Dam Search Results
- Dimensions
- Height: 35 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Liangsanping [A] | China | Sixian Water Resources Bureau | H | Leishui | 4 | - /79 | - /80 | - /81 | - /82 | 35 | 33 | 3 | 3 | |||||||||||
| Maoeryan [A] | China | Shiqi | 33 | - /68 | - /88 | - /91 | - /93 | 35 | ||||||||||||||||
| Catou | China | Dongyuan County | H | Yinjiang | 1 | - /92 | - /93 | - /94 | - /94 | 35 | 115 | 223 | 0.90 | 0.90 | 0.90 | |||||||||
| Yanwangbizi | China | Chaoyang Water Conservancy Bureau | F H I W | Daling | 217 | - /96 | - /97 | - /01 | - /02 | 35 | 383 | 87 | 220 | 64 | 118 | (F) | ||||||||
| La Rosilla II [H-F] | Mexico | CNA (Comisión Nacional del Agua) | El Salto | - /00 | - /01 | - /02 | - /03 | 35 | 250 | |||||||||||||||
| Rio Rejo [H-F] | Peru | Yanacocha Mine | E | Rejo | 1 | - /02 | - /03 | - /03 | - /04 | 35 | 125 | 30 | 33 | 0.70 | (1)* | 0.70 | (1)* | 0.70 | (12) | 300 | 300 | 100 | 0 | (-) |
| Las Truchas | Mexico | Desarrollos Mineros San Luis, S.A. de C.V. | H | La Lobor o Las Truchas | - /07 | - /08 | - /08 | - /09 | 35 | 230 | 24 | 300 | 300 | |||||||||||
| El Puente de Santolea | Spain | Acua Ebro | I | Guadalope | 18 | - /09 | 04/10 | 02/11 | 03/11 | 35 | 203 | 65 | 70 | 0.20 | (3')* | 0.60 | (3')* | 0.60 | (3')* | 300 | 300 | 65 | 153 | (F) |
| Thornton Gap (Tollway) | USA | MWRDGC (Metropolitan Water Reclamation District of Greater Chicago) | F | - | 1 | 02/10 | 06/11 | 09/11 | 11/11 | 35 | 69 | 25 | 25 | V | (3') | (3')* | 300 | 300 | 48 | 79 | (F) | |||
| Marrecas | Brazil | SAMAE (Serviço Autônomo Municipal de Água e Esgoto) | W | Marrecas | 33 | 03/10 | - /11 | - /12 | 12/12 | 35 | 430 | |||||||||||||
| Cannelton [H-F] | USA | American Municipal Partners (AMP) | H | Ohio | 05/09 | 06/12 | 08/13 | 09/16 | 35 | 158 | 113 | 0.80 | (10) | 0.80 | (10) | separate | 230 | 230 | 118 | 64 | (F) | |||
| Puhulpola (part of Uma Oya Project) | Sri Lanka | Ministry of Irrigation and Water Resources Management | H I | Dulgolla Oya | 1 | - /11 | - /13 | - /18 | - /19 | 35 | 174 | 30 | 40 | V | (1) | (1)* | (12) | 300 | 300 | 95 | 95 | (F) | ||
| Gulpur | Pakistan | WAPDA (Water and Power Development Authority) and MIRA Power Ltd. (a subsidiary of KOSEP) | H | Poonch | 22 | 09/14 | - /16 | - /18 | 02/20 | 35 | 238 | |||||||||||||
| Miguillas | Brazil | - /17 | - /19 | - /20 | - /21 | 35 | ||||||||||||||||||
| Cachoeira Cinco Veados | Brazil | Rincão dos Albinos Energética S.A. | H | Toropi | 13 | - /18 | - /19 | - /21 | 08/22 | 35 | 206 | |||||||||||||
| Babus | Turkey | DSI - State Hydraulic Works | I | Fındıklı Creek | 1 | 06/18 | - /21 | - /22 | 09/23 | 35 | 229 | 48 | V | (1) | 0.80 | (1)* | ||||||||
| Oiticica | Brazil | Secretaria de Meio Ambiente e dos Recursos Hídricos do Estado do Rio Grande do Norte | I W | Piranhas | 556 | - /13 | - /15 | - /24 | 03/25 | 35 | 989 | |||||||||||||
| Manavgat Yeniköy Yerköprü | Turkey | DSI - State Hydraulic Works | I | Hamam Suyu | 1 | 09/23 | - /25 | - /26 | - /26 | 35 | 193 | 60 | ||||||||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: China
Owner: Sixian Water Resources Bureau
Type: Thin Arch
Purpose(s): Hydropower
River: Leishui
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: -/79
Start of RCC: -/79
End of RCC: -/81
End of Project: -/82
Specifications
Height: 35 metres
Length: 33 metres
Volume of RCC: 3 m3x103
Total volume: 3 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): unknown
River: Shiqi
Reservoir capacity: 33 m3x106
Construction Dates
Start of Project: -/68
Start of RCC: -/68
End of RCC: -/91
End of Project: -/93
Specifications
Height: 35 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Dongyuan County
Type: Gravity
Purpose(s): Hydropower
River: Yinjiang
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/92
Start of RCC: -/92
End of RCC: -/94
End of Project: -/94
Specifications
Height: 35 metres
Length: 115 metres
Volume of RCC: -
Total volume: 223 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.90 |
Downstream
| Slope | Type |
|---|---|
| 0.90 | [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.90 | [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Chaoyang Water Conservancy Bureau
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Daling
Reservoir capacity: 217 m3x106
Construction Dates
Start of Project: -/96
Start of RCC: -/96
End of RCC: -/01
End of Project: -/02
Specifications
Height: 35 metres
Length: 383 metres
Volume of RCC: 87 m3x103
Total volume: 220 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 118 | Low-lime flyash (ASTM Class F) |

Details
Country: Mexico
Owner: CNA (Comisión Nacional del Agua)
Type: Hardfill
Purpose(s): unknown
River: El Salto
Reservoir capacity: -
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/02
End of Project: -/03
Specifications
Height: 35 metres
Length: 250 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Peru
Owner: Yanacocha Mine
Type: Hardfill
Purpose(s): Environmental
River: Rejo
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/03
End of Project: -/04
Specifications
Height: 35 metres
Length: 125 metres
Volume of RCC: 30 m3x103
Total volume: 33 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Mexico
Owner: Desarrollos Mineros San Luis, S.A. de C.V.
Type: Gravity
Purpose(s): Hydropower
River: La Lobor o Las Truchas
Reservoir capacity: -
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/08
End of Project: -/09
Specifications
Height: 35 metres
Length: 230 metres
Volume of RCC: 24 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Spain
Owner: Acua Ebro
Type: Gravity
Purpose(s): Irrigation
River: Guadalope
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: 02/11
End of Project: 03/11
Specifications
Height: 35 metres
Length: 203 metres
Volume of RCC: 65 m3x103
Total volume: 70 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Downstream
| Slope | Type |
|---|---|
| 0.60 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.60 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 153 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: MWRDGC (Metropolitan Water Reclamation District of Greater Chicago)
Type: Gravity
Purpose(s): Flood Control
River: -
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 02/10
Start of RCC: 02/10
End of RCC: 09/11
End of Project: 11/11
Specifications
Height: 35 metres
Length: 69 metres
Volume of RCC: 25 m3x103
Total volume: 25 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 48 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 79 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: SAMAE (Serviço Autônomo Municipal de Água e Esgoto)
Type: Gravity
Purpose(s): Water Supply
River: Marrecas
Reservoir capacity: 33 m3x106
Construction Dates
Start of Project: 03/10
Start of RCC: 03/10
End of RCC: -/12
End of Project: 12/12
Specifications
Height: 35 metres
Length: 430 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: USA
Owner: American Municipal Partners (AMP)
Type: Hardfill
Purpose(s): Hydropower
River: Ohio
Reservoir capacity: -
Construction Dates
Start of Project: 05/09
Start of RCC: 05/09
End of RCC: 08/13
End of Project: 09/16
Specifications
Height: 35 metres
Length: 158 metres
Volume of RCC: 113 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete blocks |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 230 | 230 |
Cementitious material
| Cement (kg/m3) |
|---|
| 118 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 64 | Low-lime flyash (ASTM Class F) |

Details
Country: Sri Lanka
Owner: Ministry of Irrigation and Water Resources Management
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Dulgolla Oya
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/18
End of Project: -/19
Specifications
Height: 35 metres
Length: 174 metres
Volume of RCC: 30 m3x103
Total volume: 40 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 95 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 95 | Low-lime flyash (ASTM Class F) |

Details
Country: Pakistan
Owner: WAPDA (Water and Power Development Authority) and MIRA Power Ltd. (a subsidiary of KOSEP)
Type: Gravity
Purpose(s): Hydropower
River: Poonch
Reservoir capacity: 22 m3x106
Construction Dates
Start of Project: 09/14
Start of RCC: 09/14
End of RCC: -/18
End of Project: 02/20
Specifications
Height: 35 metres
Length: 238 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): unknown
River: -
Reservoir capacity: -
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/20
End of Project: -/21
Specifications
Height: 35 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Rincão dos Albinos Energética S.A.
Type: Gravity
Purpose(s): Hydropower
River: Toropi
Reservoir capacity: 13 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/21
End of Project: 08/22
Specifications
Height: 35 metres
Length: 206 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Fındıklı Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 06/18
Start of RCC: 06/18
End of RCC: -/22
End of Project: 09/23
Specifications
Height: 35 metres
Length: 229 metres
Volume of RCC: 48 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Secretaria de Meio Ambiente e dos Recursos Hídricos do Estado do Rio Grande do Norte
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Piranhas
Reservoir capacity: 556 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/24
End of Project: 03/25
Specifications
Height: 35 metres
Length: 989 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates