SEARCHING
... please wait

Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
BalambanoIndonesiaP.T. Vale IndonesiaHLarona3303/9504/9806/9909/999435252854V(2)0.80(1)*0.80(12)4204208154(F)
Batang ToruIndonesiaPT. North Sumatra Hydro EnergyHBatang Toru1810/2107/2303/25- /2679137 500      3002000   
Cibeet
[H-F]
IndonesiaPUPR (Public Works and Public Housing Ministry)F H I WCibeet8309/23- /25- /27- /2847960371 0.90 0.90 0.90 2507501060(-)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Indonesia

Owner: P.T. Vale Indonesia

Type: Gravity

Purpose(s): Hydropower

River: Larona

Reservoir capacity: 33 m3x106

Construction Dates

Start of Project: 03/95

Start of RCC: 03/95

End of RCC: 06/99

End of Project: 09/99

Specifications

Height: 94 metres

Length: 352 metres

Volume of RCC: 528 m3x103

Total volume: 54 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork with external geomembrane
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
420420

Cementitious material

Cement (kg/m3)
81
Pozzolan (kg/m3)Pozzolan Type
54Low-lime flyash (ASTM Class F)
  
Balambano completed
Balambano completed

Full Dam Information

Details

Country: Indonesia

Owner: PT. North Sumatra Hydro Energy

Type: Gravity

Purpose(s): Hydropower

River: Batang Toru

Reservoir capacity: 18 m3x106

Construction Dates

Start of Project: 10/21

Start of RCC: 10/21

End of RCC: 03/25

End of Project: -/26

Specifications

Height: 79 metres

Length: 137 metres

Volume of RCC: -

Total volume: 500 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
3002000

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Batang Toru under construction
Batang Toru under construction

Full Dam Information

Details

Country: Indonesia

Owner: PUPR (Public Works and Public Housing Ministry)

Type: Hardfill

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Cibeet

Reservoir capacity: 83 m3x106

Construction Dates

Start of Project: 09/23

Start of RCC: 09/23

End of RCC: -/27

End of Project: -/28

Specifications

Height: 47 metres

Length: 960 metres

Volume of RCC: 371 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.90 
Downstream
SlopeType
0.90 
Spillway
SlopeType
0.90 

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
106
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates