Dam Search Results
- Purposes: Water Supply
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Shimajigawa | Japan | Ministry of Construction | F I W | Shimaji | 21 | 09/76 | 10/78 | 04/80 | 03/81 | 89 | 240 | 165 | 317 | V 0.30 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 150 to 200 | 500 700 | 84 | 36 | (F) |
| Copperfield | Australia | Kidston Gold Mines Ltd. | W | Copperfield | 20 | 12/83 | 05/84 | 09/84 | 09/84 | 40 | 340 | 140 | 156 | V | (3) | V 0.90 | (3) (17) | 0.80 | (1) | 300 | 300 | 80 | 30 | (F) |
| Middle Fork | USA | Exxon Company, Houston, Texas | F W | Middle Fork | 1 | 05/84 | 07/84 | 09/84 | 11/84 | 38 | 125 | 42 | 43 | V | (1) | 0.80 | (1)* | conduit | 300 | 300 | 66 | 0 | (-) | |
| Carroll E. Ecton (formerly Winchester) | USA | Winchester Municipal Utility | W | Upper Howard Creek | 2 | 06/84 | 08/84 | 11/84 | 01/85 | 23 | 363 | 24 | 27 | V | (6) | V 1.00 | (5) (17) | 1.00 | (1) | 300 | 300 | 104 | 0 | (-) |
| Galesville | USA | Douglas County | F I R W | Cow Creek | 52 | 07/84 | 05/85 | 08/85 | 10/85 | 50 | 290 | 161 | 171 | V | (1) | 0.80 | (17) | 0.80 | (17) | 300 | 300 | 53 | 51 | (F) |
| Castilblanco de los Arroyos | Spain | Junta de Andalucia | W | Cala | 1 | 07/84 | 05/85 | 10/85 | 12/85 | 25 | 124 | 14 | 20 | V | (1) | V 0.75 | (1) (1) | 0.75 | (1) | 450 | 450 | 72 61 | 116 120 | (F) |
| Kengkou | China | Kengkou Reservoir Management Office | H W | Youxi | 27 | 11/84 | 11/85 | 04/86 | 11/86 | 57 | 123 | 43 | 62 | V | (9) | 0.75 | (10) | 0.75 | (13) | 250 & 500 | 250 & 500 | 60 60 | 120 80 | (F) |
| Craigbourne | Australia | Rivers and Water Supply Commission of Tasmania | I W | Coal | 13 | 01/86 | 04/86 | 06/86 | 08/86 | 25 | 247 | 22 | 24 | V | (7) | 1.00 | (17) | separate | 300 | 300 | 70 | 60 | (F) | |
| Tamagawa | Japan | Ministry of Construction | F H I W | Tama | 254 | 08/80 | 09/83 | 07/86 | 12/90 | 100 | 441 | 772 | 1150 | V 0.60 | (1) (1) | 0.81 | (1) | 0.81 | (1) | 150 - 200 | 750 1000 | 91 | 39 | (F) |
| Grindstone Canyon | USA | Village of Ruidoso | W | Grindstone | 2 | 09/85 | 05/86 | 07/86 | 10/86 | 42 | 432 | 88 | 96 | V | (1) | 0.75 | (1)* | 0.75 | (1) | 300 | 300 | 76 | 0 | (-) |
| Monksville | USA | North Jersey District Water Supply Commission and Hackensack Water Company | W | Wanaque | 27 | 05/85 | 03/86 | 08/86 | 11/86 | 48 | 670 | 219 | 232 | V | (1) | V 0.78 | (1) (17) | 0.78 | (1)* | 300 | 300 | 64 | 0 | (-) |
| De Mist Kraal | South Africa | Department of Water & Sanitation | I W | Little Fish | 4 | 09/84 | 05/86 | 08/86 | 10/87 | 30 | 300 | 35 | 65 | V | (1) | 0.60 | (1)* | 0.60 | (1)* | 250 | 250 | 58 | 58 | (F) |
| Saco de Nova Olinda | Brazil | SRH (Secretaria de RecursosHidricos) | F I W | Gravata | 97 | 07/85 | 07/86 | 10/86 | 06/87 | 56 | 230 | 132 | 143 | V | (1) | 0.80 | (3)* | separate | 400 | 400 | 55 | 15 | (N) | |
| Flag Boshielo (formerly Arabie) | South Africa | Department of Water & Sanitation | I W | Olifants | 104 | 09/85 | 03/86 | 11/86 | 07/87 | 36 | 455 | 101 | 142 | V | (1) | 0.50 0.75 | (1)* (1)* | 0.75 | (1) | 300 | 300 | 36 | 74 | (S) |
| Zaaihoek | South Africa | Department of Water & Sanitation | W | Slang | 190 | 05/85 | 11/85 | 03/87 | 09/88 | 47 | 527 | 97 | 134 | V | (1) | V 0.62 | (1)* | 0.62 | (1)* | 250 | 250 | 36 | 84 | (S) |
| Upper Stillwater | USA | Central Utah Water Conservancy District | I W | Rock Creek | 37 | 12/83 | 09/85 | 08/87 | 12/87 | 91 | 815 | 1125 | 1281 | V | (14) | 0.32 0.60 | (14) (14) | 0.32 0.60 | (14)* (14)* | 300 | 300 | 79 | 173 | (F) |
| Los Morales | Spain | Confederación Hidrográfica del Tajo | W | Morales | 2 | 06/86 | 02/87 | 10/87 | 12/87 | 28 | 200 | 22 | 26 | V | (1) (3) | 0.75 | (3)* | 0.75 | (1) | 300 - 400 | 300 - 400 | 80 74 | 140 128 | (F) |
| Mano | Japan | Fukushima Prefecture | F H W | Mano | 36 | 12/83 | 04/85 | 01/88 | 03/90 | 69 | 239 | 104 | 219 | V | (1) | 0.80 | (1) | 0.80 | (1) | 180 | 500 | 96 | 24 | (F) |
| Stagecoach | USA | Upper Yampa Water Conservancy District, Steamboat Springs, Colorado | H I R W | Yampa | 42 | 08/87 | 06/88 | 07/88 | 11/88 | 46 | 116 | 34 | 39 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 71 | 71 | (F) |
| Rouidat Amont (formerly Rwedat) [H-F] | Morocco | Direction des Aménagements Hydrauliques | I W | Rouidat | 3 | 05/87 | 09/87 | 10/88 | 12/88 | 24 | 125 | 25 | 27 | 0.40 | (7)* | 0.40 | (7)* | 0.40 | (1)* | 400 | 400 | 100 | 15 | (N) |
| Nunome | Japan | Water Resources Development Public Corporation | F W | Nunome | 17 | 05/86 | 01/88 | 10/88 | 12/89 | 72 | 322 | 110 | 330 | V 0.40 | (1) (1) | 0.76 | (1) | 0.76 | (1) | 250 | 750 | 78 | 42 | (F) |
| Knellpoort [A-G] | South Africa | Department of Water & Sanitation | W | Rietspruit | 137 | 04/88 | 05/88 | 11/88 | 09/89 | 50 | 200 | 45 | 59 | V | (1) | 0.60 | (1)* | 0.60 | (1)* | 250 | 250 | 61 | 142 | (F) |
| Los Canchales | Spain | Confederación Hidrográfica del Guadiana | F W | Lácara | 15 | 05/88 | 07/88 | 11/88 | 01/89 | 32 | 240 | 25 | 54 | V | (3) | 0.50 0.80 | (3)* (3)* | 0.50 | (1)* | 250 | 250 | 84 70 | 156 145 | (F) |
| Yuxi [A] | China | W | Yuxi | 1 | - /85 | - /87 | - /88 | - /89 | 38 | 102 | (F) | |||||||||||||
| S.W. Freese (formerly Stacy - spillway) | USA | Colorado River Municipal Water District | W | Colorado | 700 | 05/87 | 05/88 | 04/89 | 01/90 | 31 | 173 | 89 | 158 | V | (13) | 0.831 | (17) | ogee | (12) | 300 | 300 | 125 | 62 | (C) |
| Longmentan Nº1 | China | Dehua County, Fujian Province | H I W | Chanxi | 53 | 12/85 | 12/87 | 08/89 | 09/89 | 58 | 150 | 71 | 93 | V 0.30 | (12) (12) | 0.75 | (10) | 0.75 | (13) | 300 | 300 | 72 54 | 82 86 | (F) |
| Wolwedans [A-G] | South Africa | Department of Water & Sanitation | W | Great Brak | 24 | 11/87 | 10/88 | 10/89 | 11/90 | 70 | 268 | 180 | 210 | V | (1) | 0.50 | (1)* | 0.50 | (1)* | 250 | 250 | 58 | 136 | (F) |
| Dodairagawa | Japan | Gunma Prefecture | F W | Kabura | 5 | 03/86 | 06/88 | 01/90 | 03/92 | 70 | 300 | 167 | 350 | V 0.40 | (1) (1) | 0.75 | (1) | 0.75 | (1) | 180 | 500 | 96 | 24 | (F) |
| Quail Creek South | USA | Washington County Water Conservancy District | W | Quail Creek | 50 | 02/90 | 03/90 | 05/90 | 08/90 | 42 | 610 | 130 | 150 | V | (1) | V 0.85 | (1) (17) | conduit | 300 | 300 | 80 | 53 | (F) | |
| Concepción | Honduras | Servicio Autonomo Nacional Acueductos y Acantarillados (SANAA) | W | San Jose | 35 | 12/88 | 12/89 | 06/90 | 08/90 | 68 | 694 | 270 | 290 | 0.075 | (2) | 0.80 | (3)* | 0.80 | (1)* | 400 | 400 | 65 | 15 | (N) |
| Wriggleswade | South Africa | Department of Water & Sanitation | W | Kubusie | 94 | 07/88 | 07/89 | 07/90 | 12/90 | 34 | 737 | 134 | 165 | V | (1) | V 0.62 | (1)* | 0.62 | (1)* | 250 | 250 | 44 | 66 | (F) |
| Maroño | Spain | Diputación Foral de Alava | W | Izoria and Idas | 2 | 01/89 | 11/89 | 08/90 | 11/91 | 53 | 182 | 80 | 91 | 0.05 | (3) | V 0.75 | (3)* (3)* | 0.75 | (1)* | 300 | 300 | 80 65 | 160 170 | (F) |
| Asari | Japan | Hokkaido Prefecture | F W | Asari | 9 | 07/86 | 10/87 | 09/90 | 03/93 | 74 | 390 | 259 | 517 | V 0.30 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 180 | 500 | 96 | 24 | (F) |
| Hervás | Spain | Junta de Extremadura | W | Hervás | 1 | 01/89 | 03/90 | 09/90 | 10/90 | 33 | 210 | 24 | 43 | 0.15 | (1) | 0.70 | (1)* (5)* | 0.70 | (1) | 300 | 300 | 80 | 155 | (F) |
| Kamuro | Japan | Yamagata Prefecture | F W | Kaneyama | 7 | 07/86 | 07/88 | 10/90 | 08/93 | 61 | 257 | 136 | 307 | V 0.60 | (1) (1) | 0.75 | (1) | 0.75 | (1) | 150 - 200 | 500 | 96 | 24 | (F) |
| Glen Melville | South Africa | Department of Water & Sanitation | W | Ecca | 7 | 02/88 | 04/89 | 12/90 | 04/91 | 32 | 380 | 66 | 114 | V | (1) | V 0.75 | (1) (1)* | 0.75 | (1)* | 330 | 330 | 65 | 65 | (F) |
| Gameleiras | Brazil | CODEVASF | F I R W | Gameleiras | 145 | 07/90 | 12/90 | 04/91 | 05/91 | 29 | 150 | 27 | 29 | V | (1) | (1)* | 400 | 400 | 52 | 13 | (-) | |||
| Sakaigawa | Japan | Toyama Prefecture | F H I W | Sakai | 60 | 03/85 | - /87 | 07/91 | 01/93 | 115 | 298 | 373 | 713 | V 0.80 | (1) (1) | 0.78 | (1) | 0.78 | (1) | 180 | 750 | 84 | 36 | (F) |
| New Victoria | Australia | Water Authority of Western Australia | W | Munday Brook | 10 | 08/90 | 03/91 | 08/91 | 11/91 | 52 | 285 | 121 | 135 | V | (14) | 0.325 0.80 | (14)* (14)* | 0.325 0.80 | (14)* (14)* | 300 | 300 | 79 | 160 | (F) |
| Burguillos del Cerro | Spain | Junta de Extremadura | W | Ribera de los Montes | 3 | 12/90 | 05/91 | 09/91 | 12/91 | 24 | 167 | 25 | 33 | V | (14) | 0.13 0.60 | (14)* | 0.60 | (13)* | 300 | 300 | 80 | 135 | (F) |
| Choldocogagna (or Xoldokogaina) | France | CAPB (Communauté d'Agglomération Pays Basque) | W | Lessarte | 1 | 04/91 | 07/91 | 10/91 | 12/91 | 32 | 132 | 19 | 23 | 0.10 | (1) | 0.75 | (16) | 0.75 | (1)* | 300 | 300 | 110 | (R) | |
| Machado | Brazil | COMPESA (Companhia Pernambucana de Saneamento) | H W | Riacho do Chorão | 15 | - /89 | - /90 | - /91 | - /92 | 42 | 360 | |||||||||||||
| Alan Henry Spillway | USA | Brazos River Authority | W | Double Mountain Fork | 140 | 03/91 | 12/91 | 04/92 | - /93 | 25 | 84 | 22 | 23 | V | (13) | 1.10 | (17) | ogee | (1) | 300 | 300 | 119 | 59 | (F) |
| Urdalur | Spain | Confederación Hidrográfica del Ebro | W | Alzania | 5 | 03/90 | 08/91 | 07/92 | 10/92 | 58 | 396 | 150 | 240 | V | (1) | 0.75 | (3)* | 0.75 | (3)* | 300 | 300 | 72 | 108 | (F) |
| Christian E. Siegrist | USA | City of Lebanon Authority | W | Mill | 4 | 09/91 | 04/92 | 07/92 | - /93 | 40 | 213 | 69 | 70 | V | (6) | 0.80 | (17) | 0.80 | (1) | 300 | 300 | 59 | 34 | (F) |
| Taung | South Africa | Department of Water & Sanitation & the former Bophuthatswana Department of Water Affairs | I W | Harts | 66 | 06/90 | 08/91 | 09/92 | 05/93 | 50 | 320 | 132 | 153 | V | (1) | V 0.75 | (1) (1)* | 0.75 | (1)* | 250 | 250 | 44 | 66 | (F) |
| Arriarán | Spain | Diputacion Foral de Gipuzkoa | W | Arriarán | 3 | 10/91 | 04/92 | 09/92 | 02/94 | 58 | 206 | 110 | 113 | 0.05 | (3) | 0.70 | (3)* | 0.70 | (3)* | 300 | 300 | 85 | 135 | (F) |
| Burton Gorge | Australia | North Goonyella Coal Properties | W | Isaac | 20 | 07/92 | 09/92 | 11/92 | 12/92 | 26 | 285 | 64 | 68 | V 1.00 | (8) (17) | 0.80 1.00 | (3)* (17) | 0.80 | (13)* | 300 | 300 | 85 | 0 | (-) |
| Ryumon | Japan | Ministry of Construction | F I W | Sakoma | 42 | 09/87 | 03/90 | 11/92 | 03/97 | 100 | 378 | 521 | 836 | V 0.30 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 150 - 200 | 750 - 1000 | 91 | 39 | (F) |
| Joumoua | Morocco | Direction des Aménagements Hydrauliques | W | Joumoua | 7 | 07/89 | 06/90 | 11/92 | 12/92 | 57 | 250 | 150 | 200 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 350 | 350 | 105 180 | 45 0 | (-) |
| Hattabara | Japan | Ministry of Construction | F W | Ashida | 60 | 08/88 | - /89 | - /92 | 03/98 | 85 | 325 | 228 | 500 | V 0.20 | (1) (1) | 0.75 | (1) | 0.75 | (1) | 150 - 200 | 750 | 84 | 36 | (F) |
| Marathia [H-F] | Greece | Ministry of Agriculture | I W | Marathia | 3 | 11/91 | 12/92 | 04/93 | 06/93 | 28 | 265 | 31 | 48 | 0.50 | (13) | 0.50 | (10) | 0.50 | (13) | 200 - 300 | 200 - 300 | 55 | 15 | (N) |
| Puding [A] | China | Guizhou Qianyuan Power Co. Ltd. | H I W | Sanchahe | 377 | 03/89 | 06/92 | 05/93 | 02/94 | 75 | 196 | 103 | 137 | V | (1) | 0.35 | (1) | ogee 0.35 | (1) (1) | 300 | 300 | 85 54 | 103 99 | (F) |
| Tsugawa | Japan | Okayama Prefecture | F H W | Kamo | 6 | 10/89 | 10/91 | 07/93 | 03/94 | 76 | 228 | 222 | 342 | V 0.60 | (1) (1) | 0.76 | (1) | 0.76 | (1) | 250 | 750 | 96 | 24 | (F) |
| Clifford D. Craig (formerly Spring Hollow) | USA | Western Virginia Water Authority | W | off-stream | 12 | 10/92 | 03/93 | 08/93 | - /94 | 74 | 302 | 222 | 223 | V | (6) | 0.80 | (17) | none | 300 | 300 | 53 | 53 | (F) | |
| Hudson River Nº11 | USA | Banks County | W | Mountain Creek | 11/92 | 04/93 | 08/93 | - /93 | 21 | 168 | 26 | 28 | V | (6) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 119 | 84 | (F) | |
| Kodama | Japan | Fukushima Prefecture | F W | Kodama | 14 | 10/89 | 05/91 | 12/93 | 03/97 | 102 | 280 | 358 | 570 | V 0.20 | (1) (1) | 0.76 | (1) | 0.76 | (1) | 250 | 750 | 91 | 36 | (S) |
| Miyatoko | Japan | Miyagi Prefecture | F W | Miyatoko | 5 | 06/89 | 06/90 | 12/93 | 01/97 | 48 | 256 | 172 | 280 | 0.60 | (1) | 0.80 | (1) | 0.80 | (1) | 180 | 500 | 96 | 24 | (F) |
| Daguangba | China | Hainan Provincial Electric Power Company (HEPCO) | H I W | Changhua | 1710 | 06/90 | 12/91 | 12/93 | 07/95 | 57 | 719 | 485 | 860 | V | (1) | 0.75 | (10) (3) | 0.75 | (1) | 300 | 300 | 55 | 96 | (F) |
| Sahla | Morocco | Direction des Aménagements Hydrauliques | I W | Sahla | 62 | 05/92 | 11/92 | 12/93 | 07/94 | 55 | 160 | 130 | 160 | 0.20 | (5) | 0.90 | (1)* | 0.80 | (1)* | 300 | 300 | 85 125 | 15 25 | (N) |
| Pelo Sinal | Brazil | SUPLAN/RN | W | Taperobá | 76 | 12/91 | - /92 | - /93 | - /94 | 34 | 296 | 69 | 89 | (1) | 300 | 300 | 64 | 16 | (-) | |||||
| Shanzi | China | Lianjiang Water Conservancy Bureau | F H I W | Aojiang | 172 | 08/92 | 11/93 | 05/94 | 06/95 | 66 | 274 | 180 | 272 | V | (5) | 0.80 | (10) | 0.77 | (13) | 300 | 300 | 65 55 | 125 95 | (F) |
| San Lazaro | Mexico | CNA (Comisión Nacional del Agua) | F G W | San Lazaro | 11 | 10/85 | 04/94 | 06/94 | 07/94 | 37 | 176 | 35 | 53 | V 0.20 | (5) | 0.80 | (3)* | 0.80 | (13) | 300 | 300 | 100 90 | 220 220 | (M) |
| Wenquanbao [A] | China | Wenquanbao Reservoir Management Office | F H I W | Tanghe | 7 | 10/91 | 10/92 | 06/94 | - /95 | 48 | 188 | 55 | 63 | V | (4) | 0.30 | (3) | ogee | (13) | 300 | 300 | 110 69 | 68 85 | (F) |
| Várzea Grande | Brazil | SUPLAN/PB | W | Picuí | 21 | 10/93 | 10/94 | 10/94 | - /95 | 31 | 135 | 27 | 28 | (1) | (3)* | 300 | 300 | 56 | 14 | (N) | ||||
| Cova da Mandioca | Brazil | CODEVASF (Companhia de Desenvolvimento dos Vales do Sao Francisco do Parnaiba) | I W | Cova da Mandioca | 126 | 01/93 | 09/93 | 12/94 | 12/94 | 32 | 342 | 75 | 79 | V | (1) | 0.75 | (3)* | 0.75 | (1)* | 400 | 400 | 64 | 16 | (-) |
| do Prata | Brazil | Companhia Pernambucana de Saceamento | W | da Prata | 42 | - /92 | 09/93 | 12/94 | - /95 | 26 | 405 | 61 | 75 | 300 | 300 | 80 | 0 | (-) | ||||||
| Miyagase | Japan | Ministry of Construction | F H W | Nakatsu | 193 | 11/87 | 11/91 | 02/95 | 03/01 | 156 | 400 | 1537 | 2060 | 0.20 0.60 | (1) (1) | 0.625 | (1) | 0.625 | (1) | 150 - 200 | 750 | 91 | 39 | (F) |
| Yoshida | Japan | Kagawa Prefecture | F W | Yoshida | 2 | 07/91 | 07/93 | 02/95 | 03/96 | 75 | 218 | 265 | 304 | V | (1) | 0.75 | (1) | 0.75 | (1) | 250 | 750 | 84 | 36 | (F) |
| Chiya | Japan | Okayama Prefecture | F H W | Takahashi | 28 | 03/89 | 09/92 | 04/95 | 03/98 | 98 | 259 | 396 | 670 | V | (1) | 0.77 | (1) | 0.77 | (1) | 250 | 750 | 91 | 39 | (F) |
| Canoas | Brazil | Companhia de Gestão dos Recursos Hídricos | I W | Riacho da Madeira | 69 | 07/93 | 08/94 | 05/95 | - /96 | 51 | 116 | 87 | 93 | 0.10 | (1) | 0.80 | (10)* | 0.80 | (1)* | 300 | 300 | 64 | 16 | (N) |
| Ohmatsugawa | Japan | Akita Prefecture | F H W | Matsu | 12 | 07/90 | 10/92 | 06/95 | 09/96 | 65 | 296 | 141 | 294 | V 0.70 | (1) (1) | 0.76 | (1) | 0.76 | (1) | 250 | 750 | 91 | 39 | (F) |
| Xibingxi [A-G] | China | Department of Electric Power, Lonyan City, Fujian Province | H W | Longshanxi | 9 | 08/93 | 12/94 | 07/95 | 10/95 | 64 | 93 | 25 | 33 | V 0.08 | (4) (4) | 0.65 | (3) | ogee 0.65 | (13) | 300 - 350 | 300 - 350 | 80 79 | 120 105 | (F) |
| Guanyinge (Kwan-in-Temple) | China | Guanyinge Reservoir Management Bureau | F H I W | Taizi | 2168 | 05/90 | 09/91 | 09/95 | 10/95 | 82 | 1040 | 1240 | 1876 | V 0.10 | (1) (1) | 0.70 | (1) | 0.70 | (1) | 270 - 280 | 750 | 91 | 39 | (F) |
| Satsunaigawa | Japan | Hokkaido Development Bureau | F H I W | Satsunai | 54 | 02/87 | 04/91 | 10/95 | 03/99 | 114 | 300 | 536 | 770 | 0.40 | (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 | 78 | 42 | (S) |
| Enjil | Morocco | Direction des Aménagements Hydrauliques | I W | Taghoucht | 12 | 11/93 | 03/94 | 10/95 | 03/96 | 36 | 80 | 45 | 57 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 110 150 | 0 0 | (N) |
| New Peterson Lake | USA | City of Greeley | W | Tributary of Cache La Poudre | 3 | 05/95 | 09/95 | 11/95 | 12/95 | 21 | 70 | 7 | 8 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 145 | 48 | (F) |
| Shiokawa | Japan | Yamanashi Prefecture | F I W | Shio | 12 | 05/93 | 08/93 | 11/95 | 03/99 | 79 | 225 | 299 | 388 | 0.10 0.70 | (1) (1) | 0.76 | (1) | 0.76 | (1) | 250 | 750 | 96 | 24 | (F) |
| Urayama | Japan | Water Resources Development Public Corporation | F H W | Urayama | 58 | 03/90 | 12/92 | 12/95 | 03/99 | 156 | 372 | 1294 | 1750 | V 0.65 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 1000 | 91 | 39 | (F) |
| Shimantan | China | Department of Water Resources, Henan Province | F I W | Gunhe | 120 | 07/93 | 04/94 | 12/95 | 07/96 | 41 | 650 | 272 | 351 | V | (3') | 0.75 | (3)* | 0.75 | (1) | 300 | 300 | 98 51 | 98 107 | (F) |
| Açude Acauã | Brazil | DNOCS (Departamento Nacional de Obras Contra a Seca) | F I W | Paraíba | 247 | - /93 | - /93 | - /95 | - /95 | 79 | 440 | 674 | 734 | (1) | (3)* | (1)* | 300 | 300 | 64 | 16 | (N) | |||
| Passagem de Trairas | Brazil | Secretaria de Meio Ambiente e dos Recursos Hídricos do Estado do Rio Grande do Norte | R W | Seridó | 50 | - /93 | - /94 | - /95 | - /96 | 26 | 458 | 27 | 28 | 64 | 16 | (N) | ||||||||
| Nacaome | Honduras | Secretaria de Recursos Naturales | W | Rio Grande Nacaome | 42 | 06/93 | 08/94 | - /95 | - /95 | 54 | 320 | 250 | 300 | 0.15 | (2) | 0.80 | (3)* | 0.80 | (12)* | 400 | 400 | 64 | 21 | (N) |
| Ano Mera [H-F] | Greece | Ministry of Agriculture | I W | Ano Mera | 1 | 04/93 | 03/95 | - /95 | - /97 | 32 | 170 | 49 | 64 | 0.50 | (13) | 0.50 | (10) | 0.50 | (1) | 200 - 300 | 200 - 300 | 55 | 15 | (N) |
| Shimagawa | Japan | Gunma Prefecture | F W | Shima | 9 | 03/91 | - /94 | 05/96 | 03/98 | 90 | 330 | 390 | 516 | V 0.50 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 | 84 | 36 | (F) |
| Jack Turner (formerly Big Haynes) | USA | Conyers-Rockdale Big Haynes Imp. Authority | W | Big Haynes Creek | 10/94 | 02/95 | 06/96 | 09/96 | 27 | 427 | 72 | 74 | V | (8) | 0.80 | (10)* | 0.80 | (10)* | 300 | 300 | 42 39 | 42 39 | (F) | |
| Hiyoshi | Japan | Water Resources Development Public Corporation | F H W | Katsura | 66 | - /83 | 10/94 | 07/96 | 03/98 | 70 | 438 | 440 | 670 | V 0.80 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 1000 | 84 77 | 36 33 | (F) |
| Tomisato | Japan | Water Resources Development Public Corporation | F I W | Douzan | 53 | 02/92 | - /95 | 02/97 | 03/00 | 111 | 250 | 355 | 510 | V | (1) | 0.76 | (1) | 0.76 | (1) | 250 | 750 1000 | 84 72 | 36 48 | (F) |
| Wanyao | China | Wanyao Reservoir Management Bureau | F H I W | Dahexi | 223 | 10/93 | 01/95 | 05/97 | 07/97 | 83 | 390 | 320 | 458 | V 0.20 | (1) (1) | 0.70 | (5) | 0.75 | (13) | 300 | 300 | 64 | 96 | (F) |
| Takisato | Japan | Hokkaido Development Bureau | F H I W | Sorachi | 108 | 10/90 | - /93 | 07/97 | 06/00 | 50 | 445 | 327 | 455 | 0.06 | (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 | 84 | 36 | (F) |
| Tie Hack | USA | City of Buffalo | W | South Fork Clear Creek | 3 | 05/96 | 10/96 | 08/97 | - /97 | 41 | 170 | 62 | 69 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 89 | 83 | (F) |
| Shuangxi | China | Department of Electricity, Dapu County, Guangdong Province | F H I W | Meixihe | 95 | 01/95 | 03/96 | 10/97 | 12/97 | 60 | 221 | 113 | 172 | V | (9) | 0.80 | (1) | 0.78 | (1) | 300 | 300 | 90 55 | 110 105 | (F) |
| Cadiangullong | Australia | Cadia Holdings Pty. Lty. | W | Cadiangullong Creek | 4 | 11/96 | 05/97 | 12/97 | 03/98 | 43 | 356 | 114 | 123 | V | (3') | 0.75 | (1)* (3')* | 0.75 | (1)* | 300 | 300 | 90 | 90 | (F) |
| Taolinkou | China | Department of Water Resources, Hebei Province | F H I R W | Qinglonghe | 859 | 11/92 | 12/94 | 12/97 | - /98 | 75 | 500 | 585 | 1350 | V 0.15 | (1) | 0.78 | (1) | ogee 0.65 | (1) (1) | 300 | 300 | 135 70 | 70 85 | (F) |
| Santa Clara-GO | Brazil | Saneamento de Goiás S/A | W | 129 | - /86 | - /95 | - /97 | - /97 | 47 | 129 | ||||||||||||||
| Prata | Brazil | COMPESA (Companhia Pernambucana de Saneamento) | W | Capema | 40 | - /95 | - /96 | - /97 | - /98 | 20 | 405 | |||||||||||||
| Pedro Moura Junior (formerly Belo Jardim) | Brazil | COMPESA (Companhia Pernambucana de Saneamento) | W | Ipojuca (Gravata) | 37 | 05/95 | 09/96 | - /97 | - /98 | 34 | 470 | 113 | 125 | (1) | (1)* | (1)* | 300 | 300 | 64 | 16 | (N) | |||
| Bouhouda | Morocco | Direction des Arrenagements Hydrauliques | I W | S’ra | 56 | 05/95 | 04/96 | 05/98 | 09/98 | 55 | 174 | 165 | 186 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 100 120 | 0 0 | (N) |
| Hayachine | Japan | Iwate Prefecture | F H I W | Hienuki | 17 | 03/93 | 10/95 | 06/98 | 03/00 | 74 | 333 | 141 | 333 | V 0.20 | (1) (1) | 0.76 | (1) | 0.76 | (1) | 250 | 750 | 84 | 36 | (F) |
| Val da Serra | Brazil | CORSAN (Companhia Riograndense de Saneamento) | W | Ibicui-Mirim | 24 | 07/97 | 11/97 | 07/98 | 11/98 | 37 | 675 | 69 | 95 | V | (13) | (12)* | (12)* | 300 | 300 | 90 | 30 | (F) | ||
| Gassan | Japan | Ministry of Construction | F H I W | Bonji | 65 | 08/88 | 06/94 | 10/98 | 03/01 | 123 | 393 | 731 | 1160 | V | (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 1000 | 91 | 39 | (F) |
| Penn Forest | USA | Bethlehem Authority, City of Bethlehem | W | Wild Creek | 2 | 08/96 | 09/97 | 10/98 | 12/98 | 49 | 610 | 283 | 283 | V | (6) | 0.50 | (15) (7) | conduit | 300 | 300 | 58 | 41 | (F) | |
| Yongxi Nº3 | China | Yongxi Hydroelectric Co. Ltd. | F H W | Dazhangxi | 68 | 05/96 | 10/97 | 10/98 | 09/99 | 87 | 198 | 170 | 255 | V | (3') | 0.73 | (10) | ogee 0.73 | (1) (1) | 280 | 3000 | 115 80 | 95 90 | (F) |
| Jucazinho | Brazil | DNOCS (Departamento Nacional de Obras Contra a Secas) | F I R W | Capiibaribe | 204 | 07/96 | 11/96 | 10/98 | - /99 | 63 | 442 | 442 | 470 | V | (12) | 0.75 | (1)* | 0.75 | (1)* | 300 | 300 | 64 | 16 | (N) |
| Rialb | Spain | Confederación Hidrográfica del Ebro | I W | Segre | 402 | 01/93 | 10/95 | 12/98 | 01/00 | 99 | 630 | 980 | 1016 | 0.15 0.35 | (1) (1) | 0.40 0.65 | (1) (1) | 0.65 | (1) | 330 | 330 | 70 65 | 130 130 | (F) |
| Changshun | China | Department of Water Resources, Hubei Province | H W | Yujiang | 68 | - /91 | 03/97 | 12/98 | 06/00 | 69 | 279 | 170 | 200 | V | (3') | 0.74 | (3) | 0.80 | (1) | 300 | 5000 | 134 72 | 89 48 | (F) |
| Bab Louta | Morocco | Direction des Aménagements Hydrauliques | W | Bous Sbaa | 37 | 01/97 | 02/98 | 02/99 | 03/99 | 55 | 110 | 63 | 77 | V | (5) | 0.75 | (1)* | 0.75 | (13) | 300 | 300 | 65 80 | 15 20 | (N) |
| Fenhe Nº2 | China | Department of Water Resources, Shanxi Province | F H W | Fenhe | 130 | 11/96 | 08/98 | 03/99 | 06/00 | 87 | 350 | 362 | 448 | V 0.20 | (1) (1) | 0.75 | (5) | 0.75 | (1) | 300 | 3000 | 127 60 | 84 93 | (F) |
| Jiangya | China | Lishui Hydropower Development Co. Ltd. | F H I N W | Loushui | 1741 | 07/95 | 10/96 | 04/99 | - /01 | 131 | 368 | 1100 | 1310 | V | (3') | 0.80 | (3)* | ogee 0.80 | (13) | 300 | 3000 | 87 64 46 | 107 96 107 | (F) |
| Buckhorn | USA | Town of Wilson | W | Contentea Creek | 03/98 | - /98 | 04/99 | 06/09 | 16 | 781 | 64 | 69 | V | (6) | 300 | 300 | 89 | 0 | (-) | |||||
| Songyue (1st Stage) | China | Helong Electricity Corporation | F H I R W | Hailanhe | 21 | 09/97 | 01/98 | 04/99 | 09/99 | 29 | 271 | 44 | 77 | V | (1) | 0.73 | (10) | conduit | 300 | 2000 | 80 | 100 | (F) | |
| Toker | Eritrea | Government of Eritrea | W | Toker | 14 | 11/96 | 02/98 | 05/99 | 08/99 | 73 | 263 | 187 | 210 | V | (1) | 0.80 | (1)* | 0.80 | (12)* | 330 | 330 | 110 | 85 | (F) |
| Bertarello | Brazil | CORSAN (Companhia Riograndense de Saneamento) | W | Arroio Burati | 6 | - /98 | 08/98 | 07/99 | - /00 | 29 | 219 | 80 | 115 | V | (13) | (12)* | (12)* | 300 | 300 | 72 | 18 | (N) | ||
| Ziga | Burkina Faso | Oner-Moz | W | Nakambe | 28 | 04/98 | 10/98 | 08/99 | 07/00 | 18 | 120 | 44 | V | (1) | 0.80 | (10)* | 0.80 | (12)* | 300 | 300 | (-) | |||
| Baishi | China | Department of Water Resources, Liaoning Province | F H I W | Dalinghe | 1645 | 09/96 | 04/97 | 09/99 | 12/00 | 49 | 513 | 111 | 603 | V 0.10 | (1) (1) | 0.70 | (1) | 0.76 | (1) | 300 | 300 | 72 | 58 | (F) |
| Hongpo [A-G] | China | Xishan Xingyu Water Resources Corporation | W | Qinggoushui | 3 | 10/97 | 07/98 | 11/99 | 12/99 | 55 | 244 | 71 | 77 | V | (3') | 0.50 | (1) | 0.50 | (1) | 300 | 3000 | 54 | 99 | (F) |
| Ponto Novo | Brazil | CERB (Companhia de Engenharia Rural da Bahia) | I W | Itapicuru-açu | 39 | 05/98 | 07/98 | 12/99 | 02/00 | 26 | 266 | 90 | 105 | (1) | (3)* | (1) | 300 | 300 | 72 | 18 | (N) | |||
| Kubusugawa | Japan | Toyama Prefecture | F H I W | Kubusu | 10 | 03/93 | 04/98 | - /99 | 10/02 | 95 | 253 | 364 | 469 | V 0.40 | (1) (1) | 0.78 | (1) | 0.78 | (1) | 250 | 750 | 84 | 36 | (F) |
| Ohnagami | Japan | Simane Prefecture | F I W | Sutu | 19 | 03/93 | 04/98 | 04/00 | 03/03 | 72 | 334 | 284 | 362 | V 0.25 | (1) (1) | 0.79 | (1) | 0.79 | (1) | 250 | 750 | 84 | 36 | (F) |
| Pickle Jar | USA | Paradise Valley Estates | W | 1 | 10/99 | 03/00 | 05/00 | 08/00 | 16 | 57 | 331 | 331 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 90 | 0 | (-) | |
| Beni Haroun | Algeria | ANBT (Agence Nationale des Barrages et Transferts) | I W | El Kebir | 963 | 01/93 | 10/98 | 07/00 | 12/00 | 118 | 714 | 1690 | 1900 | V | (1) | 0.80 | (1)* | 0.80 | (13) | 300 | 300 | 82 | 143 | (F) |
| Inyaka | South Africa | Department of Water & Sanitation | W | Marite | 123 | 01/96 | 06/97 | 10/00 | 03/02 | 53 | 350 | 160 | 327 | V | (1) | 0.68 | (1) | 0.68 | (1) | 250 | 250 | 60 | 120 | (F) |
