SEARCHING
... please wait

Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Xayaburi (Left bank closure section)LaosXPCL (Xayaburi Power Company Ltd.)HMekong 03/1201/1812/1810/19401098285V(1) (16)  30030060100(F)
Don SahongLaosDon Sahong Power Company (Mega First Corporation Berhad and Électricité du Laos)HMekong2410/15- /16- /1812/192668005666090.30(1)0.75(1)0.75(1)300240055103(F)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Laos

Owner: XPCL (Xayaburi Power Company Ltd.)

Type: Gravity

Purpose(s): Hydropower

River: Mekong

Reservoir capacity: -

Construction Dates

Start of Project: 03/12

Start of RCC: 03/12

End of RCC: 12/18

End of Project: 10/19

Specifications

Height: 40 metres

Length: 109 metres

Volume of RCC: 82 m3x103

Total volume: 85 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
 Mechanically compacted unformed face of RCC
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
100Low-lime flyash (ASTM Class F)
  
Xayaburi (Left bank closure section) under construction
Xayaburi (Left bank closure section) under construction

Full Dam Information

Details

Country: Laos

Owner: Don Sahong Power Company (Mega First Corporation Berhad and Électricité du Laos)

Type: Gravity

Purpose(s): Hydropower

River: Mekong

Reservoir capacity: 24 m3x106

Construction Dates

Start of Project: 10/15

Start of RCC: 10/15

End of RCC: -/18

End of Project: 12/19

Specifications

Height: 26 metres

Length: 6800 metres

Volume of RCC: 566 m3x103

Total volume: 609 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.30Traditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3002400

Cementitious material

Cement (kg/m3)
55
Pozzolan (kg/m3)Pozzolan Type
103Low-lime flyash (ASTM Class F)
  
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates