87 | 197 | ||||||||||||||
| Jalaur afterbay dam | Philippines | National Irrigation Administration (NIA) | F H I W | Jalaur | - /19 | - /21 | - /23 | 07/24 | 38 | 150 | ||||||||||||||
| Jalaur High Dam (JRMP 2) | Philippines | National Irrigation Administration (NIA) | F H I W | Jalaur | 229 | - /19 | - /21 | - /23 | 07/24 | 109 | 267 | |||||||||||||
| Sidi Abbou | Morocco | Direction des Aménagements Hydrauliques | F H I W | Leben | 200 | 03/21 | 01/23 | 06/24 | - /25 | 71 | 149 | 207 | 257 | V | (1) | 0.90 | (1)* | 0.90 | (1) | 300 | 300 | 110 | 0 | |
| Naruse [H-F] | Japan | Ministry of Land, Infrastructure, Transport and Tourism | F H I W | Naruse | 79 | 05/18 | 10/19 | 08/24 | 11/26 | 115 | 755 | 4450 | 4850 | |||||||||||
| Hayghar (formerly Dehroud) [H-F] | Iran | Fars Water Authority | F H I W | Firooz Abad | 146 | - /09 | - /12 | - /24 | - /26 | 88 | 230 | 260 | 285 | 0.90 | (3') | 1.20 | (3')* | 1.20 | (12) | 300 | 300 | |||
| Asuwagawa [A-G] | Japan | Ministry of Land, Infrastructure, Transport and Tourism | F | Heko | 29 | 07/06 | - /18 | - /24 | - /26 | 96 | ||||||||||||||
| Uchigatani | Japan | F H | Kibishima | 12 | - /14 | - /18 | - /24 | - /26 | 84 | 270 | 328 | |||||||||||||
| Toga | Japan | Ministry of Land, Infrastructure, Transport and Tourism | F I N | Toga | 31 | - /17 | - /19 | - /24 | - /25 | 112 | 232 | 570 | 0.10 0.60 | (1) (1) | 0.69 | (1) | 0.69 | (1) | ||||||
| Huokou | China | Department of Water Conservancy, Fujian Province | F H W | Aojiang | 297 | - /17 | - /21 | - /24 | - /25 | 91 | 338 | 300 | 663 | 0.10 | 0.76 | 0.76 | (F) | |||||||
| Quanzhou Bailai | China | F H W | 544 | 06/20 | 01/22 | - /24 | 12/25 | 106 | 596 | |||||||||||||||
| Mikasabonbetsu [H-F] | Japan | Ministry of Land, Infrastructure, Transport and Tourism | F | Honbetsu | 9 | - /85 | - /22 | - /24 | - /26 | 53 | 160 | 180 | 0.80 | (1) | 0.80 | (1) | 0.80 | (1) | ||||||
| Mashkid 2 | Iran | Sistan and Balouchestan Water Authority | F I W | Simish & Mashkid | 115 | 10/17 | 04/22 | - /24 | - /25 | 36 | 1450 | 650 | 850 | |||||||||||
| Al Khawd | Oman | Ministry of Regional Municipalities and Water Resources | F | Wadi Al Khawd | 78 | 09/22 | 01/24 | 04/25 | 11/25 | 62 | 570 | 654 | 715 | |||||||||||
| Bouhdid | Algeria | Direction de l’Hydralique de la Wilaya de Annaba | F | Oued Bouhdid | 1 | - /18 | - /19 | 07/25 | - /25 | 30 | 260 | 60 | 0.10 | 0.90 | (1)* | |||||||||
| Gatos | Brazil | SRHS (Secretaria de Recursos Hídricos e de Saneamento) | F W | Sem Nome | 6 | - /12 | - /13 | - /25 | - /26 | 38 | 325 | |||||||||||||
| Tang e Mashooreh [A] | Iran | Lorestan Water Authority | F I W | Karkheh | 55 | - /13 | - /22 | - /25 | - /26 | 73 | 220 | |||||||||||||
| Gujun | China | Dazhou Major water works construction and management center | F H | Zhonhe | 128 | 12/20 | - /22 | - /25 | - /26 | 77 | ||||||||||||||
| Beni Azimane [H-F] | Morocco | Direction des Aménagements Hydrauliques | F I W | Kert | 44 | 01/22 | 10/22 | 01/26 | 10/26 | 70 | 684 | 800 | 0.50 | (1)* | 0.90 | (1)* | 0.90 | (1)* | 300 | 300 | 100 | 0 | ||
| Assif Ouender | Morocco | AREP (Regional Project Execution Agency) | F I R W | Assif Ouender | 15 | 11/23 | - /25 | 03/26 | 06/26 | 45 | 300 | V | 0.90 | 0.90 | ||||||||||
| Kheng Grou | Morocco | Direction des Aménagements Hydrauliques | F I W | Kheng Grou | 1070 | 04/22 | 01/24 | 08/26 | - /26 | 79 | 196 | 550 | 55 | 0.20 | (5) | 1.00 | (5) | 1.00 | (13) | 300 | 3000 | |||
| Bahoosh | Iran | Bushehr Water Company | F I | Bahoosh | 9 | - /12 | - /18 | - /26 | - /28 | 37 | ||||||||||||||
| Ghiz Ghalek (formerly Dashte Palang) | Iran | Boushehr Regional Water Company | F I W | Dashte Palang | 151 | 07/13 | - /22 | - /26 | - /28 | 63 | 800 | 540 | 690 | |||||||||||
| Cheekeye Fan Debris Barrier | Canada | Matteus West and Squamish Nation | F | Cheekye | 10/23 | - /25 | - /26 | 10/26 | 25 | 200 | 55 | |||||||||||||
| Bouljir | Morocco | AREP (Regional Project Execution Agency) | F I R W | Boujir | 12 | 07/24 | - /25 | - /26 | - /27 | 25 | 416 | 0.20 | 0.80 | 0.80 | ||||||||||
| Oued Lakhdar | Morocco | Direction des Aménagements Hydrauliques | F H I W | Lakhdar | 150 | - /23 | - /25 | - /27 | - /27 | 110 | ||||||||||||||
| Cibeet [H-F] | Indonesia | PUPR (Public Works and Public Housing Ministry) | F H I W | Cibeet | 83 | 09/23 | - /25 | - /27 | - /28 | 47 | 960 | 371 | 0.90 | 0.90 | 0.90 | 250 | 750 | 106 | 0 | (-) | ||||
| Qingyukou | China | F H W | Bahe | 141 | 04/22 | - /24 | - /28 | - /29 | 71 | |||||||||||||||
| Shin Maruyama | Japan | Kansai Electric Power | F H | Kiso | 131 | - /22 | - /25 | - /28 | - /30 | 118 | 341 | |||||||||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Kazakhstan
Owner: Ministry of Energy
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Irtysh
Reservoir capacity: 31 m3x106
Construction Dates
Start of Project: 05/55
Start of RCC: 05/55
End of RCC: 10/61
End of Project: 12/63
Specifications
Height: 90 metres
Length: 450 metres
Volume of RCC: 587 m3x103
Total volume: 988 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete blocks |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 135 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 80 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Ministry of Construction
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Shimaji
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: 09/76
Start of RCC: 09/76
End of RCC: 04/80
End of Project: 03/81
Specifications
Height: 89 metres
Length: 240 metres
Volume of RCC: 165 m3x103
Total volume: 317 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.30 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 150 to | 500 |
| 200 | 700 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: US Army Corps of Engineers
Type: Gravity
Purpose(s): Flood Control / Recreation
River: Willow Creek
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: 11/81
Start of RCC: 11/81
End of RCC: 09/82
End of Project: 04/83
Specifications
Height: 52 metres
Length: 543 metres
Volume of RCC: 331 m3x103
Total volume: 331 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Unformed face of RCC |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 47 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 19 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Exxon Company, Houston, Texas
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Middle Fork
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 05/84
Start of RCC: 05/84
End of RCC: 09/84
End of Project: 11/84
Specifications
Height: 38 metres
Length: 125 metres
Volume of RCC: 42 m3x103
Total volume: 43 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| conduit |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 66 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: USA
Owner: Douglas County
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Cow Creek
Reservoir capacity: 52 m3x106
Construction Dates
Start of Project: 07/84
Start of RCC: 07/84
End of RCC: 08/85
End of Project: 10/85
Specifications
Height: 50 metres
Length: 290 metres
Volume of RCC: 161 m3x103
Total volume: 171 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Unformed face of RCC |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 53 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 51 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Ministry of Construction
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Tama
Reservoir capacity: 254 m3x106
Construction Dates
Start of Project: 08/80
Start of RCC: 08/80
End of RCC: 07/86
End of Project: 12/90
Specifications
Height: 100 metres
Length: 441 metres
Volume of RCC: 772 m3x103
Total volume: 1150 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.60 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.81 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.81 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 150 - | 750 |
| 200 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: SRH (Secretaria de RecursosHidricos)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Gravata
Reservoir capacity: 97 m3x106
Construction Dates
Start of Project: 07/85
Start of RCC: 07/85
End of RCC: 10/86
End of Project: 06/87
Specifications
Height: 56 metres
Length: 230 metres
Volume of RCC: 132 m3x103
Total volume: 143 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |

Details
Country: Mexico
Owner: CNA (Comisión Nacional del Agua)
Type: Gravity
Purpose(s): Flood Control
River: Ibarrilla
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 11/86
Start of RCC: 11/86
End of RCC: 05/87
End of Project: 07/87
Specifications
Height: 36 metres
Length: 150 metres
Volume of RCC: 20 m3x103
Total volume: 30 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
| 0.15 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
| 0.80 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 135 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 135 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Phelps Dodge Morenci Inc & Sumitomo Metal Mining
Type: Gravity
Purpose(s): Flood Control
River: Lower Chase Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 03/87
Start of RCC: 03/87
End of RCC: 06/87
End of Project: 07/87
Specifications
Height: 27 metres
Length: 122 metres
Volume of RCC: 14 m3x103
Total volume: 22 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 40 | Low-lime flyash (ASTM Class F) |

Details
Country: France
Owner: Département de l’Herault
Type: Gravity
Purpose(s): Flood Control
River: La Peyne
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: 08/86
Start of RCC: 08/86
End of RCC: 10/87
End of Project: 03/88
Specifications
Height: 36 metres
Length: 255 metres
Volume of RCC: 80 m3x103
Total volume: 85 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Mechanically compacted unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 130 | ROLAC (mixture of flyash and slag with or without limestone fines) |

Details
Country: Japan
Owner: Fukushima Prefecture
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Mano
Reservoir capacity: 36 m3x106
Construction Dates
Start of Project: 12/83
Start of RCC: 12/83
End of RCC: 01/88
End of Project: 03/90
Specifications
Height: 69 metres
Length: 239 metres
Volume of RCC: 104 m3x103
Total volume: 219 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 180 | 500 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 24 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Yamagata Prefecture
Type: Gravity
Purpose(s): Flood Control / Irrigation
River: Shiromizu
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: 10/84
Start of RCC: 10/84
End of RCC: 06/88
End of Project: 04/90
Specifications
Height: 55 metres
Length: 367 metres
Volume of RCC: 142 m3x103
Total volume: 314 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 150 - | 500 |
| 200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 24 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Toyama Prefecture
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Ogawa
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: 03/83
Start of RCC: 03/83
End of RCC: 06/88
End of Project: 06/90
Specifications
Height: 84 metres
Length: 260 metres
Volume of RCC: 268 m3x103
Total volume: 361 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.90 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 180 | 500 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 24 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Water Resources Development Public Corporation
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Nunome
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: 05/86
Start of RCC: 05/86
End of RCC: 10/88
End of Project: 12/89
Specifications
Height: 72 metres
Length: 322 metres
Volume of RCC: 110 m3x103
Total volume: 330 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.40 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 78 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 42 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: Confederación Hidrográfica del Guadiana
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Lácara
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: 05/88
Start of RCC: 05/88
End of RCC: 11/88
End of Project: 01/89
Specifications
Height: 32 metres
Length: 240 metres
Volume of RCC: 25 m3x103
Total volume: 54 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.50 | RCC against formwork [stepped face] |
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 250 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 156 | Low-lime flyash (ASTM Class F) |
| 145 |

Details
Country: China
Owner: Department of Water Resources & Hydropower, Guangxi Zhuang Autonomous Region
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation
River: Dulanghe
Reservoir capacity: 19 m3x106
Construction Dates
Start of Project: 04/88
Start of RCC: 04/88
End of RCC: 07/89
End of Project: 06/91
Specifications
Height: 53 metres
Length: 136 metres
Volume of RCC: 61 m3x103
Total volume: 108 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| 0.65 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| 69 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 140 | Low-lime flyash (ASTM Class F) |
| 111 |

Details
Country: Australia
Owner: Australian Capital Territory Government
Type: Gravity
Purpose(s): Flood Control
River: Point Hut Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 01/89
Start of RCC: 01/89
End of RCC: 08/89
End of Project: 10/89
Specifications
Height: 18 metres
Length: 86 metres
Volume of RCC: 9 m3x103
Total volume: 9 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 1.00 | Mechanically compacted unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 1.00 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 145 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 73 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Guodian Dadu River Basin Hydropower Development Co.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation
River: Dadu
Reservoir capacity: 200 m3x106
Construction Dates
Start of Project: 01/85
Start of RCC: 01/85
End of RCC: 12/89
End of Project: 10/94
Specifications
Height: 88 metres
Length: 1029 metres
Volume of RCC: 407 m3x103
Total volume: 855 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 - | 300 - |
| 500 | 500 |
Cementitious material
| Cement (kg/m3) |
|---|
| 79 |
| 82 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 79 | Low-lime flyash (ASTM Class F) |
| 83 |

Details
Country: Japan
Owner: Hokkaido Development Bureau
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation
River: Shirobeshit-oshibetsu
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: 10/82
Start of RCC: 10/82
End of RCC: -/89
End of Project: 10/91
Specifications
Height: 40 metres
Length: 755 metres
Volume of RCC: 163 m3x103
Total volume: 360 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.80 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Gunma Prefecture
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Kabura
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: 03/86
Start of RCC: 03/86
End of RCC: 01/90
End of Project: 03/92
Specifications
Height: 70 metres
Length: 300 metres
Volume of RCC: 167 m3x103
Total volume: 350 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.40 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 180 | 500 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 24 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: China Southern Power Grid
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Nanpan
Reservoir capacity: 116 m3x106
Construction Dates
Start of Project: 01/84
Start of RCC: 01/84
End of RCC: 06/90
End of Project: 12/92
Specifications
Height: 61 metres
Length: 471 metres
Volume of RCC: 143 m3x103
Total volume: 284 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete blocks |
| 0.40 |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 250 |
Cementitious material
| Cement (kg/m3) |
|---|
| 79 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 79 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: CEMIG (Companhia Energetica de Minas Gerais)
Type: Gravity
Purpose(s): Flood Control / Irrigation
River: Caraibas
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: 04/90
Start of RCC: 04/90
End of RCC: 09/90
End of Project: 02/91
Specifications
Height: 26 metres
Length: 160 metres
Volume of RCC: 18 m3x103
Total volume: 22 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 20 | Natural pozzolan (ASTM Class N) |

Details
Country: Japan
Owner: Hokkaido Prefecture
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Asari
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: 07/86
Start of RCC: 07/86
End of RCC: 09/90
End of Project: 03/93
Specifications
Height: 74 metres
Length: 390 metres
Volume of RCC: 259 m3x103
Total volume: 517 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.30 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 180 | 500 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 24 | Low-lime flyash (ASTM Class F) |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Groundwater Recharge / Irrigation
River: Souss
Reservoir capacity: 110 m3x106
Construction Dates
Start of Project: 03/88
Start of RCC: 03/88
End of RCC: 09/90
End of Project: 11/91
Specifications
Height: 79 metres
Length: 476 metres
Volume of RCC: 680 m3x103
Total volume: 850 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.85 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.85 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 500 | 500 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| 63 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Milled sand |
| 27 |

Details
Country: Japan
Owner: Yamagata Prefecture
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Kaneyama
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: 07/86
Start of RCC: 07/86
End of RCC: 10/90
End of Project: 08/93
Specifications
Height: 61 metres
Length: 257 metres
Volume of RCC: 136 m3x103
Total volume: 307 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.60 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 150 - | 500 |
| 200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 24 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: CODEVASF
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Gameleiras
Reservoir capacity: 145 m3x106
Construction Dates
Start of Project: 07/90
Start of RCC: 07/90
End of RCC: 04/91
End of Project: 05/91
Specifications
Height: 29 metres
Length: 150 metres
Volume of RCC: 27 m3x103
Total volume: 29 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 52 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 13 | No pozzolan used |

Details
Country: USA
Owner: City of Truth or Consequences
Type: Gravity
Purpose(s): Flood Control
River: Cuchillo Negro
Reservoir capacity: -
Construction Dates
Start of Project: 10/89
Start of RCC: 10/89
End of RCC: 05/91
End of Project: 07/91
Specifications
Height: 50 metres
Length: 186 metres
Volume of RCC: 75 m3x103
Total volume: 82 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.90 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 77 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 59 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Toyama Prefecture
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Sakai
Reservoir capacity: 60 m3x106
Construction Dates
Start of Project: 03/85
Start of RCC: 03/85
End of RCC: 07/91
End of Project: 01/93
Specifications
Height: 115 metres
Length: 298 metres
Volume of RCC: 373 m3x103
Total volume: 713 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.80 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 180 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: Junta de Andalucia
Type: Gravity
Purpose(s): Flood Control
River: Belén
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 03/91
Start of RCC: 03/91
End of RCC: 10/91
End of Project: 10/91
Specifications
Height: 31 metres
Length: 160 metres
Volume of RCC: 24 m3x103
Total volume: 29 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.05 | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 73 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 109 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: Junta de Andalucia
Type: Gravity
Purpose(s): Flood Control
River: Belén
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 07/91
Start of RCC: 07/91
End of RCC: 11/91
End of Project: 11/91
Specifications
Height: 34 metres
Length: 158 metres
Volume of RCC: 36 m3x103
Total volume: 41 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.05 | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 73 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 109 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: Junta de Andalucia
Type: Gravity
Purpose(s): Flood Control
River: Belén
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 09/91
Start of RCC: 09/91
End of RCC: 12/91
End of Project: 12/91
Specifications
Height: 16 metres
Length: 98 metres
Volume of RCC: 6 m3x103
Total volume: 7 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.05 | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 73 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 109 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: Junta de Andalucia
Type: Gravity
Purpose(s): Flood Control
River: Belén
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/91
Start of RCC: -/91
End of RCC: 12/91
End of Project: -/92
Specifications
Height: 15 metres
Length: 75 metres
Volume of RCC: 4 m3x103
Total volume: 5 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 73 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 109 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: Junta de Andalucia
Type: Gravity
Purpose(s): Flood Control
River: Belén
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 09/91
Start of RCC: 09/91
End of RCC: 01/92
End of Project: 01/92
Specifications
Height: 28 metres
Length: 87 metres
Volume of RCC: 10 m3x103
Total volume: 12 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.05 | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 73 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 109 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Datang Yantan Hydropower Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation
River: Hongshui
Reservoir capacity: 3350 m3x106
Construction Dates
Start of Project: 03/85
Start of RCC: 03/85
End of RCC: 03/92
End of Project: 12/95
Specifications
Height: 110 metres
Length: 525 metres
Volume of RCC: 626 m3x103
Total volume: 905 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 104 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Shuikou Hydropower Plant
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation
River: Min
Reservoir capacity: 2613 m3x106
Construction Dates
Start of Project: 03/87
Start of RCC: 03/87
End of RCC: 05/92
End of Project: 05/95
Specifications
Height: 101 metres
Length: 791 metres
Volume of RCC: 600 m3x103
Total volume: 1710 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.73 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 200 - | 200 - |
| 330 | 330 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 110 | Low-lime flyash (ASTM Class F) |
| 90 |

Details
Country: USA
Owner: Town of Mesquite, Nevada
Type: Gravity
Purpose(s): Flood Control
River: Town Wash
Reservoir capacity: -
Construction Dates
Start of Project: 01/92
Start of RCC: 01/92
End of RCC: 05/92
End of Project: 06/92
Specifications
Height: 18 metres
Length: 264 metres
Volume of RCC: 43 m3x103
Total volume: 45 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Slip-formed/extruded facing elements |
Downstream
| Slope | Type |
|---|---|
| 1.50 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| 1.50 | RCC against formwork [stepped face] |
| Unformed face of RCC [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 200 | 200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 107 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 71 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: City of Kennewick, Washington
Type: Gravity
Purpose(s): Flood Control
River: Zintel
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 03/92
Start of RCC: 03/92
End of RCC: 10/92
End of Project: 12/92
Specifications
Height: 39 metres
Length: 158 metres
Volume of RCC: 54 m3x103
Total volume: 55 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.85 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.85 | Unformed face of RCC |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 74 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Japan
Owner: Ministry of Construction
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Sakoma
Reservoir capacity: 42 m3x106
Construction Dates
Start of Project: 09/87
Start of RCC: 09/87
End of RCC: 11/92
End of Project: 03/97
Specifications
Height: 100 metres
Length: 378 metres
Volume of RCC: 521 m3x103
Total volume: 836 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.30 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 150 - | 750 - |
| 200 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: China Guodian Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation
River: Gan
Reservoir capacity: 2216 m3x106
Construction Dates
Start of Project: 11/84
Start of RCC: 11/84
End of RCC: 12/92
End of Project: 06/94
Specifications
Height: 68 metres
Length: 1104 metres
Volume of RCC: 156 m3x103
Total volume: 1480 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 105 | Low-lime flyash (ASTM Class F) |

Details
Country: Mexico
Owner: CNA (Comisión Nacional del Agua)
Type: Gravity
Purpose(s): Flood Control / Irrigation
River: Ayuguila
Reservoir capacity: 324 m3x106
Construction Dates
Start of Project: 12/86
Start of RCC: 12/86
End of RCC: 12/92
End of Project: 12/93
Specifications
Height: 107 metres
Length: 250 metres
Volume of RCC: 362 m3x103
Total volume: 681 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
| 0.24 |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
| 0.80 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 148 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 47 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Yellow River Conservancy Commission
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation
River: Luo
Reservoir capacity: 1175 m3x106
Construction Dates
Start of Project: -/78
Start of RCC: -/78
End of RCC: -/92
End of Project: -/93
Specifications
Height: 125 metres
Length: 315 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: Ministry of Construction
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Ashida
Reservoir capacity: 60 m3x106
Construction Dates
Start of Project: 08/88
Start of RCC: 08/88
End of RCC: -/92
End of Project: 03/98
Specifications
Height: 85 metres
Length: 325 metres
Volume of RCC: 228 m3x103
Total volume: 500 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.20 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 150 - | 750 |
| 200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Jinjiang Electric Co.
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Jinjianghe
Reservoir capacity: 189 m3x106
Construction Dates
Start of Project: 07/90
Start of RCC: 07/90
End of RCC: 03/93
End of Project: 07/93
Specifications
Height: 68 metres
Length: 229 metres
Volume of RCC: 182 m3x103
Total volume: 267 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.65 | Traditional concrete against formwork |
| Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 80 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Okayama Prefecture
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Kamo
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: 10/89
Start of RCC: 10/89
End of RCC: 07/93
End of Project: 03/94
Specifications
Height: 76 metres
Length: 228 metres
Volume of RCC: 222 m3x103
Total volume: 342 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.60 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 24 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Fukushima Prefecture
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Kodama
Reservoir capacity: 14 m3x106
Construction Dates
Start of Project: 10/89
Start of RCC: 10/89
End of RCC: 12/93
End of Project: 03/97
Specifications
Height: 102 metres
Length: 280 metres
Volume of RCC: 358 m3x103
Total volume: 570 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.20 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Ground-granulated blast-furnace slag |

Details
Country: France
Owner: Conseil Departemental d'Ille-et-Vilaine
Type: Gravity
Purpose(s): Flood Control
River: Le Cantache
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: 07/93
Start of RCC: 07/93
End of RCC: 12/93
End of Project: 03/94
Specifications
Height: 16 metres
Length: 147 metres
Volume of RCC: 11 m3x103
Total volume: 15 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced conventional concrete cast before RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 90 | ROLAC (mixture of flyash and slag with or without limestone fines) |

Details
Country: Mexico
Owner: CNA (Comisión Nacional del Agua)/Estado de Sinaloa
Type: Gravity
Purpose(s): Flood Control / Irrigation
River: El Bledal
Reservoir capacity: 102 m3x106
Construction Dates
Start of Project: 10/91
Start of RCC: 10/91
End of RCC: 12/93
End of Project: 01/94
Specifications
Height: 50 metres
Length: 807 metres
Volume of RCC: 117 m3x103
Total volume: 184 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Milled sand |

Details
Country: Japan
Owner: Miyagi Prefecture
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Miyatoko
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: 06/89
Start of RCC: 06/89
End of RCC: 12/93
End of Project: 01/97
Specifications
Height: 48 metres
Length: 256 metres
Volume of RCC: 172 m3x103
Total volume: 280 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.60 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 180 | 500 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 24 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Iwate Prefecture
Type: Gravity
Purpose(s): Flood Control
River: Kasshi
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: 12/90
Start of RCC: 12/90
End of RCC: 05/94
End of Project: 03/98
Specifications
Height: 57 metres
Length: 290 metres
Volume of RCC: 113 m3x103
Total volume: 232 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 180 - | 750 |
| 250 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Lianjiang Water Conservancy Bureau
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Aojiang
Reservoir capacity: 172 m3x106
Construction Dates
Start of Project: 08/92
Start of RCC: 08/92
End of RCC: 05/94
End of Project: 06/95
Specifications
Height: 66 metres
Length: 274 metres
Volume of RCC: 180 m3x103
Total volume: 272 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| 0.77 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 125 | Low-lime flyash (ASTM Class F) |
| 95 |

Details
Country: Mexico
Owner: CNA (Comisión Nacional del Agua)
Type: Gravity
Purpose(s): Flood Control / Groundwater Recharge / Water Supply
River: San Lazaro
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: 10/85
Start of RCC: 10/85
End of RCC: 06/94
End of Project: 07/94
Specifications
Height: 37 metres
Length: 176 metres
Volume of RCC: 35 m3x103
Total volume: 53 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
| 0.20 |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 220 | Milled sand |
| 220 |

Details
Country: China
Owner: Wenquanbao Reservoir Management Office
Type: Thin Arch
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Tanghe
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: 10/91
Start of RCC: 10/91
End of RCC: 06/94
End of Project: -/95
Specifications
Height: 48 metres
Length: 188 metres
Volume of RCC: 55 m3x103
Total volume: 63 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork with external geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.30 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| ogee | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 110 |
| 69 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 68 | Low-lime flyash (ASTM Class F) |
| 85 |

Details
Country: Mexico
Owner: CFE (Comisión Federal de Electricidad)
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Santiago
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: 11/93
Start of RCC: 11/93
End of RCC: 07/94
End of Project: 07/94
Specifications
Height: 48 metres
Length: 176 metres
Volume of RCC: 81 m3x103
Total volume: 110 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.66 | RCC against formwork [stepped face] |
| 0.80 |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 130 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: Huangcen Reservoir Management Office
Type: Thin Arch
Purpose(s): Flood Control / Hydropower / Irrigation
River: Leishui
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/92
Start of RCC: -/92
End of RCC: -/94
End of Project: -/95
Specifications
Height: 56 metres
Length: 147 metres
Volume of RCC: -
Total volume: 18 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: Japan
Owner: Ministry of Construction
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Nakatsu
Reservoir capacity: 193 m3x106
Construction Dates
Start of Project: 11/87
Start of RCC: 11/87
End of RCC: 02/95
End of Project: 03/01
Specifications
Height: 156 metres
Length: 400 metres
Volume of RCC: 1537 m3x103
Total volume: 2060 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against formwork |
| 0.60 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.625 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.625 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 150 - | 750 |
| 200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Kagawa Prefecture
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Yoshida
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 07/91
Start of RCC: 07/91
End of RCC: 02/95
End of Project: 03/96
Specifications
Height: 75 metres
Length: 218 metres
Volume of RCC: 265 m3x103
Total volume: 304 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Okayama Prefecture
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Takahashi
Reservoir capacity: 28 m3x106
Construction Dates
Start of Project: 03/89
Start of RCC: 03/89
End of RCC: 04/95
End of Project: 03/98
Specifications
Height: 98 metres
Length: 259 metres
Volume of RCC: 396 m3x103
Total volume: 670 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.77 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.77 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Akita Prefecture
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Matsu
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: 07/90
Start of RCC: 07/90
End of RCC: 06/95
End of Project: 09/96
Specifications
Height: 65 metres
Length: 296 metres
Volume of RCC: 141 m3x103
Total volume: 294 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.70 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Guanyinge Reservoir Management Bureau
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Taizi
Reservoir capacity: 2168 m3x106
Construction Dates
Start of Project: 05/90
Start of RCC: 05/90
End of RCC: 09/95
End of Project: 10/95
Specifications
Height: 82 metres
Length: 1040 metres
Volume of RCC: 1240 m3x103
Total volume: 1876 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 270 - | 750 |
| 280 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Hokkaido Development Bureau
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Satsunai
Reservoir capacity: 54 m3x106
Construction Dates
Start of Project: 02/87
Start of RCC: 02/87
End of RCC: 10/95
End of Project: 03/99
Specifications
Height: 114 metres
Length: 300 metres
Volume of RCC: 536 m3x103
Total volume: 770 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.40 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 78 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 42 | Ground-granulated blast-furnace slag |

Details
Country: Japan
Owner: Yamanashi Prefecture
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Shio
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: 05/93
Start of RCC: 05/93
End of RCC: 11/95
End of Project: 03/99
Specifications
Height: 79 metres
Length: 225 metres
Volume of RCC: 299 m3x103
Total volume: 388 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
| 0.70 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 24 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Water Resources Development Public Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Urayama
Reservoir capacity: 58 m3x106
Construction Dates
Start of Project: 03/90
Start of RCC: 03/90
End of RCC: 12/95
End of Project: 03/99
Specifications
Height: 156 metres
Length: 372 metres
Volume of RCC: 1294 m3x103
Total volume: 1750 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.65 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
| 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Department of Water Resources, Henan Province
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Gunhe
Reservoir capacity: 120 m3x106
Construction Dates
Start of Project: 07/93
Start of RCC: 07/93
End of RCC: 12/95
End of Project: 07/96
Specifications
Height: 41 metres
Length: 650 metres
Volume of RCC: 272 m3x103
Total volume: 351 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 98 |
| 51 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 98 | Low-lime flyash (ASTM Class F) |
| 107 |

Details
Country: China
Owner: Fengdu Water Resources Bureau
Type: Gravity
Purpose(s): Flood Control / Hydropower / Recreation
River: Longxihe
Reservoir capacity: 105 m3x106
Construction Dates
Start of Project: 12/92
Start of RCC: 12/92
End of RCC: -/95
End of Project: -/96
Specifications
Height: 84 metres
Length: 445 metres
Volume of RCC: 335 m3x103
Total volume: 564 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.65 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.65 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 126 |
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 84 | Low-lime flyash (ASTM Class F) |
| 90 |

Details
Country: Brazil
Owner: DNOCS (Departamento Nacional de Obras Contra a Seca)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Paraíba
Reservoir capacity: 247 m3x106
Construction Dates
Start of Project: -/93
Start of RCC: -/93
End of RCC: -/95
End of Project: -/95
Specifications
Height: 79 metres
Length: 440 metres
Volume of RCC: 674 m3x103
Total volume: 734 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Barragem Oeste - SDC
Type: Gravity
Purpose(s): Flood Control
River: Itajai do Oeste
Reservoir capacity: 100 m3x106
Construction Dates
Start of Project: -/93
Start of RCC: -/93
End of RCC: -/95
End of Project: -/96
Specifications
Height: 30 metres
Length: 367 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Australia
Owner: Upper Parramatta River Catchment Trust
Type: Gravity
Purpose(s): Flood Control
River: Darling Mills Creek
Reservoir capacity: -
Construction Dates
Start of Project: 06/95
Start of RCC: 06/95
End of RCC: 04/96
End of Project: 08/96
Specifications
Height: 30 metres
Length: 111 metres
Volume of RCC: 20 m3x103
Total volume: 22 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete panels |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 50 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 30 | Ground-granulated blast-furnace slag |

Details
Country: Japan
Owner: Gunma Prefecture
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Shima
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: 03/91
Start of RCC: 03/91
End of RCC: 05/96
End of Project: 03/98
Specifications
Height: 90 metres
Length: 330 metres
Volume of RCC: 390 m3x103
Total volume: 516 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.50 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Water Resources Development Public Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Katsura
Reservoir capacity: 66 m3x106
Construction Dates
Start of Project: -/83
Start of RCC: -/83
End of RCC: 07/96
End of Project: 03/98
Specifications
Height: 70 metres
Length: 438 metres
Volume of RCC: 440 m3x103
Total volume: 670 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.80 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
| 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| 77 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |
| 33 |

Details
Country: Spain
Owner: Confederación Hidrográfica del Segura
Type: Gravity
Purpose(s): Flood Control
River: Rambla del Boqueron
Reservoir capacity: 13 m3x106
Construction Dates
Start of Project: 10/94
Start of RCC: 10/94
End of RCC: 08/96
End of Project: 12/97
Specifications
Height: 58 metres
Length: 290 metres
Volume of RCC: 137 m3x103
Total volume: 145 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.05 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.73 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.73 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 130 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Chongqing Wujiang Power Company
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Apengjiang
Reservoir capacity: 115 m3x106
Construction Dates
Start of Project: -/93
Start of RCC: -/93
End of RCC: -/96
End of Project: -/97
Specifications
Height: 85 metres
Length: 149 metres
Volume of RCC: -
Total volume: 33 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: Water Resources Development Public Corporation
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Douzan
Reservoir capacity: 53 m3x106
Construction Dates
Start of Project: 02/92
Start of RCC: 02/92
End of RCC: 02/97
End of Project: 03/00
Specifications
Height: 111 metres
Length: 250 metres
Volume of RCC: 355 m3x103
Total volume: 510 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
| 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |
| 48 |

Details
Country: China
Owner: Wanyao Reservoir Management Bureau
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Dahexi
Reservoir capacity: 223 m3x106
Construction Dates
Start of Project: 10/93
Start of RCC: 10/93
End of RCC: 05/97
End of Project: 07/97
Specifications
Height: 83 metres
Length: 390 metres
Volume of RCC: 320 m3x103
Total volume: 458 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.20 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 96 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: Confederación Hidrográfica del Ebro
Type: Gravity
Purpose(s): Flood Control
River: Val
Reservoir capacity: 25 m3x106
Construction Dates
Start of Project: 01/93
Start of RCC: 01/93
End of RCC: 05/97
End of Project: 12/98
Specifications
Height: 82 metres
Length: 375 metres
Volume of RCC: 480 m3x103
Total volume: 520 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.33 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 145 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Hokkaido Development Bureau
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Sorachi
Reservoir capacity: 108 m3x106
Construction Dates
Start of Project: 10/90
Start of RCC: 10/90
End of RCC: 07/97
End of Project: 06/00
Specifications
Height: 50 metres
Length: 445 metres
Volume of RCC: 327 m3x103
Total volume: 455 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.06 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: South Africa
Owner: Department of Water & Sanitation
Type: Gravity
Purpose(s): Flood Control
River: Klip
Reservoir capacity: 128 m3x106
Construction Dates
Start of Project: 04/94
Start of RCC: 04/94
End of RCC: 08/97
End of Project: 03/98
Specifications
Height: 28 metres
Length: 490 metres
Volume of RCC: 78 m3x103
Total volume: 156 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 250 |
Cementitious material
| Cement (kg/m3) |
|---|
| 46 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 108 | Ground-granulated blast-furnace slag |

Details
Country: China
Owner: Department of Electricity, Dapu County, Guangdong Province
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Meixihe
Reservoir capacity: 95 m3x106
Construction Dates
Start of Project: 01/95
Start of RCC: 01/95
End of RCC: 10/97
End of Project: 12/97
Specifications
Height: 60 metres
Length: 221 metres
Volume of RCC: 113 m3x103
Total volume: 172 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with hot poured membrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 110 | Low-lime flyash (ASTM Class F) |
| 105 |

Details
Country: China
Owner: Department of Water Resources, Hebei Province
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Recreation / Water Supply
River: Qinglonghe
Reservoir capacity: 859 m3x106
Construction Dates
Start of Project: 11/92
Start of RCC: 11/92
End of RCC: 12/97
End of Project: -/98
Specifications
Height: 75 metres
Length: 500 metres
Volume of RCC: 585 m3x103
Total volume: 1350 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.15 |
Downstream
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
| 0.65 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 135 |
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 70 | Low-lime flyash (ASTM Class F) |
| 85 |

Details
Country: Dominican Republic
Owner: INDRHI (Instiuto Nacional de Recursos Hidráulicos de la República Dominicana)
Type: Hardfill
Purpose(s): Flood Control / Hydropower / Irrigation
River: Mao
Reservoir capacity: 8 m3x106
Construction Dates
Start of Project: 07/95
Start of RCC: 07/95
End of RCC: 03/98
End of Project: 06/98
Specifications
Height: 28 metres
Length: 254 metres
Volume of RCC: 130 m3x103
Total volume: 155 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.67 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Japan
Owner: Iwate Prefecture
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Hienuki
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: 03/93
Start of RCC: 03/93
End of RCC: 06/98
End of Project: 03/00
Specifications
Height: 74 metres
Length: 333 metres
Volume of RCC: 141 m3x103
Total volume: 333 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.20 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Ministry of Construction
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Bonji
Reservoir capacity: 65 m3x106
Construction Dates
Start of Project: 08/88
Start of RCC: 08/88
End of RCC: 10/98
End of Project: 03/01
Specifications
Height: 123 metres
Length: 393 metres
Volume of RCC: 731 m3x103
Total volume: 1160 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
| 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Yongxi Hydroelectric Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Dazhangxi
Reservoir capacity: 68 m3x106
Construction Dates
Start of Project: 05/96
Start of RCC: 05/96
End of RCC: 10/98
End of Project: 09/99
Specifications
Height: 87 metres
Length: 198 metres
Volume of RCC: 170 m3x103
Total volume: 255 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.73 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
| 0.73 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 280 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 115 |
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 95 | Low-lime flyash (ASTM Class F) |
| 90 |

Details
Country: Brazil
Owner: DNOCS (Departamento Nacional de Obras Contra a Secas)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Capiibaribe
Reservoir capacity: 204 m3x106
Construction Dates
Start of Project: 07/96
Start of RCC: 07/96
End of RCC: 10/98
End of Project: -/99
Specifications
Height: 63 metres
Length: 442 metres
Volume of RCC: 442 m3x103
Total volume: 470 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: Department of Water Resources, Shanxi Province
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Fenhe
Reservoir capacity: 130 m3x106
Construction Dates
Start of Project: 11/96
Start of RCC: 11/96
End of RCC: 03/99
End of Project: 06/00
Specifications
Height: 87 metres
Length: 350 metres
Volume of RCC: 362 m3x103
Total volume: 448 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.20 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 127 |
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 84 | Low-lime flyash (ASTM Class F) |
| 93 |

Details
Country: China
Owner: Lishui Hydropower Development Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply
River: Loushui
Reservoir capacity: 1741 m3x106
Construction Dates
Start of Project: 07/95
Start of RCC: 07/95
End of RCC: 04/99
End of Project: -/01
Specifications
Height: 131 metres
Length: 368 metres
Volume of RCC: 1100 m3x103
Total volume: 1310 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| ogee | Reinforced concrete cast against precast units or slip-formed facing elements |
| 0.80 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 87 |
| 64 46 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 107 | Low-lime flyash (ASTM Class F) |
| 96 107 |

Details
Country: China
Owner: Helong Electricity Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Recreation / Water Supply
River: Hailanhe
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: 09/97
Start of RCC: 09/97
End of RCC: 04/99
End of Project: 09/99
Specifications
Height: 29 metres
Length: 271 metres
Volume of RCC: 44 m3x103
Total volume: 77 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.73 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| conduit |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 2000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Department of Water Resources, Liaoning Province
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Dalinghe
Reservoir capacity: 1645 m3x106
Construction Dates
Start of Project: 09/96
Start of RCC: 09/96
End of RCC: 09/99
End of Project: 12/00
Specifications
Height: 49 metres
Length: 513 metres
Volume of RCC: 111 m3x103
Total volume: 603 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 58 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Davis County Flood Control
Type: Gravity
Purpose(s): Flood Control
River: Barnard Creek
Reservoir capacity: -
Construction Dates
Start of Project: 08/99
Start of RCC: 08/99
End of RCC: 11/99
End of Project: 01/00
Specifications
Height: 18 metres
Length: 46 metres
Volume of RCC: 3 m3x103
Total volume: 3 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.75 | [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 108 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 84 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Toyama Prefecture
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Kubusu
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: 03/93
Start of RCC: 03/93
End of RCC: -/99
End of Project: 10/02
Specifications
Height: 95 metres
Length: 253 metres
Volume of RCC: 364 m3x103
Total volume: 469 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.40 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Natural Resources Conservation Service
Type: Gravity
Purpose(s): Flood Control
River: Bullard Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 10/98
Start of RCC: 10/98
End of RCC: -/99
End of Project: -/99
Specifications
Height: 16 metres
Length: 110 metres
Volume of RCC: 7 m3x103
Total volume: 7 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork [stepped face] |
| 0.75 |
Spillway
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 148 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 44 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Simane Prefecture
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Sutu
Reservoir capacity: 19 m3x106
Construction Dates
Start of Project: 03/93
Start of RCC: 03/93
End of RCC: 04/00
End of Project: 03/03
Specifications
Height: 72 metres
Length: 334 metres
Volume of RCC: 284 m3x103
Total volume: 362 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.25 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.79 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.79 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Qingjiang Hydropower Development Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation
River: Qingjiang
Reservoir capacity: 536 m3x106
Construction Dates
Start of Project: 05/97
Start of RCC: 05/97
End of RCC: 04/00
End of Project: 01/01
Specifications
Height: 57 metres
Length: 440 metres
Volume of RCC: 210 m3x103
Total volume: 940 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with hot poured membrane |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 123 |
| 86 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |
| 86 |

Details
Country: Japan
Owner: Ministry of Land, Infrastructure & Transport
Type: Gravity
Purpose(s): Flood Control / Navigation
River: Ori
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: 02/93
Start of RCC: 02/93
End of RCC: 07/00
End of Project: 03/04
Specifications
Height: 114 metres
Length: 331 metres
Volume of RCC: 673 m3x103
Total volume: 742 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.60 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.77 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.77 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: Iran
Owner: Khuzestan Water & Energy Authority
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Karkeh
Reservoir capacity: 40 m3x106
Construction Dates
Start of Project: 02/98
Start of RCC: 02/98
End of RCC: 07/00
End of Project: -/01
Specifications
Height: 34 metres
Length: 350 metres
Volume of RCC: 130 m3x103
Total volume: 270 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Spillway
| Slope | Type |
|---|---|
| ogee | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 97 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 33 | No pozzolan used |

Details
Country: USA
Owner: US Department of Energy (Los Alamos Lab.)/US Army Corps of Engineers
Type: Gravity
Purpose(s): Flood Control
River: Pajarito
Reservoir capacity: 8 m3x106
Construction Dates
Start of Project: 06/00
Start of RCC: 06/00
End of RCC: 08/00
End of Project: 09/00
Specifications
Height: 36 metres
Length: 112 metres
Volume of RCC: 48 m3x103
Total volume: 48 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC supported by fill shoulders |
Downstream
| Slope | Type |
|---|---|
| 1.00 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| conduit |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 148 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Brazil
Owner: Secretaria Estadual do Meio Ambiente e Recursos Hídricos do Rio Grande do Norte
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Apodi
Reservoir capacity: 600 m3x106
Construction Dates
Start of Project: -/98
Start of RCC: -/98
End of RCC: -/00
End of Project: 03/02
Specifications
Height: 48 metres
Length: 1660 metres
Volume of RCC: 1023 m3x103
Total volume: 1120 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: China
Owner: Shixing County Power Development Corporation
Type: Thin Arch
Purpose(s): Flood Control / Hydropower
River: Du’anshui (Chengjiang)
Reservoir capacity: 48 m3x106
Construction Dates
Start of Project: 09/99
Start of RCC: 09/99
End of RCC: 01/01
End of Project: 03/01
Specifications
Height: 57 metres
Length: 179 metres
Volume of RCC: 90 m3x103
Total volume: 119 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 330 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 105 |
| 63 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 86 | Low-lime flyash (ASTM Class F) |
| 80 |

Details
Country: USA
Owner: USDA Natural Resources Conservation Service
Type: Gravity
Purpose(s): Flood Control / Recreation / Water Supply
River: North Fork Hughes River
Reservoir capacity: 1480 m3x106
Construction Dates
Start of Project: 07/99
Start of RCC: 07/99
End of RCC: 07/01
End of Project: -/01
Specifications
Height: 26 metres
Length: 200 metres
Volume of RCC: 65 m3x103
Total volume: 65 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 59 |
| 107 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 59 | Low-lime flyash (ASTM Class F) |
| 65 |

Details
Country: Japan
Owner: Ministry of Land, Infrastructure and Transport
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Chubetu
Reservoir capacity: 93 m3x106
Construction Dates
Start of Project: 03/94
Start of RCC: 03/94
End of RCC: 08/01
End of Project: 03/04
Specifications
Height: 86 metres
Length: 290 metres
Volume of RCC: 523 m3x103
Total volume: 1007 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.80 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
| 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Department of Electricity, Yunnan Province
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Lancang (Mekong)
Reservoir capacity: 89 m3x106
Construction Dates
Start of Project: 10/97
Start of RCC: 10/97
End of RCC: 10/01
End of Project: 07/02
Specifications
Height: 115 metres
Length: 481 metres
Volume of RCC: 757 m3x103
Total volume: 1287 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.20 |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against precast concrete blocks [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 94 |
| 67 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 94 | Natural pozzolan (ASTM Class N) |
| 101 |

Details
Country: China
Owner: Mianhuatan Hydroelectric Development Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Water Supply
River: Ting
Reservoir capacity: 2035 m3x106
Construction Dates
Start of Project: 04/98
Start of RCC: 04/98
End of RCC: 11/01
End of Project: 04/02
Specifications
Height: 111 metres
Length: 302 metres
Volume of RCC: 500 m3x103
Total volume: 615 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with hot poured membrane |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 82 |
| 59 48 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |
| 88 88 |

Details
Country: Japan
Owner: Fukuoka Prefecture
Type: Gravity
Purpose(s): Flood Control / Navigation / Water Supply
River: Fukuti
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 10/98
Start of RCC: 10/98
End of RCC: 12/01
End of Project: 03/03
Specifications
Height: 65 metres
Length: 255 metres
Volume of RCC: 115 m3x103
Total volume: 201 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: DNOCS/Minas Gerais
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Congonhas
Reservoir capacity: 6700 m3x106
Construction Dates
Start of Project: 10/99
Start of RCC: 10/99
End of RCC: 12/01
End of Project: -/02
Specifications
Height: 85 metres
Length: 668 metres
Volume of RCC: 890 m3x103
Total volume: 1030 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: China
Owner: Chaoyang Water Conservancy Bureau
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Daling
Reservoir capacity: 217 m3x106
Construction Dates
Start of Project: -/96
Start of RCC: -/96
End of RCC: -/01
End of Project: -/02
Specifications
Height: 35 metres
Length: 383 metres
Volume of RCC: 87 m3x103
Total volume: 220 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 118 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: DNOCS (Departamento Nacional de Obras Contra a Seca)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: do Carmo
Reservoir capacity: 293 m3x106
Construction Dates
Start of Project: -/98
Start of RCC: -/98
End of RCC: -/01
End of Project: -/01
Specifications
Height: 42 metres
Length: 2308 metres
Volume of RCC: 655 m3x103
Total volume: 660 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: China
Owner: Yushi Reservoir Construction Management Bureau
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Biliuhe
Reservoir capacity: 89 m3x106
Construction Dates
Start of Project: -/98
Start of RCC: -/98
End of RCC: -/01
End of Project: -/02
Specifications
Height: 50 metres
Length: 267 metres
Volume of RCC: 218 m3x103
Total volume: 233 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 70 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: CERB (Companhia de Engenharia Rural da Bahia)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Itapicuru-mirim
Reservoir capacity: -
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/01
End of Project: -/01
Specifications
Height: 24 metres
Length: 1090 metres
Volume of RCC: 42 m3x103
Total volume: 60 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 34 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 41 | Ground-granulated blast-furnace slag |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Curimatá
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: -/97
Start of RCC: -/97
End of RCC: -/01
End of Project: 11/02
Specifications
Height: 26 metres
Length: 300 metres
Volume of RCC: 12 m3x103
Total volume: 14 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | Natural pozzolan (ASTM Class N) |

Details
Country: Japan
Owner: Isikawa Prefecture
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Daishoji
Reservoir capacity: 25 m3x106
Construction Dates
Start of Project: 12/96
Start of RCC: 12/96
End of RCC: 07/02
End of Project: 03/06
Specifications
Height: 76 metres
Length: 280 metres
Volume of RCC: 188 m3x103
Total volume: 360 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.80 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Ibaraki Prefecture
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Ohkita
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: 11/94
Start of RCC: 11/94
End of RCC: 12/02
End of Project: 03/05
Specifications
Height: 65 metres
Length: 462 metres
Volume of RCC: 270 m3x103
Total volume: 531 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Ground-granulated blast-furnace slag |

Details
Country: Japan
Owner: Japan Water Agency
Type: Gravity
Purpose(s): Flood Control / Navigation / Water Supply
River: Nakatu
Reservoir capacity: 63 m3x106
Construction Dates
Start of Project: 03/99
Start of RCC: 03/99
End of RCC: 06/03
End of Project: 03/07
Specifications
Height: 139 metres
Length: 424 metres
Volume of RCC: 810 m3x103
Total volume: 1670 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.15 | Traditional concrete against formwork |
| 0.70 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.72 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.72 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |
| 48 |

Details
Country: Russia
Owner: RusHydro
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Bureya
Reservoir capacity: 21000 m3x106
Construction Dates
Start of Project: 01/76
Start of RCC: 01/76
End of RCC: -/03
End of Project: -/09
Specifications
Height: 139 metres
Length: 810 metres
Volume of RCC: 709 m3x103
Total volume: 3538 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 - | 300 - |
| 500 | 500 |
Cementitious material
| Cement (kg/m3) |
|---|
| 95 to |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 25 to | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: Anhui Hydropower Development Co. Ltd.,
Type: Thin Arch
Purpose(s): Flood Control / Hydropower
River: Xipihe
Reservoir capacity: 51 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/03
End of Project: -/04
Specifications
Height: 70 metres
Length: 258 metres
Volume of RCC: 130 m3x103
Total volume: 168 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: Mexico
Owner: Secretaria de Desarrollo Urbano Y Obras Publicas, Gobierno Del Estado de Nuevo Leon
Type: Gravity
Purpose(s): Flood Control
River: Santa Catarina
Reservoir capacity: 100 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/03
End of Project: -/04
Specifications
Height: 109 metres
Length: 250 metres
Volume of RCC: 380 m3x103
Total volume: 400 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
| 0.85 | Unformed face of RCC [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.85 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 35 | Low-lime flyash (ASTM Class F) |

Details
Country: Portugal
Owner: EDIA (Empresa de Desenvolvimento e Infra-Estruturas do Alqueva)
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation
River: Guadiana
Reservoir capacity: 106 m3x106
Construction Dates
Start of Project: 08/02
Start of RCC: 08/02
End of RCC: 08/04
End of Project: -/05
Specifications
Height: 43 metres
Length: 448 metres
Volume of RCC: 172 m3x103
Total volume: 392 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 165 | Low-lime flyash (ASTM Class F) |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Zamrine
Reservoir capacity: 56 m3x106
Construction Dates
Start of Project: 05/03
Start of RCC: 05/03
End of RCC: 09/04
End of Project: 05/05
Specifications
Height: 69 metres
Length: 220 metres
Volume of RCC: 190 m3x103
Total volume: 215 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: Guiyang Water Conservancy Bureau
Type: Thin Arch
Purpose(s): Flood Control / Irrigation / Water Supply
River: Wu
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/04
End of Project: -/05
Specifications
Height: 81 metres
Length: 180 metres
Volume of RCC: 105 m3x103
Total volume: 110 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 |
Downstream
| Slope | Type |
|---|---|
| 0.76 |
Spillway
| Slope | Type |
|---|---|
| 0.76 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Moulouya
Reservoir capacity: 400 m3x106
Construction Dates
Start of Project: 02/01
Start of RCC: 02/01
End of RCC: 04/05
End of Project: 03/06
Specifications
Height: 115 metres
Length: 577 metres
Volume of RCC: 590 m3x103
Total volume: 690 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |
| 20 |

Details
Country: Iran
Owner: Hormozgan Water Authority
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Jagin
Reservoir capacity: 300 m3x106
Construction Dates
Start of Project: 12/01
Start of RCC: 12/01
End of RCC: 05/05
End of Project: 09/07
Specifications
Height: 78 metres
Length: 220 metres
Volume of RCC: 232 m3x103
Total volume: 382 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.30 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 105 |
| 160 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 90 | Natural pozzolan (ASTM Class N) |
| 90 |

Details
Country: China
Owner: Hanjiang Hydropower Development Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation
River: Han
Reservoir capacity: 229 m3x106
Construction Dates
Start of Project: 11/03
Start of RCC: 11/03
End of RCC: 05/05
End of Project: 06/07
Specifications
Height: 63 metres
Length: 346 metres
Volume of RCC: 194 m3x103
Total volume: 631 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: Guizhou-Wujiang Hydropower Development Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply
River: Wu
Reservoir capacity: 201 m3x106
Construction Dates
Start of Project: 10/00
Start of RCC: 10/00
End of RCC: 08/05
End of Project: 03/06
Specifications
Height: 116 metres
Length: 165 metres
Volume of RCC: 421 m3x103
Total volume: 739 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.25 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 95 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Fukushima Prefecture
Type: Gravity
Purpose(s): Flood Control / Irrigation / Navigation / Water Supply
River: Kido
Reservoir capacity: 19 m3x106
Construction Dates
Start of Project: 10/00
Start of RCC: 10/00
End of RCC: 08/05
End of Project: 03/08
Specifications
Height: 94 metres
Length: 350 metres
Volume of RCC: 291 m3x103
Total volume: 501 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
| 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: Australia
Owner: Sunwater
Type: Gravity
Purpose(s): Flood Control / Irrigation
River: Burnett
Reservoir capacity: 300 m3x106
Construction Dates
Start of Project: 11/03
Start of RCC: 11/03
End of RCC: 09/05
End of Project: 11/05
Specifications
Height: 50 metres
Length: 940 metres
Volume of RCC: 400 m3x103
Total volume: 400 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.64 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.64 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 310 | 310 |
Cementitious material
| Cement (kg/m3) |
|---|
| 63 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: China
Owner: Xixi Reservoir Development Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Daxi
Reservoir capacity: 85 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/05
End of Project: -/06
Specifications
Height: 71 metres
Length: 243 metres
Volume of RCC: 231 m3x103
Total volume: 244 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: Guangxi-Youjiang Hydraulic Development Co.Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply
River: You
Reservoir capacity: 5660 m3x106
Construction Dates
Start of Project: 10/01
Start of RCC: 10/01
End of RCC: 04/06
End of Project: 12/06
Specifications
Height: 130 metres
Length: 720 metres
Volume of RCC: 1995 m3x103
Total volume: 2672 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with hot poured membrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 50 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 132 | Low-lime flyash (ASTM Class F) |
| 110 |

Details
Country: Japan
Owner: Ministry of Land, Infrastructure and Transport
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Water Supply
River: Okitamano
Reservoir capacity: 51 m3x106
Construction Dates
Start of Project: 03/00
Start of RCC: 03/00
End of RCC: 11/06
End of Project: 03/11
Specifications
Height: 126 metres
Length: 381 metres
Volume of RCC: 703 m3x103
Total volume: 1200 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.50 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.73 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.73 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Wujaing Qingshuihe Hydropower Development Co. Ltd.
Type: Thin Arch
Purpose(s): Flood Control / Hydropower
River: Qingshuihe
Reservoir capacity: 276 m3x106
Construction Dates
Start of Project: 12/03
Start of RCC: 12/03
End of RCC: 11/06
End of Project: -/07
Specifications
Height: 135 metres
Length: 198 metres
Volume of RCC: 550 m3x103
Total volume: 670 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 81 |
| 94 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 81 | Low-lime flyash (ASTM Class F) |
| 94 |

Details
Country: Venezuela
Owner: MARN (Ministerio del Ambiente y los Recursos Naturales)
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
River: El Guapo
Reservoir capacity: 141 m3x106
Construction Dates
Start of Project: 08/05
Start of RCC: 08/05
End of RCC: 12/06
End of Project: 08/07
Specifications
Height: 50 metres
Length: 138 metres
Volume of RCC: 320 m3x103
Total volume: 342 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.60 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.85 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 1.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: China
Owner: China Huadian Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Wanan
Reservoir capacity: 199 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/06
Specifications
Height: 75 metres
Length: 172 metres
Volume of RCC: 211 m3x103
Total volume: 239 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Chengdu Haineng Power Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Mabianhe
Reservoir capacity: 204 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 73 metres
Length: 163 metres
Volume of RCC: 229 m3x103
Total volume: 405 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 110 |
| 66 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 73 | Low-lime flyash (ASTM Class F) |
| 66 |

Details
Country: China
Owner: Lishui Basin Hydraulic and Hydroelectric Development Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Water Supply
River: Dieshui
Reservoir capacity: 1439 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 88 metres
Length: 351 metres
Volume of RCC: 450 m3x103
Total volume: 930 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.25 |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 53 |
| 83 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 99 | Low-lime flyash (ASTM Class F) |
| 102 |

Details
Country: China
Owner: Longtan Hydropower Development Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Water Supply
River: Hongshui
Reservoir capacity: 16210 m3x106
Construction Dates
Start of Project: 07/01
Start of RCC: 07/01
End of RCC: 06/07
End of Project: 12/09
Specifications
Height: 192 metres
Length: 832 metres
Volume of RCC: 4623 m3x103
Total volume: 7400 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.25 |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.68 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 99 |
| 86 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 121 | Low-lime flyash (ASTM Class F) |
| 109 |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: R’Mel
Reservoir capacity: 25 m3x106
Construction Dates
Start of Project: 05/05
Start of RCC: 05/05
End of RCC: 06/07
End of Project: 10/07
Specifications
Height: 80 metres
Length: 250 metres
Volume of RCC: 230 m3x103
Total volume: 243 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced conventional concrete cast before RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |
| 0 |

Details
Country: Australia
Owner: Gawler River Flood Plain Management Authority
Type: Gravity
Purpose(s): Flood Control
River: North Para
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 11/06
Start of RCC: 11/06
End of RCC: 09/07
End of Project: -/07
Specifications
Height: 33 metres
Length: 206 metres
Volume of RCC: 50 m3x103
Total volume: 50 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 160 | Low-lime flyash (ASTM Class F) |

Details
Country: Vietnam
Owner: Ministry of Agriculture and Rural Development (MARD)
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Kon
Reservoir capacity: 226 m3x106
Construction Dates
Start of Project: 05/04
Start of RCC: 05/04
End of RCC: 12/07
End of Project: 12/08
Specifications
Height: 55 metres
Length: 571 metres
Volume of RCC: 183 m3x103
Total volume: 430 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced conventional concrete cast before RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| ogee | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 900 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| 126 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 175 | Low-lime flyash (ASTM Class F) |
| 141 |

Details
Country: China
Owner: Zhouluo County Government
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Lituohe
Reservoir capacity: 58 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 56 metres
Length: 193 metres
Volume of RCC: 162 m3x103
Total volume: 354 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Department of WaterResources, Henan Province
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation
River: Luohe
Reservoir capacity: 28 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 62 metres
Length: 244 metres
Volume of RCC: 133 m3x103
Total volume: 234 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Anhui Water Resources Development Co. Ltd.
Type: Thin Arch
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Dongpi
Reservoir capacity: 480 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: 04/09
Specifications
Height: 105 metres
Length: 422 metres
Volume of RCC: 485 m3x103
Total volume: 600 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.335 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.335 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| 56 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 108 | Low-lime flyash (ASTM Class F) |
| 84 |

Details
Country: France
Owner: Agglomeration Sud Pays Basque
Type: Gravity
Purpose(s): Flood Control
River: Nivelle
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/07
End of Project: -/08
Specifications
Height: 22 metres
Length: 168 metres
Volume of RCC: -
Total volume: 190 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guizhou-Wujiang Hydropower Development Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation
River: Wujiang
Reservoir capacity: 1593 m3x106
Construction Dates
Start of Project: 11/05
Start of RCC: 11/05
End of RCC: 03/08
End of Project: -/09
Specifications
Height: 117 metres
Length: 310 metres
Volume of RCC: 825 m3x103
Total volume: 1100 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 66 |
| 89 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |
| 109 |

Details
Country: Japan
Owner: Hokkaido Prefecture
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Toppu
Reservoir capacity: 36 m3x106
Construction Dates
Start of Project: 07/02
Start of RCC: 07/02
End of RCC: 10/08
End of Project: 03/14
Specifications
Height: 78 metres
Length: 309 metres
Volume of RCC: 440 m3x103
Total volume: 530 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.80 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Huaneng Lancang River Hydropower Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Recreation
River: Lancang (Mekong)
Reservoir capacity: 1139 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/08
End of Project: -/09
Specifications
Height: 108 metres
Length: 705 metres
Volume of RCC: 848 m3x103
Total volume: 3068 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| 93 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 93 | Ground-granulated blast-furnace slag |
| 93 |

Details
Country: USA
Owner: Tennessee Valley Authority
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Bear Creek
Reservoir capacity: 47 m3x106
Construction Dates
Start of Project: 01/08
Start of RCC: 01/08
End of RCC: 05/09
End of Project: 06/09
Specifications
Height: 27 metres
Length: 292 metres
Volume of RCC: 60 m3x103
Total volume: 69 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 77 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 77 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Ministry of Land, Infrastructure, Transport and Tourism
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Kase
Reservoir capacity: 71 m3x106
Construction Dates
Start of Project: 02/05
Start of RCC: 02/05
End of RCC: 06/09
End of Project: 03/12
Specifications
Height: 99 metres
Length: 456 metres
Volume of RCC: 830 m3x103
Total volume: 948 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.60 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: Algeria
Owner: ANBT (Agence Nationale des Barrages et Transfert)
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
River: Saf-Saf
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: 03/06
Start of RCC: 03/06
End of RCC: 10/09
End of Project: 03/11
Specifications
Height: 36 metres
Length: 270 metres
Volume of RCC: 120 m3x103
Total volume: 175 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 120 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: USA
Owner: Yadkin County and NRCS
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Deep Creek
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: 12/08
Start of RCC: 12/08
End of RCC: 12/09
End of Project: 07/10
Specifications
Height: 22 metres
Length: 226 metres
Volume of RCC: 39 m3x103
Total volume: 45 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 89 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 89 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Sichuan Wudu Water Conservancy and Hydropower Group Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Fu
Reservoir capacity: 572 m3x106
Construction Dates
Start of Project: 10/04
Start of RCC: 10/04
End of RCC: -/09
End of Project: -/10
Specifications
Height: 120 metres
Length: 631 metres
Volume of RCC: 1151 m3x103
Total volume: 1580 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: Saudi Arabia
Owner: Ministry of Water and Energy of the Kingdom of Saudi Arabia
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Jawrah
Reservoir capacity: 33 m3x106
Construction Dates
Start of Project: 05/06
Start of RCC: 05/06
End of RCC: -/09
End of Project: 05/10
Specifications
Height: 52 metres
Length: 592 metres
Volume of RCC: 207 m3x103
Total volume: 384 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 - | 1000 - |
| 500 | 1500 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Sehb el Merga
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: 06/07
Start of RCC: 06/07
End of RCC: -/09
End of Project: -/10
Specifications
Height: 37 metres
Length: 480 metres
Volume of RCC: 85 m3x103
Total volume: 95 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 25 | Natural pozzolan (ASTM Class N) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Çine
Reservoir capacity: 350 m3x106
Construction Dates
Start of Project: 12/95
Start of RCC: 12/95
End of RCC: 04/10
End of Project: 10/11
Specifications
Height: 137 metres
Length: 300 metres
Volume of RCC: 1560 m3x103
Total volume: 1650 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | RCC against precast concrete panels (GEVR/GE-RCC) |
| 0.20 |
Downstream
| Slope | Type |
|---|---|
| 0.85 | RCC against precast concrete panels (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.85 | RCC against precast concrete panels (GEVR/GE-RCC) |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 105 | Low-lime flyash (ASTM Class F) |
| 95 |

Details
Country: Japan
Owner: Ministry of Land, Infrastructure, Transport and Tourism
Type: Hardfill
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Kase
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 03/08
Start of RCC: 03/08
End of RCC: 06/10
End of Project: 09/10
Specifications
Height: 29 metres
Length: 116 metres
Volume of RCC: 52 m3x103
Total volume: 68 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Vietnam
Owner: EVN (Electricté de Vietnam)
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Song Da (Black river)
Reservoir capacity: 9260 m3x106
Construction Dates
Start of Project: 04/04
Start of RCC: 04/04
End of RCC: 08/10
End of Project: 12/12
Specifications
Height: 138 metres
Length: 962 metres
Volume of RCC: 2677 m3x103
Total volume: 4800 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.73 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 160 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Hokkaido Prefecture
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
River: Tobetsu
Reservoir capacity: 75 m3x106
Construction Dates
Start of Project: 10/08
Start of RCC: 10/08
End of RCC: 09/10
End of Project: 10/12
Specifications
Height: 52 metres
Length: 432 metres
Volume of RCC: 665 m3x103
Total volume: 803 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| 80 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |
| 0 |

Details
Country: Turkey
Owner: Akfen Energy
Type: Hardfill
Purpose(s): Flood Control / Hydropower
River: Zamanti
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 04/08
Start of RCC: 04/08
End of RCC: 12/10
End of Project: 04/11
Specifications
Height: 52 metres
Length: 186 metres
Volume of RCC: 160 m3x103
Total volume: 182 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 88 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 37 | Low-lime flyash (ASTM Class F) |

Details
Country: Vietnam
Owner: EVN (Electrictie de Vietnam)
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Dong Nai
Reservoir capacity: 1690 m3x106
Construction Dates
Start of Project: 12/04
Start of RCC: 12/04
End of RCC: 12/10
End of Project: 10/11
Specifications
Height: 108 metres
Length: 594 metres
Volume of RCC: 1138 m3x103
Total volume: 1235 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: China
Owner: Hubei Energy Group Co. Ltd.
Type: Thin Arch
Purpose(s): Flood Control / Hydropower
River: Nanhe
Reservoir capacity: 499 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/10
End of Project: -/11
Specifications
Height: 133 metres
Length: 285 metres
Volume of RCC: -
Total volume: 390 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Enshi Tianfa Electric Ltd.
Type: Thin Arch
Purpose(s): Flood Control / Hydropower / Recreation
River: Lengshui
Reservoir capacity: 87 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/10
End of Project: -/11
Specifications
Height: 114 metres
Length: 192 metres
Volume of RCC: 21 m3x103
Total volume: 21 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: Brazil
Owner: DNOCS (Departamento Nacional de Obras Contra a Seca)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Pajeú
Reservoir capacity: 49 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/10
End of Project: -/11
Specifications
Height: 26 metres
Length: 566 metres
Volume of RCC: 64 m3x103
Total volume: 92 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Argentina
Owner: Provincia de Catamarca
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Las Tunas
Reservoir capacity: 101 m3x106
Construction Dates
Start of Project: 02/09
Start of RCC: 02/09
End of RCC: 02/11
End of Project: 12/11
Specifications
Height: 33 metres
Length: 259 metres
Volume of RCC: 30 m3x103
Total volume: 56 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 200 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 25 | Natural pozzolan (ASTM Class N) |

Details
Country: Japan
Owner: Okinawa General Bureau, Cabinet Office, Japan
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
River: Okukubi
Reservoir capacity: 79 m3x106
Construction Dates
Start of Project: 03/09
Start of RCC: 03/09
End of RCC: 03/11
End of Project: 07/11
Specifications
Height: 39 metres
Length: 461 metres
Volume of RCC: 339 m3x103
Total volume: 430 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against precast concrete panels |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Japan
Owner: Ministry of Land, Infrastructure, Transport and Tourism
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Yunishi
Reservoir capacity: 75 m3x106
Construction Dates
Start of Project: 08/08
Start of RCC: 08/08
End of RCC: 05/11
End of Project: 09/12
Specifications
Height: 119 metres
Length: 320 metres
Volume of RCC: 967 m3x103
Total volume: 1053 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.60 |
Downstream
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control
River: Maleh
Reservoir capacity: 35 m3x106
Construction Dates
Start of Project: 01/07
Start of RCC: 01/07
End of RCC: 06/11
End of Project: 10/12
Specifications
Height: 49 metres
Length: 174 metres
Volume of RCC: 100 m3x103
Total volume: 140 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.60 | Traditional concrete against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 0.60 | Traditional concrete against precast concrete panels |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 120 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Pakistan
Owner: WAPDA (Water and Power Development Authority)
Type: Arch-Gravity
Purpose(s): Flood Control / Hydropower / Irrigation
River: Gomal
Reservoir capacity: 1424 m3x106
Construction Dates
Start of Project: 07/02
Start of RCC: 07/02
End of RCC: 09/11
End of Project: 06/13
Specifications
Height: 133 metres
Length: 231 metres
Volume of RCC: 390 m3x103
Total volume: 474 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.60 |
Spillway
| Slope | Type |
|---|---|
| 0.60 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 to |
| 4000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 91 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Ministry of Land, Infrastructure and Transport
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Yubari
Reservoir capacity: 427 m3x106
Construction Dates
Start of Project: 11/03
Start of RCC: 11/03
End of RCC: 09/11
End of Project: 03/15
Specifications
Height: 111 metres
Length: 390 metres
Volume of RCC: 584 m3x103
Total volume: 940 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.80 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.82 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.82 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 & |
| 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: MWRDGC (Metropolitan Water Reclamation District of Greater Chicago)
Type: Gravity
Purpose(s): Flood Control
River: -
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 02/10
Start of RCC: 02/10
End of RCC: 09/11
End of Project: 11/11
Specifications
Height: 35 metres
Length: 69 metres
Volume of RCC: 25 m3x103
Total volume: 25 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 48 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 79 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Yunnan Jinsha River Hydropower Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation
River: Jinsha
Reservoir capacity: 885 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/11
End of Project: -/12
Specifications
Height: 138 metres
Length: 482 metres
Volume of RCC: -
Total volume: 2707 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: USA
Owner: US Army Corps of Engineers, Jacksonville and Department of Natural Resources of Puerto Rico
Type: Arch-Gravity
Purpose(s): Flood Control
River: Portugues
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: 04/08
Start of RCC: 04/08
End of RCC: 05/12
End of Project: 12/13
Specifications
Height: 67 metres
Length: 375 metres
Volume of RCC: 270 m3x103
Total volume: 310 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.35 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.35 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 114 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 51 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Comal County, Texas
Type: Gravity
Purpose(s): Flood Control
River: Dry Comal Creek
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: 10/11
Start of RCC: 10/11
End of RCC: 08/12
End of Project: 12/12
Specifications
Height: 26 metres
Length: 457 metres
Volume of RCC: 62 m3x103
Total volume: 67 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | High-lime flyash (ASTM Class C) |

Details
Country: China
Owner: Yunnan Jinsha River Hydropower Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Recreation / Water Supply
River: Jinsha
Reservoir capacity: 558 m3x106
Construction Dates
Start of Project: 08/07
Start of RCC: 08/07
End of RCC: -/12
End of Project: -/13
Specifications
Height: 119 metres
Length: 768 metres
Volume of RCC: 2840 m3x103
Total volume: 3853 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 96 | Low-lime flyash (ASTM Class F) |
| 90 |

Details
Country: China
Owner: Wujiang Hydroelectric Development Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation
River: Wu
Reservoir capacity: 910 m3x106
Construction Dates
Start of Project: 05/06
Start of RCC: 05/06
End of RCC: -/12
End of Project: -/13
Specifications
Height: 101 metres
Length: 631 metres
Volume of RCC: 1510 m3x103
Total volume: 1980 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.15 |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Department of Water Resources, Xinjiang Province
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: E’erqisi
Reservoir capacity: 2419 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/13
End of Project: -/14
Specifications
Height: 122 metres
Length: 1489 metres
Volume of RCC: 2520 m3x103
Total volume: 2890 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
| 0.75 |
Spillway
| Slope | Type |
|---|---|
| 0.75 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Iriri
Reservoir capacity: 270 m3x106
Construction Dates
Start of Project: 05/10
Start of RCC: 05/10
End of RCC: -/13
End of Project: -/13
Specifications
Height: 90 metres
Length: 202 metres
Volume of RCC: 270 m3x103
Total volume: 380 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: China
Owner: HydroChina Co.
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Furong
Reservoir capacity: 57 m3x106
Construction Dates
Start of Project: 10/11
Start of RCC: 10/11
End of RCC: -/13
End of Project: -/13
Specifications
Height: 59 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Flood Control / Irrigation
River: Manavgat
Reservoir capacity: 104 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: 01/14
End of Project: 05/14
Specifications
Height: 78 metres
Length: 448 metres
Volume of RCC: 620 m3x103
Total volume: 677 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.15 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 110 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 90 | Natural pozzolan (ASTM Class N) |

Details
Country: Iran
Owner: Fars Water Authority
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Cheshmeh Ashegh
Reservoir capacity: 62 m3x106
Construction Dates
Start of Project: 06/10
Start of RCC: 06/10
End of RCC: 05/14
End of Project: 03/17
Specifications
Height: 60 metres
Length: 375 metres
Volume of RCC: 130 m3x103
Total volume: 250 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 600 - |
| 900 |
Cementitious material
| Cement (kg/m3) |
|---|
| 120 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 80 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: Datang Huarui Investment Group Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Recreation
River: Jinsha
Reservoir capacity: 2263 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: 05/14
End of Project: -/16
Specifications
Height: 159 metres
Length: 1250 metres
Volume of RCC: 6473 m3x103
Total volume: 9364 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.10 |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 53 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 99 | Low-lime flyash (ASTM Class F) |

Details
Country: Oman
Owner: Ministry of Rural Municipalities and Water Resources
Type: Hardfill
Purpose(s): Flood Control
River: Wadi Umti
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 04/13
Start of RCC: 04/13
End of RCC: 07/14
End of Project: 07/14
Specifications
Height: 16 metres
Length: 145 metres
Volume of RCC: 34 m3x103
Total volume: 58 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: South Korea
Owner: Kwater (Korean Water Resources Corporation)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Hantan
Reservoir capacity: 270 m3x106
Construction Dates
Start of Project: 02/09
Start of RCC: 02/09
End of RCC: 07/14
End of Project: 12/14
Specifications
Height: 84 metres
Length: 690 metres
Volume of RCC: 650 m3x103
Total volume: 709 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Ministry of Land, Infrastructure, Transport and Tourism
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation
River: Iwaki
Reservoir capacity: 141 m3x106
Construction Dates
Start of Project: 10/08
Start of RCC: 10/08
End of RCC: 08/14
End of Project: 03/16
Specifications
Height: 97 metres
Length: 342 metres
Volume of RCC: 500 m3x103
Total volume: 717 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 1.00 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.74 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.74 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Flood Control
River: Bağ
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/14
End of Project: -/14
Specifications
Height: 31 metres
Length: 118 metres
Volume of RCC: 30 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Helong Electricity Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Recreation / Water Supply
River: Hailanhe
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/14
End of Project: -/15
Specifications
Height: 41 metres
Length: 271 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.73 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| conduit |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 2000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Fukuoka Prefecture
Type: Gravity
Purpose(s): Flood Control / Navigation / Water Supply
River: Naka
Reservoir capacity: 40 m3x106
Construction Dates
Start of Project: 06/12
Start of RCC: 06/12
End of RCC: 07/15
End of Project: 03/18
Specifications
Height: 103 metres
Length: 556 metres
Volume of RCC: 634 m3x103
Total volume: 935 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 1.00 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 104 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 26 | Low-lime flyash (ASTM Class F) |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Rkiza
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/15
End of Project: -/15
Specifications
Height: 26 metres
Length: 500 metres
Volume of RCC: 55 m3x103
Total volume: 60 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.85 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.85 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Laos
Owner: EDL (Electricite du Laos)
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Nam Khan
Reservoir capacity: 249 m3x106
Construction Dates
Start of Project: 12/12
Start of RCC: 12/12
End of RCC: -/15
End of Project: 06/16
Specifications
Height: 67 metres
Length: 154 metres
Volume of RCC: 125 m3x103
Total volume: 145 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Yunxi Shuishimen Reservoir Bureau
Type: Thin Arch
Purpose(s): Flood Control / Hydropower / Water Supply
River: Tianhe
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/15
End of Project: -/16
Specifications
Height: 86 metres
Length: -
Volume of RCC: -
Total volume: 150 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: Hokkaido Prefecture
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
River: Atsuma
Reservoir capacity: 106 m3x106
Construction Dates
Start of Project: 10/14
Start of RCC: 10/14
End of RCC: 06/16
End of Project: 03/18
Specifications
Height: 47 metres
Length: 516 metres
Volume of RCC: 354 m3x103
Total volume: 490 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Vietnam
Owner: EVN (Electrictie de Vietnam)
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Ma
Reservoir capacity: 349 m3x106
Construction Dates
Start of Project: 11/12
Start of RCC: 11/12
End of RCC: 08/16
End of Project: 02/17
Specifications
Height: 88 metres
Length: 498 metres
Volume of RCC: 770 m3x103
Total volume: 1140 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.35 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Downstream
| Slope | Type |
|---|---|
| 0.65 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.65 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 140 | Natural pozzolan (ASTM Class N) |
| 150 |

Details
Country: Albania
Owner: Diteko Sh.p.k
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Okshtuni
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: 08/15
Start of RCC: 08/15
End of RCC: 10/17
End of Project: 02/18
Specifications
Height: 65 metres
Length: 253 metres
Volume of RCC: 141 m3x103
Total volume: 194 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced conventional concrete cast after RCC placement |
| 0.15 |
Downstream
| Slope | Type |
|---|---|
| 0.90 | Reinforced conventional concrete cast after RCC placement [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.90 | Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 115 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Japan
Owner: Ministry of Land, Infrastructure, Transport and Tourism
Type: Hardfill
Purpose(s): Flood Control / Navigation / Water Supply
River: Sanru
Reservoir capacity: 50 m3x106
Construction Dates
Start of Project: 08/14
Start of RCC: 08/14
End of RCC: 10/17
End of Project: 03/19
Specifications
Height: 46 metres
Length: 350 metres
Volume of RCC: 375 m3x103
Total volume: 500 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
River: Ansegmir
Reservoir capacity: 50 m3x106
Construction Dates
Start of Project: 10/10
Start of RCC: 10/10
End of RCC: -/17
End of Project: -/18
Specifications
Height: 61 metres
Length: 320 metres
Volume of RCC: 380 m3x103
Total volume: 405 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 70 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |
| 0 |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
River: Beht
Reservoir capacity: 510 m3x106
Construction Dates
Start of Project: 05/10
Start of RCC: 05/10
End of RCC: -/17
End of Project: -/18
Specifications
Height: 98 metres
Length: 383 metres
Volume of RCC: 900 m3x103
Total volume: 930 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 25 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: Muling Fendou Reservoir Construction office
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Mulenghe
Reservoir capacity: 191 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/17
End of Project: -/18
Specifications
Height: 46 metres
Length: 406 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Dashahe
Reservoir capacity: 196 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/17
End of Project: -/18
Specifications
Height: 74 metres
Length: 296 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: Fukuoka Prefecture
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Harai
Reservoir capacity: 29 m3x106
Construction Dates
Start of Project: 07/14
Start of RCC: 07/14
End of RCC: 03/18
End of Project: 03/19
Specifications
Height: 81 metres
Length: 295 metres
Volume of RCC: 372 m3x103
Total volume: 419 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.60 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.77 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.77 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: Iran
Owner: Iran Water & Power Resources Development Company (IWPC)
Type: Hardfill
Purpose(s): Flood Control / Irrigation
River: Javeh Roud
Reservoir capacity: 95 m3x106
Construction Dates
Start of Project: 03/09
Start of RCC: 03/09
End of RCC: -/18
End of Project: 07/19
Specifications
Height: 86 metres
Length: 301 metres
Volume of RCC: 680 m3x103
Total volume: 750 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.90 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 1.20 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 1.20 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 94 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 31 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Changlehe
Reservoir capacity: 133 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/18
End of Project: -/19
Specifications
Height: 101 metres
Length: 355 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guangxi Datengxia Gorge Water Conservancy Development Co. .Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Water Supply
River: Xijiang
Reservoir capacity: 3479 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/18
End of Project: 07/20
Specifications
Height: 80 metres
Length: -
Volume of RCC: -
Total volume: 7100 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Zhuangli reservoir construction and management office
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Shizihe
Reservoir capacity: 133 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/18
End of Project: -/19
Specifications
Height: 44 metres
Length: 49 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: Ministry of Land, Infrastructure, Transport and Tourism
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply
River: Agatsuma
Reservoir capacity: 108 m3x106
Construction Dates
Start of Project: 08/14
Start of RCC: 08/14
End of RCC: 05/19
End of Project: 10/19
Specifications
Height: 116 metres
Length: 291 metres
Volume of RCC: 575 m3x103
Total volume: 911 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.15 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.08 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Ministry of Land, Infrastructure, Transport and Tourism
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply
River: Nukapira
Reservoir capacity: 46 m3x106
Construction Dates
Start of Project: -/73
Start of RCC: -/73
End of RCC: -/19
End of Project: -/21
Specifications
Height: 57 metres
Length: 600 metres
Volume of RCC: -
Total volume: 180 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Afghanistan
Owner: Ministry of Energy and Water
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Shakardar
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/19
End of Project: 04/21
Specifications
Height: 78 metres
Length: 303 metres
Volume of RCC: 270 m3x103
Total volume: 337 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.20 |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 105 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 45 | Natural pozzolan (ASTM Class N) |

Details
Country: Mexico
Owner: CNA (Comisión Nacional del Agua)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Mayo
Reservoir capacity: 478 m3x106
Construction Dates
Start of Project: 02/14
Start of RCC: 02/14
End of RCC: -/19
End of Project: 08/20
Specifications
Height: 73 metres
Length: 232 metres
Volume of RCC: 600 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: -
Reservoir capacity: 96 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: 03/20
End of Project: 01/21
Specifications
Height: 76 metres
Length: 173 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Nigeria
Owner: Federal Ministry of Power, Nigeria
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Kaduna
Reservoir capacity: 11400 m3x106
Construction Dates
Start of Project: 09/13
Start of RCC: 09/13
End of RCC: 08/20
End of Project: 10/21
Specifications
Height: 101 metres
Length: 1090 metres
Volume of RCC: 1920 m3x103
Total volume: 2400 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 59 |
| 69 94 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 76 | Low-lime flyash (ASTM Class F) |
| 69 76 |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
River: Ouaar
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: 04/10
Start of RCC: 04/10
End of RCC: -/20
End of Project: -/20
Specifications
Height: 68 metres
Length: 370 metres
Volume of RCC: 580 m3x103
Total volume: 610 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |
| 0 |

Details
Country: Japan
Owner: Iwate Prefecture
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Yana
Reservoir capacity: 19 m3x106
Construction Dates
Start of Project: 12/14
Start of RCC: 12/14
End of RCC: -/20
End of Project: 03/21
Specifications
Height: 77 metres
Length: 243 metres
Volume of RCC: -
Total volume: 213 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: USA
Owner: US Army Corps of Engineers - Nashville District
Type: Gravity
Purpose(s): Flood Control / Hydropower / Recreation / Water Supply
River: Caney Fork
Reservoir capacity: 940 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/20
End of Project: -/21
Specifications
Height: 40 metres
Length: 293 metres
Volume of RCC: 99 m3x103
Total volume: 122 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork [stepped face] |
| 0.83 |
Spillway
| Slope | Type |
|---|---|
| 0.83 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 93 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 93 | Low-lime flyash (ASTM Class F) |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Daraa
Reservoir capacity: 247 m3x106
Construction Dates
Start of Project: 05/16
Start of RCC: 05/16
End of RCC: 09/21
End of Project: 06/22
Specifications
Height: 110 metres
Length: 317 metres
Volume of RCC: 833 m3x103
Total volume: 993 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Natural pozzolan (ASTM Class N) | |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Guir
Reservoir capacity: 220 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/21
End of Project: -/21
Specifications
Height: 62 metres
Length: 271 metres
Volume of RCC: 180 m3x103
Total volume: 210 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Natural pozzolan (ASTM Class N) | |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Bou Regreg
Reservoir capacity: 507 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/21
End of Project: -/22
Specifications
Height: 106 metres
Length: 345 metres
Volume of RCC: 900 m3x103
Total volume: 1 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Toudgha
Reservoir capacity: 33 m3x106
Construction Dates
Start of Project: 11/17
Start of RCC: 11/17
End of RCC: -/21
End of Project: -/22
Specifications
Height: 68 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Flood Control / Hydropower
River: Qianhe
Reservoir capacity: 160 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/21
End of Project: -/22
Specifications
Height: 132 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: Kagawa Prefecture
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Kaba
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: 10/14
Start of RCC: 10/14
End of RCC: 05/22
End of Project: 09/24
Specifications
Height: 89 metres
Length: 266 metres
Volume of RCC: 242 m3x103
Total volume: 448 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.40 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.77 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.77 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Assayad
Reservoir capacity: 79 m3x106
Construction Dates
Start of Project: 07/17
Start of RCC: 07/17
End of RCC: 12/22
End of Project: 07/23
Specifications
Height: 77 metres
Length: 830 metres
Volume of RCC: 1400 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Natural pozzolan (ASTM Class N) | |

Details
Country: China
Owner: Guilin Dayu Water Infrastructure Development Investment Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Lijiang
Reservoir capacity: 188 m3x106
Construction Dates
Start of Project: 11/11
Start of RCC: 11/11
End of RCC: -/22
End of Project: -/23
Specifications
Height: 77 metres
Length: 239 metres
Volume of RCC: -
Total volume: 304 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Iran
Owner: Iran Water & Power Resources Development Company (IWPC)
Type: Arch-Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Zohreh
Reservoir capacity: 2300 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/22
End of Project: 07/23
Specifications
Height: 151 metres
Length: 680 metres
Volume of RCC: 1100 m3x103
Total volume: 1200 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.70 |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 160 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Iran
Owner: Boushehr Water Authority
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Baghan
Reservoir capacity: 32 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/22
End of Project: -/25
Specifications
Height: 58 metres
Length: 311 metres
Volume of RCC: -
Total volume: 220 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Lichuan City Yujiang Valley Hudropower Ltd. Hubei Province
Type: Thin Arch
Purpose(s): Flood Control / Hydropower
River: Yu
Reservoir capacity: 55 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/22
End of Project: -/22
Specifications
Height: 70 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Jialing River Tingzikou Water Resources and Hydropower Development Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply
River: Jialing
Reservoir capacity: 4067 m3x106
Construction Dates
Start of Project: 11/09
Start of RCC: 11/09
End of RCC: -/22
End of Project: -/25
Specifications
Height: 116 metres
Length: 995 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Cameroon
Owner: EDC (Electricity Development Corporation)
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Lom
Reservoir capacity: 6000 m3x106
Construction Dates
Start of Project: -/19
Start of RCC: -/19
End of RCC: 03/23
End of Project: 09/24
Specifications
Height: 46 metres
Length: 185 metres
Volume of RCC: 175 m3x103
Total volume: 290 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.85 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.85 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Kirkpinarlar
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 10/21
Start of RCC: 10/21
End of RCC: 08/23
End of Project: 10/23
Specifications
Height: 28 metres
Length: 168 metres
Volume of RCC: -
Total volume: 60 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Nishiki
Reservoir capacity: 30 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/23
End of Project: -/24
Specifications
Height: 73 metres
Length: 300 metres
Volume of RCC: -
Total volume: 340 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control
River: Shirakawa
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/23
End of Project: 02/24
Specifications
Height: 87 metres
Length: 197 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Philippines
Owner: National Irrigation Administration (NIA)
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Jalaur
Reservoir capacity: -
Construction Dates
Start of Project: -/19
Start of RCC: -/19
End of RCC: -/23
End of Project: 07/24
Specifications
Height: 38 metres
Length: 150 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Philippines
Owner: National Irrigation Administration (NIA)
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Jalaur
Reservoir capacity: 229 m3x106
Construction Dates
Start of Project: -/19
Start of RCC: -/19
End of RCC: -/23
End of Project: 07/24
Specifications
Height: 109 metres
Length: 267 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Leben
Reservoir capacity: 200 m3x106
Construction Dates
Start of Project: 03/21
Start of RCC: 03/21
End of RCC: 06/24
End of Project: -/25
Specifications
Height: 71 metres
Length: 149 metres
Volume of RCC: 207 m3x103
Total volume: 257 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 110 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | |

Details
Country: Japan
Owner: Ministry of Land, Infrastructure, Transport and Tourism
Type: Hardfill
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Naruse
Reservoir capacity: 79 m3x106
Construction Dates
Start of Project: 05/18
Start of RCC: 05/18
End of RCC: 08/24
End of Project: 11/26
Specifications
Height: 115 metres
Length: 755 metres
Volume of RCC: 4450 m3x103
Total volume: 4850 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Iran
Owner: Fars Water Authority
Type: Hardfill
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Firooz Abad
Reservoir capacity: 146 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/24
End of Project: -/26
Specifications
Height: 88 metres
Length: 230 metres
Volume of RCC: 260 m3x103
Total volume: 285 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.90 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 1.20 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 1.20 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: Ministry of Land, Infrastructure, Transport and Tourism
Type: Arch-Gravity
Purpose(s): Flood Control
River: Heko
Reservoir capacity: 29 m3x106
Construction Dates
Start of Project: 07/06
Start of RCC: 07/06
End of RCC: -/24
End of Project: -/26
Specifications
Height: 96 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Kibishima
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/24
End of Project: -/26
Specifications
Height: 84 metres
Length: 270 metres
Volume of RCC: -
Total volume: 328 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: Ministry of Land, Infrastructure, Transport and Tourism
Type: Gravity
Purpose(s): Flood Control / Irrigation / Navigation
River: Toga
Reservoir capacity: 31 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/24
End of Project: -/25
Specifications
Height: 112 metres
Length: 232 metres
Volume of RCC: -
Total volume: 570 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
| 0.60 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.69 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.69 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Department of Water Conservancy, Fujian Province
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Aojiang
Reservoir capacity: 297 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/24
End of Project: -/25
Specifications
Height: 91 metres
Length: 338 metres
Volume of RCC: 300 m3x103
Total volume: 663 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 |
Downstream
| Slope | Type |
|---|---|
| 0.76 |
Spillway
| Slope | Type |
|---|---|
| 0.76 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: -
Reservoir capacity: 544 m3x106
Construction Dates
Start of Project: 06/20
Start of RCC: 06/20
End of RCC: -/24
End of Project: 12/25
Specifications
Height: 106 metres
Length: 596 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: Ministry of Land, Infrastructure, Transport and Tourism
Type: Hardfill
Purpose(s): Flood Control
River: Honbetsu
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: -/85
Start of RCC: -/85
End of RCC: -/24
End of Project: -/26
Specifications
Height: 53 metres
Length: 160 metres
Volume of RCC: -
Total volume: 180 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Iran
Owner: Sistan and Balouchestan Water Authority
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Simish & Mashkid
Reservoir capacity: 115 m3x106
Construction Dates
Start of Project: 10/17
Start of RCC: 10/17
End of RCC: -/24
End of Project: -/25
Specifications
Height: 36 metres
Length: 1450 metres
Volume of RCC: 650 m3x103
Total volume: 850 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Oman
Owner: Ministry of Regional Municipalities and Water Resources
Type: Gravity
Purpose(s): Flood Control
River: Wadi Al Khawd
Reservoir capacity: 78 m3x106
Construction Dates
Start of Project: 09/22
Start of RCC: 09/22
End of RCC: 04/25
End of Project: 11/25
Specifications
Height: 62 metres
Length: 570 metres
Volume of RCC: 654 m3x103
Total volume: 715 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Algeria
Owner: Direction de l’Hydralique de la Wilaya de Annaba
Type: Gravity
Purpose(s): Flood Control
River: Oued Bouhdid
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: 07/25
End of Project: -/25
Specifications
Height: 30 metres
Length: 260 metres
Volume of RCC: -
Total volume: 60 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 |
Downstream
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: SRHS (Secretaria de Recursos Hídricos e de Saneamento)
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Sem Nome
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/25
End of Project: -/26
Specifications
Height: 38 metres
Length: 325 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Iran
Owner: Lorestan Water Authority
Type: Thin Arch
Purpose(s): Flood Control / Irrigation / Water Supply
River: Karkheh
Reservoir capacity: 55 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/25
End of Project: -/26
Specifications
Height: 73 metres
Length: 220 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Dazhou Major water works construction and management center
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Zhonhe
Reservoir capacity: 128 m3x106
Construction Dates
Start of Project: 12/20
Start of RCC: 12/20
End of RCC: -/25
End of Project: -/26
Specifications
Height: 77 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
River: Kert
Reservoir capacity: 44 m3x106
Construction Dates
Start of Project: 01/22
Start of RCC: 01/22
End of RCC: 01/26
End of Project: 10/26
Specifications
Height: 70 metres
Length: 684 metres
Volume of RCC: 800 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork [stepped face] |
Downstream
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | |

Details
Country: Morocco
Owner: AREP (Regional Project Execution Agency)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Assif Ouender
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: 11/23
Start of RCC: 11/23
End of RCC: 03/26
End of Project: 06/26
Specifications
Height: 45 metres
Length: 300 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.90 |
Spillway
| Slope | Type |
|---|---|
| 0.90 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Kheng Grou
Reservoir capacity: 1070 m3x106
Construction Dates
Start of Project: 04/22
Start of RCC: 04/22
End of RCC: 08/26
End of Project: -/26
Specifications
Height: 79 metres
Length: 196 metres
Volume of RCC: 550 m3x103
Total volume: 55 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 1.00 | Traditional concrete against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 1.00 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Iran
Owner: Bushehr Water Company
Type: Gravity
Purpose(s): Flood Control / Irrigation
River: Bahoosh
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/26
End of Project: -/28
Specifications
Height: 37 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Iran
Owner: Boushehr Regional Water Company
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Dashte Palang
Reservoir capacity: 151 m3x106
Construction Dates
Start of Project: 07/13
Start of RCC: 07/13
End of RCC: -/26
End of Project: -/28
Specifications
Height: 63 metres
Length: 800 metres
Volume of RCC: 540 m3x103
Total volume: 690 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Canada
Owner: Matteus West and Squamish Nation
Type: Gravity
Purpose(s): Flood Control
River: Cheekye
Reservoir capacity: -
Construction Dates
Start of Project: 10/23
Start of RCC: 10/23
End of RCC: -/26
End of Project: 10/26
Specifications
Height: 25 metres
Length: 200 metres
Volume of RCC: 55 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: AREP (Regional Project Execution Agency)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Boujir
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: 07/24
Start of RCC: 07/24
End of RCC: -/26
End of Project: -/27
Specifications
Height: 25 metres
Length: 416 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 |
Downstream
| Slope | Type |
|---|---|
| 0.80 |
Spillway
| Slope | Type |
|---|---|
| 0.80 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Lakhdar
Reservoir capacity: 150 m3x106
Construction Dates
Start of Project: -/23
Start of RCC: -/23
End of RCC: -/27
End of Project: -/27
Specifications
Height: 110 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Indonesia
Owner: PUPR (Public Works and Public Housing Ministry)
Type: Hardfill
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Cibeet
Reservoir capacity: 83 m3x106
Construction Dates
Start of Project: 09/23
Start of RCC: 09/23
End of RCC: -/27
End of Project: -/28
Specifications
Height: 47 metres
Length: 960 metres
Volume of RCC: 371 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.90 |
Downstream
| Slope | Type |
|---|---|
| 0.90 |
Spillway
| Slope | Type |
|---|---|
| 0.90 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 106 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Bahe
Reservoir capacity: 141 m3x106
Construction Dates
Start of Project: 04/22
Start of RCC: 04/22
End of RCC: -/28
End of Project: -/29
Specifications
Height: 71 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: Kansai Electric Power
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Kiso
Reservoir capacity: 131 m3x106
Construction Dates
Start of Project: -/22
Start of RCC: -/22
End of RCC: -/28
End of Project: -/30
Specifications
Height: 118 metres
Length: 341 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Search again