Dam Search Results
- Dimensions
- Height: 67 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Gov. José Richa (formerly Salto Caxias) | Brazil | COPEL (Companhia Paranense de Energia) Geração E Transmissão S.A. | H | Iguaçu | 3573 | 02/95 | 01/96 | 07/98 | 12/98 | 67 | 1083 | 912 | 1438 | V | (13) | 0.75 | (1)* | 0.75 | (12) | 300 | 300 | 80 | 20 | (F) |
| Cana Brava | Brazil | Companhia Energética Mercosul (of the Tractebel Group) | H | Tocantins | 2300 | 03/99 | 02/00 | 10/01 | 10/02 | 67 | 510 | 527 | 833 | (1) | (3)* | ogee | (1) | 300 | 300 | 40 | 50 | (S) | ||
| Mujib | Jordan | Jordan Valley Authority, Ministry of Water and Irrigation | I W | Mujib | 35 | 01/99 | 01/01 | 02/03 | 11/03 | 67 | 490 | 654 | 694 | 0.10 | (2) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 85 | 0 | (-) |
| Santa Clara-PR | Brazil | Elejor Centrais Elétricas do Rio Jordåo S.A. | H | Jordåo | 431 | 11/02 | 12/03 | - /04 | 01/05 | 67 | 543 | 530 | 606 | (1) | (1) | (1)* | 300 | 300 | 40 | 50 | (S) | |||
| Şirnak | Turkey | DSI - State Hydraulic Works | H | Ortasui | 18 | - /08 | 11/09 | 08/10 | 09/10 | 67 | 198 | 157 | 231 | 0.10 | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 600 | 125 | 0 | (-) |
| Portugues [A-G] | USA | US Army Corps of Engineers, Jacksonville and Department of Natural Resources of Puerto Rico | F | Portugues | 20 | 04/08 | 01/11 | 05/12 | 12/13 | 67 | 375 | 270 | 310 | V | (3') | 0.35 | (3')* | 0.35 | (1) | 300 | 300 | 114 | 51 | (F) |
| Teles Pires | Brazil | ANEEL (Agência Nacional de Energia Elétrica) | H | Teles Pires | 1 | 07/11 | - /13 | - /15 | 09/16 | 67 | 360 | 500 | 1020 | |||||||||||
| Nam Khan 3 | Laos | EDL (Electricite du Laos) | F H W | Nam Khan | 249 | 12/12 | - /14 | - /15 | 06/16 | 67 | 154 | 125 | 145 | |||||||||||
| Wala Dam Raise | Jordan | Jordan Valley Authority, Ministry of Water and Irrigation | G | Wala | 26 | 09/17 | 06/19 | 10/19 | 07/20 | 67 | 300 | 80 | 82 | 0.30 | (1) | 0.70 | (1)* | 0.70 | (1)* | 300 | 300 | 98 | 52 | (N) |
| Tan My | Vietnam | Ministry of Agriculture and Rural Development | H I W | Cai | 219 | - /16 | - /18 | - /20 | - /21 | 67 | 603 | 510 | 640 | |||||||||||
| Gürsöğüt 1 | Turkey | Limak Energy | H | Sakarya | 77 | - /19 | - /19 | - /20 | - /20 | 67 | 135 | 105 | 115 | |||||||||||
| Gümüshane Bahçecik | Turkey | DSI - State Hydraulic Works | W | Şenkale Deresi | 3 | 06/17 | 11/18 | - /21 | - /22 | 67 | 273 | 148 | 0.10 | (1) | 0.80 | (1)* | 300 | 300 | (N) | |||||
| Dongyang [H-F] | China | Dongyanggou | 5 | 05/22 | - /23 | - /24 | - /25 | 67 | 136 | |||||||||||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Brazil
Owner: COPEL (Companhia Paranense de Energia) Geração E Transmissão S.A.
Type: Gravity
Purpose(s): Hydropower
River: Iguaçu
Reservoir capacity: 3573 m3x106
Construction Dates
Start of Project: 02/95
Start of RCC: 02/95
End of RCC: 07/98
End of Project: 12/98
Specifications
Height: 67 metres
Length: 1083 metres
Volume of RCC: 912 m3x103
Total volume: 1438 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 20 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: Companhia Energética Mercosul (of the Tractebel Group)
Type: Gravity
Purpose(s): Hydropower
River: Tocantins
Reservoir capacity: 2300 m3x106
Construction Dates
Start of Project: 03/99
Start of RCC: 03/99
End of RCC: 10/01
End of Project: 10/02
Specifications
Height: 67 metres
Length: 510 metres
Volume of RCC: 527 m3x103
Total volume: 833 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 40 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 50 | Ground-granulated blast-furnace slag |

