Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Langshan
[A]
ChinaDinggeniu33- /74- /76- /78- /7941              
Liangsanping
[A]
ChinaSixian Water Resources BureauHLeishui4- /79- /80- /81- /82353333           
Maoeryan
[A]
ChinaShiqi33- /68- /88- /91- /9335              
Puding
[A]
ChinaGuizhou Qianyuan Power Co. Ltd.H I WSanchahe37703/8906/9205/9302/9475196103145V(1)0.35(1)ogee
0.35
(1)
(1)
30030085
54
103
99
(F)
Wenquanbao
[A]
ChinaReservoir Management OfficeF H I WTanghe710/9110/9206/94- /95481885563V(4)0.30(3)ogee(13)300300110
69
68
85
(F)
Maojiang
[A]
ChinaLanshan County Hydropower BureauH IXiangjiang7- /92- /93- /94- /9545150 45          (F)
Sishanping
[A]
ChinaHuangcen Reservoir Management OfficeF H ILeishui3- /92- /93- /94- /9556147 18          (F)
Fengxiangxia
[A]
ChinaFengdu Hydropower BureauHHuilonghe8- /93- /95- /97- /9890158 7700.10 0.76 0.76      
Wajin
[A]
ChinaFushan Power Station Management BureauH INanxi7- /94- /96- /98- /9947235 240           
Kengxiashan
[A]
ChinaWencheng County Kengxiashan Hydropower Development Co. Ltd.HYuquanxi1- /96- /97- /98- /983480             
Shankou Nº3
[A]
ChinaShixing County Power Development CorporationF HDu’anshui (Chengjiang)4809/9902/0001/0103/015717990119V(3')0.75(3')0.80(1)3303000105
63
86
80
(F)
Shimenzi
[A]
ChinaShimenzi Reservoir Engineering Management OfficeH I WTaxi5006/9806/9906/0110/011091761882110.142
V
(3')
(3')
V
0.18
(3)
(3)
crest(12)300300093
62
110
110
(F)
Shuangkengkou
[A]
ChinaHXiaoxihe12- /99- /00- /01- /0268              
Shapai
[A]
ChinaSichuan Minjiang Hydropower Co. Ltd.HCaopohe1806/9703/0005/0204/03130250380383V
0.10
(3')0.21(3)crest
0.21
(1)300300108
89
72
89
(F)
Nankengyuan
[A]
ChinaHXiaoxihe1- /98- /00- /02- /0334114             
Junxi II
[A]
ChinaCounty Bureau of HydropowerHJunxi6- /00- /01- /02- /0369192             
Linhekou
[A]
ChinaShaanxi Lan River Hydropower Development CorporationH ILinhe14701/0012/0106/0312/0397311229293curve(3')curve(3')ogee(1)300300074
66
111
111
(F)
Maobaguan
[A]
ChinaShanxi Hanjiang Hydropower Development Co. Ltd.HRenhe2- /00- /02- /03- /046612081106           
Shanggou
[A]
ChinaXifeng County Water Conservancy BureauWYangshui1- /01- /02- /03- /0439176             
Liubo
[A]
ChinaAnhui Hydropower Development Co. Ltd.,F HXipihe51- /02- /03- /03- /0470258130168          (F)
Xuanmiaoguan
[A]
China  - /00- /02- /04- /0566191 66           
Lijiahe
[A]
China  - /02- /03- /04- /0599352 370           
Yujianhe
[A]
ChinaGuiyang Water Conservancy BureauI WWujiang11- /02- /03- /04- /05831671051550.10 0.76 0.76      
Shaba
[A]
ChinaGuizhou Zhongsui Energy Ltd.HHongduhe99- /03- /04- /04- /05881486790           
Zhaolaihe
[A]
ChinaChangyang Electric Power BureauHSidu6912/0103/0305/0510/05105206166254curve(3')curve(3') (3')300300084
126
126
103
(F)
Xiaqiao
[A]
ChinaGuangxi Water Conservancy and Electric Power CorporationHLong49- /02- /03- /05- /0668213172226           
Tangkeng
[A]
ChinaHGuxi10- /03- /04- /05- /0566    (12) (12) (12)     
Dahuashui
[A]
ChinaWujaing Hydropower Debelopment Co. Ltd.HQingshui27701/0404/0511/06- /07135198550650curve(3')curve(3') (1)300300081
94
81
94
(F)
Niuqiao
[A]
ChinaNiu Qiao Reservoir Development Co. Ltd.HQingtonghe26- /03- /0512/06- /0762201 710           
Qilitang
[A]
ChinaLiuchi71- /03- /04- /06- /0781              
Wuchuanshaba
[A]
ChinaHWujlang9940- /04- /05- /06- /0787              
Longqiao
[A]
ChinaLichuan City Yujaing Valley Hudropower Ltd. Hubei ProvinceH RYujiang2612/0503/0602/0705/0791156135160curve(3')curve(3) (3)     
Qilinguan
[A]
ChinaNanhe Hydropower Development Ltd.HNanhe14- /04- /06- /07- /08771404555           
Bailianya
[A]
ChinaAnhui Water Resources Development Co. Ltd.F H I WDongpi453- /05- /06- /0704/09105422485560V(1)0.335(1)0.335(1)300300072
56
108
84
(F)
Weihou
[A]
ChinaXilin River Hydropower Development Co. Ltd.HTuoniangiang13303/05- /0604/08- /0982              
Huanghuazhai
[A]
ChinaChina Datang CorporationHGetu17507/06- /07- /08- /08110275280         5296(F)
Qingxi
[A]
ChinaGuizhou Qianyuan Power Co. Ltd.Furong98- /06- /07- /08- /0981              
Naen
[A]
ChinaHBaidu22- /06- /08- /08- /0975              
Yunlonghe Nº3
[A]
ChinaEngshi Yuefeng Yunlong River Hydropower Development Co. Ltd.HYunlong4403/0604/0704/09- /09135119182207curve(3')curve(3') (3')     
Yunkou
[A]
ChinaYujiang Hydropower Co. Ltd.HWuni3506/0704/0806/09- /12119152 205           
Tianhuaban
[A]
ChinaNiulanjiang Hydropower Development Co. Ltd.HNiulan6612/06- /07- /09- /10113160182360curve(3')curve(3')ogee(3)     
Yangjiayuan
[A]
ChinaH WTongxinhe78- /07- /08- /09- /1068              
Tiechuanqiao
[A]
ChinaYupaojiang25- /07- /08- /10- /1195              
Saizhu
[A]
ChinaNiulanjiang Hydropower Development Company Ltd.HXima304/06- /09- /10- /1172160107115curve(3')curve(3') (3)     
Luoboba
[A]
ChinaEnshi Tianfa Electric Ltd.F H RLengshui87- /07- /09- /10- /111111922121          (F)
Sanliping
[A]
ChinaHubei Energy Group Co. Ltd.F HNanhe499- /0705/08- /11- /12133185 400 (1) (1) (1)     
Sanglang
[A]
ChinaSanglang15- /08- /09- /11- /1290              
Qinglong
[A]
ChinaEnshi Mawei Valley Hydropower Development Co. Ltd.HMaweigou2812/08- /09- /11- /12140              
Maduhe
[A]
ChinaHQingjing2463- /07- /09- /11- /1399              
Shankouyan
[A]
ChinaShankouyan Hydro Project Development Co.HYuanhe10511/07- /09- /12- /1399              
Dayuhyan
[A]
ChinaMasha61- /09- /10- /12- /1381              
Nankangheerji
[A]
ChinaHNankang31- /10- /11- /12- /1268              
Linxihe
[A]
ChinaHubei Huaqing Power Co. Ltd.HLoushui52- /08- /10- /13- /1474146             
Luntan
[A]
ChinaLuntan Hydraulic Engineering Co. Ltd.HYangcunshui18012/08- /10- /13- /1490377             
Lizhou
[A]
ChinaChina Huadian CorporationHMuli190- /09- /11- /13- /14138              
Shannipo
[A]
ChinaGuizhou Qianyuan Power Co. Ltd.HBeipan85- /09- /11- /14- /15119205199267curve(3')curve(3)ogee(3)     
Wanjiakouzi
[A]
ChinaChina Datang CorporationHGexiang279- /12- /14- /16- /17168413             
Nam Ngum 5
[A]
LaosH  - /12- /14- /17- /1899              

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): unknown

River: Dinggeniu

Reservoir capacity: 33 m3x106

Construction Dates

Start of Project: -/74

Start of RCC: -/74

End of RCC: -/78

End of Project: -/79

Specifications

Height: 41 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Sixian Water Resources Bureau

Type: Thin Arch

Purpose(s): Hydropower

River: Leishui

Reservoir capacity: 4 m3x106

Construction Dates

Start of Project: -/79

Start of RCC: -/79

End of RCC: -/81

End of Project: -/82

Specifications

Height: 35 metres

Length: 33 metres

Volume of RCC: 3 m3x103

Total volume: 3 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Liangsanping on Google Earth
Liangsanping on Google Earth

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): unknown

River: Shiqi

Reservoir capacity: 33 m3x106

Construction Dates

Start of Project: -/68

Start of RCC: -/68

End of RCC: -/91

End of Project: -/93

Specifications

Height: 35 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Guizhou Qianyuan Power Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower / Irrigation / Water Supply

River: Sanchahe

Reservoir capacity: 377 m3x106

Construction Dates

Start of Project: 03/89

Start of RCC: 03/89

End of RCC: 05/93

End of Project: 02/94

Specifications

Height: 75 metres

Length: 196 metres

Volume of RCC: 103 m3x103

Total volume: 145 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.35Traditional concrete against formwork
Spillway
SlopeType
ogeeTraditional concrete against formwork
0.35Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
54
Pozzolan (kg/m3)Pozzolan Type
103Low-lime flyash (ASTM Class F)
99 
Puding completed
Puding completed

Full Dam Information

Details

Country: China

Owner: Reservoir Management Office

Type: Thin Arch

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Tanghe

Reservoir capacity: 7 m3x106

Construction Dates

Start of Project: 10/91

Start of RCC: 10/91

End of RCC: 06/94

End of Project: -/95

Specifications

Height: 48 metres

Length: 188 metres

Volume of RCC: 55 m3x103

Total volume: 63 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork with external geomembrane
Downstream
SlopeType
0.30RCC against formwork
Spillway
SlopeType
ogeeReinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
110
69
Pozzolan (kg/m3)Pozzolan Type
68Low-lime flyash (ASTM Class F)
85 
Wenquanbao completed
Wenquanbao completed

Full Dam Information

Details

Country: China

Owner: Lanshan County Hydropower Bureau

Type: Thin Arch

Purpose(s): Hydropower / Irrigation

River: Xiangjiang

Reservoir capacity: 7 m3x106

Construction Dates

Start of Project: -/92

Start of RCC: -/92

End of RCC: -/94

End of Project: -/95

Specifications

Height: 45 metres

Length: 150 metres

Volume of RCC: -

Total volume: 45 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Huangcen Reservoir Management Office

Type: Thin Arch

Purpose(s): Flood Control / Hydropower / Irrigation

River: Leishui

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: -/92

Start of RCC: -/92

End of RCC: -/94

End of Project: -/95

Specifications

Height: 56 metres

Length: 147 metres

Volume of RCC: -

Total volume: 18 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Fengdu Hydropower Bureau

Type: Thin Arch

Purpose(s): Hydropower

River: Huilonghe

Reservoir capacity: 8 m3x106

Construction Dates

Start of Project: -/93

Start of RCC: -/93

End of RCC: -/97

End of Project: -/98

Specifications

Height: 90 metres

Length: 158 metres

Volume of RCC: -

Total volume: 770 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10 
Downstream
SlopeType
0.76 
Spillway
SlopeType
0.76 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Fushan Power Station Management Bureau

Type: Thin Arch

Purpose(s): Hydropower / Irrigation

River: Nanxi

Reservoir capacity: 7 m3x106

Construction Dates

Start of Project: -/94

Start of RCC: -/94

End of RCC: -/98

End of Project: -/99

Specifications

Height: 47 metres

Length: 235 metres

Volume of RCC: -

Total volume: 240 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Wencheng County Kengxiashan Hydropower Development Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Yuquanxi

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/96

Start of RCC: -/96

End of RCC: -/98

End of Project: -/98

Specifications

Height: 34 metres

Length: 80 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Shixing County Power Development Corporation

Type: Thin Arch

Purpose(s): Flood Control / Hydropower

River: Du’anshui (Chengjiang)

Reservoir capacity: 48 m3x106

Construction Dates

Start of Project: 09/99

Start of RCC: 09/99

End of RCC: 01/01

End of Project: 03/01

Specifications

Height: 57 metres

Length: 179 metres

Volume of RCC: 90 m3x103

Total volume: 119 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3303000

Cementitious material

Cement (kg/m3)
105
63
Pozzolan (kg/m3)Pozzolan Type
86Low-lime flyash (ASTM Class F)
80 
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Shimenzi Reservoir Engineering Management Office

Type: Thin Arch

Purpose(s): Hydropower / Irrigation / Water Supply

River: Taxi

Reservoir capacity: 50 m3x106

Construction Dates

Start of Project: 06/98

Start of RCC: 06/98

End of RCC: 06/01

End of Project: 10/01

Specifications

Height: 109 metres

Length: 176 metres

Volume of RCC: 188 m3x103

Total volume: 211 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.142RCC against formwork (GEVR/GE-RCC)
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
VerticalRCC against formwork
0.18RCC against formwork
Spillway
SlopeType
crestReinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
93
62
Pozzolan (kg/m3)Pozzolan Type
110Low-lime flyash (ASTM Class F)
110 
Shimenzi completed
Shimenzi completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower

River: Xiaoxihe

Reservoir capacity: 12 m3x106

Construction Dates

Start of Project: -/99

Start of RCC: -/99

End of RCC: -/01

End of Project: -/02

Specifications

Height: 68 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Sichuan Minjiang Hydropower Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Caopohe

Reservoir capacity: 18 m3x106

Construction Dates

Start of Project: 06/97

Start of RCC: 06/97

End of RCC: 05/02

End of Project: 04/03

Specifications

Height: 130 metres

Length: 250 metres

Volume of RCC: 380 m3x103

Total volume: 383 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
0.10 
Downstream
SlopeType
0.21RCC against formwork
Spillway
SlopeType
crestTraditional concrete against formwork
0.21 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
108
89
Pozzolan (kg/m3)Pozzolan Type
72Low-lime flyash (ASTM Class F)
89 
Shapai completed
Shapai completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower

River: Xiaoxihe

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/98

Start of RCC: -/98

End of RCC: -/02

End of Project: -/03

Specifications

Height: 34 metres

Length: 114 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: County Bureau of Hydropower

Type: Thin Arch

Purpose(s): Hydropower

River: Junxi

Reservoir capacity: 6 m3x106

Construction Dates

Start of Project: -/00

Start of RCC: -/00

End of RCC: -/02

End of Project: -/03

Specifications

Height: 69 metres

Length: 192 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Shaanxi Lan River Hydropower Development Corporation

Type: Thin Arch

Purpose(s): Hydropower / Irrigation

River: Linhe

Reservoir capacity: 147 m3x106

Construction Dates

Start of Project: 01/00

Start of RCC: 01/00

End of RCC: 06/03

End of Project: 12/03

Specifications

Height: 97 metres

Length: 311 metres

Volume of RCC: 229 m3x103

Total volume: 293 m3x103

Construction Methods

Facings

Upstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
ogeeTraditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
74
66
Pozzolan (kg/m3)Pozzolan Type
111Low-lime flyash (ASTM Class F)
111 
Linhekou completed
Linhekou completed

Full Dam Information

Details

Country: China

Owner: Shanxi Hanjiang Hydropower Development Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Renhe

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/00

Start of RCC: -/00

End of RCC: -/03

End of Project: -/04

Specifications

Height: 66 metres

Length: 120 metres

Volume of RCC: 81 m3x103

Total volume: 106 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Xifeng County Water Conservancy Bureau

Type: Thin Arch

Purpose(s): Water Supply

River: Yangshui

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/01

Start of RCC: -/01

End of RCC: -/03

End of Project: -/04

Specifications

Height: 39 metres

Length: 176 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Anhui Hydropower Development Co. Ltd.,

Type: Thin Arch

Purpose(s): Flood Control / Hydropower

River: Xipihe

Reservoir capacity: 51 m3x106

Construction Dates

Start of Project: -/02

Start of RCC: -/02

End of RCC: -/03

End of Project: -/04

Specifications

Height: 70 metres

Length: 258 metres

Volume of RCC: 130 m3x103

Total volume: 168 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): unknown

River: -

Reservoir capacity: -

Construction Dates

Start of Project: -/00

Start of RCC: -/00

End of RCC: -/04

End of Project: -/05

Specifications

Height: 66 metres

Length: 191 metres

Volume of RCC: -

Total volume: 66 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): unknown

River: -

Reservoir capacity: -

Construction Dates

Start of Project: -/02

Start of RCC: -/02

End of RCC: -/04

End of Project: -/05

Specifications

Height: 99 metres

Length: 352 metres

Volume of RCC: -

Total volume: 370 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Guiyang Water Conservancy Bureau

Type: Thin Arch

Purpose(s): Irrigation / Water Supply

River: Wujiang

Reservoir capacity: 11 m3x106

Construction Dates

Start of Project: -/02

Start of RCC: -/02

End of RCC: -/04

End of Project: -/05

Specifications

Height: 83 metres

Length: 167 metres

Volume of RCC: 105 m3x103

Total volume: 155 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10 
Downstream
SlopeType
0.76 
Spillway
SlopeType
0.76 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Guizhou Zhongsui Energy Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Hongduhe

Reservoir capacity: 99 m3x106

Construction Dates

Start of Project: -/03

Start of RCC: -/03

End of RCC: -/04

End of Project: -/05

Specifications

Height: 88 metres

Length: 148 metres

Volume of RCC: 67 m3x103

Total volume: 90 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Shaba completed
Shaba completed

Full Dam Information

Details

Country: China

Owner: Changyang Electric Power Bureau

Type: Thin Arch

Purpose(s): Hydropower

River: Sidu

Reservoir capacity: 69 m3x106

Construction Dates

Start of Project: 12/01

Start of RCC: 12/01

End of RCC: 05/05

End of Project: 10/05

Specifications

Height: 105 metres

Length: 206 metres

Volume of RCC: 166 m3x103

Total volume: 254 m3x103

Construction Methods

Facings

Upstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
 RCC against formwork (GEVR/GE-RCC)

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
84
126
Pozzolan (kg/m3)Pozzolan Type
126Low-lime flyash (ASTM Class F)
103 
Zhaolaihe completed
Zhaolaihe completed

Full Dam Information

Details

Country: China

Owner: Guangxi Water Conservancy and Electric Power Corporation

Type: Thin Arch

Purpose(s): Hydropower

River: Long

Reservoir capacity: 49 m3x106

Construction Dates

Start of Project: -/02

Start of RCC: -/02

End of RCC: -/05

End of Project: -/06

Specifications

Height: 68 metres

Length: 213 metres

Volume of RCC: 172 m3x103

Total volume: 226 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Xiaqiao completed
Xiaqiao completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower

River: Guxi

Reservoir capacity: 10 m3x106

Construction Dates

Start of Project: -/03

Start of RCC: -/03

End of RCC: -/05

End of Project: -/05

Specifications

Height: 66 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
 Reinforced conventional concrete cast after RCC placement
Downstream
SlopeType
 Reinforced conventional concrete cast after RCC placement
Spillway
SlopeType
 Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Wujaing Hydropower Debelopment Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Qingshui

Reservoir capacity: 277 m3x106

Construction Dates

Start of Project: 01/04

Start of RCC: 01/04

End of RCC: 11/06

End of Project: -/07

Specifications

Height: 135 metres

Length: 198 metres

Volume of RCC: 550 m3x103

Total volume: 650 m3x103

Construction Methods

Facings

Upstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
 Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
81
94
Pozzolan (kg/m3)Pozzolan Type
81Low-lime flyash (ASTM Class F)
94 
Dahuashui completed
Dahuashui completed

Full Dam Information

Details

Country: China

Owner: Niu Qiao Reservoir Development Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Qingtonghe

Reservoir capacity: 26 m3x106

Construction Dates

Start of Project: -/03

Start of RCC: -/03

End of RCC: 12/06

End of Project: -/07

Specifications

Height: 62 metres

Length: 201 metres

Volume of RCC: -

Total volume: 710 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): unknown

River: Liuchi

Reservoir capacity: 71 m3x106

Construction Dates

Start of Project: -/03

Start of RCC: -/03

End of RCC: -/06

End of Project: -/07

Specifications

Height: 81 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower

River: Wujlang

Reservoir capacity: 9940 m3x106

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/06

End of Project: -/07

Specifications

Height: 87 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Lichuan City Yujaing Valley Hudropower Ltd. Hubei Province

Type: Thin Arch

Purpose(s): Hydropower / Recreation

River: Yujiang

Reservoir capacity: 26 m3x106

Construction Dates

Start of Project: 12/05

Start of RCC: 12/05

End of RCC: 02/07

End of Project: 05/07

Specifications

Height: 91 metres

Length: 156 metres

Volume of RCC: 135 m3x103

Total volume: 160 m3x103

Construction Methods

Facings

Upstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
curveRCC against formwork
Spillway
SlopeType
 RCC against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Nanhe Hydropower Development Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Nanhe

Reservoir capacity: 14 m3x106

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/07

End of Project: -/08

Specifications

Height: 77 metres

Length: 140 metres

Volume of RCC: 45 m3x103

Total volume: 55 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Anhui Water Resources Development Co. Ltd.

Type: Thin Arch

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Dongpi

Reservoir capacity: 453 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/07

End of Project: 04/09

Specifications

Height: 105 metres

Length: 422 metres

Volume of RCC: 485 m3x103

Total volume: 560 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.335Traditional concrete against formwork
Spillway
SlopeType
0.335Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
72
56
Pozzolan (kg/m3)Pozzolan Type
108Low-lime flyash (ASTM Class F)
84 
Bailianya completed
Bailianya completed

Full Dam Information

Details

Country: China

Owner: Xilin River Hydropower Development Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Tuoniangiang

Reservoir capacity: 133 m3x106

Construction Dates

Start of Project: 03/05

Start of RCC: 03/05

End of RCC: 04/08

End of Project: -/09

Specifications

Height: 82 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: China Datang Corporation

Type: Thin Arch

Purpose(s): Hydropower

River: Getu

Reservoir capacity: 175 m3x106

Construction Dates

Start of Project: 07/06

Start of RCC: 07/06

End of RCC: -/08

End of Project: -/08

Specifications

Height: 110 metres

Length: 275 metres

Volume of RCC: 280 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
52
Pozzolan (kg/m3)Pozzolan Type
96Low-lime flyash (ASTM Class F)
  
Huanghuazhai completed
Huanghuazhai completed

Full Dam Information

Details

Country: China

Owner: Guizhou Qianyuan Power Co. Ltd.

Type: Thin Arch

Purpose(s): unknown

River: Furong

Reservoir capacity: 98 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/08

End of Project: -/09

Specifications

Height: 81 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Qingxi completed
Qingxi completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower

River: Baidu

Reservoir capacity: 22 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/08

End of Project: -/09

Specifications

Height: 75 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Engshi Yuefeng Yunlong River Hydropower Development Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Yunlong

Reservoir capacity: 44 m3x106

Construction Dates

Start of Project: 03/06

Start of RCC: 03/06

End of RCC: 04/09

End of Project: -/09

Specifications

Height: 135 metres

Length: 119 metres

Volume of RCC: 182 m3x103

Total volume: 207 m3x103

Construction Methods

Facings

Upstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
 RCC against formwork (GEVR/GE-RCC)

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Yunlonghe Nº3 completed
Yunlonghe Nº3 completed

Full Dam Information

Details

Country: China

Owner: Yujiang Hydropower Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Wuni

Reservoir capacity: 35 m3x106

Construction Dates

Start of Project: 06/07

Start of RCC: 06/07

End of RCC: 06/09

End of Project: -/12

Specifications

Height: 119 metres

Length: 152 metres

Volume of RCC: -

Total volume: 205 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Yunkou completed
Yunkou completed

Full Dam Information

Details

Country: China

Owner: Niulanjiang Hydropower Development Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Niulan

Reservoir capacity: 66 m3x106

Construction Dates

Start of Project: 12/06

Start of RCC: 12/06

End of RCC: -/09

End of Project: -/10

Specifications

Height: 113 metres

Length: 160 metres

Volume of RCC: 182 m3x103

Total volume: 360 m3x103

Construction Methods

Facings

Upstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
ogeeRCC against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Tianhuaban completed
Tianhuaban completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower / Water Supply

River: Tongxinhe

Reservoir capacity: 78 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/09

End of Project: -/10

Specifications

Height: 68 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Yangjiayuan completed
Yangjiayuan completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): unknown

River: Yupaojiang

Reservoir capacity: 25 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/10

End of Project: -/11

Specifications

Height: 95 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Tiechuanqiao under construction
Tiechuanqiao under construction

Full Dam Information

Details

Country: China

Owner: Niulanjiang Hydropower Development Company Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Xima

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: 04/06

Start of RCC: 04/06

End of RCC: -/10

End of Project: -/11

Specifications

Height: 72 metres

Length: 160 metres

Volume of RCC: 107 m3x103

Total volume: 115 m3x103

Construction Methods

Facings

Upstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
 RCC against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Saizhu completed
Saizhu completed

Full Dam Information

Details

Country: China

Owner: Enshi Tianfa Electric Ltd.

Type: Thin Arch

Purpose(s): Flood Control / Hydropower / Recreation

River: Lengshui

Reservoir capacity: 87 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/10

End of Project: -/11

Specifications

Height: 111 metres

Length: 192 metres

Volume of RCC: 21 m3x103

Total volume: 21 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Luoboba completed
Luoboba completed

Full Dam Information

Details

Country: China

Owner: Hubei Energy Group Co. Ltd.

Type: Thin Arch

Purpose(s): Flood Control / Hydropower

River: Nanhe

Reservoir capacity: 499 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/11

End of Project: -/12

Specifications

Height: 133 metres

Length: 185 metres

Volume of RCC: -

Total volume: 400 m3x103

Construction Methods

Facings

Upstream
SlopeType
 Traditional concrete against formwork
Downstream
SlopeType
 Traditional concrete against formwork
Spillway
SlopeType
 Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Sanliping completed
Sanliping completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): unknown

River: Sanglang

Reservoir capacity: 15 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/11

End of Project: -/12

Specifications

Height: 90 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Enshi Mawei Valley Hydropower Development Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Maweigou

Reservoir capacity: 28 m3x106

Construction Dates

Start of Project: 12/08

Start of RCC: 12/08

End of RCC: -/11

End of Project: -/12

Specifications

Height: 140 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Qinglong completed
Qinglong completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower

River: Qingjing

Reservoir capacity: 2463 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/11

End of Project: -/13

Specifications

Height: 99 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Maduhe completed
Maduhe completed

Full Dam Information

Details

Country: China

Owner: Shankouyan Hydro Project Development Co.

Type: Thin Arch

Purpose(s): Hydropower

River: Yuanhe

Reservoir capacity: 105 m3x106

Construction Dates

Start of Project: 11/07

Start of RCC: 11/07

End of RCC: -/12

End of Project: -/13

Specifications

Height: 99 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Shankouyan completed
Shankouyan completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): unknown

River: Masha

Reservoir capacity: 61 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/12

End of Project: -/13

Specifications

Height: 81 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower

River: Nankang

Reservoir capacity: 31 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/12

End of Project: -/12

Specifications

Height: 68 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Hubei Huaqing Power Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Loushui

Reservoir capacity: 52 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/13

End of Project: -/14

Specifications

Height: 74 metres

Length: 146 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Luntan Hydraulic Engineering Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Yangcunshui

Reservoir capacity: 180 m3x106

Construction Dates

Start of Project: 12/08

Start of RCC: 12/08

End of RCC: -/13

End of Project: -/14

Specifications

Height: 90 metres

Length: 377 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: China Huadian Corporation

Type: Thin Arch

Purpose(s): Hydropower

River: Muli

Reservoir capacity: 190 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/13

End of Project: -/14

Specifications

Height: 138 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Lizhou completed
Lizhou completed

Full Dam Information

Details

Country: China

Owner: Guizhou Qianyuan Power Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Beipan

Reservoir capacity: 85 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/14

End of Project: -/15

Specifications

Height: 119 metres

Length: 205 metres

Volume of RCC: 199 m3x103

Total volume: 267 m3x103

Construction Methods

Facings

Upstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
curveRCC against formwork
Spillway
SlopeType
ogeeRCC against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Shannipo completed
Shannipo completed

Full Dam Information

Details

Country: China

Owner: China Datang Corporation

Type: Thin Arch

Purpose(s): Hydropower

River: Gexiang

Reservoir capacity: 279 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/16

End of Project: -/17

Specifications

Height: 168 metres

Length: 413 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Wanjiakouzi completed
Wanjiakouzi completed

Full Dam Information

Details

Country: Laos

Owner: -

Type: Thin Arch

Purpose(s): Hydropower

River: -

Reservoir capacity: -

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/17

End of Project: -/18

Specifications

Height: 99 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

 

Search again