SEARCHING
... please wait

Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
JordãoBrazilCOPEL (Companhia Paranense de Energia)HJordão11005/9401/9502/9609/9695550570647V(1)0.74(3)*0.74(12)4004006015(N)
PlatanovryssiGreecePublic Power Corporation (PPC)H INestos8401/8910/9503/9706/99953054204400.10(14)0.75(14)*0.75(13)30030050225(C)
BalambanoIndonesiaP.T. IncoHLarona3109/9604/9806/9909/9995351528534V(2)0.80(1)*0.80(12)4204208154(F)
KubusugawaJapanToyama PrefectureF H I WKubusu1003/9304/98- /9910/0295253364469V
0.40
(1)
(1)
0.78(1)0.78(1)2507508436(F)
Tha DanThailandRoyal Irrigation DepartmentINakhon Nayok22411/9903/0107/0401/0595260049005400V
0.40
(14)0.80(14)*0.80(14)*30030090100(F)
FengmanChinaNortheast China Electric PowerHSecond Songhua10377- /00- /03- /07- /10951080             
JupuduChinaDatang International Power Generation Co. Ltd.HSipanjiang17411/04- /05- /07- /0895320480800V
0.20
(3)0.80(3)0.80(3)     
Tiechuanqiao
[A]
ChinaYupaojiang25- /07- /08- /10- /1195              
Köroglu Kotanli 1
[A-G]
TurkeyEBD En. Ür. ve Tic. A.S.HKura11203/1506/1510/1604/1795404640680V(3')0.60(3')*0.60 30030085130(N)
KargiTurkeyLimak EnergyHSakarya - /11- /1512/1606/1795270535 0.10 0.80        

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Brazil

Owner: COPEL (Companhia Paranense de Energia)

Type: Gravity

Purpose(s): Hydropower

River: Jordão

Reservoir capacity: 110 m3x106

Construction Dates

Start of Project: 05/94

Start of RCC: 05/94

End of RCC: 02/96

End of Project: 09/96

Specifications

Height: 95 metres

Length: 550 metres

Volume of RCC: 570 m3x103

Total volume: 647 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.74RCC against formwork  [stepped face]
Spillway
SlopeType
0.74Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
400400

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
15Natural pozzolan (ASTM Class N)
  
Jordão completed
Jordão completed

Full Dam Information

Details

Country: Greece

Owner: Public Power Corporation (PPC)

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Nestos

Reservoir capacity: 84 m3x106

Construction Dates

Start of Project: 01/89

Start of RCC: 01/89

End of RCC: 03/97

End of Project: 06/99

Specifications

Height: 95 metres

Length: 305 metres

Volume of RCC: 420 m3x103

Total volume: 440 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Slip-formed/extruded facing elements
Downstream
SlopeType
0.75Slip-formed/extruded facing elements  [stepped face]
Spillway
SlopeType
0.75Reinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
50
Pozzolan (kg/m3)Pozzolan Type
225High-lime flyash (ASTM Class C)
  
Platanovryssi completed
Platanovryssi completed

Full Dam Information

Details

Country: Indonesia

Owner: P.T. Inco

Type: Gravity

Purpose(s): Hydropower

River: Larona

Reservoir capacity: 31 m3x106

Construction Dates

Start of Project: 09/96

Start of RCC: 09/96

End of RCC: 06/99

End of Project: 09/99

Specifications

Height: 95 metres

Length: 351 metres

Volume of RCC: 528 m3x103

Total volume: 534 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork with external geomembrane
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
420420

Cementitious material

Cement (kg/m3)
81
Pozzolan (kg/m3)Pozzolan Type
54Low-lime flyash (ASTM Class F)
  
Balambano completed
Balambano completed

Full Dam Information

Details

Country: Japan

Owner: Toyama Prefecture

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Kubusu

Reservoir capacity: 10 m3x106

Construction Dates

Start of Project: 03/93

Start of RCC: 03/93

End of RCC: -/99

End of Project: 10/02

Specifications

Height: 95 metres

Length: 253 metres

Volume of RCC: 364 m3x103

Total volume: 469 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.40Traditional concrete against formwork
Downstream
SlopeType
0.78Traditional concrete against formwork
Spillway
SlopeType
0.78Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
84
Pozzolan (kg/m3)Pozzolan Type
36Low-lime flyash (ASTM Class F)
  
Kubusugawa completed
Kubusugawa completed

Full Dam Information

Details

Country: Thailand

Owner: Royal Irrigation Department

Type: Gravity

Purpose(s): Irrigation

River: Nakhon Nayok

Reservoir capacity: 224 m3x106

Construction Dates

Start of Project: 11/99

Start of RCC: 11/99

End of RCC: 07/04

End of Project: 01/05

Specifications

Height: 95 metres

Length: 2600 metres

Volume of RCC: 4900 m3x103

Total volume: 5400 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalSlip-formed/extruded facing elements
0.40 
Downstream
SlopeType
0.80Slip-formed/extruded facing elements  [stepped face]
Spillway
SlopeType
0.80Slip-formed/extruded facing elements  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
100Low-lime flyash (ASTM Class F)
  
Tha Dan completed
Tha Dan completed

Full Dam Information

Details

Country: China

Owner: Northeast China Electric Power

Type: Gravity

Purpose(s): Hydropower

River: Second Songhua

Reservoir capacity: 10377 m3x106

Construction Dates

Start of Project: -/00

Start of RCC: -/00

End of RCC: -/07

End of Project: -/10

Specifications

Height: 95 metres

Length: 1080 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Fengman completed
Fengman completed

Full Dam Information

Details

Country: China

Owner: Datang International Power Generation Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Sipanjiang

Reservoir capacity: 174 m3x106

Construction Dates

Start of Project: 11/04

Start of RCC: 11/04

End of RCC: -/07

End of Project: -/08

Specifications

Height: 95 metres

Length: 320 metres

Volume of RCC: 480 m3x103

Total volume: 800 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork
0.20 
Downstream
SlopeType
0.80RCC against formwork
Spillway
SlopeType
0.80RCC against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Jupudu completed
Jupudu completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): unknown

River: Yupaojiang

Reservoir capacity: 25 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/10

End of Project: -/11

Specifications

Height: 95 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Tiechuanqiao under construction
Tiechuanqiao under construction

Full Dam Information

Details

Country: Turkey

Owner: EBD En. Ür. ve Tic. A.S.

Type: Arch-Gravity

Purpose(s): Hydropower

River: Kura

Reservoir capacity: 112 m3x106

Construction Dates

Start of Project: 03/15

Start of RCC: 03/15

End of RCC: 10/16

End of Project: 04/17

Specifications

Height: 95 metres

Length: 404 metres

Volume of RCC: 640 m3x103

Total volume: 680 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.60RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.60 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
Pozzolan (kg/m3)Pozzolan Type
130Natural pozzolan (ASTM Class N)
  
Köroglu Kotanli 1 under construction
Köroglu Kotanli 1 under construction

Full Dam Information

Details

Country: Turkey

Owner: Limak Energy

Type: Gravity

Purpose(s): Hydropower

River: Sakarya

Reservoir capacity: -

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: 12/16

End of Project: 06/17

Specifications

Height: 95 metres

Length: 270 metres

Volume of RCC: 535 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.10 
Downstream
SlopeType
0.80 
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates