Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Ponto NovoBrazilCERB (Companhia de Engenharia Rural da Bahia)WItapicuru-açu3905/9807/9812/9902/003226690105 (1) (3)* (1)3003007218(N)
Kabagawa
[H-F]
JapanKagawa PrefectureF WKaba1110/1411/1605/1909/2089266242448V
0.40
(1)
(1)
0.77(1)0.77(1)25010009139(F)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Brazil

Owner: CERB (Companhia de Engenharia Rural da Bahia)

Type: Gravity

Purpose(s): Water Supply

River: Itapicuru-açu

Reservoir capacity: 39 m3x106

Construction Dates

Start of Project: 05/98

Start of RCC: 05/98

End of RCC: 12/99

End of Project: 02/00

Specifications

Height: 32 metres

Length: 266 metres

Volume of RCC: 90 m3x103

Total volume: 105 m3x103

Construction Methods

Facings

Upstream
SlopeType
 Traditional concrete against formwork
Downstream
SlopeType
 RCC against formwork  [stepped face]
Spillway
SlopeType
 Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
72
Pozzolan (kg/m3)Pozzolan Type
18Natural pozzolan (ASTM Class N)
  
Ponto Novo completed
Ponto Novo completed

Full Dam Information

Details

Country: Japan

Owner: Kagawa Prefecture

Type: Hardfill

Purpose(s): Flood Control / Water Supply

River: Kaba

Reservoir capacity: 11 m3x106

Construction Dates

Start of Project: 10/14

Start of RCC: 10/14

End of RCC: 05/19

End of Project: 09/20

Specifications

Height: 89 metres

Length: 266 metres

Volume of RCC: 242 m3x103

Total volume: 448 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.40Traditional concrete against formwork
Downstream
SlopeType
0.77Traditional concrete against formwork
Spillway
SlopeType
0.77Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
2501000

Cementitious material

Cement (kg/m3)
91
Pozzolan (kg/m3)Pozzolan Type
39Low-lime flyash (ASTM Class F)
  
Kabagawa completed
Kabagawa completed

 

Search again