Details
Country: Jordan
Owner: Jordan Valley Authority, Ministry of Water and Irrigation
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Mujib
Reservoir capacity: 35 m3x106
Construction Dates
Start of Project: 01/99
Start of RCC: 01/99
End of RCC: 02/03
End of Project: 11/03
Specifications
Height: 67 metres
Length: 490 metres
Volume of RCC: 654 m3x103
Total volume: 694 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork with external geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Brazil
Owner: Elejor Centrais Elétricas do Rio Jordåo S.A.
Type: Gravity
Purpose(s): Hydropower
River: Jordåo
Reservoir capacity: 431 m3x106
Construction Dates
Start of Project: 11/02
Start of RCC: 11/02
End of RCC: -/04
End of Project: 01/05
Specifications
Height: 67 metres
Length: 543 metres
Volume of RCC: 530 m3x103
Total volume: 606 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 40 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 50 | Ground-granulated blast-furnace slag |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower
River: Ortasui
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: 08/10
End of Project: 09/10
Specifications
Height: 67 metres
Length: 198 metres
Volume of RCC: 157 m3x103
Total volume: 231 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 600 |
Cementitious material
| Cement (kg/m3) |
|---|
| 125 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: USA
Owner: US Army Corps of Engineers, Jacksonville and Department of Natural Resources of Puerto Rico
Type: Arch-Gravity
Purpose(s): Flood Control
River: Portugues
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: 04/08
Start of RCC: 04/08
End of RCC: 05/12
End of Project: 12/13
Specifications
Height: 67 metres
Length: 375 metres
Volume of RCC: 270 m3x103
Total volume: 310 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.35 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.35 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 114 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 51 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: ANEEL (Agência Nacional de Energia Elétrica)
Type: Gravity
Purpose(s): Hydropower
River: Teles Pires
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 07/11
Start of RCC: 07/11
End of RCC: -/15
End of Project: 09/16
Specifications
Height: 67 metres
Length: 360 metres
Volume of RCC: 500 m3x103
Total volume: 1020 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Laos
Owner: EDL (Electricite du Laos)
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Nam Khan
Reservoir capacity: 249 m3x106
Construction Dates
Start of Project: 12/12
Start of RCC: 12/12
End of RCC: -/15
End of Project: 06/16
Specifications
Height: 67 metres
Length: 154 metres
Volume of RCC: 125 m3x103
Total volume: 145 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Jordan
Owner: Jordan Valley Authority, Ministry of Water and Irrigation
Type: Gravity
Purpose(s): Groundwater Recharge
River: Wala
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: 09/17
Start of RCC: 09/17
End of RCC: 10/19
End of Project: 07/20
Specifications
Height: 67 metres
Length: 300 metres
Volume of RCC: 80 m3x103
Total volume: 82 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.30 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 98 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 52 | Natural pozzolan (ASTM Class N) |

Details
Country: Vietnam
Owner: Ministry of Agriculture and Rural Development
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Cai
Reservoir capacity: 219 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/20
End of Project: -/21
Specifications
Height: 67 metres
Length: 603 metres
Volume of RCC: 510 m3x103
Total volume: 640 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: Limak Energy
Type: Gravity
Purpose(s): Hydropower
River: Sakarya
Reservoir capacity: 77 m3x106
Construction Dates
Start of Project: -/19
Start of RCC: -/19
End of RCC: -/20
End of Project: -/20
Specifications
Height: 67 metres
Length: 135 metres
Volume of RCC: 105 m3x103
Total volume: 115 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Water Supply
River: Şenkale Deresi
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 06/17
Start of RCC: 06/17
End of RCC: -/21
End of Project: -/22
Specifications
Height: 67 metres
Length: 273 metres
Volume of RCC: 148 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Natural pozzolan (ASTM Class N) | |

Details
Country: China
Owner: -
Type: Hardfill
Purpose(s): unknown
River: Dongyanggou
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: 05/22
Start of RCC: 05/22
End of RCC: -/24
End of Project: -/25
Specifications
Height: 67 metres
Length: 136 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates