SEARCHING
... please wait

Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
NunomeJapanWater Resources Development Public CorporationF WNunome1705/8601/8810/8812/8972322110330V
0.40
(1)
(1)
0.76(1)0.76(1)2507507842(F)
OhnagamiJapanSimane PrefectureF I WSutu1903/9304/9804/0003/0372334284362V
0.25
(1)
(1)
0.79(1)0.79(1)2507508436(F)
TongkouChinaBeichuan Bashu Tongkou River Development CorporationHTongkouhe3610/98- /02- /04- /0472198300352V(1)1.10(1)ogee(1)300300  (F)
ShuheChinaHHanjiang176- /06- /07- /08- /0972              
Santa ClaraBrazilCentrais Elétricas do Rio Jordão S/AHMucuri151- /07- /08- /09- /1072242520600      300300 0 
Saizhu
[A]
ChinaNiulanjiang Hydropower Development Company Ltd.HXima304/06- /09- /10- /1172160107115curve(3')curve(3') (3)     
GüllübagTurkeySenerji EnerjiHÇoruh1105/0902/1106/1102/127297160175V(3)0.50
0.70
(3)0.70(12)3003007070(F)
Dong Nai 5VietnamHDong Nai - /10- /12- /14- /1572              
BoqaataLebanonMinistry of Energy and WaterW 607/1204/1512/16- /1772222200255V
0.80
(12)0.80(3')*0.80(3')*300300900(-) -
BobokéNicaraguaHTuma - /15- /17- /19- /2072   0.70
1.00
(5)
(5)
0.70
1.00
(1)*
(1)*
0.70(1)*     

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Japan

Owner: Water Resources Development Public Corporation

Type: Gravity

Purpose(s): Flood Control / Water Supply

River: Nunome

Reservoir capacity: 17 m3x106

Construction Dates

Start of Project: 05/86

Start of RCC: 05/86

End of RCC: 10/88

End of Project: 12/89

Specifications

Height: 72 metres

Length: 322 metres

Volume of RCC: 110 m3x103

Total volume: 330 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.40Traditional concrete against formwork
Downstream
SlopeType
0.76Traditional concrete against formwork
Spillway
SlopeType
0.76Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
78
Pozzolan (kg/m3)Pozzolan Type
42Low-lime flyash (ASTM Class F)
  
Nunome completed
Nunome completed

Full Dam Information

Details

Country: Japan

Owner: Simane Prefecture

Type: Gravity

Purpose(s): Flood Control / Irrigation / Water Supply

River: Sutu

Reservoir capacity: 19 m3x106

Construction Dates

Start of Project: 03/93

Start of RCC: 03/93

End of RCC: 04/00

End of Project: 03/03

Specifications

Height: 72 metres

Length: 334 metres

Volume of RCC: 284 m3x103

Total volume: 362 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.25Traditional concrete against formwork
Downstream
SlopeType
0.79Traditional concrete against formwork
Spillway
SlopeType
0.79Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
84
Pozzolan (kg/m3)Pozzolan Type
36Low-lime flyash (ASTM Class F)
  
Ohnagami completed
Ohnagami completed

Full Dam Information

Details

Country: China

Owner: Beichuan Bashu Tongkou River Development Corporation

Type: Gravity

Purpose(s): Hydropower

River: Tongkouhe

Reservoir capacity: 36 m3x106

Construction Dates

Start of Project: 10/98

Start of RCC: 10/98

End of RCC: -/04

End of Project: -/04

Specifications

Height: 72 metres

Length: 198 metres

Volume of RCC: 300 m3x103

Total volume: 352 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
1.10Traditional concrete against formwork
Spillway
SlopeType
ogeeTraditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Tongkou completed
Tongkou completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Hanjiang

Reservoir capacity: 176 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/08

End of Project: -/09

Specifications

Height: 72 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Shuhe completed
Shuhe completed

Full Dam Information

Details

Country: Brazil

Owner: Centrais Elétricas do Rio Jordão S/A

Type: Gravity

Purpose(s): Hydropower

River: Mucuri

Reservoir capacity: 151 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/09

End of Project: -/10

Specifications

Height: 72 metres

Length: 242 metres

Volume of RCC: 520 m3x103

Total volume: 600 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
0 
  
Santa Clara completed
Santa Clara completed

Full Dam Information

Details

Country: China

Owner: Niulanjiang Hydropower Development Company Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Xima

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: 04/06

Start of RCC: 04/06

End of RCC: -/10

End of Project: -/11

Specifications

Height: 72 metres

Length: 160 metres

Volume of RCC: 107 m3x103

Total volume: 115 m3x103

Construction Methods

Facings

Upstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
 RCC against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Saizhu completed
Saizhu completed

Full Dam Information

Details

Country: Turkey

Owner: Senerji Enerji

Type: Gravity

Purpose(s): Hydropower

River: Çoruh

Reservoir capacity: 11 m3x106

Construction Dates

Start of Project: 05/09

Start of RCC: 05/09

End of RCC: 06/11

End of Project: 02/12

Specifications

Height: 72 metres

Length: 97 metres

Volume of RCC: 160 m3x103

Total volume: 175 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork
Downstream
SlopeType
0.50RCC against formwork
0.70 
Spillway
SlopeType
0.70Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
70Low-lime flyash (ASTM Class F)
  
Güllübag completed
Güllübag completed

Full Dam Information

Details

Country: Vietnam

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Dong Nai

Reservoir capacity: -

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/14

End of Project: -/15

Specifications

Height: 72 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Dong Nai 5 on Google Earth
Dong Nai 5 on Google Earth

Full Dam Information

Details

Country: Lebanon

Owner: Ministry of Energy and Water

Type: Gravity

Purpose(s): Water Supply

River: -

Reservoir capacity: 6 m3x106

Construction Dates

Start of Project: 07/12

Start of RCC: 07/12

End of RCC: 12/16

End of Project: -/17

Specifications

Height: 72 metres

Length: 222 metres

Volume of RCC: 200 m3x103

Total volume: 255 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalReinforced conventional concrete cast after RCC placement
0.80 
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Boqaata completed
Boqaata completed

Full Dam Information

Details

Country: Nicaragua

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Tuma

Reservoir capacity: -

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/19

End of Project: -/20

Specifications

Height: 72 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.70Traditional concrete against precast concrete panels
1.00Traditional concrete against precast concrete panels
Downstream
SlopeType
0.70Traditional concrete against formwork  [stepped face]
1.00Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.70Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates