Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
HervásSpainJunta de ExtremaduraWHervás101/8903/9009/9010/903321024430.15(1)0.70(1)*
(5)*
0.70(1)30030080155(F)
Pau FerroBrazilCOMPESA (Companhia Pernambucana de Saneamento)W-12- /00- /02- /04- /0533210             
PinalitoDominican RepublicCorporacion de Empresas de Energia Electrica (CDEEE), Unidad Ejecutora Proyecto Pinalito (UEPP)HTireo409/0411/0503/07- /085221073100V(1)0.80(1)*0.80(12)300300988(N)
São Sebastião do AltoBrazilGeracao Hidroeletrica Rio Grande S/AHGrande44- /08- /09- /10- /11412105175           
AslandagTurkeyDSI - State Hydraulic WorksH I WBembo1109/0811/1102/1411/14692101622020.10(1)0.80(1)*0.80(12)300120010080(N)
GerminalBrazilCompanhia de Gestão dos Recursos HídricosWGerminal2- /16- /18- /1908/2028210             

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Spain

Owner: Junta de Extremadura

Type: Gravity

Purpose(s): Water Supply

River: Hervás

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 01/89

Start of RCC: 01/89

End of RCC: 09/90

End of Project: 10/90

Specifications

Height: 33 metres

Length: 210 metres

Volume of RCC: 24 m3x103

Total volume: 43 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.15Traditional concrete against formwork
Downstream
SlopeType
0.70Traditional concrete against formwork  [stepped face]
 Traditional concrete against precast concrete panels  [stepped face]
Spillway
SlopeType
0.70Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
155Low-lime flyash (ASTM Class F)
  
Hervás completed
Hervás completed

Full Dam Information

Details

Country: Brazil

Owner: COMPESA (Companhia Pernambucana de Saneamento)

Type: Gravity

Purpose(s): Water Supply

River: -

Reservoir capacity: 12 m3x106

Construction Dates

Start of Project: -/00

Start of RCC: -/00

End of RCC: -/04

End of Project: -/05

Specifications

Height: 33 metres

Length: 210 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Pau Ferro completed
Pau Ferro completed

Full Dam Information

Details

Country: Dominican Republic

Owner: Corporacion de Empresas de Energia Electrica (CDEEE), Unidad Ejecutora Proyecto Pinalito (UEPP)

Type: Gravity

Purpose(s): Hydropower

River: Tireo

Reservoir capacity: 4 m3x106

Construction Dates

Start of Project: 09/04

Start of RCC: 09/04

End of RCC: 03/07

End of Project: -/08

Specifications

Height: 52 metres

Length: 210 metres

Volume of RCC: 73 m3x103

Total volume: 100 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
98
Pozzolan (kg/m3)Pozzolan Type
8Natural pozzolan (ASTM Class N)
  
Pinalito completed
Pinalito completed

Full Dam Information

Details

Country: Brazil

Owner: Geracao Hidroeletrica Rio Grande S/A

Type: Gravity

Purpose(s): Hydropower

River: Grande

Reservoir capacity: 44 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/10

End of Project: -/11

Specifications

Height: 41 metres

Length: 210 metres

Volume of RCC: 51 m3x103

Total volume: 75 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
São Sebastião do Alto completed
São Sebastião do Alto completed

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Bembo

Reservoir capacity: 11 m3x106

Construction Dates

Start of Project: 09/08

Start of RCC: 09/08

End of RCC: 02/14

End of Project: 11/14

Specifications

Height: 69 metres

Length: 210 metres

Volume of RCC: 162 m3x103

Total volume: 202 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3001200

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
80Natural pozzolan (ASTM Class N)
  
Aslandag completed
Aslandag completed

Full Dam Information

Details

Country: Brazil

Owner: Companhia de Gestão dos Recursos Hídricos

Type: Gravity

Purpose(s): Water Supply

River: Germinal

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/19

End of Project: 08/20

Specifications

Height: 28 metres

Length: 210 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates