| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Urugua-i | Argentina | Electriciad Misiones S.A. | H | Urugua-i | 1175 | 10/85 | 04/88 | 04/89 | - /89 | 77 | 687 | 590 | 626 | V | (6) | 0.80 | (17) | 0.80 | (1) | 400 | 400 | 60 | 0 | (-) |
| Qilinguan [A] | China | Nanhe Hydropower Development Ltd. | H | Nanhe | 14 | - /05 | - /06 | - /07 | - /08 | 77 | 140 | 45 | 55 | |||||||||||
| Uludere | Turkey | DSI - State Hydraulic Works | H | Ortasu | 17 | - /08 | - /12 | - /16 | - /18 | 77 | 431 | 800 | 887 | 0.10 | (1) | 0.80 | (1)* | 300 | 300 | 95 | 45 | (N) | ||
| Bouzina | Algeria | ANBT (Agence Nationale des Barrages et Transferts) | I W | 18 | - /14 | 02/18 | 07/19 | 01/23 | 77 | 177 | 250 | 330 | V | (1) | 0.89 | (1)* | 0.89 | (12) | 300 | 300 | 110 77 | 0 33 | (F) | |
| Yanagawa | Japan | Iwate Prefecture | F H W | Yana | 19 | 12/14 | - /17 | - /20 | 03/21 | 77 | 243 | 213 | ||||||||||||
| Fask | Morocco | Direction des Aménagements Hydrauliques | F I W | Assayad | 79 | 07/17 | 01/19 | 12/22 | 07/23 | 77 | 830 | 1400 | 0.10 | (1) | 0.80 | (1) | 0.80 | (1) | 300 | 300 | (N) | |||
| Fuzikou | China | Guilin Dayu Water Infrastructure Development Investment Co. Ltd. | F H | Lijiang | 188 | 11/11 | - /13 | - /22 | - /23 | 77 | 239 | 304 | ||||||||||||
| Gujun | China | Dazhou Major water works construction and management center | F H | Zhonhe | 128 | 12/20 | - /22 | - /25 | - /26 | 77 | ||||||||||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Argentina
Owner: Electriciad Misiones S.A.
Type: Gravity
Purpose(s): Hydropower
River: Urugua-i
Reservoir capacity: 1175 m3x106
Construction Dates
Start of Project: 10/85
Start of RCC: 10/85
End of RCC: 04/89
End of Project: -/89
Specifications
Height: 77 metres
Length: 687 metres
Volume of RCC: 590 m3x103
Total volume: 626 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: China
Owner: Nanhe Hydropower Development Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Nanhe
Reservoir capacity: 14 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 77 metres
Length: 140 metres
Volume of RCC: 45 m3x103
Total volume: 55 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower
River: Ortasu
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/16
End of Project: -/18
Specifications
Height: 77 metres
Length: 431 metres
Volume of RCC: 800 m3x103
Total volume: 887 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 95 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 45 | Natural pozzolan (ASTM Class N) |

Details
Country: Algeria
Owner: ANBT (Agence Nationale des Barrages et Transferts)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: -
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: 07/19
End of Project: 01/23
Specifications
Height: 77 metres
Length: 177 metres
Volume of RCC: 250 m3x103
Total volume: 330 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.89 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.89 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 110 |
| 77 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | Low-lime flyash (ASTM Class F) |
| 33 |

Details
Country: Japan
Owner: Iwate Prefecture
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Yana
Reservoir capacity: 19 m3x106
Construction Dates
Start of Project: 12/14
Start of RCC: 12/14
End of RCC: -/20
End of Project: 03/21
Specifications
Height: 77 metres
Length: 243 metres
Volume of RCC: -
Total volume: 213 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Assayad
Reservoir capacity: 79 m3x106
Construction Dates
Start of Project: 07/17
Start of RCC: 07/17
End of RCC: 12/22
End of Project: 07/23
Specifications
Height: 77 metres
Length: 830 metres
Volume of RCC: 1400 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Natural pozzolan (ASTM Class N) | |

Details
Country: China
Owner: Guilin Dayu Water Infrastructure Development Investment Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Lijiang
Reservoir capacity: 188 m3x106
Construction Dates
Start of Project: 11/11
Start of RCC: 11/11
End of RCC: -/22
End of Project: -/23
Specifications
Height: 77 metres
Length: 239 metres
Volume of RCC: -
Total volume: 304 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Dazhou Major water works construction and management center
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Zhonhe
Reservoir capacity: 128 m3x106
Construction Dates
Start of Project: 12/20
Start of RCC: 12/20
End of RCC: -/25
End of Project: -/26
Specifications
Height: 77 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Search again