| Santa Cruz do Apodi | Brazil | Secretaria Estadual do Meio Ambiente e Recursos Hídricos do Rio Grande do Norte | F I R W | Apodi | 600 | - /98 | - /99 | - /00 | 03/02 | 48 | 1660 | 1023 | 1120 | 300 | 300 | 80 | 0 | (-) | ||||||
| Tiúma | Brazil | COMPESA (Companhia Pernambucana de Saneamento) | W | Tiúma | 6 | - /99 | - /00 | 01/01 | 05/01 | 16 | 132 | |||||||||||||
| Shimenzi [A] | China | Shimenzi Reservoir Engineering Management Office | H I W | Taxi | 80 | 06/98 | 06/99 | 06/01 | 10/01 | 110 | 176 | 188 | 211 | 0.142 V | (3') (3') | V 0.18 | (3) (3) | crest | (12) | 300 | 3000 | 93 62 | 110 110 | (F) |
| North Fork Hughes River | USA | USDA Natural Resources Conservation Service | F R W | North Fork Hughes River | 1480 | 07/99 | 03/01 | 07/01 | - /01 | 26 | 200 | 65 | 65 | V | (8) | 0.80 | (10) | 0.80 | (1) | 300 | 300 | 59 107 | 59 65 | (F) |
| Chubetsu | Japan | Ministry of Land, Infrastructure and Transport | F H I W | Chubetu | 93 | 03/94 | 09/97 | 08/01 | 03/04 | 86 | 290 | 523 | 1007 | V 0.80 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 1000 | 84 | 36 | (F) |
| Mianhuatan | China | Mianhuatan Hydroelectric Development Corporation | F H N W | Ting | 2035 | 04/98 | 12/98 | 11/01 | 04/02 | 111 | 302 | 500 | 615 | V | (9) | 0.75 | (3)* | 0.70 | (13) | 300 | 3000 | 82 59 48 | 100 88 88 | (F) |
| Fukuchiyama | Japan | Fukuoka Prefecture | F N W | Fukuti | 3 | 10/98 | - /99 | 12/01 | 03/03 | 65 | 255 | 115 | 201 | V | (1) | 0.78 | (1) | 0.78 | (1) | 250 | 750 | 84 | 36 | (F) |
| Castanhão | Brazil | DNOCS/Minas Gerais | F I R W | Congonhas | 6700 | 10/99 | - /00 | 12/01 | - /02 | 85 | 668 | 890 | 1030 | 300 | 300 | 85 | 0 | (-) | ||||||
| Yanwangbizi | China | Chaoyang Water Conservancy Bureau | F H I W | Daling | 217 | - /96 | - /97 | - /01 | - /02 | 35 | 383 | 87 | 220 | 64 | 118 | (F) | ||||||||
| Rivaldo de Carvalho | Brazil | Companhia de Gestão dos Recursos Hídricos | I W | Condado | 20 | - /95 | - /98 | - /01 | 12/02 | 18 | 270 | |||||||||||||
| Umari | Brazil | DNOCS (Departamento Nacional de Obras Contra a Seca) | F I R W | do Carmo | 293 | - /98 | - /99 | - /01 | - /01 | 42 | 2308 | 655 | 660 | (12) | 300 | 300 | 70 | 0 | (-) | |||||
| Yushi | China | Yushi Reservoir Construction Management Bureau | F I W | Biliuhe | 89 | - /98 | - /99 | - /01 | - /02 | 50 | 267 | 218 | 233 | 70 | 70 | (F) | ||||||||
| Pedras Altas | Brazil | CERB (Companhia de Engenharia Rural da Bahia) | F I R W | Itapicuru-mirim | - /00 | - /00 | - /01 | - /01 | 24 | 1090 | 42 | 60 | 300 | 300 | 34 | 41 | (S) | |||||||
| Pirapama | Brazil | CAGEPE (Companhia Pernambucana de Saneamento) | W | Pirapama | 61 | - /00 | - /00 | - /01 | - /01 | 25 | 300 | 87 | 137 | (1) | 300 | 300 | 72 | 18 | (-) | |||||
| Estreito | Brazil | F I R W | Curimatá | 24 | - /97 | - /00 | - /01 | 11/02 | 26 | 300 | 12 | 14 | 300 | 300 | 64 | 16 | (N) | |||||||
| Helong | China | Electricity Corporation, Yanji | H R W | Hailanhe | 30 | 11/98 | 08/99 | 01/02 | 12/02 | 30 | 244 | 43 | 89 | V | (1) | 0.75 | (10) | ogee | (10)* | 300 | 2000 | 113 | 113 | (F) |
| Hunting Run | USA | Spotsylvania County | W | Hunting Run | 2 | 05/00 | 02/01 | 01/02 | 08/02 | 36 | 720 | 115 | 128 | V | (8) | (17) | (17) | 300 | 300 | 74 | 37 | (F) | ||
| Camará | Brazil | Estado da Paraiba (Companhia de Aguas e Esgotus) | W | Riachäo | 27 | 05/00 | 09/01 | 06/02 | - /02 | 56 | 296 | V | (1) | 0.80 | (1)* | 300 | 300 | 80 | 0 | (-) | ||||
| Kutani | Japan | Isikawa Prefecture | F W | Daishoji | 25 | 12/96 | 04/00 | 07/02 | 03/06 | 76 | 280 | 188 | 360 | V 0.80 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 | 84 | 36 | (F) |
| Randleman Lake | USA | Piedmont Triad Regional Water Authority | R W | Deep | 84 | 07/01 | 04/02 | 07/02 | 01/03 | 31 | 280 | 70 | 76 | V | (1) | 0.75 | (1)* | 0.75 | (1)* | 300 | 300 | 89 | 104 | (F) |
| Xiaoyangxi (and saddle dam) | China | Guizhou Province Electric Power Co. | W | Xia Oyangxi | 15 | 05/00 | 01/01 | 10/02 | 12/03 | 45 | 118 | 47 | 49 | V | (3') | 0.75 | (3')* | 0.75 | (12) | 350 | 3500 | 138 60 | 113 90 | (F) |
| Steno [H-F] | Greece | Ministry of Agriculture | I W | Steno | 1 | 02/00 | 07/01 | 10/02 | 06/03 | 32 | 170 | 69 | 70 | 0.70 | (13) | 0.70 | (10) | 0.70 | (1) | 200 - 300 | 200 - 300 | 55 | 5 | (N) |
| Olivenhain | USA | San Diego County Water Authority | W | Escondido Creek | 30 | 06/01 | 02/02 | 10/02 | 07/03 | 97 | 788 | 1070 | 1140 | V | (4') | 0.80 | (3)* | 0.80 | (1)* | 300 | 300 | 74 | 121 | (F) |
| Carnaúba | Brazil | Secretaria Recursos Hídricos | I W | Quixeré | 26 | - /01 | 02/02 | 11/02 | - /03 | 19 | 700 | 300 | 300 | 100 | 0 | (-) | ||||||||
| Koyama | Japan | Ibaraki Prefecture | F I W | Ohkita | 17 | 11/94 | 05/00 | 12/02 | 03/05 | 65 | 462 | 270 | 531 | V | (1) | 0.78 | (1) | 0.78 | (1) | 250 | 750 | 84 | 36 | (S) |
| Ribeirão Riacho Pasto Velho | Brazil | CERB (Companhia de Engenharia Ambiental e Recursos Hidricos da Bahia) | I W | Pasto Velho | 11 | - /00 | - /01 | - /02 | - /03 | 27 | ||||||||||||||
| Mujib | Jordan | Jordan Valley Authority, Ministry of Water and Irrigation | I W | Mujib | 35 | 01/99 | 01/01 | 02/03 | 11/03 | 67 | 490 | 654 | 694 | 0.10 | (2) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 85 | 0 | (-) |
| Ahl Souss (formely Ait M’Zal) | Morocco | Direction des Aménagements Hydrauliques | I W | Izig | 5 | 11/01 | 01/03 | 05/03 | 01/04 | 49 | 222 | 50 | 27 | 0.20 | (1) | 0.80 | (1)* | 0.85 | (12) | 300 | 300 | 80 100 | 0 0 | (-) |
| Takizawa | Japan | Japan Water Agency | F N W | Nakatu | 63 | 03/99 | 10/01 | 06/03 | 03/07 | 139 | 424 | 810 | 1670 | 0.15 0.70 | (1) (1) | 0.72 | (1) | 0.72 | (1) | 250 | 1000 | 84 72 | 36 48 | (F) |
| Nandoni (formerly Mutoti) | South Africa | Department of Water & Sanitation | I W | Luvuvhu | 164 | 04/98 | 12/99 | 08/03 | 04/04 | 47 | 392 | 150 | 316 | V | (1) | 0.75 | (1) | 0.75 | (1)* | 250 | 250 | 54 | 129 | (F) |
| Shanggou [A] | China | Xifeng County Water Conservancy Bureau | W | Yangshui | 1 | - /01 | - /02 | - /03 | - /04 | 39 | 176 | |||||||||||||
| Tamesna (formerly Boukerkour) | Morocco | Direction des Aménagements Hydrauliques | F I W | Zamrine | 56 | 05/03 | 04/04 | 09/04 | 05/05 | 69 | 220 | 190 | 215 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 100 | 0 | (N) |
| Pau Ferro | Brazil | COMPESA (Companhia Pernambucana de Saneamento) | W | - | 12 | - /00 | - /02 | - /04 | - /05 | 33 | 210 | |||||||||||||
| João Leite Saneago | Brazil | SANEAGO (Saneamento de Goiás S.A.) | W | João Leite | 129 | 03/01 | 01/03 | - /04 | - /04 | 55 | 380 | 270 | 290 | 300 | 300 | 80 | 20 | (N) | ||||||
| Quixeramobim | Brazil | DNOCS (Departamento Nacional de Obras Contra as Secas) | W | Banabuiú | 54 | - /01 | - /03 | - /04 | - /05 | 19 | 290 | |||||||||||||
| Yujianhe [A] | China | Guiyang Water Conservancy Bureau | F I W | Wu | 11 | - /02 | - /03 | - /04 | - /05 | 81 | 180 | 105 | 110 | 0.10 | 0.76 | 0.76 | ||||||||
| Pindobaçu | Brazil | CERB (Companhia de Engenharia Ambiental e Recursos Hidricos da Bahia) | I W | Itapicuru-aço | 17 | - /01 | - /03 | - /04 | - /05 | 44 | 191 | 75 | 85 | 300 | 300 | 56 | 14 | (N) | ||||||
| Bandeira de Melo | Brazil | CERB (Companhia de Engenharia Ambiental e Recursos Hidricos da Bahia) | I W | Paraguaçu | 112 | - /02 | 09/03 | - /04 | - /05 | 19 | 320 | 75 | 85 | (1) | (1)* | (1)* | 300 | 300 | 56 | 14 | (N) | |||
| Big Cherry | USA | Town of Big Stone Gap | W | South Fork, Powell River | 2 | 04/04 | 09/04 | 01/05 | 07/05 | 26 | 113 | 11 | 12 | 300 | 300 | 82 | 82 | (F) | ||||||
| Hassan II (formerly Sidi Said) | Morocco | Direction des Aménagements Hydrauliques | F I W | Moulouya | 400 | 02/01 | 03/03 | 04/05 | 03/06 | 115 | 577 | 590 | 690 | V | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 65 80 | 15 20 | (N) |
| Jagin | Iran | Hormozgan Water Authority | F I W | Jagin | 300 | 12/01 | 05/04 | 05/05 | 09/07 | 78 | 220 | 232 | 382 | V 0.30 | (3') (3')* | 0.75 | (3')* | 0.75 | (12) | 300 | 300 | 105 160 | 90 90 | (N) |
| Zhaolaihe [A] | China | Changyang Electric Power Bureau | H I W | Duhu | 70 | 12/03 | 03/04 | 05/05 | 10/05 | 107 | 206 | 166 | 255 | curve | (3') | curve | (3') | (3') | 300 | 3000 | 84 126 | 126 103 | (F) | |
| Çindere [H-F] | Turkey | DSI - State Hydraulic Works | H I W | Buyuk Menderes | 82 | 04/94 | 07/02 | 05/05 | 11/07 | 107 | 280 | 1500 | 1685 | 0.70 | (6) | 0.70 | (1)* | 0.89 | (12) | 300 | 300 | 50 | 20 | (F) |
| Suofengying | China | Guizhou-Wujiang Hydropower Development Co. Ltd. | F H I N W | Wu | 201 | 10/00 | 06/03 | 08/05 | 03/06 | 116 | 165 | 421 | 739 | V 0.25 | (3') (3') | 0.70 | (3') | 0.70 | (1) | 300 | 3000 | 64 | 95 | (F) |
| Kido | Japan | Fukushima Prefecture | F I N W | Kido | 19 | 10/00 | 06/03 | 08/05 | 03/08 | 94 | 350 | 291 | 501 | V 0.10 | (1) (1) | 0.78 | (1) | 0.78 | (1) | 250 | 750 1000 | 84 | 36 | (F) |
| Poço do Magro | Brazil | CODEVASF (Companhia de Desenvolvimento dos Vales do São Francisco e do Parnaíba) | W | Poço do Magro | 32 | - /03 | - /04 | - /05 | - /06 | 22 | 540 | 58 | 68 | 64 | 16 | (N) | ||||||||
| Artur Tavares de Melo (formerly Guararema) | Brazil | Usina Central Olho D'Água S/A | I W | Itambé | 21 | - /03 | - /04 | - /05 | - /06 | 30 | 306 | 50 | 300 | 300 | 80 | 0 | (-) | |||||||
| Xixi | China | Xixi Reservoir Development Co. Ltd. | F H I W | Daxi | 85 | - /03 | - /04 | - /05 | - /06 | 71 | 243 | 231 | 244 | (F) | ||||||||||
| Kinta | Malaysia | Lembaga Air Perak/Metropolitan Utilities Corporation | W | Kinta | 30 | 01/03 | 02/04 | 03/06 | 07/06 | 90 | 792 | 952 | 975 | V | (3') | 0.80 | (3')* | 0.80 | (3')* | 300 | 300 | 100 | 100 | (F) |
| Pine Brook | USA | Pine Brook Water District | W | 1 | 01/05 | 10/05 | 04/06 | - /06 | 26 | 170 | 27 | 30 | V | (7) | (17) | separate | 300 | 300 | 95 | 59 | (F) | |||
| Baise | China | Guangxi-Youjiang Hydraulic Development Co.Ltd. | F H I N W | You | 5660 | 10/01 | 12/02 | 04/06 | 12/06 | 130 | 720 | 1995 | 2672 | V | (9) | 0.80 | (1) | 0.80 | (1) | 300 | 3000 | 80 50 | 132 110 | (F) |
| Al Wehdah | Jordan/ Syria | Jordan Valley Authority, Ministry of Water and Irrigation | W | Yarmouk | 110 | 06/03 | 02/05 | 07/06 | 12/07 | 103 | 485 | 1426 | 1478 | V 0.60 | (3') | 0.80 | (3')* | 0.80 | 300 | 300 | 70 60 | 60 60 | (F) | |
| Ntimbale | Botswana | Department of Water Affairs | W | 26 | 11/04 | 04/06 | 09/06 | 05/07 | 33 | 153 | 30 | |||||||||||||
| Genesee #2 | USA | Genesee Water and Sanitation District | W | Bear Creek | 1 | 06/06 | 11/06 | 11/06 | 10/07 | 29 | 168 | 24 | V | 300 | 300 | |||||||||
| Nagai | Japan | Ministry of Land, Infrastructure and Transport | F H N W | Okitamano | 51 | 03/00 | 10/02 | 11/06 | 03/11 | 126 | 381 | 703 | 1200 | V 0.50 | (1) (1) | 0.73 | (1) | 0.73 | (1) | 250 | 1000 | 91 | 39 | (F) |
| El Guapo spillway [H-F] | Venezuela | MARN (Ministerio del Ambiente y los Recursos Naturales) | F I W | El Guapo | 141 | 08/05 | 04/06 | 12/06 | 08/07 | 50 | 138 | 320 | 342 | 0.60 | (1) | 0.85 | (17) | 1.80 | (1) | 300 | 300 | 75 | 0 | (-) |
| Flor do Sertão | Brazil | Maue Geradora | W | 05/05 | - /05 | - /06 | 10/06 | 19 | 245 | |||||||||||||||
| El Sauz | Mexico | CNA (Comisión Nacional del Agua) | W | - /04 | - /05 | - /06 | - /07 | 30 | ||||||||||||||||
| Zaoshi | China | Lishui Basin Hydraulic and Hydroelectric Development Corporation | F H N W | Dieshui | 1439 | - /04 | - /05 | - /06 | - /07 | 88 | 351 | 450 | 930 | V 0.25 | (3') | 0.80 | (3') | 0.75 | (1) | 300 | 3000 | 53 83 | 99 102 | (F) |
| Hickory Log Creek | USA | Marietta (Georgia) Water Authority | W | Hickory Log Creek | 1 | 10/05 | 12/06 | 06/07 | 10/07 | 55 | 290 | 165 | V | (8) | 0.80 | (3')* | 0.80 | (1) | 300 | 300 | 89 80 74 | 89 98 104 | (F) | |
| Longtan (Stage 1) | China | Longtan Hydropower Development Co. Ltd. | F H N W | Hongshui | 16210 | 07/01 | 10/04 | 06/07 | 12/09 | 192 | 832 | 4623 | 7400 | V 0.25 | (3') | 0.70 | (3') | 0.68 | (12) | 300 | 300 | 99 86 | 121 109 | (F) |
| Tanger-Med (formerly R’Mel) | Morocco | Direction des Aménagements Hydrauliques | F W | R’Mel | 25 | 05/05 | 06/06 | 06/07 | 10/07 | 80 | 250 | 230 | 243 | V | (11) | 0.75 | (1)* | 0.75 | (1) | 300 | 3000 | 100 90 | 0 0 | (-) |
| Taishir | Mongolia | Ministry of Energy | H I W | Zabkhan | 930 | 02/05 | 05/06 | 06/07 | 12/07 | 60 | 200 | 210 | 250 | V | (2) | 0.72 | (1)* | 0.72 | (12)* | 333 | 333 | 75 | 0 | (-) |
| Yacoub El Mansour (formerly Ouirgane) | Morocco | Direction des Aménagements Hydrauliques | W | N’Fis | 70 | 07/05 | 10/06 | 07/07 | 03/08 | 71 | 233 | 202 | 216 | V | (11) | 0.75 | (1)* | 0.75 | (1)* | 300 | 3000 | 100 | 0 | (-) |
| Elkwater Fork | USA | Natural Resources Conservation Service | W | Tygart Tributory | 3 | - /06 | 04/07 | 08/07 | - /07 | 39 | 204 | 106 | 113 | V | (8) | 0.80 | (3)* | 0.80 | (1)* | 300 | 300 | 59 | 89 | (F) |
| Meander | Australia | Rivers and Water Supply Commission, Tasmania | I W | Meander | 43 | 01/06 | 01/07 | 08/07 | 12/07 | 47 | 180 | 85 | 85 | V | (4) | 0.70 | (10) | 0.70 | (10) | 300 | 300 | 70 | 0 | (-) |
| Dinh Binh | Vietnam | Ministry of Agriculture and Rural Development (MARD) | F H I W | Kon | 226 | 05/04 | 08/05 | 12/07 | 12/08 | 55 | 571 | 183 | 430 | V | (11) | 0.75 | (3')* | ogee | (12) | 300 | 900 | 70 126 | 175 141 | (F) |
| Hongkou | China | Fujian Hongkou Hydropower Co. Ltd. | H W | Huotong | 449 | - /03 | - /05 | - /07 | - /08 | 130 | 341 | 681 | 830 | |||||||||||
| Serra Preta | Brazil | EMBASA (Empresa Baiana de Aguas e Saneamento S/A) | W | Gaviãozinho | 5 | - /05 | - /05 | - /07 | - /08 | 34 | 154 | 44 | 51 | V | 0.80 | 0.80 | 80 | 20 | (N) | |||||
| Duas Serras | Brazil | COMPESA (Companhia Pernambucana de Saneamento) | W | Duas Serras | 2 | - /05 | - /06 | - /07 | - /08 | 19 | 113 | 6 | 300 | 300 | ||||||||||
| Shihu | China | Zhouluo County Government | F I W | Lituohe | 58 | - /05 | - /06 | - /07 | - /08 | 56 | 193 | 162 | 354 | |||||||||||
| Bailianya [A] | China | Anhui Water Resources Development Co. Ltd. | F H I W | Dongpi | 480 | - /05 | - /06 | - /07 | 04/09 | 105 | 422 | 485 | 600 | V | (1) | 0.335 | (1) | 0.335 | (1) | 300 | 3000 | 72 56 | 108 84 | (F) |
| Beydag [H-F] | Turkey | DSI - State Hydraulic Works | I W | Kucuk Menderes | 248 | 04/94 | 07/06 | 04/08 | 11/08 | 95 | 800 | 2350 | 2650 | 0.25 | (6) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 60 | 30 | (F) |
| Koudiat Acerdoune [H-F] | Algeria | ANBT (Agence Nationale des Barrages et Transfert) | I W | Wadi Isser | 800 | 11/02 | 05/06 | 06/08 | 09/08 | 121 | 492 | 1650 | 1850 | 0.65 | (1)* | 0.65 | (1)* | 0.65 | (1)* | 300 to 400 | 300 to 400 | 77 | 87 | (F) |
| Sidi Yahya (formerly Ain Kwachia) | Morocco | Direction des Aménagements Hydrauliques | I W | Khellata | 11 | 01/07 | 05/07 | 07/08 | 11/08 | 30 | 213 | 60 | 78 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 105 | 0 | (-) |
| Toppu | Japan | Hokkaido Prefecture | F I W | Toppu | 36 | 07/02 | 06/05 | 10/08 | 03/14 | 78 | 309 | 440 | 530 | V 0.80 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 250 | 1000 | 84 | 36 | (F) |
| Boussiaba | Algeria | ANBT (Agence Nationale des Barrages et Transferts) | W | Boussiaba | 120 | 12/06 | 05/08 | 11/08 | 08/09 | 51 | 310 | 160 | 190 | V | (2) | (1)* | (1) | 300 | 300 | 112 | 28 | (F) | ||
| Picachos | Mexico | CNA (Comisión Nacional del Agua) | I W | Presidio | 322 | 02/07 | 09/07 | - /08 | - /09 | 85 | 256 | 85 | V 0.15 | (12) (12) | 0.85 | (12) | 0.85 | (12) | 300 | 3000 | 50 | 45 | (S) | |
| Wadi Dayqah | Oman | Ministry of Regional Municipalities and Water Resources | W | Wadi Dayqah | 100 | 08/06 | 01/08 | 04/09 | 11/09 | 75 | 410 | 590 | 650 | V | (3') | 0.75 | (3')* | 0.75 | (3')* | 300 | 1200 | 126 112 | 54 48 | (M) |
| Big Bear Creek | USA | Tennessee Valley Authority | F W | Bear Creek | 47 | 01/08 | 10/08 | 05/09 | 06/09 | 27 | 292 | 60 | 69 | V | (1) | 0.80 | (1)* | 300 | 300 | 77 | 77 | (F) | ||
| Kasegawa | Japan | Ministry of Land, Infrastructure, Transport and Tourism | F H I W | Kase | 71 | 02/05 | 10/07 | 06/09 | 03/12 | 99 | 456 | 830 | 948 | V 0.60 | (1) (1) | 0.75 | (1) | 0.75 | (1) | 250 | 1000 | 84 | 36 | (F) |
| Saf-Saf [H-F] | Algeria | ANBT (Agence Nationale des Barrages et Transfert) | F I W | Saf-Saf | 18 | 03/06 | - /08 | 10/09 | 03/11 | 36 | 270 | 120 | 175 | 0.70 | (12) | 0.70 | (7) | 0.70 | (12) | 300 | 300 | 120 | 0 | (-) |
| Deep Creek Nº5D | USA | Yadkin County and NRCS | F W | Deep Creek | 15 | 12/08 | 04/09 | 12/09 | 07/10 | 22 | 226 | 39 | 45 | V | (3') | 0.80 | (3')* | 0.80 | (1)* | 300 | 300 | 89 | 89 | (F) |
| Cristalandia | Brazil | EMBASA (Empresa Baiana de Aguas e Saneamento S.A) | W | de Contas | 17 | - /05 | - /07 | - /09 | 01/10 | 22 | 337 | 61 | 68 | |||||||||||
| Wudu | China | Sichuan Wudu Water Conservancy and Hydropower Group Ltd. | F H I W | Fu | 572 | 10/04 | - /07 | - /09 | - /10 | 120 | 631 | 1151 | 1580 | V | (3') | 0.75 | (3') | 0.80 | (3') | (F) | ||||
| Baishiya | China | Quifeng Water Supply Co. of Fangchenggang City | H I W | Xijiang | 26 | - /04 | - /07 | - /09 | - /12 | 74 | 190 | 230 | 240 | 0.75 | ||||||||||
| Xiaotianlong | China | Hongguo Water Resources Development Co. | W | Tuochang | 1 | - /07 | - /08 | - /09 | - /09 | 58 | 168 | 125 | ||||||||||||
| Mulungu do Morro | Brazil | EMBASA (Empresa Baiana de Aguas e Saneamento S/A) | I W | Tijuco | 2 | - /07 | - /08 | - /09 | 03/10 | 16 | 156 | 13 | ||||||||||||
| Damad | Saudi Arabia | Ministry of Water and Energy of the Kingdom of Saudi Arabia | F I W | Jawrah | 33 | 05/06 | - /08 | - /09 | 05/10 | 52 | 592 | 207 | 384 | 300 - 500 | 1000 - 1500 | |||||||||
| Poço do Marruáo | Brazil | Insituto de Desenvolvimento do Piauí | I W | Riacho do Jorge | 293 | - /07 | - /08 | - /09 | - /10 | 48 | 870 | 293 | 306 | |||||||||||
| Barra dos Coqueiros | Brazil | Gerdau Aços Longos | H W | Claro | 1 | 08/07 | - /08 | - /09 | 07/10 | 60 | 1670 | 172 | 282 | |||||||||||
| Yangjiayuan [A] | China | Guizhou Tongzihe Hydropower Development Co. Ltd. | H W | Tongzhi | 78 | - /07 | - /08 | - /09 | - /10 | 68 | 153 | |||||||||||||
| Sehb el Merga | Morocco | Direction des Aménagements Hydrauliques | F I W | Sehb el Merga | 7 | 06/07 | - /08 | - /09 | - /10 | 37 | 480 | 85 | 95 | V | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 65 | 25 | (N) |
| Adnan Mendres (formerly Çine) | Turkey | DSI - State Hydraulic Works | F H I W | Çine | 350 | 12/95 | 11/04 | 04/10 | 10/11 | 137 | 300 | 1560 | 1650 | 0.10 0.20 | (7') | 0.85 | (7') | 0.85 | (7') | 300 | 300 | 85 75 | 105 95 | (F) |
| Ulu Sepri (formerly Batu Hampar) | Malaysia | Jabatan Bekalan Air Negeri Sembilan | W | Batu Hampar | 3 | 11/07 | 10/09 | 04/10 | 05/10 | 65 | 236 | 200 | 203 | (3') | (10) | (10) | 300 | 1200 | 65 | 120 | (F) | |||
| Bengoh | Malaysia | Public Works Department | W | Sungai Bengoh | 144 | 06/07 | 06/09 | 05/10 | - /12 | 63 | 267 | 130 | 172 | V | (3') | 0.80 | (3')* | 0.80 | (3')* | 300 | 3000 | 60 | 120 | (F) |
| Kasegawa auxiliary dam [H-F] | Japan | Ministry of Land, Infrastructure, Transport and Tourism | F H I W | Kase | 1 | 03/08 | 10/09 | 06/10 | 09/10 | 29 | 116 | 52 | 68 | 0.80 | (12) | 0.80 | (12) | 0.80 | (12) | 250 | 750 | 80 | 0 | (-) |
| Koris Gefiri (Maiden’s bridge) [H-F] | Greece | Ministry of Agriculture | I W | Partheni | 3 | 11/05 | 03/07 | 07/10 | - /16 | 42 | 221 | 170 | 190 | 0.80 | (13) | 0.80 | (3) | 0.80 | (1)* | 300 - 450 | 300 - 450 | 50 | 10 | (N) |
| Ghasre Ghand (formerly Zirdan) | Iran | Sistan & Balouchestan Water Authority | I W | Kajoo | 207 | 11/02 | 08/07 | 08/10 | 11/10 | 65 | 350 | 265 | 437 | (5) | (3)* | 300 | 300 | 98 | 42 | (N) | ||||
| Abou Abbas Al-Sabti (formerly Taskourt) | Morocco | Direction des Aménagements Hydrauliques | I W | Al Mal | 25 | 01/08 | 04/09 | 09/10 | 04/11 | 75 | 408 | 415 | 490 | V | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 73 | 32 | (N) |
| Tobetsu [H-F] | Japan | Hokkaido Prefecture | F I W | Tobetsu | 75 | 10/08 | 06/09 | 09/10 | 10/12 | 52 | 432 | 665 | 803 | 0.80 | (5) | 0.80 | (5) | 0.80 | (1) | 250 | 750 | 100 80 60 | 0 0 | (-) |
| Saladillo | Argentina | Provincia de San Luis | W | Quinto | 02/09 | 09/09 | 09/10 | 01/11 | 79 | 487 | 210 | 249 | (5) | (5) | ||||||||||
| Wyaralong | Australia | Queensland Water Infrastructure Pty. Ltd. | W | Teviot Brook | 1 | 09/09 | 04/10 | 12/10 | 06/11 | 48 | 464 | 173 | (1) | (1)* | (1) | 300 | 300 | 85 | 85 | (F) | ||||
| Gasparino | Brazil | CERB (Companhia de Engenharia Ambiental e Recursos Hídricos da Bahia) | W | Vaza-Barris | 49 | - /07 | - /08 | - /10 | 10/10 | 23 | 927 | 130 | ||||||||||||
| Moula [H-F] | Tunisia | Ministère de l’Agriculture | W | Bou Terfess | 26 | 02/03 | - /08 | - /10 | 11/11 | 81 | 324 | 422 | 450 | V | (3') | (3')* | (3')* | 300 | 300 | 120 | 0 | (-) | ||
| Ingazeira (formerly San Antonio and Cachoeirinha) | Brazil | DNOCS (Departamento Nacional de Obras Contra a Seca) | F I W | Pajeú | 49 | - /08 | - /09 | - /10 | - /11 | 26 | 566 | 64 | 92 | |||||||||||
| Ait Moulay Ahmed | Morocco | Direction des Aménagements Hydrauliques | I W | Ain Leuh | 2 | 10/09 | - /10 | 01/11 | 10/11 | 29 | 136 | 18 | 20 | V | (5) | 0.75 | (1)* | 0.75 | (1)* | 300 | 300 | 70 | 30 | (N) |
| Las Tunas | Argentina | Provincia de Catamarca | F I W | Las Tunas | 101 | 02/09 | 09/10 | 02/11 | 12/11 | 33 | 259 | 30 | 56 | V | (1) | 200 | 400 | 85 | 25 | (N) | ||||
| Okukubi (Kin) [H-F] | Japan | Okinawa General Bureau, Cabinet Office, Japan | F I W | Okukubi | 79 | 03/09 | 11/10 | 03/11 | 07/11 | 39 | 461 | 339 | 430 | 0.80 | (5) | 0.80 | (5) | 0.80 | (5) | 300 | 750 | 80 | 0 | (-) |
| Yunishigawa | Japan | Ministry of Land, Infrastructure, Transport and Tourism | F I W | Yunishi | 75 | 08/08 | 09/09 | 05/11 | 09/12 | 119 | 320 | 967 | 1053 | V 0.60 | (1) | 0.78 | (1) | 0.78 | (1) | 250 | 1000 | 91 | 39 | (F) |
| Yubari Syuparo | Japan | Ministry of Land, Infrastructure and Transport | F H I W | Yubari | 427 | 11/03 | 10/09 | 09/11 | 03/15 | 111 | 390 | 584 | 940 | V 0.80 | (1) (1) | 0.82 | (1) | 0.82 | (1) | 250 | 750 & 1000 | 91 | 39 | (F) |
| Lusixi | China | Lusi Reservoir Management Office | W | Lusixi | 33 | - /09 | - /10 | - /11 | - /12 | 39 | 140 | |||||||||||||
| Silopi | Turkey | DSI - State Hydraulic Works | H W | Hezil | 29 | 08/08 | - /10 | - /11 | 02/12 | 89 | 356 | 718 | 752 | 0.10 | (7) | 0.70 | (3')* | 0.70 | (1) | 300 | 300 | 81 | 39 | (-) |
| Madushan | China | Honghe Guangyuan Hydropwer and Madushan Development Co. Ltd. | H N W | Honghe | 552 | - /08 | - /09 | - /11 | - /12 | 108 | 353 | 987 | ||||||||||||
| Ahl Lafouim | Morocco | Direction des Aménagements Hydrauliques | W | Ahl Lafouim | 3 | - /09 | - /10 | - /11 | - /12 | 15 | 95 | 20 | 24 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | |||||
| Krayma | Morocco | Direction des Aménagements Hydrauliques | W | Tiyoughza | 3 | - /09 | - /10 | - /11 | - /12 | 32 | 170 | 45 | 53 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 120 100 | 0 | (-) | ||
| Middle Vaitarna | India | Municipal Corporation of Greater Mumbai | W | Vaitarna | 202 | 10/08 | 05/10 | 04/12 | - /12 | 102 | 565 | 1202 | 1500 | 0.15 | (3') | 0.75 | (3')* | 0.75 | (12) | 300 | 300 | 75 | 145 | (F) |
| San Vicente Dam Raise | USA | San Diego County Water Authority and City of San Diego | W | San Diego | 299 | 06/09 | 09/11 | 09/12 | 09/14 | 103 | 474 | 459 | 465 | V | (4') | 0.78 | (3')* | 0.78 | (3')* | 300 | 300 | 86 | 127 | (F) |
| Enlarged Cotter | Australia | Icon Water (formerly ACTEW Corp.) | W | Cotter | 78 | 10/09 | 08/11 | 12/12 | 08/13 | 87 | 350 | 369 | 400 | V | (3') | 0.75 | (3')* | 0.75 | (3')* | 300 400 | 300 400 | 75 | 120 | (F) |
| Longkaikou | China | Yunnan Jinsha River Hydropower Co. Ltd. | F H N R W | Jinsha | 558 | 08/07 | 09/08 | - /12 | - /13 | 119 | 768 | 2840 | 3853 | V | (3) | 0.75 | (3) | 300 | 3000 | 96 60 | 96 90 | (F) | ||
| Marrecas | Brazil | SAMAE (Serviço Autônomo Municipal de Água e Esgoto) | W | Marrecas | 33 | 03/10 | - /11 | - /12 | 12/12 | 35 | 430 | |||||||||||||
| Mamoeiro | Brazil | Companhia de Gestão dos Recursos Hídricos | I W | - | 21 | - /10 | - /11 | - /12 | - /13 | 28 | 310 | |||||||||||||
| Spring Grove | South Africa | TCTA (Trans Caledon Tunnel Authority) | W | Mooi | 140 | 03/11 | 06/12 | 05/13 | 05/14 | 39 | 300 | 96 | 114 | (3') | (3')* | 300 | 300 | 50 | 110 | (F) | ||||
| De Hoop | South Africa | Department of Water & Sanitation | W | Steelpoort | 347 | 07/07 | 07/09 | 11/13 | 03/14 | 85 | 1015 | 769 | 1012 | V | (3') | (3')* | (3')* | 300 | 1200 | 62 | 145 | (F) | ||
| Kalashuke | China | Department of Water Resources, Xinjiang Province | F H W | E’erqisi | 2419 | - /07 | - /10 | - /13 | - /14 | 122 | 1489 | 2520 | 2890 | 0.75 | 0.75 | 300 | 3000 | (F) | ||||||
| Sultan Moulay Ali Cherif (formely Tiouine) | Morocco | Direction des Aménagements Hydrauliques | F I W | Iriri | 270 | 05/10 | - /11 | - /13 | - /13 | 90 | 202 | 270 | 380 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 100 | 0 | (-) | ||
| Lizhou [A] | China | China Huadian Corporation | H W | Muli | 190 | - /09 | - /11 | - /13 | - /14 | 132 | 211 | |||||||||||||
| Barra do Rio Chapéu | Brazil | Eletrosul Centrais Elétricas S/A | H W | Braço do Norte | 2 | - /12 | - /12 | - /13 | - /13 | 25 | 117 | |||||||||||||
| Hongling | China | Guodian Haikong Hongling water construction Co. Ltd. | H I W | Dabian | 662 | - /11 | - /12 | - /13 | - /14 | 92 | ||||||||||||||
| Aslandag | Turkey | DSI - State Hydraulic Works | H I W | Bembo | 11 | 09/08 | 11/11 | 02/14 | 11/14 | 69 | 210 | 162 | 202 | 0.10 | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 1200 | 100 | 80 | (N) |
| Cheshmeh Ashegh | Iran | Fars Water Authority | F I W | Cheshmeh Ashegh | 62 | 06/10 | 10/11 | 05/14 | 03/17 | 60 | 375 | 130 | 250 | (1) | (1)* | (12) | 300 | 600 - 900 | 120 | 80 | (N) | |||
| Hantangang | South Korea | Kwater (Korean Water Resources Corporation) | F I W | Hantan | 270 | 02/09 | 07/10 | 07/14 | 12/14 | 84 | 690 | 650 | 709 | V | (1) | (1) | (1) | 250 | 750 | 91 | 39 | (F) | ||
| Gümüsören [H-F] | Turkey | DSI - State Hydraulic Works | H I W | Zamanti | 195 | - /11 | - /13 | - /14 | 06/15 | 37 | 842 | 1890 | 1943 | 0.70 | (3') | 0.76 | (3')* | 0.76 | (12) | 300 | 1200 | 84 | 36 | (F) |
| Songyue (2nd Stage) | China | Helong Electricity Corporation | F H I R W | Hailanhe | 21 | - /12 | - /13 | - /14 | - /15 | 41 | 271 | V | (1) | 0.73 | (10) | conduit | 300 | 2000 | 80 | 100 | (F) | |||
| Eduardo Campos (formerly Serro Azul) | Brazil | W | Una | 303 | - /12 | - /13 | - /14 | - /15 | 66 | 1015 | ||||||||||||||
| Kahe | China | W | 20 | - /12 | - /13 | - /14 | - /15 | 72 | ||||||||||||||||
| Metolong | Lesotho | Government of the Kingdom of Lesotho/Metolong Authority | W | South Phuthiatsana | 64 | 09/11 | 08/13 | 02/15 | 08/16 | 83 | 278 | 280 | 314 | (3') | (3')* | (3') | 300 | 3000 | 90 | 110 | (F) | |||
| Gokayama | Japan | Fukuoka Prefecture | F N W | Naka | 40 | 06/12 | 06/14 | 07/15 | 03/18 | 103 | 556 | 634 | 935 | V 1.00 | (1) (1) | 0.76 | (1) | 0.76 | (1) | 250 | 1000 | 104 | 26 | (F) |
| Tabellout [A-G] | Algeria | ANBT (Agence Nationale des Barrages et Transfert) | I W | Djen Djen | 294 | 03/10 | 03/13 | 08/15 | 12/15 | 121 | 366 | 975 | (12) | (12) | (12)* | 300 | 300 | 85 | 45 | (S) | ||||
| Duck River | USA | Cullman Utilities Board | W | Duck | 31 | 01/14 | - /15 | 09/15 | - /16 | 41 | 90 | 121 | 128 | 0.10 | (1) (3) | (3')* | 1.00 | (1')* (3')* | 300 | 300 | 107 | 55 | (F) | |
| Rkiza | Morocco | Direction des Aménagements Hydrauliques | F I W | Rkiza | 17 | - /12 | - /13 | - /15 | - /15 | 26 | 500 | 55 | 60 | V | (5) | 0.85 | (1)* | 0.85 | (1)* | |||||
| Nam Khan 3 | Laos | EDL (Electricite du Laos) | F H W | Nam Khan | 249 | 12/12 | - /14 | - /15 | 06/16 | 67 | 154 | 125 | 145 | |||||||||||
| Shuishimen [A] | China | Yunxi Shuishimen Reservoir Bureau | F H W | Tianhe | 37 | - /13 | - /14 | - /15 | - /16 | 86 | 150 | |||||||||||||
| Apporo [H-F] | Japan | Hokkaido Prefecture | F I W | Atsuma | 106 | 10/14 | 06/15 | 06/16 | 03/18 | 47 | 516 | 354 | 490 | 0.80 | (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 | 80 | 0 | (-) |
| Akçakoca | Turkey | DSI - State Hydraulic Works | I W | Sarma | 2 | 01/13 | 05/15 | 10/16 | - /17 | 66 | 148 | 85 | 130 | 0.10 | (1) | 0.80 | (1) | 0.80 | (12) | 300 | ||||
| Boqaata | Lebanon | Ministry of Energy and Water | W | Boqaata | 6 | 07/12 | 04/15 | 12/16 | 12/21 | 72 | 222 | 200 | 255 | V 0.80 | (12) | 0.80 | (3')* | 0.80 | (3')* | 300 | 300 | 90 | 0 | (-) |
| Cacimba Nova | Brazil | Projeto Transposição das Águas do Rio São Francisco | I W | 3 | - /13 | - /14 | - /16 | - /16 | 18 | 196 | 52 | |||||||||||||
| Kelebek | Turkey | DSI - State Hydraulic Works | I W | Kelebek | 23 | - /12 | - /14 | - /16 | - /17 | 62 | 193 | 74 | 97 | 0.10 | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 300 | 120 | (F) | |
| Güdül Kırkkavak | Turkey | DSI - State Hydraulic Works | I W | Ormanlik | 1 | - /14 | - /15 | - /16 | 10/17 | 49 | 265 | 114 | ||||||||||||
| Siriji (also know as Murupé) | Brazil | COMPESA (Companhia Pernambucana de Saneamento ) | I W | Siriji | 17 | - /13 | - /15 | - /16 | - /17 | 20 | 100 | |||||||||||||
| Karareis | Turkey | DSI - State Hydraulic Works | W | Camibogazi | 10 | - /14 | - /15 | - /16 | - /17 | 50 | 295 | 142 | 173 | 0.05 | (3') | 0.80 | (3')* | 0.80 | (12) | 300 | 300 | 98 | 52 | (F) |
| Guanchang | China | H I W | Qiduxi | 24 | - /14 | - /15 | - /16 | - /17 | 54 | 246 | ||||||||||||||
| Ibn Hammad | Jordan | Jordan Valley Authority, Ministry of Water and Irrigation | G W | Ibn Hammad | 4 | - /15 | 12/16 | 07/17 | - /22 | 56 | 160 | 160 | 160 | 0.30 | (1) | 0.70 | (1)* | 0.70 | (1)* | 300 | 300 | 90 100 | 0 0 | (-) |
| Enciso | Spain | Confederación Hidrográfica del Ebro, Ministerio de Agricultura Alimentación y Medio Ambiente | I W | Cidacos | 47 | 07/08 | 08/14 | 07/17 | 09/18 | 103 | 376 | 698 | 765 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 60 | 140 | (F) |
| Sanru [H-F] | Japan | Ministry of Land, Infrastructure, Transport and Tourism | F N W | Sanru | 50 | 08/14 | 09/15 | 10/17 | 03/19 | 46 | 350 | 375 | 500 | 0.80 | (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 | 80 | 0 | (-) |
| Tamalout [H-F] | Morocco | Direction des Aménagements Hydrauliques | F I W | Ansegmir | 50 | 10/10 | - /13 | - /17 | - /18 | 61 | 320 | 380 | 405 | 0.50 | (5) | 0.70 | (1)* | 0.70 | (1)* | 300 | 300 | 80 70 60 | 0 0 | (-) |
| Ouldjet Mellegue | Algeria | ANBT (Agence Nationale des Barrages et Transfert) | I W | Mellegue | 155 | 10/11 | - /13 | - /17 | - /18 | 51 | 900 | 245 | 320 | V | (1) | 0.80 | (1) | 0.80 | (1) | 300 | 300 | 110 | 0 | (-) |
| El Bolsón | Argentina | Provincia de Catamarca | I W | Albigasta | 38 | - /08 | - /13 | - /17 | - /19 | 64 | 380 | 279 | ||||||||||||
| Ouljet Es Soltane [H-F] | Morocco | Direction des Aménagements Hydrauliques | F I W | Beht | 510 | 05/10 | - /14 | - /17 | - /18 | 98 | 383 | 900 | 930 | 0.50 | (1) | 0.70 | (1)* | 0.70 | (1)* | 300 | 300 | 55 | 25 | (N) |
| Ouagjdit | Morocco | Direction des Aménagements Hydrauliques | I W | Asif N Talaght | 1 | - /13 | - /15 | - /17 | - /18 | 44 | ||||||||||||||
| Shangshui [A] | China | I W | 12 | - /13 | - /15 | - /17 | - /18 | 58 | 269 | |||||||||||||||
| Üniversite | Turkey | DSI - State Hydraulic Works | W | Çırçıp | 1 | - /15 | - /16 | - /17 | - /17 | 36 | 110 | 20 | ||||||||||||
| Ximihe | China | H I W | Ximihe | 17 | - /14 | - /16 | - /17 | - /18 | 88 | 147 | ||||||||||||||
| Fendou | China | Muling Fendou Reservoir Construction office | F H I W | Mulenghe | 191 | - /15 | - /16 | - /17 | - /18 | 46 | 406 | |||||||||||||
| Xiahushan | China | F H I W | Dashahe | 196 | - /15 | - /16 | - /17 | - /18 | 74 | 296 | ||||||||||||||
| Wugachong [A] | China | H I W | Mabie | 99 | - /15 | - /16 | - /17 | - /18 | 108 | 182 | ||||||||||||||
| Irahara | Japan | Fukuoka Prefecture | F W | Harai | 29 | 07/14 | 07/15 | 03/18 | 03/19 | 81 | 295 | 372 | 419 | V 0.60 | (1) (1) | 0.77 | (1) | 0.77 | (1) | 250 | 1000 | 84 | 36 | (F) |
| Shangcun | China | W | Shangcunxi | 123 | - /11 | - /14 | - /18 | - /19 | 89 | 338 | ||||||||||||||
| Mangshan | China | F H I W | Changlehe | 133 | - /15 | - /16 | - /18 | - /19 | 101 | 355 | ||||||||||||||
| Datengxia | China | Guangxi Datengxia Gorge Water Conservancy Development Co. .Ltd. | F H N W | Xijiang | 3479 | - /14 | - /16 | - /18 | 07/20 | 80 | 7100 | |||||||||||||
| Colonia | Brazil | CERB (Companhia de Engenharia Ambienytal e Recursos Hídricos da Bahia) | W | Colonia | 62 | 09/15 | - /17 | - /18 | 09/18 | 21 | 195 | 30 | 34 | |||||||||||
| Zhuangli | China | Zhuangli reservoir construction and management office | F H I W | Shizihe | 133 | - /15 | - /17 | - /18 | - /19 | 44 | 49 | |||||||||||||
| Cudi-Circip | Turkey | DSI - State Hydraulic Works | W | Circip | 2 | - /16 | - /17 | - /18 | - /19 | 30 | 213 | 48 | 59 | 0.10 | (1) | 0.80 | (1) | 0.80 | (12) | 300 | 1200 | 98 | 52 | |
| Melen | Turkey | DSI - State Hydraulic Works | H I W | Melen | 693 | - /13 | 06/15 | 03/19 | - /25 | 124 | 944 | 1871 | 2096 | 0.15 | (3') | 0.70 | (3')* | 0.70 | (3') | 300 | 300 | 90 | 60 | (F) |
| Yamba | Japan | Ministry of Land, Infrastructure, Transport and Tourism | F H I N W | Agatsuma | 108 | 08/14 | 05/17 | 05/19 | 10/19 | 116 | 291 | 575 | 911 | 0.15 | (1) | 0.80 | (1) | 0.08 | (1) | 250 | 1000 | 91 | 39 | (F) |
| Bouzina | Algeria | ANBT (Agence Nationale des Barrages et Transferts) | I W | 18 | - /14 | 02/18 | 07/19 | 01/23 | 77 | 177 | 250 | 330 | V | (1) | 0.89 | (1)* | 0.89 | (12) | 300 | 300 | 110 77 | 0 33 | (F) | |
| Taşköprü Hasanlı | Turkey | DSI - State Hydraulic Works | I W | Ayvali | 988 | 06/14 | 04/17 | 08/19 | 11/19 | 43 | 157 | 37 | 46 | 0.10 | (1) | 0.80 | (1) | 300 | 66 | 44 | (F) | |||
| Karamürsel Ihsaniye | Turkey | DSI - State Hydraulic Works | I W | Suludere | 9 | 03/16 | 07/17 | 09/19 | 10/19 | 69 | 212 | 130 | 185 | 0.10 | (1) | 0.80 | (1) | 300 | 300 | 75 | 45 | (F) | ||
| Biratori | Japan | Ministry of Land, Infrastructure, Transport and Tourism | F H I N W | Nukapira | 46 | - /73 | - /87 | - /19 | - /21 | 57 | 600 | 180 | V | (1) | 0.78 | (1) | 0.78 | (1) | ||||||
| Taquarembó | Brazil | Estado | W | Taquarembó | 05/08 | - /10 | - /19 | - /20 | 33 | 330 | ||||||||||||||
| Shah wa Arüs | Afghanistan | Ministry of Energy and Water | F H I W | Shakardar | 10 | - /12 | - /13 | - /19 | 04/21 | 78 | 303 | 270 | 337 | V 0.20 | (1) | 0.80 | (1)* | 0.80 | (1) | 300 | 300 | 105 | 45 | (N) |
| Ghadrooni | Iran | Kerman Water Authority | G I W | Gharanghou | 44 | - /08 | - /14 | - /19 | - /20 | 44 | 352 | 106 | 147 | |||||||||||
| Pingzhai | China | H I W | Sanchahe | 1089 | - /13 | - /15 | - /19 | - /21 | 163 | |||||||||||||||
| Los Pilares (Bicentennial) | Mexico | CNA (Comisión Nacional del Agua) | F I W | Mayo | 478 | 02/14 | - /16 | - /19 | 08/20 | 73 | 232 | 600 | 300 | 300 | ||||||||||
| Germinal | Brazil | Companhia de Gestão dos Recursos Hídricos | W | Germinal | 2 | - /16 | - /18 | - /19 | 08/20 | 28 | 210 | |||||||||||||
| Negreiros | Brazil | Ministério da Integração Nacional | W | dos Negreiros | 24 | - /17 | - /18 | - /19 | - /20 | 37 | 246 | 56 | ||||||||||||
| Yunzhen | China | F I W | 96 | - /16 | - /19 | 03/20 | 01/21 | 76 | 173 | |||||||||||||||
| Sidi Abdellah [H-F] | Morocco | Direction des Aménagements Hydrauliques | F I W | Ouaar | 10 | 04/10 | - /13 | - /20 | - /20 | 68 | 370 | 580 | 610 | 0.50 | (1) | 0.70 | (1)* | 0.70 | (1)* | 300 | 300 | 80 100 | 0 0 | (-) |
| Ballikaya | Turkey | DSI - State Hydraulic Works | W | Mudurnu | 143 | - /13 | - /15 | - /20 | - /23 | 98 | 357 | 800 | 0.10 0.35 | (1) | 0.70 | (1) | 300 | 300 | 63 83 | 63 83 | ||||
| Yanagawa | Japan | Iwate Prefecture | F H W | Yana | 19 | 12/14 | - /17 | - /20 | 03/21 | 77 | 243 | 213 | ||||||||||||
| Tan My | Vietnam | Ministry of Agriculture and Rural Development | H I W | Cai | 219 | - /16 | - /18 | - /20 | - /21 | 67 | 603 | 510 | 640 | |||||||||||
| Center Hill Auxiliary Backup Dam | USA | US Army Corps of Engineers - Nashville District | F H R W | Caney Fork | 940 | - /17 | - /19 | - /20 | - /21 | 40 | 293 | 99 | 122 | V | (1) | V 0.83 | (1)* | 0.83 | (1)* | 300 | 300 | 93 | 93 | (F) |
| Vizcachas | Peru | Anglo American (Quellaveco copper mine) | W | - /19 | - /20 | - /20 | - /21 | 40 | V 0.10 | (2) | 0.80 | (1) | 0.80 | (12) | ||||||||||
| Agdez | Morocco | Direction des Aménagements Hydrauliques | F I W | Daraa | 247 | 05/16 | 03/19 | 09/21 | 06/22 | 110 | 317 | 833 | 993 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | (N) | ||||
| Kaddoussa | Morocco | Direction des Aménagements Hydrauliques | F I W | Guir | 220 | - /16 | - /18 | - /21 | - /21 | 62 | 271 | 180 | 210 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | (N) | ||
| Tiddas | Morocco | Direction des Aménagements Hydrauliques | F I W | Bou Regreg | 507 | - /16 | - /18 | - /21 | - /22 | 106 | 345 | 900 | 1 | V | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | |||
| Gümüshane Bahçecik | Turkey | DSI - State Hydraulic Works | W | Şenkale Deresi | 3 | 06/17 | 11/18 | - /21 | - /22 | 67 | 273 | 148 | 0.10 | (1) | 0.80 | (1)* | 300 | 300 | (N) | |||||
| San Julian | Mexico | Peñoles | W | Fuerte | - /16 | - /19 | - /21 | - /22 | 44 | 240 | 300 | 300 | ||||||||||||
| Toudgha | Morocco | Direction des Aménagements Hydrauliques | F I W | Toudgha | 33 | 11/17 | - /19 | - /21 | - /22 | 68 | V | (1) | 0.90 | (1)* | 0.90 | (1)* | ||||||||
| Kabagawa | Japan | Kagawa Prefecture | F W | Kaba | 11 | 10/14 | 11/16 | 05/22 | 09/24 | 89 | 266 | 242 | 448 | V 0.40 | (1) (1) | 0.77 | (1) | 0.77 | (1) | 250 | 1000 | 91 | 39 | (F) |
| Tayabasan weir [H-F] | Philippines | Wawa JV Co. Inc. (Prime Infrastructure Capital Inc and San Lorenzo Ruiz Builders and Developers Group) | H I W | Tayabasan | 1 | - /20 | - /21 | 05/22 | 07/22 | 24 | 114 | 30 | 0.40 | (4') | 0.40 0.92 | (3') | 0.92 | (1)* | 300 | 300 | 90 | 120 | (F) | |
| Kahir [H-F] | Iran | Sistan & Balouchestan Water Authority | I W | Kahir | 314 | 11/10 | - /14 | 07/22 | 08/25 | 55 | 383 | 550 | 730 | 0.80 | (12) | 0.80 | (12) | 0.80 | (12) | |||||
| Huanglinxia | China | H W | Hanshui | 221 | 10/18 | - /20 | 11/22 | 07/23 | 70 | 349 | ||||||||||||||
| Fask | Morocco | Direction des Aménagements Hydrauliques | F I W | Assayad | 79 | 07/17 | 01/19 | 12/22 | 07/23 | 77 | 830 | 1400 | 0.10 | (1) | 0.80 | (1) | 0.80 | (1) | 300 | 300 | (N) | |||
| Chame Shir [A-G] | Iran | Iran Water & Power Resources Development Company (IWPC) | F H I W | Zohreh | 2300 | - /11 | - /16 | - /22 | 07/23 | 151 | 680 | 1100 | 1200 | V | 0.70 | 300 | 300 | 160 | 0 | (-) | ||||
| Baghan | Iran | Boushehr Water Authority | F I W | Baghan | 32 | - /14 | - /18 | - /22 | - /25 | 58 | 311 | 220 | ||||||||||||
| Yuwanghe | China | Guizhou Shuicheng Water-investment Co. Ltd. | I W | Yuwanghe | 11 | 09/16 | - /19 | - /22 | 11/23 | 50 | 157 | 106 | ||||||||||||
| Tingzikou | China | Jialing River Tingzikou Water Resources and Hydropower Development Co. Ltd. | F H I N W | Jialing | 4067 | 11/09 | - /19 | - /22 | - /25 | 116 | 995 | |||||||||||||
| Gomaspan (formerly Bastora) | Iraq | Ministry of Agriculture and Water Resources in Kurdistan | I W | Bastora | 215 | - /13 | 03/19 | - /22 | 10/24 | 85 | 577 | 1160 | 1223 | V | 0.80 | 0.80 | ||||||||
| Ulus Eldeş | Turkey | DSI - State Hydraulic Works | I W | Karakuz Creek | 1 | - /16 | - /20 | - /22 | - /23 | 46 | 125 | 38 | V 0.10 | (1) (1) | 0.80 | (1)* | 300 | 83 | 68 | (F) | ||||
| Guangshan | China | Large and medium sized Irrigation District Service Center of Qiannan Prefecture | I W | Qingshui | 1 | 04/20 | - /21 | - /22 | - /22 | 32 | 198 | V | (1) | V 1.00 | (1) (17) | none | (F) | |||||||
| Bursa Uludag | Turkey | DSI - State Hydraulic Works | F W | Kirkpinarlar | 1 | 10/21 | 01/22 | 08/23 | 10/23 | 28 | 168 | 60 | ||||||||||||
| Hirase | Japan | F H W | Nishiki | 30 | - /10 | - /16 | - /23 | - /24 | 73 | 300 | 340 | |||||||||||||
| Bahçecik | Turkey | W | 3 | - /16 | - /19 | - /23 | - /24 | 69 | 204 | |||||||||||||||
| Aldegirmen | Turkey | DSI - State Hydraulic Works | I W | Akasya | 24 | - /17 | - /20 | - /23 | - /24 | 59 | 227 | 189 | V | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 300 | 55 | 45 | (F) | |
| Jalaur afterbay dam | Philippines | National Irrigation Administration (NIA) | F H I W | Jalaur | - /19 | - /21 | - /23 | 07/24 | 38 | 150 | ||||||||||||||
| Jalaur High Dam (JRMP 2) | Philippines | National Irrigation Administration (NIA) | F H I W | Jalaur | 229 | - /19 | - /21 | - /23 | 07/24 | 109 | 267 | |||||||||||||
| Gölecik | Turkey | DSI - State Hydraulic Works | I W | Gölecik | 36 | 12/16 | 02/21 | 06/24 | - /24 | 95 | 424 | 900 | V | (3') | 0.80 | (3')* | 0.80 | (12) | 300 | 300 | 72 | 48 | (F) | |
| Sidi Abbou | Morocco | Direction des Aménagements Hydrauliques | F H I W | Leben | 200 | 03/21 | 01/23 | 06/24 | - /25 | 71 | 149 | 207 | 257 | V | (1) | 0.90 | (1)* | 0.90 | (1) | 300 | 300 | 110 | 0 | |
| Naruse [H-F] | Japan | Ministry of Land, Infrastructure, Transport and Tourism | F H I W | Naruse | 79 | 05/18 | 10/19 | 08/24 | 11/26 | 115 | 755 | 4450 | 4850 | |||||||||||
| El Zapotillo | Mexico | CNA (Comisión Nacional del Agua) | W | Verde | 910 | - /09 | 11/11 | - /24 | 12/24 | 80 | 271 | 1100 | 1200 | V | (3') | 0.83 | (3)* | 0.83 | (3)* | 300 | 300 | 60 to 80 | 50 to 70 | (S) |
| Hayghar (formerly Dehroud) [H-F] | Iran | Fars Water Authority | F H I W | Firooz Abad | 146 | - /09 | - /12 | - /24 | - /26 | 88 | 230 | 260 | 285 | 0.90 | (3') | 1.20 | (3')* | 1.20 | (12) | 300 | 300 | |||
| Oiticica | Brazil | Secretaria de Meio Ambiente e dos Recursos Hídricos do Estado do Rio Grande do Norte | I W | Piranhas | 556 | - /13 | - /15 | - /24 | 03/25 | 35 | 989 | |||||||||||||
| Divaresh | Iran | Gilan Province Water Authority | I W | Kharshak | 3 | - /13 | - /15 | - /24 | - /26 | 45 | 195 | |||||||||||||
| Huokou | China | Department of Water Conservancy, Fujian Province | F H W | Aojiang | 297 | - /17 | - /21 | - /24 | - /25 | 91 | 338 | 300 | 663 | 0.10 | 0.76 | 0.76 | (F) | |||||||
| Tianjiaotan | China | I W | Beimen | 191 | 04/20 | 11/21 | - /24 | 08/25 | 52 | 295 | ||||||||||||||
| Quanzhou Bailai | China | F H W | 544 | 06/20 | 01/22 | - /24 | 12/25 | 106 | 596 | |||||||||||||||
| Tekke Kavakli | Turkey | DSI - State Hydraulic Works | I W | Çat | 2 | - /19 | - /22 | - /24 | - /25 | 42 | 325 | 225 | ||||||||||||
| La Libertad | Mexico | Organismo Servicios de Agua y Drenaje de Monterrey, IPD (SADM) | W | Potosi | 221 | - /20 | 04/22 | - /24 | - /24 | 47 | 1915 | 1118 | 1162 | V | (1) | 0.75 | (3) | 300 | 300 | (F) | ||||
| Mashkid 2 | Iran | Sistan and Balouchestan Water Authority | F I W | Simish & Mashkid | 115 | 10/17 | 04/22 | - /24 | - /25 | 36 | 1450 | 650 | 850 | |||||||||||
| Uçarsu | Turkey | DSI - State Hydraulic Works | W | Uçarsu | 1 | - /18 | - /23 | - /24 | - /25 | 30 | 199 | 50 | ||||||||||||
| Upper Wawa [H-F] | Philippines | Wawa JV Co. Inc. (Prime Infrastructure Capital Inc and San Lorenzo Ruiz Builders and Developers Group) | W | Marikina | 120 | 06/21 | 01/23 | - /24 | - /25 | 87 | 439 | 1035 | 1043 | 0.60 | (3') | 0.80 | (3')* | 0.80 | (3')* | 300 | 3600 | 80 70 | 120 110 | (F) |
| Daxingzhai | China | I W | Tong | 113 | 06/22 | 02/24 | 06/25 | - /26 | 69 | 288 | ||||||||||||||
| Gross Dam Raise [A-G] | USA | Denver Water | W | South Boulder Creek | 147 | 04/22 | 04/24 | 11/25 | 12/26 | 144 | 610 | 568 | 300 | 300 | ||||||||||
| Gatos | Brazil | SRHS (Secretaria de Recursos Hídricos e de Saneamento) | F W | Sem Nome | 6 | - /12 | - /13 | - /25 | - /26 | 38 | 325 | |||||||||||||
| El-Janneh [A-G] | Lebanon | EBML | H I W | Ibrahim (Abraham) | 38 | - /15 | 02/20 | - /25 | - /26 | 162 | 350 | 1450 | 300 | 300 | ||||||||||
| Zimari | Turkey | DSI - State Hydraulic Works | W | Zimari | 2 | - /18 | - /21 | - /25 | - /26 | 37 | 126 | 80 | ||||||||||||
| Sariçay | Turkey | DSI - State Hydraulic Works | W | Sariçay | 67 | 08/19 | - /22 | - /25 | 07/26 | 125 | 441 | 1163 | ||||||||||||
| Tang e Mashooreh [A] | Iran | Lorestan Water Authority | F I W | Karkheh | 55 | - /13 | - /22 | - /25 | - /26 | 73 | 220 | |||||||||||||
| Nwamitwa | South Africa | Department of Water & Sanitation | W | Groot Letaba | - /17 | - /22 | - /25 | - /26 | 44 | 350 | 170 | 226 | ||||||||||||
| Niulu | China | H I W | Niulushi | 66 | - /18 | - /22 | - /25 | - /26 | 80 | 391 | ||||||||||||||
| Leon Hurse | USA | Upper Trinity Regional Water District | W | Sulphur | 00/00 | 00/00 | 00/00 | 00/00 | 32 | 215 | ||||||||||||||
| Mohammed V Dam Raise | Morocco | Ministère de l'Equipement, des Transports, de la Logistique et de l'Eau | I W | Moulouya | 980 | - /22 | - /24 | - /25 | - /26 | 73 | ||||||||||||||
| Beni Azimane [H-F] | Morocco | Direction des Aménagements Hydrauliques | F I W | Kert | 44 | 01/22 | 10/22 | 01/26 | 10/26 | 70 | 684 | 800 | 0.50 | (1)* | 0.90 | (1)* | 0.90 | (1)* | 300 | 300 | 100 | 0 | ||
| Assif Ouender | Morocco | AREP (Regional Project Execution Agency) | F I R W | Assif Ouender | 15 | 11/23 | - /25 | 03/26 | 06/26 | 45 | 300 | V | 0.90 | 0.90 | ||||||||||
| Mwache | Kenya | Ministry of Water and Sanitation | I W | Mwache | 136 | 04/22 | 03/25 | 06/26 | - /26 | 84 | 526 | 610 | 620 | (3')* | 300 | 300 | 70 | 150 | ||||||
| Panelas II | Brazil | SRHS (Secretaria de Recursos Hídricos e de Saneamento) | W | Una | 17 | - /16 | - /17 | 06/26 | - /27 | 55 | 311 | |||||||||||||
| Shafaroud | Iran | Iran Water & Power Development Company (IWPCo) | H I W | Shafaroud | 52 | 03/12 | 03/20 | 07/24 | 11/25 | 101 | 300 | 725 | 740 | 0.10 0.50 | (3') | 0.80 | (3')* | 0.80 | (12) | 300 | 300 | |||
| Kheng Grou | Morocco | Direction des Aménagements Hydrauliques | F I W | Kheng Grou | 1070 | 04/22 | 01/24 | 08/26 | - /26 | 79 | 196 | 550 | 55 | 0.20 | (5) | 1.00 | (5) | 1.00 | (13) | 300 | 3000 | |||
| Gwayi-Shangani | Zimbabwe | Zimbabwe National Water Authority (Zinwa) | H I W | Gwayi | 634 | 09/04 | - /22 | - /26 | - /27 | 72 | 305 | 300 | 60 | 140 | (F) | |||||||||
| Ghiz Ghalek (formerly Dashte Palang) | Iran | Boushehr Regional Water Company | F I W | Dashte Palang | 151 | 07/13 | - /22 | - /26 | - /28 | 63 | 800 | 540 | 690 | |||||||||||
| Guanyin | China | Guizhou Water Conservancy Investment Group Co, Ltd | H I W | Guanyinsi | 121 | 12/21 | - /23 | - /26 | - /27 | 109 | ||||||||||||||
| Salipazari | Turkey | DSI - State Hydraulic Works | I W | Degimendere | 16 | - /17 | - /24 | - /26 | - /27 | 89 | 396 | 430 | ||||||||||||
| Heibaoshan [H-F] | China | Construction Headquarters of Heibaoshan Reservoir Project in Wanyuan City | I W | Dayan | 2 | - /22 | - /24 | - /26 | - /27 | 60 | ||||||||||||||
| Bouljir | Morocco | AREP (Regional Project Execution Agency) | F I R W | Boujir | 12 | 07/24 | - /25 | - /26 | - /27 | 25 | 416 | 0.20 | 0.80 | 0.80 | ||||||||||
| Oued Lakhdar | Morocco | Direction des Aménagements Hydrauliques | F H I W | Lakhdar | 150 | - /23 | - /25 | - /27 | - /27 | 110 | ||||||||||||||
| Cibeet [H-F] | Indonesia | PUPR (Public Works and Public Housing Ministry) | F H I W | Cibeet | 83 | 09/23 | - /25 | - /27 | - /28 | 47 | 960 | 371 | 0.90 | 0.90 | 0.90 | 250 | 750 | 106 | 0 | (-) | ||||
| Monti Nieddu (formerly Sa Stria) | Italy | Consorzio di Bonifica della Sardegna Meridionale | I W | Monti Nieddu | 35 | 01/98 | - /18 | - /28 | - /28 | 88 | 360 | 333 | 449 | 0.05 | (1) | 0.75 | (1)* | 0.75 | (1) | 300 | 300 | (F) | ||
| Qingyukou | China | F H W | Bahe | 141 | 04/22 | - /24 | - /28 | - /29 | 71 | |||||||||||||||
| Taraz | Iran | Khuzestan Province Power & Water Authority | H I W | Harkesh | 38 | - /18 | - /22 | - /29 | - /31 | 57 | 350 | 240 | ||||||||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Japan
Owner: Ministry of Construction
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Shimaji
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: 09/76
Start of RCC: 09/76
End of RCC: 04/80
End of Project: 03/81
Specifications
Height: 89 metres
Length: 240 metres
Volume of RCC: 165 m3x103
Total volume: 317 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.30 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 150 to | 500 |
| 200 | 700 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: Australia
Owner: Kidston Gold Mines Ltd.
Type: Gravity
Purpose(s): Water Supply
River: Copperfield
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: 12/83
Start of RCC: 12/83
End of RCC: 09/84
End of Project: 09/84
Specifications
Height: 40 metres
Length: 340 metres
Volume of RCC: 140 m3x103
Total volume: 156 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork |
| 0.90 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 30 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Exxon Company, Houston, Texas
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Middle Fork
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 05/84
Start of RCC: 05/84
End of RCC: 09/84
End of Project: 11/84
Specifications
Height: 38 metres
Length: 125 metres
Volume of RCC: 42 m3x103
Total volume: 43 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| conduit |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 66 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: USA
Owner: Winchester Municipal Utility
Type: Gravity
Purpose(s): Water Supply
River: Upper Howard Creek
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 06/84
Start of RCC: 06/84
End of RCC: 11/84
End of Project: 01/85
Specifications
Height: 23 metres
Length: 363 metres
Volume of RCC: 24 m3x103
Total volume: 27 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
| 1.00 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 1.00 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 104 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: USA
Owner: Douglas County
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Cow Creek
Reservoir capacity: 52 m3x106
Construction Dates
Start of Project: 07/84
Start of RCC: 07/84
End of RCC: 08/85
End of Project: 10/85
Specifications
Height: 50 metres
Length: 290 metres
Volume of RCC: 161 m3x103
Total volume: 171 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Unformed face of RCC |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 53 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 51 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: Junta de Andalucia
Type: Gravity
Purpose(s): Water Supply
River: Cala
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 07/84
Start of RCC: 07/84
End of RCC: 10/85
End of Project: 12/85
Specifications
Height: 25 metres
Length: 124 metres
Volume of RCC: 14 m3x103
Total volume: 20 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 450 | 450 |
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| 61 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 116 | Low-lime flyash (ASTM Class F) |
| 120 |

Details
Country: China
Owner: Kengkou Reservoir Management Office
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Youxi
Reservoir capacity: 27 m3x106
Construction Dates
Start of Project: 11/84
Start of RCC: 11/84
End of RCC: 04/86
End of Project: 11/86
Specifications
Height: 57 metres
Length: 123 metres
Volume of RCC: 43 m3x103
Total volume: 62 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with hot poured membrane |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 & | 250 & |
| 500 | 500 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Low-lime flyash (ASTM Class F) |
| 80 |

Details
Country: Australia
Owner: Rivers and Water Supply Commission of Tasmania
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Coal
Reservoir capacity: 13 m3x106
Construction Dates
Start of Project: 01/86
Start of RCC: 01/86
End of RCC: 06/86
End of Project: 08/86
Specifications
Height: 25 metres
Length: 247 metres
Volume of RCC: 22 m3x103
Total volume: 24 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 1.00 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 60 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Ministry of Construction
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Tama
Reservoir capacity: 254 m3x106
Construction Dates
Start of Project: 08/80
Start of RCC: 08/80
End of RCC: 07/86
End of Project: 12/90
Specifications
Height: 100 metres
Length: 441 metres
Volume of RCC: 772 m3x103
Total volume: 1150 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.60 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.81 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.81 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 150 - | 750 |
| 200 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Village of Ruidoso
Type: Gravity
Purpose(s): Water Supply
River: Grindstone
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 09/85
Start of RCC: 09/85
End of RCC: 07/86
End of Project: 10/86
Specifications
Height: 42 metres
Length: 432 metres
Volume of RCC: 88 m3x103
Total volume: 96 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 76 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: USA
Owner: North Jersey District Water Supply Commission and Hackensack Water Company
Type: Gravity
Purpose(s): Water Supply
River: Wanaque
Reservoir capacity: 27 m3x106
Construction Dates
Start of Project: 05/85
Start of RCC: 05/85
End of RCC: 08/86
End of Project: 11/86
Specifications
Height: 48 metres
Length: 670 metres
Volume of RCC: 219 m3x103
Total volume: 232 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.78 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: South Africa
Owner: Department of Water & Sanitation
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Little Fish
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: 09/84
Start of RCC: 09/84
End of RCC: 08/86
End of Project: 10/87
Specifications
Height: 30 metres
Length: 300 metres
Volume of RCC: 35 m3x103
Total volume: 65 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.60 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.60 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 250 |
Cementitious material
| Cement (kg/m3) |
|---|
| 58 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 58 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: SRH (Secretaria de RecursosHidricos)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Gravata
Reservoir capacity: 97 m3x106
Construction Dates
Start of Project: 07/85
Start of RCC: 07/85
End of RCC: 10/86
End of Project: 06/87
Specifications
Height: 56 metres
Length: 230 metres
Volume of RCC: 132 m3x103
Total volume: 143 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |

Details
Country: South Africa
Owner: Department of Water & Sanitation
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Olifants
Reservoir capacity: 104 m3x106
Construction Dates
Start of Project: 09/85
Start of RCC: 09/85
End of RCC: 11/86
End of Project: 07/87
Specifications
Height: 36 metres
Length: 455 metres
Volume of RCC: 101 m3x103
Total volume: 142 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork [stepped face] |
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 36 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 74 | Ground-granulated blast-furnace slag |

Details
Country: South Africa
Owner: Department of Water & Sanitation
Type: Gravity
Purpose(s): Water Supply
River: Slang
Reservoir capacity: 190 m3x106
Construction Dates
Start of Project: 05/85
Start of RCC: 05/85
End of RCC: 03/87
End of Project: 09/88
Specifications
Height: 47 metres
Length: 527 metres
Volume of RCC: 97 m3x103
Total volume: 134 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork [stepped face] |
| 0.62 |
Spillway
| Slope | Type |
|---|---|
| 0.62 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 250 |
Cementitious material
| Cement (kg/m3) |
|---|
| 36 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 84 | Ground-granulated blast-furnace slag |

Details
Country: USA
Owner: Central Utah Water Conservancy District
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Rock Creek
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: 12/83
Start of RCC: 12/83
End of RCC: 08/87
End of Project: 12/87
Specifications
Height: 91 metres
Length: 815 metres
Volume of RCC: 1125 m3x103
Total volume: 1281 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Slip-formed/extruded facing elements |
Downstream
| Slope | Type |
|---|---|
| 0.32 | Slip-formed/extruded facing elements |
| 0.60 | Slip-formed/extruded facing elements |
Spillway
| Slope | Type |
|---|---|
| 0.32 | Slip-formed/extruded facing elements [stepped face] |
| 0.60 | Slip-formed/extruded facing elements [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 79 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 173 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: Confederación Hidrográfica del Tajo
Type: Gravity
Purpose(s): Water Supply
River: Morales
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 06/86
Start of RCC: 06/86
End of RCC: 10/87
End of Project: 12/87
Specifications
Height: 28 metres
Length: 200 metres
Volume of RCC: 22 m3x103
Total volume: 26 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 - | 300 - |
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 74 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 140 | Low-lime flyash (ASTM Class F) |
| 128 |

Details
Country: Japan
Owner: Fukushima Prefecture
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Mano
Reservoir capacity: 36 m3x106
Construction Dates
Start of Project: 12/83
Start of RCC: 12/83
End of RCC: 01/88
End of Project: 03/90
Specifications
Height: 69 metres
Length: 239 metres
Volume of RCC: 104 m3x103
Total volume: 219 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 180 | 500 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 24 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Upper Yampa Water Conservancy District, Steamboat Springs, Colorado
Type: Gravity
Purpose(s): Hydropower / Irrigation / Recreation / Water Supply
River: Yampa
Reservoir capacity: 42 m3x106
Construction Dates
Start of Project: 08/87
Start of RCC: 08/87
End of RCC: 07/88
End of Project: 11/88
Specifications
Height: 46 metres
Length: 116 metres
Volume of RCC: 34 m3x103
Total volume: 39 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 71 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 71 | Low-lime flyash (ASTM Class F) |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Hardfill
Purpose(s): Irrigation / Water Supply
River: Rouidat
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 05/87
Start of RCC: 05/87
End of RCC: 10/88
End of Project: 12/88
Specifications
Height: 24 metres
Length: 125 metres
Volume of RCC: 25 m3x103
Total volume: 27 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.40 | RCC against precast concrete panels [stepped face] |
Downstream
| Slope | Type |
|---|---|
| 0.40 | RCC against precast concrete panels [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.40 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |

Details
Country: Japan
Owner: Water Resources Development Public Corporation
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Nunome
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: 05/86
Start of RCC: 05/86
End of RCC: 10/88
End of Project: 12/89
Specifications
Height: 72 metres
Length: 322 metres
Volume of RCC: 110 m3x103
Total volume: 330 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.40 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 78 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 42 | Low-lime flyash (ASTM Class F) |

Details
Country: South Africa
Owner: Department of Water & Sanitation
Type: Arch-Gravity
Purpose(s): Water Supply
River: Rietspruit
Reservoir capacity: 137 m3x106
Construction Dates
Start of Project: 04/88
Start of RCC: 04/88
End of RCC: 11/88
End of Project: 09/89
Specifications
Height: 50 metres
Length: 200 metres
Volume of RCC: 45 m3x103
Total volume: 59 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.60 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.60 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 250 |
Cementitious material
| Cement (kg/m3) |
|---|
| 61 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 142 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: Confederación Hidrográfica del Guadiana
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Lácara
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: 05/88
Start of RCC: 05/88
End of RCC: 11/88
End of Project: 01/89
Specifications
Height: 32 metres
Length: 240 metres
Volume of RCC: 25 m3x103
Total volume: 54 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.50 | RCC against formwork [stepped face] |
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 250 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 156 | Low-lime flyash (ASTM Class F) |
| 145 |

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Water Supply
River: Yuxi
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/85
Start of RCC: -/85
End of RCC: -/88
End of Project: -/89
Specifications
Height: 38 metres
Length: 102 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: USA
Owner: Colorado River Municipal Water District
Type: Gravity
Purpose(s): Water Supply
River: Colorado
Reservoir capacity: 700 m3x106
Construction Dates
Start of Project: 05/87
Start of RCC: 05/87
End of RCC: 04/89
End of Project: 01/90
Specifications
Height: 31 metres
Length: 173 metres
Volume of RCC: 89 m3x103
Total volume: 158 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
| Slope | Type |
|---|---|
| 0.831 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| ogee | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 125 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 62 | High-lime flyash (ASTM Class C) |

Details
Country: China
Owner: Dehua County, Fujian Province
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Chanxi
Reservoir capacity: 53 m3x106
Construction Dates
Start of Project: 12/85
Start of RCC: 12/85
End of RCC: 08/89
End of Project: 09/89
Specifications
Height: 58 metres
Length: 150 metres
Volume of RCC: 71 m3x103
Total volume: 93 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced conventional concrete cast after RCC placement |
| 0.30 | Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| 54 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 82 | Low-lime flyash (ASTM Class F) |
| 86 |

Details
Country: South Africa
Owner: Department of Water & Sanitation
Type: Arch-Gravity
Purpose(s): Water Supply
River: Great Brak
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: 11/87
Start of RCC: 11/87
End of RCC: 10/89
End of Project: 11/90
Specifications
Height: 70 metres
Length: 268 metres
Volume of RCC: 180 m3x103
Total volume: 210 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 250 |
Cementitious material
| Cement (kg/m3) |
|---|
| 58 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 136 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Gunma Prefecture
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Kabura
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: 03/86
Start of RCC: 03/86
End of RCC: 01/90
End of Project: 03/92
Specifications
Height: 70 metres
Length: 300 metres
Volume of RCC: 167 m3x103
Total volume: 350 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.40 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 180 | 500 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 24 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Washington County Water Conservancy District
Type: Gravity
Purpose(s): Water Supply
River: Quail Creek
Reservoir capacity: 50 m3x106
Construction Dates
Start of Project: 02/90
Start of RCC: 02/90
End of RCC: 05/90
End of Project: 08/90
Specifications
Height: 42 metres
Length: 610 metres
Volume of RCC: 130 m3x103
Total volume: 150 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.85 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| conduit |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 53 | Low-lime flyash (ASTM Class F) |

Details
Country: Honduras
Owner: Servicio Autonomo Nacional Acueductos y Acantarillados (SANAA)
Type: Gravity
Purpose(s): Water Supply
River: San Jose
Reservoir capacity: 35 m3x106
Construction Dates
Start of Project: 12/88
Start of RCC: 12/88
End of RCC: 06/90
End of Project: 08/90
Specifications
Height: 68 metres
Length: 694 metres
Volume of RCC: 270 m3x103
Total volume: 290 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.075 | Traditional concrete against formwork with external geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |

Details
Country: South Africa
Owner: Department of Water & Sanitation
Type: Gravity
Purpose(s): Water Supply
River: Kubusie
Reservoir capacity: 94 m3x106
Construction Dates
Start of Project: 07/88
Start of RCC: 07/88
End of RCC: 07/90
End of Project: 12/90
Specifications
Height: 34 metres
Length: 737 metres
Volume of RCC: 134 m3x103
Total volume: 165 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork [stepped face] |
| 0.62 |
Spillway
| Slope | Type |
|---|---|
| 0.62 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 250 |
Cementitious material
| Cement (kg/m3) |
|---|
| 44 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 66 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: Diputación Foral de Alava
Type: Gravity
Purpose(s): Water Supply
River: Izoria and Idas
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 01/89
Start of RCC: 01/89
End of RCC: 08/90
End of Project: 11/91
Specifications
Height: 53 metres
Length: 182 metres
Volume of RCC: 80 m3x103
Total volume: 91 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.05 | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork [stepped face] |
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 160 | Low-lime flyash (ASTM Class F) |
| 170 |

Details
Country: Japan
Owner: Hokkaido Prefecture
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Asari
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: 07/86
Start of RCC: 07/86
End of RCC: 09/90
End of Project: 03/93
Specifications
Height: 74 metres
Length: 390 metres
Volume of RCC: 259 m3x103
Total volume: 517 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.30 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 180 | 500 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 24 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: Junta de Extremadura
Type: Gravity
Purpose(s): Water Supply
River: Hervás
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 01/89
Start of RCC: 01/89
End of RCC: 09/90
End of Project: 10/90
Specifications
Height: 33 metres
Length: 210 metres
Volume of RCC: 24 m3x103
Total volume: 43 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.15 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
| Traditional concrete against precast concrete panels [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 155 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Yamagata Prefecture
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Kaneyama
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: 07/86
Start of RCC: 07/86
End of RCC: 10/90
End of Project: 08/93
Specifications
Height: 61 metres
Length: 257 metres
Volume of RCC: 136 m3x103
Total volume: 307 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.60 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 150 - | 500 |
| 200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 24 | Low-lime flyash (ASTM Class F) |

Details
Country: South Africa
Owner: Department of Water & Sanitation
Type: Gravity
Purpose(s): Water Supply
River: Ecca
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: 02/88
Start of RCC: 02/88
End of RCC: 12/90
End of Project: 04/91
Specifications
Height: 32 metres
Length: 380 metres
Volume of RCC: 66 m3x103
Total volume: 114 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 330 | 330 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 65 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: CODEVASF
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Gameleiras
Reservoir capacity: 145 m3x106
Construction Dates
Start of Project: 07/90
Start of RCC: 07/90
End of RCC: 04/91
End of Project: 05/91
Specifications
Height: 29 metres
Length: 150 metres
Volume of RCC: 27 m3x103
Total volume: 29 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 52 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 13 | No pozzolan used |

Details
Country: Japan
Owner: Toyama Prefecture
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Sakai
Reservoir capacity: 60 m3x106
Construction Dates
Start of Project: 03/85
Start of RCC: 03/85
End of RCC: 07/91
End of Project: 01/93
Specifications
Height: 115 metres
Length: 298 metres
Volume of RCC: 373 m3x103
Total volume: 713 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.80 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 180 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: Australia
Owner: Water Authority of Western Australia
Type: Gravity
Purpose(s): Water Supply
River: Munday Brook
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: 08/90
Start of RCC: 08/90
End of RCC: 08/91
End of Project: 11/91
Specifications
Height: 52 metres
Length: 285 metres
Volume of RCC: 121 m3x103
Total volume: 135 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Slip-formed/extruded facing elements |
Downstream
| Slope | Type |
|---|---|
| 0.325 | Slip-formed/extruded facing elements [stepped face] |
| 0.80 | Slip-formed/extruded facing elements [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.325 | Slip-formed/extruded facing elements [stepped face] |
| 0.80 | Slip-formed/extruded facing elements [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 79 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 160 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: Junta de Extremadura
Type: Gravity
Purpose(s): Water Supply
River: Ribera de los Montes
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 12/90
Start of RCC: 12/90
End of RCC: 09/91
End of Project: 12/91
Specifications
Height: 24 metres
Length: 167 metres
Volume of RCC: 25 m3x103
Total volume: 33 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Slip-formed/extruded facing elements |
Downstream
| Slope | Type |
|---|---|
| 0.13 | Slip-formed/extruded facing elements [stepped face] |
| 0.60 |
Spillway
| Slope | Type |
|---|---|
| 0.60 | Reinforced concrete cast against precast units or slip-formed facing elements [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 135 | Low-lime flyash (ASTM Class F) |

Details
Country: France
Owner: CAPB (Communauté d'Agglomération Pays Basque)
Type: Gravity
Purpose(s): Water Supply
River: Lessarte
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 04/91
Start of RCC: 04/91
End of RCC: 10/91
End of Project: 12/91
Specifications
Height: 32 metres
Length: 132 metres
Volume of RCC: 19 m3x103
Total volume: 23 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Mechanically compacted unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 110 | ROLAC (mixture of flyash and slag with or without limestone fines) |

Details
Country: Brazil
Owner: COMPESA (Companhia Pernambucana de Saneamento)
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Riacho do Chorão
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: -/89
Start of RCC: -/89
End of RCC: -/91
End of Project: -/92
Specifications
Height: 42 metres
Length: 360 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: USA
Owner: Brazos River Authority
Type: Gravity
Purpose(s): Water Supply
River: Double Mountain Fork
Reservoir capacity: 140 m3x106
Construction Dates
Start of Project: 03/91
Start of RCC: 03/91
End of RCC: 04/92
End of Project: -/93
Specifications
Height: 25 metres
Length: 84 metres
Volume of RCC: 22 m3x103
Total volume: 23 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
| Slope | Type |
|---|---|
| 1.10 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 119 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 59 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: Confederación Hidrográfica del Ebro
Type: Gravity
Purpose(s): Water Supply
River: Alzania
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: 03/90
Start of RCC: 03/90
End of RCC: 07/92
End of Project: 10/92
Specifications
Height: 58 metres
Length: 396 metres
Volume of RCC: 150 m3x103
Total volume: 240 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 108 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: City of Lebanon Authority
Type: Gravity
Purpose(s): Water Supply
River: Mill
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: 09/91
Start of RCC: 09/91
End of RCC: 07/92
End of Project: -/93
Specifications
Height: 40 metres
Length: 213 metres
Volume of RCC: 69 m3x103
Total volume: 70 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 59 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 34 | Low-lime flyash (ASTM Class F) |

Details
Country: South Africa
Owner: Department of Water & Sanitation & the former Bophuthatswana Department of Water Affairs
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Harts
Reservoir capacity: 66 m3x106
Construction Dates
Start of Project: 06/90
Start of RCC: 06/90
End of RCC: 09/92
End of Project: 05/93
Specifications
Height: 50 metres
Length: 320 metres
Volume of RCC: 132 m3x103
Total volume: 153 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 250 |
Cementitious material
| Cement (kg/m3) |
|---|
| 44 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 66 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: Diputacion Foral de Gipuzkoa
Type: Gravity
Purpose(s): Water Supply
River: Arriarán
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 10/91
Start of RCC: 10/91
End of RCC: 09/92
End of Project: 02/94
Specifications
Height: 58 metres
Length: 206 metres
Volume of RCC: 110 m3x103
Total volume: 113 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.05 | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 135 | Low-lime flyash (ASTM Class F) |

Details
Country: Australia
Owner: North Goonyella Coal Properties
Type: Gravity
Purpose(s): Water Supply
River: Isaac
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: 07/92
Start of RCC: 07/92
End of RCC: 11/92
End of Project: 12/92
Specifications
Height: 26 metres
Length: 285 metres
Volume of RCC: 64 m3x103
Total volume: 68 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with geomembrane |
| 1.00 | Unformed face of RCC |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
| 1.00 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced concrete cast against precast units or slip-formed facing elements [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Japan
Owner: Ministry of Construction
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Sakoma
Reservoir capacity: 42 m3x106
Construction Dates
Start of Project: 09/87
Start of RCC: 09/87
End of RCC: 11/92
End of Project: 03/97
Specifications
Height: 100 metres
Length: 378 metres
Volume of RCC: 521 m3x103
Total volume: 836 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.30 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 150 - | 750 - |
| 200 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Water Supply
River: Joumoua
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: 07/89
Start of RCC: 07/89
End of RCC: 11/92
End of Project: 12/92
Specifications
Height: 57 metres
Length: 250 metres
Volume of RCC: 150 m3x103
Total volume: 200 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 350 | 350 |
Cementitious material
| Cement (kg/m3) |
|---|
| 105 |
| 180 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 45 | No pozzolan used |
| 0 |

Details
Country: Japan
Owner: Ministry of Construction
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Ashida
Reservoir capacity: 60 m3x106
Construction Dates
Start of Project: 08/88
Start of RCC: 08/88
End of RCC: -/92
End of Project: 03/98
Specifications
Height: 85 metres
Length: 325 metres
Volume of RCC: 228 m3x103
Total volume: 500 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.20 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 150 - | 750 |
| 200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: Greece
Owner: Ministry of Agriculture
Type: Hardfill
Purpose(s): Irrigation / Water Supply
River: Marathia
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 11/91
Start of RCC: 11/91
End of RCC: 04/93
End of Project: 06/93
Specifications
Height: 28 metres
Length: 265 metres
Volume of RCC: 31 m3x103
Total volume: 48 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.50 | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
| Slope | Type |
|---|---|
| 0.50 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| 0.50 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 200 - | 200 - |
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: Guizhou Qianyuan Power Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower / Irrigation / Water Supply
River: Sanchahe
Reservoir capacity: 377 m3x106
Construction Dates
Start of Project: 03/89
Start of RCC: 03/89
End of RCC: 05/93
End of Project: 02/94
Specifications
Height: 75 metres
Length: 196 metres
Volume of RCC: 103 m3x103
Total volume: 137 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.35 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
| 0.35 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| 54 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 103 | Low-lime flyash (ASTM Class F) |
| 99 |

Details
Country: Japan
Owner: Okayama Prefecture
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Kamo
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: 10/89
Start of RCC: 10/89
End of RCC: 07/93
End of Project: 03/94
Specifications
Height: 76 metres
Length: 228 metres
Volume of RCC: 222 m3x103
Total volume: 342 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.60 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 24 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Western Virginia Water Authority
Type: Gravity
Purpose(s): Water Supply
River: off-stream
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: 10/92
Start of RCC: 10/92
End of RCC: 08/93
End of Project: -/94
Specifications
Height: 74 metres
Length: 302 metres
Volume of RCC: 222 m3x103
Total volume: 223 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| none |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 53 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 53 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Banks County
Type: Gravity
Purpose(s): Water Supply
River: Mountain Creek
Reservoir capacity: -
Construction Dates
Start of Project: 11/92
Start of RCC: 11/92
End of RCC: 08/93
End of Project: -/93
Specifications
Height: 21 metres
Length: 168 metres
Volume of RCC: 26 m3x103
Total volume: 28 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 119 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 84 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Fukushima Prefecture
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Kodama
Reservoir capacity: 14 m3x106
Construction Dates
Start of Project: 10/89
Start of RCC: 10/89
End of RCC: 12/93
End of Project: 03/97
Specifications
Height: 102 metres
Length: 280 metres
Volume of RCC: 358 m3x103
Total volume: 570 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.20 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Ground-granulated blast-furnace slag |

Details
Country: Japan
Owner: Miyagi Prefecture
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Miyatoko
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: 06/89
Start of RCC: 06/89
End of RCC: 12/93
End of Project: 01/97
Specifications
Height: 48 metres
Length: 256 metres
Volume of RCC: 172 m3x103
Total volume: 280 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.60 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 180 | 500 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 24 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Hainan Provincial Electric Power Company (HEPCO)
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Changhua
Reservoir capacity: 1710 m3x106
Construction Dates
Start of Project: 06/90
Start of RCC: 06/90
End of RCC: 12/93
End of Project: 07/95
Specifications
Height: 57 metres
Length: 719 metres
Volume of RCC: 485 m3x103
Total volume: 860 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against precast concrete blocks |
| RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 96 | Low-lime flyash (ASTM Class F) |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Sahla
Reservoir capacity: 62 m3x106
Construction Dates
Start of Project: 05/92
Start of RCC: 05/92
End of RCC: 12/93
End of Project: 07/94
Specifications
Height: 55 metres
Length: 160 metres
Volume of RCC: 130 m3x103
Total volume: 160 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| 125 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |
| 25 |

Details
Country: Brazil
Owner: SUPLAN/RN
Type: Gravity
Purpose(s): Water Supply
River: Taperobá
Reservoir capacity: 76 m3x106
Construction Dates
Start of Project: 12/91
Start of RCC: 12/91
End of RCC: -/93
End of Project: -/94
Specifications
Height: 34 metres
Length: 296 metres
Volume of RCC: 69 m3x103
Total volume: 89 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | No pozzolan used |

Details
Country: China
Owner: Lianjiang Water Conservancy Bureau
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Aojiang
Reservoir capacity: 172 m3x106
Construction Dates
Start of Project: 08/92
Start of RCC: 08/92
End of RCC: 05/94
End of Project: 06/95
Specifications
Height: 66 metres
Length: 274 metres
Volume of RCC: 180 m3x103
Total volume: 272 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| 0.77 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 125 | Low-lime flyash (ASTM Class F) |
| 95 |

Details
Country: Mexico
Owner: CNA (Comisión Nacional del Agua)
Type: Gravity
Purpose(s): Flood Control / Groundwater Recharge / Water Supply
River: San Lazaro
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: 10/85
Start of RCC: 10/85
End of RCC: 06/94
End of Project: 07/94
Specifications
Height: 37 metres
Length: 176 metres
Volume of RCC: 35 m3x103
Total volume: 53 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
| 0.20 |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 220 | Milled sand |
| 220 |

Details
Country: China
Owner: Wenquanbao Reservoir Management Office
Type: Thin Arch
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Tanghe
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: 10/91
Start of RCC: 10/91
End of RCC: 06/94
End of Project: -/95
Specifications
Height: 48 metres
Length: 188 metres
Volume of RCC: 55 m3x103
Total volume: 63 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork with external geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.30 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| ogee | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 110 |
| 69 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 68 | Low-lime flyash (ASTM Class F) |
| 85 |

Details
Country: Brazil
Owner: SUPLAN/PB
Type: Gravity
Purpose(s): Water Supply
River: Picuí
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: 10/93
Start of RCC: 10/93
End of RCC: 10/94
End of Project: -/95
Specifications
Height: 31 metres
Length: 135 metres
Volume of RCC: 27 m3x103
Total volume: 28 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 56 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 14 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: CODEVASF (Companhia de Desenvolvimento dos Vales do Sao Francisco do Parnaiba)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Cova da Mandioca
Reservoir capacity: 126 m3x106
Construction Dates
Start of Project: 01/93
Start of RCC: 01/93
End of RCC: 12/94
End of Project: 12/94
Specifications
Height: 32 metres
Length: 342 metres
Volume of RCC: 75 m3x103
Total volume: 79 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | No pozzolan used |

Details
Country: Brazil
Owner: Companhia Pernambucana de Saceamento
Type: Gravity
Purpose(s): Water Supply
River: da Prata
Reservoir capacity: 42 m3x106
Construction Dates
Start of Project: -/92
Start of RCC: -/92
End of RCC: 12/94
End of Project: -/95
Specifications
Height: 26 metres
Length: 405 metres
Volume of RCC: 61 m3x103
Total volume: 75 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
| [stepped face] |
Spillway
| Slope | Type |
|---|---|
| [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Japan
Owner: Ministry of Construction
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Nakatsu
Reservoir capacity: 193 m3x106
Construction Dates
Start of Project: 11/87
Start of RCC: 11/87
End of RCC: 02/95
End of Project: 03/01
Specifications
Height: 156 metres
Length: 400 metres
Volume of RCC: 1537 m3x103
Total volume: 2060 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against formwork |
| 0.60 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.625 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.625 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 150 - | 750 |
| 200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Kagawa Prefecture
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Yoshida
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 07/91
Start of RCC: 07/91
End of RCC: 02/95
End of Project: 03/96
Specifications
Height: 75 metres
Length: 218 metres
Volume of RCC: 265 m3x103
Total volume: 304 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Okayama Prefecture
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Takahashi
Reservoir capacity: 28 m3x106
Construction Dates
Start of Project: 03/89
Start of RCC: 03/89
End of RCC: 04/95
End of Project: 03/98
Specifications
Height: 98 metres
Length: 259 metres
Volume of RCC: 396 m3x103
Total volume: 670 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.77 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.77 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: Companhia de Gestão dos Recursos Hídricos
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Riacho da Madeira
Reservoir capacity: 69 m3x106
Construction Dates
Start of Project: 07/93
Start of RCC: 07/93
End of RCC: 05/95
End of Project: -/96
Specifications
Height: 51 metres
Length: 116 metres
Volume of RCC: 87 m3x103
Total volume: 93 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete blocks [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | Natural pozzolan (ASTM Class N) |

Details
Country: Japan
Owner: Akita Prefecture
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Matsu
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: 07/90
Start of RCC: 07/90
End of RCC: 06/95
End of Project: 09/96
Specifications
Height: 65 metres
Length: 296 metres
Volume of RCC: 141 m3x103
Total volume: 294 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.70 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Department of Electric Power, Lonyan City, Fujian Province
Type: Arch-Gravity
Purpose(s): Hydropower / Water Supply
River: Longshanxi
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: 08/93
Start of RCC: 08/93
End of RCC: 07/95
End of Project: 10/95
Specifications
Height: 64 metres
Length: 93 metres
Volume of RCC: 25 m3x103
Total volume: 33 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork with external geomembrane |
| 0.08 | RCC against formwork with external geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.65 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| ogee | Reinforced concrete cast against precast units or slip-formed facing elements |
| 0.65 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 - | 300 - |
| 350 | 350 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 79 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Low-lime flyash (ASTM Class F) |
| 105 |

Details
Country: China
Owner: Guanyinge Reservoir Management Bureau
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Taizi
Reservoir capacity: 2168 m3x106
Construction Dates
Start of Project: 05/90
Start of RCC: 05/90
End of RCC: 09/95
End of Project: 10/95
Specifications
Height: 82 metres
Length: 1040 metres
Volume of RCC: 1240 m3x103
Total volume: 1876 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 270 - | 750 |
| 280 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Hokkaido Development Bureau
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Satsunai
Reservoir capacity: 54 m3x106
Construction Dates
Start of Project: 02/87
Start of RCC: 02/87
End of RCC: 10/95
End of Project: 03/99
Specifications
Height: 114 metres
Length: 300 metres
Volume of RCC: 536 m3x103
Total volume: 770 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.40 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 78 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 42 | Ground-granulated blast-furnace slag |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Taghoucht
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: 11/93
Start of RCC: 11/93
End of RCC: 10/95
End of Project: 03/96
Specifications
Height: 36 metres
Length: 80 metres
Volume of RCC: 45 m3x103
Total volume: 57 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 110 |
| 150 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | Natural pozzolan (ASTM Class N) |
| 0 |

Details
Country: USA
Owner: City of Greeley
Type: Gravity
Purpose(s): Water Supply
River: Tributary of Cache La Poudre
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 05/95
Start of RCC: 05/95
End of RCC: 11/95
End of Project: 12/95
Specifications
Height: 21 metres
Length: 70 metres
Volume of RCC: 7 m3x103
Total volume: 8 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 145 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 48 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Yamanashi Prefecture
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Shio
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: 05/93
Start of RCC: 05/93
End of RCC: 11/95
End of Project: 03/99
Specifications
Height: 79 metres
Length: 225 metres
Volume of RCC: 299 m3x103
Total volume: 388 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
| 0.70 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 24 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Water Resources Development Public Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Urayama
Reservoir capacity: 58 m3x106
Construction Dates
Start of Project: 03/90
Start of RCC: 03/90
End of RCC: 12/95
End of Project: 03/99
Specifications
Height: 156 metres
Length: 372 metres
Volume of RCC: 1294 m3x103
Total volume: 1750 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.65 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
| 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Department of Water Resources, Henan Province
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Gunhe
Reservoir capacity: 120 m3x106
Construction Dates
Start of Project: 07/93
Start of RCC: 07/93
End of RCC: 12/95
End of Project: 07/96
Specifications
Height: 41 metres
Length: 650 metres
Volume of RCC: 272 m3x103
Total volume: 351 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 98 |
| 51 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 98 | Low-lime flyash (ASTM Class F) |
| 107 |

Details
Country: Brazil
Owner: DNOCS (Departamento Nacional de Obras Contra a Seca)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Paraíba
Reservoir capacity: 247 m3x106
Construction Dates
Start of Project: -/93
Start of RCC: -/93
End of RCC: -/95
End of Project: -/95
Specifications
Height: 79 metres
Length: 440 metres
Volume of RCC: 674 m3x103
Total volume: 734 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Secretaria de Meio Ambiente e dos Recursos Hídricos do Estado do Rio Grande do Norte
Type: Gravity
Purpose(s): Recreation / Water Supply
River: Seridó
Reservoir capacity: 50 m3x106
Construction Dates
Start of Project: -/93
Start of RCC: -/93
End of RCC: -/95
End of Project: -/96
Specifications
Height: 26 metres
Length: 458 metres
Volume of RCC: 27 m3x103
Total volume: 28 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | Natural pozzolan (ASTM Class N) |

Details
Country: Honduras
Owner: Secretaria de Recursos Naturales
Type: Gravity
Purpose(s): Water Supply
River: Rio Grande Nacaome
Reservoir capacity: 42 m3x106
Construction Dates
Start of Project: 06/93
Start of RCC: 06/93
End of RCC: -/95
End of Project: -/95
Specifications
Height: 54 metres
Length: 320 metres
Volume of RCC: 250 m3x103
Total volume: 300 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.15 | Traditional concrete against formwork with external geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 21 | Natural pozzolan (ASTM Class N) |

Details
Country: Greece
Owner: Ministry of Agriculture
Type: Hardfill
Purpose(s): Irrigation / Water Supply
River: Ano Mera
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 04/93
Start of RCC: 04/93
End of RCC: -/95
End of Project: -/97
Specifications
Height: 32 metres
Length: 170 metres
Volume of RCC: 49 m3x103
Total volume: 64 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.50 | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
| Slope | Type |
|---|---|
| 0.50 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 200 - | 200 - |
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |

Details
Country: Japan
Owner: Gunma Prefecture
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Shima
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: 03/91
Start of RCC: 03/91
End of RCC: 05/96
End of Project: 03/98
Specifications
Height: 90 metres
Length: 330 metres
Volume of RCC: 390 m3x103
Total volume: 516 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.50 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Conyers-Rockdale Big Haynes Imp. Authority
Type: Gravity
Purpose(s): Water Supply
River: Big Haynes Creek
Reservoir capacity: -
Construction Dates
Start of Project: 10/94
Start of RCC: 10/94
End of RCC: 06/96
End of Project: 09/96
Specifications
Height: 27 metres
Length: 427 metres
Volume of RCC: 72 m3x103
Total volume: 74 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete blocks [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete blocks [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 42 |
| 39 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 42 | Low-lime flyash (ASTM Class F) |
| 39 |

Details
Country: Japan
Owner: Water Resources Development Public Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Katsura
Reservoir capacity: 66 m3x106
Construction Dates
Start of Project: -/83
Start of RCC: -/83
End of RCC: 07/96
End of Project: 03/98
Specifications
Height: 70 metres
Length: 438 metres
Volume of RCC: 440 m3x103
Total volume: 670 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.80 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
| 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| 77 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |
| 33 |

Details
Country: Japan
Owner: Water Resources Development Public Corporation
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Douzan
Reservoir capacity: 53 m3x106
Construction Dates
Start of Project: 02/92
Start of RCC: 02/92
End of RCC: 02/97
End of Project: 03/00
Specifications
Height: 111 metres
Length: 250 metres
Volume of RCC: 355 m3x103
Total volume: 510 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
| 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |
| 48 |

Details
Country: China
Owner: Wanyao Reservoir Management Bureau
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Dahexi
Reservoir capacity: 223 m3x106
Construction Dates
Start of Project: 10/93
Start of RCC: 10/93
End of RCC: 05/97
End of Project: 07/97
Specifications
Height: 83 metres
Length: 390 metres
Volume of RCC: 320 m3x103
Total volume: 458 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.20 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 96 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Hokkaido Development Bureau
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Sorachi
Reservoir capacity: 108 m3x106
Construction Dates
Start of Project: 10/90
Start of RCC: 10/90
End of RCC: 07/97
End of Project: 06/00
Specifications
Height: 50 metres
Length: 445 metres
Volume of RCC: 327 m3x103
Total volume: 455 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.06 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: City of Buffalo
Type: Gravity
Purpose(s): Water Supply
River: South Fork Clear Creek
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 05/96
Start of RCC: 05/96
End of RCC: 08/97
End of Project: -/97
Specifications
Height: 41 metres
Length: 170 metres
Volume of RCC: 62 m3x103
Total volume: 69 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 89 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 83 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Department of Electricity, Dapu County, Guangdong Province
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Meixihe
Reservoir capacity: 95 m3x106
Construction Dates
Start of Project: 01/95
Start of RCC: 01/95
End of RCC: 10/97
End of Project: 12/97
Specifications
Height: 60 metres
Length: 221 metres
Volume of RCC: 113 m3x103
Total volume: 172 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with hot poured membrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 110 | Low-lime flyash (ASTM Class F) |
| 105 |

Details
Country: Australia
Owner: Cadia Holdings Pty. Lty.
Type: Gravity
Purpose(s): Water Supply
River: Cadiangullong Creek
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: 11/96
Start of RCC: 11/96
End of RCC: 12/97
End of Project: 03/98
Specifications
Height: 43 metres
Length: 356 metres
Volume of RCC: 114 m3x103
Total volume: 123 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 90 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Department of Water Resources, Hebei Province
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Recreation / Water Supply
River: Qinglonghe
Reservoir capacity: 859 m3x106
Construction Dates
Start of Project: 11/92
Start of RCC: 11/92
End of RCC: 12/97
End of Project: -/98
Specifications
Height: 75 metres
Length: 500 metres
Volume of RCC: 585 m3x103
Total volume: 1350 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.15 |
Downstream
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
| 0.65 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 135 |
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 70 | Low-lime flyash (ASTM Class F) |
| 85 |

Details
Country: Brazil
Owner: Saneamento de Goiás S/A
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 129 m3x106
Construction Dates
Start of Project: -/86
Start of RCC: -/86
End of RCC: -/97
End of Project: -/97
Specifications
Height: 47 metres
Length: -
Volume of RCC: -
Total volume: 129 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: COMPESA (Companhia Pernambucana de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: Capema
Reservoir capacity: 40 m3x106
Construction Dates
Start of Project: -/95
Start of RCC: -/95
End of RCC: -/97
End of Project: -/98
Specifications
Height: 20 metres
Length: 405 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: COMPESA (Companhia Pernambucana de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: Ipojuca (Gravata)
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: 05/95
Start of RCC: 05/95
End of RCC: -/97
End of Project: -/98
Specifications
Height: 34 metres
Length: 470 metres
Volume of RCC: 113 m3x103
Total volume: 125 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | Natural pozzolan (ASTM Class N) |

Details
Country: Morocco
Owner: Direction des Arrenagements Hydrauliques
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: S’ra
Reservoir capacity: 56 m3x106
Construction Dates
Start of Project: 05/95
Start of RCC: 05/95
End of RCC: 05/98
End of Project: 09/98
Specifications
Height: 55 metres
Length: 174 metres
Volume of RCC: 165 m3x103
Total volume: 186 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| 120 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | Natural pozzolan (ASTM Class N) |
| 0 |

Details
Country: Japan
Owner: Iwate Prefecture
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Hienuki
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: 03/93
Start of RCC: 03/93
End of RCC: 06/98
End of Project: 03/00
Specifications
Height: 74 metres
Length: 333 metres
Volume of RCC: 141 m3x103
Total volume: 333 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.20 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: CORSAN (Companhia Riograndense de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: Ibicui-Mirim
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: 07/97
Start of RCC: 07/97
End of RCC: 07/98
End of Project: 11/98
Specifications
Height: 37 metres
Length: 675 metres
Volume of RCC: 69 m3x103
Total volume: 95 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 30 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Ministry of Construction
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Bonji
Reservoir capacity: 65 m3x106
Construction Dates
Start of Project: 08/88
Start of RCC: 08/88
End of RCC: 10/98
End of Project: 03/01
Specifications
Height: 123 metres
Length: 393 metres
Volume of RCC: 731 m3x103
Total volume: 1160 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
| 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Bethlehem Authority, City of Bethlehem
Type: Gravity
Purpose(s): Water Supply
River: Wild Creek
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 08/96
Start of RCC: 08/96
End of RCC: 10/98
End of Project: 12/98
Specifications
Height: 49 metres
Length: 610 metres
Volume of RCC: 283 m3x103
Total volume: 283 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.50 | RCC supported by fill shoulders |
| RCC against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| conduit |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 58 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 41 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Yongxi Hydroelectric Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Dazhangxi
Reservoir capacity: 68 m3x106
Construction Dates
Start of Project: 05/96
Start of RCC: 05/96
End of RCC: 10/98
End of Project: 09/99
Specifications
Height: 87 metres
Length: 198 metres
Volume of RCC: 170 m3x103
Total volume: 255 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.73 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
| 0.73 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 280 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 115 |
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 95 | Low-lime flyash (ASTM Class F) |
| 90 |

Details
Country: Brazil
Owner: DNOCS (Departamento Nacional de Obras Contra a Secas)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Capiibaribe
Reservoir capacity: 204 m3x106
Construction Dates
Start of Project: 07/96
Start of RCC: 07/96
End of RCC: 10/98
End of Project: -/99
Specifications
Height: 63 metres
Length: 442 metres
Volume of RCC: 442 m3x103
Total volume: 470 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | Natural pozzolan (ASTM Class N) |

Details
Country: Spain
Owner: Confederación Hidrográfica del Ebro
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Segre
Reservoir capacity: 402 m3x106
Construction Dates
Start of Project: 01/93
Start of RCC: 01/93
End of RCC: 12/98
End of Project: 01/00
Specifications
Height: 99 metres
Length: 630 metres
Volume of RCC: 980 m3x103
Total volume: 1016 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.15 | Traditional concrete against formwork |
| 0.35 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.40 | Traditional concrete against formwork |
| 0.65 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.65 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 330 | 330 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 130 | Low-lime flyash (ASTM Class F) |
| 130 |

Details
Country: China
Owner: Department of Water Resources, Hubei Province
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Yujiang
Reservoir capacity: 68 m3x106
Construction Dates
Start of Project: -/91
Start of RCC: -/91
End of RCC: 12/98
End of Project: 06/00
Specifications
Height: 69 metres
Length: 279 metres
Volume of RCC: 170 m3x103
Total volume: 200 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.74 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 5000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 134 |
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 89 | Low-lime flyash (ASTM Class F) |
| 48 |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Water Supply
River: Bous Sbaa
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: 01/97
Start of RCC: 01/97
End of RCC: 02/99
End of Project: 03/99
Specifications
Height: 55 metres
Length: 110 metres
Volume of RCC: 63 m3x103
Total volume: 77 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |
| 20 |

Details
Country: China
Owner: Department of Water Resources, Shanxi Province
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Fenhe
Reservoir capacity: 130 m3x106
Construction Dates
Start of Project: 11/96
Start of RCC: 11/96
End of RCC: 03/99
End of Project: 06/00
Specifications
Height: 87 metres
Length: 350 metres
Volume of RCC: 362 m3x103
Total volume: 448 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.20 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 127 |
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 84 | Low-lime flyash (ASTM Class F) |
| 93 |

Details
Country: China
Owner: Lishui Hydropower Development Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply
River: Loushui
Reservoir capacity: 1741 m3x106
Construction Dates
Start of Project: 07/95
Start of RCC: 07/95
End of RCC: 04/99
End of Project: -/01
Specifications
Height: 131 metres
Length: 368 metres
Volume of RCC: 1100 m3x103
Total volume: 1310 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| ogee | Reinforced concrete cast against precast units or slip-formed facing elements |
| 0.80 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 87 |
| 64 46 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 107 | Low-lime flyash (ASTM Class F) |
| 96 107 |

Details
Country: USA
Owner: Town of Wilson
Type: Gravity
Purpose(s): Water Supply
River: Contentea Creek
Reservoir capacity: -
Construction Dates
Start of Project: 03/98
Start of RCC: 03/98
End of RCC: 04/99
End of Project: 06/09
Specifications
Height: 16 metres
Length: 781 metres
Volume of RCC: 64 m3x103
Total volume: 69 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 89 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: China
Owner: Helong Electricity Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Recreation / Water Supply
River: Hailanhe
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: 09/97
Start of RCC: 09/97
End of RCC: 04/99
End of Project: 09/99
Specifications
Height: 29 metres
Length: 271 metres
Volume of RCC: 44 m3x103
Total volume: 77 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.73 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| conduit |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 2000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |

Details
Country: Eritrea
Owner: Government of Eritrea
Type: Gravity
Purpose(s): Water Supply
River: Toker
Reservoir capacity: 14 m3x106
Construction Dates
Start of Project: 11/96
Start of RCC: 11/96
End of RCC: 05/99
End of Project: 08/99
Specifications
Height: 73 metres
Length: 263 metres
Volume of RCC: 187 m3x103
Total volume: 210 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 330 | 330 |
Cementitious material
| Cement (kg/m3) |
|---|
| 110 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 85 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: CORSAN (Companhia Riograndense de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: Arroio Burati
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: -/98
Start of RCC: -/98
End of RCC: 07/99
End of Project: -/00
Specifications
Height: 29 metres
Length: 219 metres
Volume of RCC: 80 m3x103
Total volume: 115 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 18 | Natural pozzolan (ASTM Class N) |

Details
Country: Burkina Faso
Owner: Oner-Moz
Type: Gravity
Purpose(s): Water Supply
River: Nakambe
Reservoir capacity: 28 m3x106
Construction Dates
Start of Project: 04/98
Start of RCC: 04/98
End of RCC: 08/99
End of Project: 07/00
Specifications
Height: 18 metres
Length: 120 metres
Volume of RCC: 44 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete blocks [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| No pozzolan used | |

Details
Country: China
Owner: Department of Water Resources, Liaoning Province
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Dalinghe
Reservoir capacity: 1645 m3x106
Construction Dates
Start of Project: 09/96
Start of RCC: 09/96
End of RCC: 09/99
End of Project: 12/00
Specifications
Height: 49 metres
Length: 513 metres
Volume of RCC: 111 m3x103
Total volume: 603 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 58 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Xishan Xingyu Water Resources Corporation
Type: Arch-Gravity
Purpose(s): Water Supply
River: Qinggoushui
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 10/97
Start of RCC: 10/97
End of RCC: 11/99
End of Project: 12/99
Specifications
Height: 55 metres
Length: 244 metres
Volume of RCC: 71 m3x103
Total volume: 77 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 54 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 99 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: CERB (Companhia de Engenharia Rural da Bahia)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Itapicuru-açu
Reservoir capacity: 39 m3x106
Construction Dates
Start of Project: 05/98
Start of RCC: 05/98
End of RCC: 12/99
End of Project: 02/00
Specifications
Height: 26 metres
Length: 266 metres
Volume of RCC: 90 m3x103
Total volume: 105 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 18 | Natural pozzolan (ASTM Class N) |

Details
Country: Japan
Owner: Toyama Prefecture
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Kubusu
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: 03/93
Start of RCC: 03/93
End of RCC: -/99
End of Project: 10/02
Specifications
Height: 95 metres
Length: 253 metres
Volume of RCC: 364 m3x103
Total volume: 469 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.40 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Simane Prefecture
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Sutu
Reservoir capacity: 19 m3x106
Construction Dates
Start of Project: 03/93
Start of RCC: 03/93
End of RCC: 04/00
End of Project: 03/03
Specifications
Height: 72 metres
Length: 334 metres
Volume of RCC: 284 m3x103
Total volume: 362 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.25 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.79 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.79 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Paradise Valley Estates
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 10/99
Start of RCC: 10/99
End of RCC: 05/00
End of Project: 08/00
Specifications
Height: 16 metres
Length: 57 metres
Volume of RCC: 331 m3x103
Total volume: 331 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Algeria
Owner: ANBT (Agence Nationale des Barrages et Transferts)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: El Kebir
Reservoir capacity: 963 m3x106
Construction Dates
Start of Project: 01/93
Start of RCC: 01/93
End of RCC: 07/00
End of Project: 12/00
Specifications
Height: 118 metres
Length: 714 metres
Volume of RCC: 1690 m3x103
Total volume: 1900 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 82 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 143 | Low-lime flyash (ASTM Class F) |

Details
Country: South Africa
Owner: Department of Water & Sanitation
Type: Gravity
Purpose(s): Water Supply
River: Marite
Reservoir capacity: 123 m3x106
Construction Dates
Start of Project: 01/96
Start of RCC: 01/96
End of RCC: 10/00
End of Project: 03/02
Specifications
Height: 53 metres
Length: 350 metres
Volume of RCC: 160 m3x103
Total volume: 327 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.68 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.68 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 250 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: Secretaria Estadual do Meio Ambiente e Recursos Hídricos do Rio Grande do Norte
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Apodi
Reservoir capacity: 600 m3x106
Construction Dates
Start of Project: -/98
Start of RCC: -/98
End of RCC: -/00
End of Project: 03/02
Specifications
Height: 48 metres
Length: 1660 metres
Volume of RCC: 1023 m3x103
Total volume: 1120 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Brazil
Owner: COMPESA (Companhia Pernambucana de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: Tiúma
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: -/99
Start of RCC: -/99
End of RCC: 01/01
End of Project: 05/01
Specifications
Height: 16 metres
Length: 132 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Shimenzi Reservoir Engineering Management Office
Type: Thin Arch
Purpose(s): Hydropower / Irrigation / Water Supply
River: Taxi
Reservoir capacity: 80 m3x106
Construction Dates
Start of Project: 06/98
Start of RCC: 06/98
End of RCC: 06/01
End of Project: 10/01
Specifications
Height: 110 metres
Length: 176 metres
Volume of RCC: 188 m3x103
Total volume: 211 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.142 | RCC against formwork (GEVR/GE-RCC) |
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork |
| 0.18 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| crest | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 93 |
| 62 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 110 | Low-lime flyash (ASTM Class F) |
| 110 |

Details
Country: USA
Owner: USDA Natural Resources Conservation Service
Type: Gravity
Purpose(s): Flood Control / Recreation / Water Supply
River: North Fork Hughes River
Reservoir capacity: 1480 m3x106
Construction Dates
Start of Project: 07/99
Start of RCC: 07/99
End of RCC: 07/01
End of Project: -/01
Specifications
Height: 26 metres
Length: 200 metres
Volume of RCC: 65 m3x103
Total volume: 65 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 59 |
| 107 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 59 | Low-lime flyash (ASTM Class F) |
| 65 |

Details
Country: Japan
Owner: Ministry of Land, Infrastructure and Transport
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Chubetu
Reservoir capacity: 93 m3x106
Construction Dates
Start of Project: 03/94
Start of RCC: 03/94
End of RCC: 08/01
End of Project: 03/04
Specifications
Height: 86 metres
Length: 290 metres
Volume of RCC: 523 m3x103
Total volume: 1007 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.80 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
| 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Mianhuatan Hydroelectric Development Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Water Supply
River: Ting
Reservoir capacity: 2035 m3x106
Construction Dates
Start of Project: 04/98
Start of RCC: 04/98
End of RCC: 11/01
End of Project: 04/02
Specifications
Height: 111 metres
Length: 302 metres
Volume of RCC: 500 m3x103
Total volume: 615 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with hot poured membrane |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 82 |
| 59 48 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |
| 88 88 |

Details
Country: Japan
Owner: Fukuoka Prefecture
Type: Gravity
Purpose(s): Flood Control / Navigation / Water Supply
River: Fukuti
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 10/98
Start of RCC: 10/98
End of RCC: 12/01
End of Project: 03/03
Specifications
Height: 65 metres
Length: 255 metres
Volume of RCC: 115 m3x103
Total volume: 201 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: DNOCS/Minas Gerais
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Congonhas
Reservoir capacity: 6700 m3x106
Construction Dates
Start of Project: 10/99
Start of RCC: 10/99
End of RCC: 12/01
End of Project: -/02
Specifications
Height: 85 metres
Length: 668 metres
Volume of RCC: 890 m3x103
Total volume: 1030 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: China
Owner: Chaoyang Water Conservancy Bureau
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Daling
Reservoir capacity: 217 m3x106
Construction Dates
Start of Project: -/96
Start of RCC: -/96
End of RCC: -/01
End of Project: -/02
Specifications
Height: 35 metres
Length: 383 metres
Volume of RCC: 87 m3x103
Total volume: 220 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 118 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: Companhia de Gestão dos Recursos Hídricos
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Condado
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: -/95
Start of RCC: -/95
End of RCC: -/01
End of Project: 12/02
Specifications
Height: 18 metres
Length: 270 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: DNOCS (Departamento Nacional de Obras Contra a Seca)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: do Carmo
Reservoir capacity: 293 m3x106
Construction Dates
Start of Project: -/98
Start of RCC: -/98
End of RCC: -/01
End of Project: -/01
Specifications
Height: 42 metres
Length: 2308 metres
Volume of RCC: 655 m3x103
Total volume: 660 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: China
Owner: Yushi Reservoir Construction Management Bureau
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Biliuhe
Reservoir capacity: 89 m3x106
Construction Dates
Start of Project: -/98
Start of RCC: -/98
End of RCC: -/01
End of Project: -/02
Specifications
Height: 50 metres
Length: 267 metres
Volume of RCC: 218 m3x103
Total volume: 233 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 70 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: CERB (Companhia de Engenharia Rural da Bahia)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Itapicuru-mirim
Reservoir capacity: -
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/01
End of Project: -/01
Specifications
Height: 24 metres
Length: 1090 metres
Volume of RCC: 42 m3x103
Total volume: 60 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 34 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 41 | Ground-granulated blast-furnace slag |

Details
Country: Brazil
Owner: CAGEPE (Companhia Pernambucana de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: Pirapama
Reservoir capacity: 61 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/01
End of Project: -/01
Specifications
Height: 25 metres
Length: 300 metres
Volume of RCC: 87 m3x103
Total volume: 137 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 18 | No pozzolan used |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Curimatá
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: -/97
Start of RCC: -/97
End of RCC: -/01
End of Project: 11/02
Specifications
Height: 26 metres
Length: 300 metres
Volume of RCC: 12 m3x103
Total volume: 14 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: Electricity Corporation, Yanji
Type: Gravity
Purpose(s): Hydropower / Recreation / Water Supply
River: Hailanhe
Reservoir capacity: 30 m3x106
Construction Dates
Start of Project: 11/98
Start of RCC: 11/98
End of RCC: 01/02
End of Project: 12/02
Specifications
Height: 30 metres
Length: 244 metres
Volume of RCC: 43 m3x103
Total volume: 89 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| ogee | RCC against precast concrete blocks [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 2000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 113 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 113 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Spotsylvania County
Type: Gravity
Purpose(s): Water Supply
River: Hunting Run
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 05/00
Start of RCC: 05/00
End of RCC: 01/02
End of Project: 08/02
Specifications
Height: 36 metres
Length: 720 metres
Volume of RCC: 115 m3x103
Total volume: 128 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| Unformed face of RCC |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 74 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 37 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: Estado da Paraiba (Companhia de Aguas e Esgotus)
Type: Gravity
Purpose(s): Water Supply
River: Riachäo
Reservoir capacity: 27 m3x106
Construction Dates
Start of Project: 05/00
Start of RCC: 05/00
End of RCC: 06/02
End of Project: -/02
Specifications
Height: 56 metres
Length: 296 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Japan
Owner: Isikawa Prefecture
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Daishoji
Reservoir capacity: 25 m3x106
Construction Dates
Start of Project: 12/96
Start of RCC: 12/96
End of RCC: 07/02
End of Project: 03/06
Specifications
Height: 76 metres
Length: 280 metres
Volume of RCC: 188 m3x103
Total volume: 360 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.80 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Piedmont Triad Regional Water Authority
Type: Gravity
Purpose(s): Recreation / Water Supply
River: Deep
Reservoir capacity: 84 m3x106
Construction Dates
Start of Project: 07/01
Start of RCC: 07/01
End of RCC: 07/02
End of Project: 01/03
Specifications
Height: 31 metres
Length: 280 metres
Volume of RCC: 70 m3x103
Total volume: 76 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 89 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 104 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Guizhou Province Electric Power Co.
Type: Gravity
Purpose(s): Water Supply
River: Xia Oyangxi
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: 05/00
Start of RCC: 05/00
End of RCC: 10/02
End of Project: 12/03
Specifications
Height: 45 metres
Length: 118 metres
Volume of RCC: 47 m3x103
Total volume: 49 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 350 | 3500 |
Cementitious material
| Cement (kg/m3) |
|---|
| 138 |
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 113 | Low-lime flyash (ASTM Class F) |
| 90 |

Details
Country: Greece
Owner: Ministry of Agriculture
Type: Hardfill
Purpose(s): Irrigation / Water Supply
River: Steno
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 02/00
Start of RCC: 02/00
End of RCC: 10/02
End of Project: 06/03
Specifications
Height: 32 metres
Length: 170 metres
Volume of RCC: 69 m3x103
Total volume: 70 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 200 - | 200 - |
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 5 | Natural pozzolan (ASTM Class N) |

Details
Country: USA
Owner: San Diego County Water Authority
Type: Gravity
Purpose(s): Water Supply
River: Escondido Creek
Reservoir capacity: 30 m3x106
Construction Dates
Start of Project: 06/01
Start of RCC: 06/01
End of RCC: 10/02
End of Project: 07/03
Specifications
Height: 97 metres
Length: 788 metres
Volume of RCC: 1070 m3x103
Total volume: 1140 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork with external geomembrane (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 74 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 121 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: Secretaria Recursos Hídricos
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Quixeré
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: -/01
Start of RCC: -/01
End of RCC: 11/02
End of Project: -/03
Specifications
Height: 19 metres
Length: 700 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
| [stepped face] |
Spillway
| Slope | Type |
|---|---|
| [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Japan
Owner: Ibaraki Prefecture
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Ohkita
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: 11/94
Start of RCC: 11/94
End of RCC: 12/02
End of Project: 03/05
Specifications
Height: 65 metres
Length: 462 metres
Volume of RCC: 270 m3x103
Total volume: 531 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Ground-granulated blast-furnace slag |

Details
Country: Brazil
Owner: CERB (Companhia de Engenharia Ambiental e Recursos Hidricos da Bahia)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Pasto Velho
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/02
End of Project: -/03
Specifications
Height: 27 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Jordan
Owner: Jordan Valley Authority, Ministry of Water and Irrigation
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Mujib
Reservoir capacity: 35 m3x106
Construction Dates
Start of Project: 01/99
Start of RCC: 01/99
End of RCC: 02/03
End of Project: 11/03
Specifications
Height: 67 metres
Length: 490 metres
Volume of RCC: 654 m3x103
Total volume: 694 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork with external geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Izig
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: 11/01
Start of RCC: 11/01
End of RCC: 05/03
End of Project: 01/04
Specifications
Height: 49 metres
Length: 222 metres
Volume of RCC: 50 m3x103
Total volume: 27 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.85 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |
| 0 |

Details
Country: Japan
Owner: Japan Water Agency
Type: Gravity
Purpose(s): Flood Control / Navigation / Water Supply
River: Nakatu
Reservoir capacity: 63 m3x106
Construction Dates
Start of Project: 03/99
Start of RCC: 03/99
End of RCC: 06/03
End of Project: 03/07
Specifications
Height: 139 metres
Length: 424 metres
Volume of RCC: 810 m3x103
Total volume: 1670 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.15 | Traditional concrete against formwork |
| 0.70 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.72 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.72 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |
| 48 |

Details
Country: South Africa
Owner: Department of Water & Sanitation
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Luvuvhu
Reservoir capacity: 164 m3x106
Construction Dates
Start of Project: 04/98
Start of RCC: 04/98
End of RCC: 08/03
End of Project: 04/04
Specifications
Height: 47 metres
Length: 392 metres
Volume of RCC: 150 m3x103
Total volume: 316 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 250 |
Cementitious material
| Cement (kg/m3) |
|---|
| 54 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 129 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Xifeng County Water Conservancy Bureau
Type: Thin Arch
Purpose(s): Water Supply
River: Yangshui
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/01
Start of RCC: -/01
End of RCC: -/03
End of Project: -/04
Specifications
Height: 39 metres
Length: 176 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Zamrine
Reservoir capacity: 56 m3x106
Construction Dates
Start of Project: 05/03
Start of RCC: 05/03
End of RCC: 09/04
End of Project: 05/05
Specifications
Height: 69 metres
Length: 220 metres
Volume of RCC: 190 m3x103
Total volume: 215 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: COMPESA (Companhia Pernambucana de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/04
End of Project: -/05
Specifications
Height: 33 metres
Length: 210 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: SANEAGO (Saneamento de Goiás S.A.)
Type: Gravity
Purpose(s): Water Supply
River: João Leite
Reservoir capacity: 129 m3x106
Construction Dates
Start of Project: 03/01
Start of RCC: 03/01
End of RCC: -/04
End of Project: -/04
Specifications
Height: 55 metres
Length: 380 metres
Volume of RCC: 270 m3x103
Total volume: 290 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 20 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: DNOCS (Departamento Nacional de Obras Contra as Secas)
Type: Gravity
Purpose(s): Water Supply
River: Banabuiú
Reservoir capacity: 54 m3x106
Construction Dates
Start of Project: -/01
Start of RCC: -/01
End of RCC: -/04
End of Project: -/05
Specifications
Height: 19 metres
Length: 290 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guiyang Water Conservancy Bureau
Type: Thin Arch
Purpose(s): Flood Control / Irrigation / Water Supply
River: Wu
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/04
End of Project: -/05
Specifications
Height: 81 metres
Length: 180 metres
Volume of RCC: 105 m3x103
Total volume: 110 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 |
Downstream
| Slope | Type |
|---|---|
| 0.76 |
Spillway
| Slope | Type |
|---|---|
| 0.76 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: CERB (Companhia de Engenharia Ambiental e Recursos Hidricos da Bahia)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Itapicuru-aço
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/01
Start of RCC: -/01
End of RCC: -/04
End of Project: -/05
Specifications
Height: 44 metres
Length: 191 metres
Volume of RCC: 75 m3x103
Total volume: 85 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 56 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 14 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: CERB (Companhia de Engenharia Ambiental e Recursos Hidricos da Bahia)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Paraguaçu
Reservoir capacity: 112 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/04
End of Project: -/05
Specifications
Height: 19 metres
Length: 320 metres
Volume of RCC: 75 m3x103
Total volume: 85 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 56 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 14 | Natural pozzolan (ASTM Class N) |

Details
Country: USA
Owner: Town of Big Stone Gap
Type: Gravity
Purpose(s): Water Supply
River: South Fork, Powell River
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 04/04
Start of RCC: 04/04
End of RCC: 01/05
End of Project: 07/05
Specifications
Height: 26 metres
Length: 113 metres
Volume of RCC: 11 m3x103
Total volume: 12 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 82 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 82 | Low-lime flyash (ASTM Class F) |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Moulouya
Reservoir capacity: 400 m3x106
Construction Dates
Start of Project: 02/01
Start of RCC: 02/01
End of RCC: 04/05
End of Project: 03/06
Specifications
Height: 115 metres
Length: 577 metres
Volume of RCC: 590 m3x103
Total volume: 690 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |
| 20 |

Details
Country: Iran
Owner: Hormozgan Water Authority
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Jagin
Reservoir capacity: 300 m3x106
Construction Dates
Start of Project: 12/01
Start of RCC: 12/01
End of RCC: 05/05
End of Project: 09/07
Specifications
Height: 78 metres
Length: 220 metres
Volume of RCC: 232 m3x103
Total volume: 382 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.30 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 105 |
| 160 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 90 | Natural pozzolan (ASTM Class N) |
| 90 |

Details
Country: China
Owner: Changyang Electric Power Bureau
Type: Thin Arch
Purpose(s): Hydropower / Irrigation / Water Supply
River: Duhu
Reservoir capacity: 70 m3x106
Construction Dates
Start of Project: 12/03
Start of RCC: 12/03
End of RCC: 05/05
End of Project: 10/05
Specifications
Height: 107 metres
Length: 206 metres
Volume of RCC: 166 m3x103
Total volume: 255 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| 126 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 126 | Low-lime flyash (ASTM Class F) |
| 103 |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Hardfill
Purpose(s): Hydropower / Irrigation / Water Supply
River: Buyuk Menderes
Reservoir capacity: 82 m3x106
Construction Dates
Start of Project: 04/94
Start of RCC: 04/94
End of RCC: 05/05
End of Project: 11/07
Specifications
Height: 107 metres
Length: 280 metres
Volume of RCC: 1500 m3x103
Total volume: 1685 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.89 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 50 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 20 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Guizhou-Wujiang Hydropower Development Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply
River: Wu
Reservoir capacity: 201 m3x106
Construction Dates
Start of Project: 10/00
Start of RCC: 10/00
End of RCC: 08/05
End of Project: 03/06
Specifications
Height: 116 metres
Length: 165 metres
Volume of RCC: 421 m3x103
Total volume: 739 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.25 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 95 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Fukushima Prefecture
Type: Gravity
Purpose(s): Flood Control / Irrigation / Navigation / Water Supply
River: Kido
Reservoir capacity: 19 m3x106
Construction Dates
Start of Project: 10/00
Start of RCC: 10/00
End of RCC: 08/05
End of Project: 03/08
Specifications
Height: 94 metres
Length: 350 metres
Volume of RCC: 291 m3x103
Total volume: 501 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
| 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: CODEVASF (Companhia de Desenvolvimento dos Vales do São Francisco e do Parnaíba)
Type: Gravity
Purpose(s): Water Supply
River: Poço do Magro
Reservoir capacity: 32 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/05
End of Project: -/06
Specifications
Height: 22 metres
Length: 540 metres
Volume of RCC: 58 m3x103
Total volume: 68 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Usina Central Olho D'Água S/A
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Itambé
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/05
End of Project: -/06
Specifications
Height: 30 metres
Length: 306 metres
Volume of RCC: 50 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
| [stepped face] |
Spillway
| Slope | Type |
|---|---|
| [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: China
Owner: Xixi Reservoir Development Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Daxi
Reservoir capacity: 85 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/05
End of Project: -/06
Specifications
Height: 71 metres
Length: 243 metres
Volume of RCC: 231 m3x103
Total volume: 244 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: Malaysia
Owner: Lembaga Air Perak/Metropolitan Utilities Corporation
Type: Gravity
Purpose(s): Water Supply
River: Kinta
Reservoir capacity: 30 m3x106
Construction Dates
Start of Project: 01/03
Start of RCC: 01/03
End of RCC: 03/06
End of Project: 07/06
Specifications
Height: 90 metres
Length: 792 metres
Volume of RCC: 952 m3x103
Total volume: 975 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Pine Brook Water District
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 01/05
Start of RCC: 01/05
End of RCC: 04/06
End of Project: -/06
Specifications
Height: 26 metres
Length: 170 metres
Volume of RCC: 27 m3x103
Total volume: 30 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 95 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 59 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Guangxi-Youjiang Hydraulic Development Co.Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply
River: You
Reservoir capacity: 5660 m3x106
Construction Dates
Start of Project: 10/01
Start of RCC: 10/01
End of RCC: 04/06
End of Project: 12/06
Specifications
Height: 130 metres
Length: 720 metres
Volume of RCC: 1995 m3x103
Total volume: 2672 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with hot poured membrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 50 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 132 | Low-lime flyash (ASTM Class F) |
| 110 |

Details
Country: Jordan/ Syria
Owner: Jordan Valley Authority, Ministry of Water and Irrigation
Type: Gravity
Purpose(s): Water Supply
River: Yarmouk
Reservoir capacity: 110 m3x106
Construction Dates
Start of Project: 06/03
Start of RCC: 06/03
End of RCC: 07/06
End of Project: 12/07
Specifications
Height: 103 metres
Length: 485 metres
Volume of RCC: 1426 m3x103
Total volume: 1478 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.60 |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 60 | Low-lime flyash (ASTM Class F) |
| 60 |

Details
Country: Botswana
Owner: Department of Water Affairs
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: 11/04
Start of RCC: 11/04
End of RCC: 09/06
End of Project: 05/07
Specifications
Height: 33 metres
Length: 153 metres
Volume of RCC: 30 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: USA
Owner: Genesee Water and Sanitation District
Type: Gravity
Purpose(s): Water Supply
River: Bear Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 06/06
Start of RCC: 06/06
End of RCC: 11/06
End of Project: 10/07
Specifications
Height: 29 metres
Length: 168 metres
Volume of RCC: 24 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: Ministry of Land, Infrastructure and Transport
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Water Supply
River: Okitamano
Reservoir capacity: 51 m3x106
Construction Dates
Start of Project: 03/00
Start of RCC: 03/00
End of RCC: 11/06
End of Project: 03/11
Specifications
Height: 126 metres
Length: 381 metres
Volume of RCC: 703 m3x103
Total volume: 1200 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.50 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.73 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.73 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: Venezuela
Owner: MARN (Ministerio del Ambiente y los Recursos Naturales)
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
River: El Guapo
Reservoir capacity: 141 m3x106
Construction Dates
Start of Project: 08/05
Start of RCC: 08/05
End of RCC: 12/06
End of Project: 08/07
Specifications
Height: 50 metres
Length: 138 metres
Volume of RCC: 320 m3x103
Total volume: 342 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.60 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.85 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 1.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Brazil
Owner: Maue Geradora
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: -
Construction Dates
Start of Project: 05/05
Start of RCC: 05/05
End of RCC: -/06
End of Project: 10/06
Specifications
Height: 19 metres
Length: 245 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Mexico
Owner: CNA (Comisión Nacional del Agua)
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: -
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 30 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Lishui Basin Hydraulic and Hydroelectric Development Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Water Supply
River: Dieshui
Reservoir capacity: 1439 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 88 metres
Length: 351 metres
Volume of RCC: 450 m3x103
Total volume: 930 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.25 |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 53 |
| 83 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 99 | Low-lime flyash (ASTM Class F) |
| 102 |

Details
Country: USA
Owner: Marietta (Georgia) Water Authority
Type: Gravity
Purpose(s): Water Supply
River: Hickory Log Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 10/05
Start of RCC: 10/05
End of RCC: 06/07
End of Project: 10/07
Specifications
Height: 55 metres
Length: 290 metres
Volume of RCC: 165 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 89 |
| 80 74 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 89 | Low-lime flyash (ASTM Class F) |
| 98 104 |

Details
Country: China
Owner: Longtan Hydropower Development Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Water Supply
River: Hongshui
Reservoir capacity: 16210 m3x106
Construction Dates
Start of Project: 07/01
Start of RCC: 07/01
End of RCC: 06/07
End of Project: 12/09
Specifications
Height: 192 metres
Length: 832 metres
Volume of RCC: 4623 m3x103
Total volume: 7400 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.25 |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.68 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 99 |
| 86 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 121 | Low-lime flyash (ASTM Class F) |
| 109 |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: R’Mel
Reservoir capacity: 25 m3x106
Construction Dates
Start of Project: 05/05
Start of RCC: 05/05
End of RCC: 06/07
End of Project: 10/07
Specifications
Height: 80 metres
Length: 250 metres
Volume of RCC: 230 m3x103
Total volume: 243 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced conventional concrete cast before RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |
| 0 |

Details
Country: Mongolia
Owner: Ministry of Energy
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Zabkhan
Reservoir capacity: 930 m3x106
Construction Dates
Start of Project: 02/05
Start of RCC: 02/05
End of RCC: 06/07
End of Project: 12/07
Specifications
Height: 60 metres
Length: 200 metres
Volume of RCC: 210 m3x103
Total volume: 250 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork with external geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.72 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.72 | Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 333 | 333 |
Cementitious material
| Cement (kg/m3) |
|---|
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Water Supply
River: N’Fis
Reservoir capacity: 70 m3x106
Construction Dates
Start of Project: 07/05
Start of RCC: 07/05
End of RCC: 07/07
End of Project: 03/08
Specifications
Height: 71 metres
Length: 233 metres
Volume of RCC: 202 m3x103
Total volume: 216 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced conventional concrete cast before RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: USA
Owner: Natural Resources Conservation Service
Type: Gravity
Purpose(s): Water Supply
River: Tygart Tributory
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: 08/07
End of Project: -/07
Specifications
Height: 39 metres
Length: 204 metres
Volume of RCC: 106 m3x103
Total volume: 113 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 59 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 89 | Low-lime flyash (ASTM Class F) |

Details
Country: Australia
Owner: Rivers and Water Supply Commission, Tasmania
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Meander
Reservoir capacity: 43 m3x106
Construction Dates
Start of Project: 01/06
Start of RCC: 01/06
End of RCC: 08/07
End of Project: 12/07
Specifications
Height: 47 metres
Length: 180 metres
Volume of RCC: 85 m3x103
Total volume: 85 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork with external geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| 0.70 | RCC against precast concrete blocks |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Vietnam
Owner: Ministry of Agriculture and Rural Development (MARD)
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Kon
Reservoir capacity: 226 m3x106
Construction Dates
Start of Project: 05/04
Start of RCC: 05/04
End of RCC: 12/07
End of Project: 12/08
Specifications
Height: 55 metres
Length: 571 metres
Volume of RCC: 183 m3x103
Total volume: 430 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced conventional concrete cast before RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| ogee | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 900 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| 126 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 175 | Low-lime flyash (ASTM Class F) |
| 141 |

Details
Country: China
Owner: Fujian Hongkou Hydropower Co. Ltd.
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Huotong
Reservoir capacity: 449 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/07
End of Project: -/08
Specifications
Height: 130 metres
Length: 341 metres
Volume of RCC: 681 m3x103
Total volume: 830 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: EMBASA (Empresa Baiana de Aguas e Saneamento S/A)
Type: Gravity
Purpose(s): Water Supply
River: Gaviãozinho
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 34 metres
Length: 154 metres
Volume of RCC: 44 m3x103
Total volume: 51 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.80 |
Spillway
| Slope | Type |
|---|---|
| 0.80 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 20 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: COMPESA (Companhia Pernambucana de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: Duas Serras
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 19 metres
Length: 113 metres
Volume of RCC: 6 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Zhouluo County Government
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Lituohe
Reservoir capacity: 58 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 56 metres
Length: 193 metres
Volume of RCC: 162 m3x103
Total volume: 354 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Anhui Water Resources Development Co. Ltd.
Type: Thin Arch
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Dongpi
Reservoir capacity: 480 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: 04/09
Specifications
Height: 105 metres
Length: 422 metres
Volume of RCC: 485 m3x103
Total volume: 600 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.335 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.335 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| 56 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 108 | Low-lime flyash (ASTM Class F) |
| 84 |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Hardfill
Purpose(s): Irrigation / Water Supply
River: Kucuk Menderes
Reservoir capacity: 248 m3x106
Construction Dates
Start of Project: 04/94
Start of RCC: 04/94
End of RCC: 04/08
End of Project: 11/08
Specifications
Height: 95 metres
Length: 800 metres
Volume of RCC: 2350 m3x103
Total volume: 2650 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.25 | Traditional concrete against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 30 | Low-lime flyash (ASTM Class F) |

Details
Country: Algeria
Owner: ANBT (Agence Nationale des Barrages et Transfert)
Type: Hardfill
Purpose(s): Irrigation / Water Supply
River: Wadi Isser
Reservoir capacity: 800 m3x106
Construction Dates
Start of Project: 11/02
Start of RCC: 11/02
End of RCC: 06/08
End of Project: 09/08
Specifications
Height: 121 metres
Length: 492 metres
Volume of RCC: 1650 m3x103
Total volume: 1850 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.65 | Traditional concrete against formwork [stepped face] |
Downstream
| Slope | Type |
|---|---|
| 0.65 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.65 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 to | 300 to |
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 77 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 87 | Low-lime flyash (ASTM Class F) |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Khellata
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: 01/07
Start of RCC: 01/07
End of RCC: 07/08
End of Project: 11/08
Specifications
Height: 30 metres
Length: 213 metres
Volume of RCC: 60 m3x103
Total volume: 78 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 105 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Japan
Owner: Hokkaido Prefecture
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Toppu
Reservoir capacity: 36 m3x106
Construction Dates
Start of Project: 07/02
Start of RCC: 07/02
End of RCC: 10/08
End of Project: 03/14
Specifications
Height: 78 metres
Length: 309 metres
Volume of RCC: 440 m3x103
Total volume: 530 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.80 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: Algeria
Owner: ANBT (Agence Nationale des Barrages et Transferts)
Type: Gravity
Purpose(s): Water Supply
River: Boussiaba
Reservoir capacity: 120 m3x106
Construction Dates
Start of Project: 12/06
Start of RCC: 12/06
End of RCC: 11/08
End of Project: 08/09
Specifications
Height: 51 metres
Length: 310 metres
Volume of RCC: 160 m3x103
Total volume: 190 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork with external geomembrane |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 112 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 28 | Low-lime flyash (ASTM Class F) |

Details
Country: Mexico
Owner: CNA (Comisión Nacional del Agua)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Presidio
Reservoir capacity: 322 m3x106
Construction Dates
Start of Project: 02/07
Start of RCC: 02/07
End of RCC: -/08
End of Project: -/09
Specifications
Height: 85 metres
Length: 256 metres
Volume of RCC: 85 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced conventional concrete cast after RCC placement |
| 0.15 | Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.85 | Reinforced conventional concrete cast after RCC placement |
Spillway
| Slope | Type |
|---|---|
| 0.85 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 50 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 45 | Ground-granulated blast-furnace slag |

Details
Country: Oman
Owner: Ministry of Regional Municipalities and Water Resources
Type: Gravity
Purpose(s): Water Supply
River: Wadi Dayqah
Reservoir capacity: 100 m3x106
Construction Dates
Start of Project: 08/06
Start of RCC: 08/06
End of RCC: 04/09
End of Project: 11/09
Specifications
Height: 75 metres
Length: 410 metres
Volume of RCC: 590 m3x103
Total volume: 650 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 126 |
| 112 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 54 | Milled sand |
| 48 |

Details
Country: USA
Owner: Tennessee Valley Authority
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Bear Creek
Reservoir capacity: 47 m3x106
Construction Dates
Start of Project: 01/08
Start of RCC: 01/08
End of RCC: 05/09
End of Project: 06/09
Specifications
Height: 27 metres
Length: 292 metres
Volume of RCC: 60 m3x103
Total volume: 69 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 77 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 77 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Ministry of Land, Infrastructure, Transport and Tourism
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Kase
Reservoir capacity: 71 m3x106
Construction Dates
Start of Project: 02/05
Start of RCC: 02/05
End of RCC: 06/09
End of Project: 03/12
Specifications
Height: 99 metres
Length: 456 metres
Volume of RCC: 830 m3x103
Total volume: 948 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.60 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: Algeria
Owner: ANBT (Agence Nationale des Barrages et Transfert)
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
River: Saf-Saf
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: 03/06
Start of RCC: 03/06
End of RCC: 10/09
End of Project: 03/11
Specifications
Height: 36 metres
Length: 270 metres
Volume of RCC: 120 m3x103
Total volume: 175 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 120 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: USA
Owner: Yadkin County and NRCS
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Deep Creek
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: 12/08
Start of RCC: 12/08
End of RCC: 12/09
End of Project: 07/10
Specifications
Height: 22 metres
Length: 226 metres
Volume of RCC: 39 m3x103
Total volume: 45 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 89 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 89 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: EMBASA (Empresa Baiana de Aguas e Saneamento S.A)
Type: Gravity
Purpose(s): Water Supply
River: de Contas
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/09
End of Project: 01/10
Specifications
Height: 22 metres
Length: 337 metres
Volume of RCC: 61 m3x103
Total volume: 68 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Sichuan Wudu Water Conservancy and Hydropower Group Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Fu
Reservoir capacity: 572 m3x106
Construction Dates
Start of Project: 10/04
Start of RCC: 10/04
End of RCC: -/09
End of Project: -/10
Specifications
Height: 120 metres
Length: 631 metres
Volume of RCC: 1151 m3x103
Total volume: 1580 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: Quifeng Water Supply Co. of Fangchenggang City
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Xijiang
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/09
End of Project: -/12
Specifications
Height: 74 metres
Length: 190 metres
Volume of RCC: 230 m3x103
Total volume: 240 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
| 0.75 |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Hongguo Water Resources Development Co.
Type: Gravity
Purpose(s): Water Supply
River: Tuochang
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: -/09
Specifications
Height: 58 metres
Length: 168 metres
Volume of RCC: -
Total volume: 125 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: EMBASA (Empresa Baiana de Aguas e Saneamento S/A)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Tijuco
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: 03/10
Specifications
Height: 16 metres
Length: 156 metres
Volume of RCC: 13 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Saudi Arabia
Owner: Ministry of Water and Energy of the Kingdom of Saudi Arabia
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Jawrah
Reservoir capacity: 33 m3x106
Construction Dates
Start of Project: 05/06
Start of RCC: 05/06
End of RCC: -/09
End of Project: 05/10
Specifications
Height: 52 metres
Length: 592 metres
Volume of RCC: 207 m3x103
Total volume: 384 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 - | 1000 - |
| 500 | 1500 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Insituto de Desenvolvimento do Piauí
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Riacho do Jorge
Reservoir capacity: 293 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: -/10
Specifications
Height: 48 metres
Length: 870 metres
Volume of RCC: 293 m3x103
Total volume: 306 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Gerdau Aços Longos
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Claro
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 08/07
Start of RCC: 08/07
End of RCC: -/09
End of Project: 07/10
Specifications
Height: 60 metres
Length: 1670 metres
Volume of RCC: 172 m3x103
Total volume: 282 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guizhou Tongzihe Hydropower Development Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower / Water Supply
River: Tongzhi
Reservoir capacity: 78 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: -/10
Specifications
Height: 68 metres
Length: 153 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Sehb el Merga
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: 06/07
Start of RCC: 06/07
End of RCC: -/09
End of Project: -/10
Specifications
Height: 37 metres
Length: 480 metres
Volume of RCC: 85 m3x103
Total volume: 95 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 25 | Natural pozzolan (ASTM Class N) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Çine
Reservoir capacity: 350 m3x106
Construction Dates
Start of Project: 12/95
Start of RCC: 12/95
End of RCC: 04/10
End of Project: 10/11
Specifications
Height: 137 metres
Length: 300 metres
Volume of RCC: 1560 m3x103
Total volume: 1650 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | RCC against precast concrete panels (GEVR/GE-RCC) |
| 0.20 |
Downstream
| Slope | Type |
|---|---|
| 0.85 | RCC against precast concrete panels (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.85 | RCC against precast concrete panels (GEVR/GE-RCC) |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 105 | Low-lime flyash (ASTM Class F) |
| 95 |

Details
Country: Malaysia
Owner: Jabatan Bekalan Air Negeri Sembilan
Type: Gravity
Purpose(s): Water Supply
River: Batu Hampar
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 11/07
Start of RCC: 11/07
End of RCC: 04/10
End of Project: 05/10
Specifications
Height: 65 metres
Length: 236 metres
Volume of RCC: 200 m3x103
Total volume: 203 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| RCC against precast concrete blocks |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Low-lime flyash (ASTM Class F) |

Details
Country: Malaysia
Owner: Public Works Department
Type: Gravity
Purpose(s): Water Supply
River: Sungai Bengoh
Reservoir capacity: 144 m3x106
Construction Dates
Start of Project: 06/07
Start of RCC: 06/07
End of RCC: 05/10
End of Project: -/12
Specifications
Height: 63 metres
Length: 267 metres
Volume of RCC: 130 m3x103
Total volume: 172 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Ministry of Land, Infrastructure, Transport and Tourism
Type: Hardfill
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Kase
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 03/08
Start of RCC: 03/08
End of RCC: 06/10
End of Project: 09/10
Specifications
Height: 29 metres
Length: 116 metres
Volume of RCC: 52 m3x103
Total volume: 68 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Greece
Owner: Ministry of Agriculture
Type: Hardfill
Purpose(s): Irrigation / Water Supply
River: Partheni
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 11/05
Start of RCC: 11/05
End of RCC: 07/10
End of Project: -/16
Specifications
Height: 42 metres
Length: 221 metres
Volume of RCC: 170 m3x103
Total volume: 190 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.80 | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 - | 300 - |
| 450 | 450 |
Cementitious material
| Cement (kg/m3) |
|---|
| 50 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 10 | Natural pozzolan (ASTM Class N) |

Details
Country: Iran
Owner: Sistan & Balouchestan Water Authority
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Kajoo
Reservoir capacity: 207 m3x106
Construction Dates
Start of Project: 11/02
Start of RCC: 11/02
End of RCC: 08/10
End of Project: 11/10
Specifications
Height: 65 metres
Length: 350 metres
Volume of RCC: 265 m3x103
Total volume: 437 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 98 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 42 | Natural pozzolan (ASTM Class N) |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Al Mal
Reservoir capacity: 25 m3x106
Construction Dates
Start of Project: 01/08
Start of RCC: 01/08
End of RCC: 09/10
End of Project: 04/11
Specifications
Height: 75 metres
Length: 408 metres
Volume of RCC: 415 m3x103
Total volume: 490 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 73 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 32 | Natural pozzolan (ASTM Class N) |

Details
Country: Japan
Owner: Hokkaido Prefecture
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
River: Tobetsu
Reservoir capacity: 75 m3x106
Construction Dates
Start of Project: 10/08
Start of RCC: 10/08
End of RCC: 09/10
End of Project: 10/12
Specifications
Height: 52 metres
Length: 432 metres
Volume of RCC: 665 m3x103
Total volume: 803 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| 80 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |
| 0 |

Details
Country: Argentina
Owner: Provincia de San Luis
Type: Gravity
Purpose(s): Water Supply
River: Quinto
Reservoir capacity: -
Construction Dates
Start of Project: 02/09
Start of RCC: 02/09
End of RCC: 09/10
End of Project: 01/11
Specifications
Height: 79 metres
Length: 487 metres
Volume of RCC: 210 m3x103
Total volume: 249 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Australia
Owner: Queensland Water Infrastructure Pty. Ltd.
Type: Gravity
Purpose(s): Water Supply
River: Teviot Brook
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 09/09
Start of RCC: 09/09
End of RCC: 12/10
End of Project: 06/11
Specifications
Height: 48 metres
Length: 464 metres
Volume of RCC: 173 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 85 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: CERB (Companhia de Engenharia Ambiental e Recursos Hídricos da Bahia)
Type: Gravity
Purpose(s): Water Supply
River: Vaza-Barris
Reservoir capacity: 49 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/10
End of Project: 10/10
Specifications
Height: 23 metres
Length: 927 metres
Volume of RCC: -
Total volume: 130 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Tunisia
Owner: Ministère de l’Agriculture
Type: Hardfill
Purpose(s): Water Supply
River: Bou Terfess
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: 02/03
Start of RCC: 02/03
End of RCC: -/10
End of Project: 11/11
Specifications
Height: 81 metres
Length: 324 metres
Volume of RCC: 422 m3x103
Total volume: 450 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 120 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Brazil
Owner: DNOCS (Departamento Nacional de Obras Contra a Seca)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Pajeú
Reservoir capacity: 49 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/10
End of Project: -/11
Specifications
Height: 26 metres
Length: 566 metres
Volume of RCC: 64 m3x103
Total volume: 92 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Ain Leuh
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 10/09
Start of RCC: 10/09
End of RCC: 01/11
End of Project: 10/11
Specifications
Height: 29 metres
Length: 136 metres
Volume of RCC: 18 m3x103
Total volume: 20 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 30 | Natural pozzolan (ASTM Class N) |

Details
Country: Argentina
Owner: Provincia de Catamarca
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Las Tunas
Reservoir capacity: 101 m3x106
Construction Dates
Start of Project: 02/09
Start of RCC: 02/09
End of RCC: 02/11
End of Project: 12/11
Specifications
Height: 33 metres
Length: 259 metres
Volume of RCC: 30 m3x103
Total volume: 56 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 200 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 25 | Natural pozzolan (ASTM Class N) |

Details
Country: Japan
Owner: Okinawa General Bureau, Cabinet Office, Japan
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
River: Okukubi
Reservoir capacity: 79 m3x106
Construction Dates
Start of Project: 03/09
Start of RCC: 03/09
End of RCC: 03/11
End of Project: 07/11
Specifications
Height: 39 metres
Length: 461 metres
Volume of RCC: 339 m3x103
Total volume: 430 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against precast concrete panels |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Japan
Owner: Ministry of Land, Infrastructure, Transport and Tourism
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Yunishi
Reservoir capacity: 75 m3x106
Construction Dates
Start of Project: 08/08
Start of RCC: 08/08
End of RCC: 05/11
End of Project: 09/12
Specifications
Height: 119 metres
Length: 320 metres
Volume of RCC: 967 m3x103
Total volume: 1053 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.60 |
Downstream
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Ministry of Land, Infrastructure and Transport
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Yubari
Reservoir capacity: 427 m3x106
Construction Dates
Start of Project: 11/03
Start of RCC: 11/03
End of RCC: 09/11
End of Project: 03/15
Specifications
Height: 111 metres
Length: 390 metres
Volume of RCC: 584 m3x103
Total volume: 940 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.80 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.82 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.82 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 & |
| 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Lusi Reservoir Management Office
Type: Gravity
Purpose(s): Water Supply
River: Lusixi
Reservoir capacity: 33 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/12
Specifications
Height: 39 metres
Length: 140 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Hezil
Reservoir capacity: 29 m3x106
Construction Dates
Start of Project: 08/08
Start of RCC: 08/08
End of RCC: -/11
End of Project: 02/12
Specifications
Height: 89 metres
Length: 356 metres
Volume of RCC: 718 m3x103
Total volume: 752 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 81 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | No pozzolan used |

Details
Country: China
Owner: Honghe Guangyuan Hydropwer and Madushan Development Co. Ltd.
Type: Gravity
Purpose(s): Hydropower / Navigation / Water Supply
River: Honghe
Reservoir capacity: 552 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/11
End of Project: -/12
Specifications
Height: 108 metres
Length: 353 metres
Volume of RCC: -
Total volume: 987 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Water Supply
River: Ahl Lafouim
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/12
Specifications
Height: 15 metres
Length: 95 metres
Volume of RCC: 20 m3x103
Total volume: 24 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Water Supply
River: Tiyoughza
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/12
Specifications
Height: 32 metres
Length: 170 metres
Volume of RCC: 45 m3x103
Total volume: 53 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 120 |
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: India
Owner: Municipal Corporation of Greater Mumbai
Type: Gravity
Purpose(s): Water Supply
River: Vaitarna
Reservoir capacity: 202 m3x106
Construction Dates
Start of Project: 10/08
Start of RCC: 10/08
End of RCC: 04/12
End of Project: -/12
Specifications
Height: 102 metres
Length: 565 metres
Volume of RCC: 1202 m3x103
Total volume: 1500 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.15 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 145 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: San Diego County Water Authority and City of San Diego
Type: Gravity
Purpose(s): Water Supply
River: San Diego
Reservoir capacity: 299 m3x106
Construction Dates
Start of Project: 06/09
Start of RCC: 06/09
End of RCC: 09/12
End of Project: 09/14
Specifications
Height: 103 metres
Length: 474 metres
Volume of RCC: 459 m3x103
Total volume: 465 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork with external geomembrane (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.78 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.78 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 86 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 127 | Low-lime flyash (ASTM Class F) |

Details
Country: Australia
Owner: Icon Water (formerly ACTEW Corp.)
Type: Gravity
Purpose(s): Water Supply
River: Cotter
Reservoir capacity: 78 m3x106
Construction Dates
Start of Project: 10/09
Start of RCC: 10/09
End of RCC: 12/12
End of Project: 08/13
Specifications
Height: 87 metres
Length: 350 metres
Volume of RCC: 369 m3x103
Total volume: 400 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Yunnan Jinsha River Hydropower Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Recreation / Water Supply
River: Jinsha
Reservoir capacity: 558 m3x106
Construction Dates
Start of Project: 08/07
Start of RCC: 08/07
End of RCC: -/12
End of Project: -/13
Specifications
Height: 119 metres
Length: 768 metres
Volume of RCC: 2840 m3x103
Total volume: 3853 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 96 | Low-lime flyash (ASTM Class F) |
| 90 |

Details
Country: Brazil
Owner: SAMAE (Serviço Autônomo Municipal de Água e Esgoto)
Type: Gravity
Purpose(s): Water Supply
River: Marrecas
Reservoir capacity: 33 m3x106
Construction Dates
Start of Project: 03/10
Start of RCC: 03/10
End of RCC: -/12
End of Project: 12/12
Specifications
Height: 35 metres
Length: 430 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Companhia de Gestão dos Recursos Hídricos
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: -
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/12
End of Project: -/13
Specifications
Height: 28 metres
Length: 310 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: South Africa
Owner: TCTA (Trans Caledon Tunnel Authority)
Type: Gravity
Purpose(s): Water Supply
River: Mooi
Reservoir capacity: 140 m3x106
Construction Dates
Start of Project: 03/11
Start of RCC: 03/11
End of RCC: 05/13
End of Project: 05/14
Specifications
Height: 39 metres
Length: 300 metres
Volume of RCC: 96 m3x103
Total volume: 114 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 50 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 110 | Low-lime flyash (ASTM Class F) |

Details
Country: South Africa
Owner: Department of Water & Sanitation
Type: Gravity
Purpose(s): Water Supply
River: Steelpoort
Reservoir capacity: 347 m3x106
Construction Dates
Start of Project: 07/07
Start of RCC: 07/07
End of RCC: 11/13
End of Project: 03/14
Specifications
Height: 85 metres
Length: 1015 metres
Volume of RCC: 769 m3x103
Total volume: 1012 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 62 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 145 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Department of Water Resources, Xinjiang Province
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: E’erqisi
Reservoir capacity: 2419 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/13
End of Project: -/14
Specifications
Height: 122 metres
Length: 1489 metres
Volume of RCC: 2520 m3x103
Total volume: 2890 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
| 0.75 |
Spillway
| Slope | Type |
|---|---|
| 0.75 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Iriri
Reservoir capacity: 270 m3x106
Construction Dates
Start of Project: 05/10
Start of RCC: 05/10
End of RCC: -/13
End of Project: -/13
Specifications
Height: 90 metres
Length: 202 metres
Volume of RCC: 270 m3x103
Total volume: 380 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: China
Owner: China Huadian Corporation
Type: Thin Arch
Purpose(s): Hydropower / Water Supply
River: Muli
Reservoir capacity: 190 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/13
End of Project: -/14
Specifications
Height: 132 metres
Length: 211 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Eletrosul Centrais Elétricas S/A
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Braço do Norte
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/13
End of Project: -/13
Specifications
Height: 25 metres
Length: 117 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guodian Haikong Hongling water construction Co. Ltd.
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Dabian
Reservoir capacity: 662 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/13
End of Project: -/14
Specifications
Height: 92 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Bembo
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: 09/08
Start of RCC: 09/08
End of RCC: 02/14
End of Project: 11/14
Specifications
Height: 69 metres
Length: 210 metres
Volume of RCC: 162 m3x103
Total volume: 202 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 80 | Natural pozzolan (ASTM Class N) |

Details
Country: Iran
Owner: Fars Water Authority
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Cheshmeh Ashegh
Reservoir capacity: 62 m3x106
Construction Dates
Start of Project: 06/10
Start of RCC: 06/10
End of RCC: 05/14
End of Project: 03/17
Specifications
Height: 60 metres
Length: 375 metres
Volume of RCC: 130 m3x103
Total volume: 250 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 600 - |
| 900 |
Cementitious material
| Cement (kg/m3) |
|---|
| 120 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 80 | Natural pozzolan (ASTM Class N) |

Details
Country: South Korea
Owner: Kwater (Korean Water Resources Corporation)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Hantan
Reservoir capacity: 270 m3x106
Construction Dates
Start of Project: 02/09
Start of RCC: 02/09
End of RCC: 07/14
End of Project: 12/14
Specifications
Height: 84 metres
Length: 690 metres
Volume of RCC: 650 m3x103
Total volume: 709 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Hardfill
Purpose(s): Hydropower / Irrigation / Water Supply
River: Zamanti
Reservoir capacity: 195 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/14
End of Project: 06/15
Specifications
Height: 37 metres
Length: 842 metres
Volume of RCC: 1890 m3x103
Total volume: 1943 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.76 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.76 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Helong Electricity Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Recreation / Water Supply
River: Hailanhe
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/14
End of Project: -/15
Specifications
Height: 41 metres
Length: 271 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.73 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| conduit |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 2000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Una
Reservoir capacity: 303 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/14
End of Project: -/15
Specifications
Height: 66 metres
Length: 1015 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/14
End of Project: -/15
Specifications
Height: 72 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Lesotho
Owner: Government of the Kingdom of Lesotho/Metolong Authority
Type: Gravity
Purpose(s): Water Supply
River: South Phuthiatsana
Reservoir capacity: 64 m3x106
Construction Dates
Start of Project: 09/11
Start of RCC: 09/11
End of RCC: 02/15
End of Project: 08/16
Specifications
Height: 83 metres
Length: 278 metres
Volume of RCC: 280 m3x103
Total volume: 314 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 110 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Fukuoka Prefecture
Type: Gravity
Purpose(s): Flood Control / Navigation / Water Supply
River: Naka
Reservoir capacity: 40 m3x106
Construction Dates
Start of Project: 06/12
Start of RCC: 06/12
End of RCC: 07/15
End of Project: 03/18
Specifications
Height: 103 metres
Length: 556 metres
Volume of RCC: 634 m3x103
Total volume: 935 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 1.00 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 104 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 26 | Low-lime flyash (ASTM Class F) |

Details
Country: Algeria
Owner: ANBT (Agence Nationale des Barrages et Transfert)
Type: Arch-Gravity
Purpose(s): Irrigation / Water Supply
River: Djen Djen
Reservoir capacity: 294 m3x106
Construction Dates
Start of Project: 03/10
Start of RCC: 03/10
End of RCC: 08/15
End of Project: 12/15
Specifications
Height: 121 metres
Length: 366 metres
Volume of RCC: 975 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Spillway
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 45 | Ground-granulated blast-furnace slag |

Details
Country: USA
Owner: Cullman Utilities Board
Type: Gravity
Purpose(s): Water Supply
River: Duck
Reservoir capacity: 31 m3x106
Construction Dates
Start of Project: 01/14
Start of RCC: 01/14
End of RCC: 09/15
End of Project: -/16
Specifications
Height: 41 metres
Length: 90 metres
Volume of RCC: 121 m3x103
Total volume: 128 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
| RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 1.00 | Traditional concrete against formwork (GEVR/GE-RCC) [stepped face] |
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 107 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 55 | Low-lime flyash (ASTM Class F) |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Rkiza
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/15
End of Project: -/15
Specifications
Height: 26 metres
Length: 500 metres
Volume of RCC: 55 m3x103
Total volume: 60 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.85 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.85 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Laos
Owner: EDL (Electricite du Laos)
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Nam Khan
Reservoir capacity: 249 m3x106
Construction Dates
Start of Project: 12/12
Start of RCC: 12/12
End of RCC: -/15
End of Project: 06/16
Specifications
Height: 67 metres
Length: 154 metres
Volume of RCC: 125 m3x103
Total volume: 145 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Yunxi Shuishimen Reservoir Bureau
Type: Thin Arch
Purpose(s): Flood Control / Hydropower / Water Supply
River: Tianhe
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/15
End of Project: -/16
Specifications
Height: 86 metres
Length: -
Volume of RCC: -
Total volume: 150 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: Hokkaido Prefecture
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
River: Atsuma
Reservoir capacity: 106 m3x106
Construction Dates
Start of Project: 10/14
Start of RCC: 10/14
End of RCC: 06/16
End of Project: 03/18
Specifications
Height: 47 metres
Length: 516 metres
Volume of RCC: 354 m3x103
Total volume: 490 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Sarma
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 01/13
Start of RCC: 01/13
End of RCC: 10/16
End of Project: -/17
Specifications
Height: 66 metres
Length: 148 metres
Volume of RCC: 85 m3x103
Total volume: 130 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Lebanon
Owner: Ministry of Energy and Water
Type: Gravity
Purpose(s): Water Supply
River: Boqaata
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: 07/12
Start of RCC: 07/12
End of RCC: 12/16
End of Project: 12/21
Specifications
Height: 72 metres
Length: 222 metres
Volume of RCC: 200 m3x103
Total volume: 255 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced conventional concrete cast after RCC placement |
| 0.80 |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Brazil
Owner: Projeto Transposição das Águas do Rio São Francisco
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: -
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/16
End of Project: -/16
Specifications
Height: 18 metres
Length: 196 metres
Volume of RCC: 52 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Kelebek
Reservoir capacity: 23 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/16
End of Project: -/17
Specifications
Height: 62 metres
Length: 193 metres
Volume of RCC: 74 m3x103
Total volume: 97 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 120 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Ormanlik
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/16
End of Project: 10/17
Specifications
Height: 49 metres
Length: 265 metres
Volume of RCC: 114 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: COMPESA (Companhia Pernambucana de Saneamento )
Type: -
Purpose(s): Irrigation / Water Supply
River: Siriji
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/16
End of Project: -/17
Specifications
Height: 20 metres
Length: 100 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Water Supply
River: Camibogazi
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/16
End of Project: -/17
Specifications
Height: 50 metres
Length: 295 metres
Volume of RCC: 142 m3x103
Total volume: 173 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.05 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 98 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 52 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Qiduxi
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/16
End of Project: -/17
Specifications
Height: 54 metres
Length: 246 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Jordan
Owner: Jordan Valley Authority, Ministry of Water and Irrigation
Type: Gravity
Purpose(s): Groundwater Recharge / Water Supply
River: Ibn Hammad
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: 07/17
End of Project: -/22
Specifications
Height: 56 metres
Length: 160 metres
Volume of RCC: 160 m3x103
Total volume: 160 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.30 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |
| 0 |

Details
Country: Spain
Owner: Confederación Hidrográfica del Ebro, Ministerio de Agricultura Alimentación y Medio Ambiente
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Cidacos
Reservoir capacity: 47 m3x106
Construction Dates
Start of Project: 07/08
Start of RCC: 07/08
End of RCC: 07/17
End of Project: 09/18
Specifications
Height: 103 metres
Length: 376 metres
Volume of RCC: 698 m3x103
Total volume: 765 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 140 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Ministry of Land, Infrastructure, Transport and Tourism
Type: Hardfill
Purpose(s): Flood Control / Navigation / Water Supply
River: Sanru
Reservoir capacity: 50 m3x106
Construction Dates
Start of Project: 08/14
Start of RCC: 08/14
End of RCC: 10/17
End of Project: 03/19
Specifications
Height: 46 metres
Length: 350 metres
Volume of RCC: 375 m3x103
Total volume: 500 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
River: Ansegmir
Reservoir capacity: 50 m3x106
Construction Dates
Start of Project: 10/10
Start of RCC: 10/10
End of RCC: -/17
End of Project: -/18
Specifications
Height: 61 metres
Length: 320 metres
Volume of RCC: 380 m3x103
Total volume: 405 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 70 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |
| 0 |

Details
Country: Algeria
Owner: ANBT (Agence Nationale des Barrages et Transfert)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Mellegue
Reservoir capacity: 155 m3x106
Construction Dates
Start of Project: 10/11
Start of RCC: 10/11
End of RCC: -/17
End of Project: -/18
Specifications
Height: 51 metres
Length: 900 metres
Volume of RCC: 245 m3x103
Total volume: 320 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 110 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Argentina
Owner: Provincia de Catamarca
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Albigasta
Reservoir capacity: 38 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/17
End of Project: -/19
Specifications
Height: 64 metres
Length: 380 metres
Volume of RCC: -
Total volume: 279 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
River: Beht
Reservoir capacity: 510 m3x106
Construction Dates
Start of Project: 05/10
Start of RCC: 05/10
End of RCC: -/17
End of Project: -/18
Specifications
Height: 98 metres
Length: 383 metres
Volume of RCC: 900 m3x103
Total volume: 930 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 25 | Natural pozzolan (ASTM Class N) |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Asif N Talaght
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/17
End of Project: -/18
Specifications
Height: 44 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Irrigation / Water Supply
River: -
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/17
End of Project: -/18
Specifications
Height: 58 metres
Length: 269 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Water Supply
River: Çırçıp
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/17
End of Project: -/17
Specifications
Height: 36 metres
Length: 110 metres
Volume of RCC: 20 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Ximihe
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/17
End of Project: -/18
Specifications
Height: 88 metres
Length: 147 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Muling Fendou Reservoir Construction office
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Mulenghe
Reservoir capacity: 191 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/17
End of Project: -/18
Specifications
Height: 46 metres
Length: 406 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Dashahe
Reservoir capacity: 196 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/17
End of Project: -/18
Specifications
Height: 74 metres
Length: 296 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower / Irrigation / Water Supply
River: Mabie
Reservoir capacity: 99 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/17
End of Project: -/18
Specifications
Height: 108 metres
Length: 182 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: Fukuoka Prefecture
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Harai
Reservoir capacity: 29 m3x106
Construction Dates
Start of Project: 07/14
Start of RCC: 07/14
End of RCC: 03/18
End of Project: 03/19
Specifications
Height: 81 metres
Length: 295 metres
Volume of RCC: 372 m3x103
Total volume: 419 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.60 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.77 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.77 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Shangcunxi
Reservoir capacity: 123 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/18
End of Project: -/19
Specifications
Height: 89 metres
Length: 338 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Changlehe
Reservoir capacity: 133 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/18
End of Project: -/19
Specifications
Height: 101 metres
Length: 355 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guangxi Datengxia Gorge Water Conservancy Development Co. .Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Water Supply
River: Xijiang
Reservoir capacity: 3479 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/18
End of Project: 07/20
Specifications
Height: 80 metres
Length: -
Volume of RCC: -
Total volume: 7100 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: CERB (Companhia de Engenharia Ambienytal e Recursos Hídricos da Bahia)
Type: Gravity
Purpose(s): Water Supply
River: Colonia
Reservoir capacity: 62 m3x106
Construction Dates
Start of Project: 09/15
Start of RCC: 09/15
End of RCC: -/18
End of Project: 09/18
Specifications
Height: 21 metres
Length: 195 metres
Volume of RCC: 30 m3x103
Total volume: 34 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Zhuangli reservoir construction and management office
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Shizihe
Reservoir capacity: 133 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/18
End of Project: -/19
Specifications
Height: 44 metres
Length: 49 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Water Supply
River: Circip
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/18
End of Project: -/19
Specifications
Height: 30 metres
Length: 213 metres
Volume of RCC: 48 m3x103
Total volume: 59 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 98 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 52 | |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Melen
Reservoir capacity: 693 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: 03/19
End of Project: -/25
Specifications
Height: 124 metres
Length: 944 metres
Volume of RCC: 1871 m3x103
Total volume: 2096 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.15 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 60 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Ministry of Land, Infrastructure, Transport and Tourism
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply
River: Agatsuma
Reservoir capacity: 108 m3x106
Construction Dates
Start of Project: 08/14
Start of RCC: 08/14
End of RCC: 05/19
End of Project: 10/19
Specifications
Height: 116 metres
Length: 291 metres
Volume of RCC: 575 m3x103
Total volume: 911 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.15 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.08 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: Algeria
Owner: ANBT (Agence Nationale des Barrages et Transferts)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: -
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: 07/19
End of Project: 01/23
Specifications
Height: 77 metres
Length: 177 metres
Volume of RCC: 250 m3x103
Total volume: 330 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.89 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.89 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 110 |
| 77 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | Low-lime flyash (ASTM Class F) |
| 33 |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Ayvali
Reservoir capacity: 988 m3x106
Construction Dates
Start of Project: 06/14
Start of RCC: 06/14
End of RCC: 08/19
End of Project: 11/19
Specifications
Height: 43 metres
Length: 157 metres
Volume of RCC: 37 m3x103
Total volume: 46 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 66 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 44 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Suludere
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: 03/16
Start of RCC: 03/16
End of RCC: 09/19
End of Project: 10/19
Specifications
Height: 69 metres
Length: 212 metres
Volume of RCC: 130 m3x103
Total volume: 185 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 45 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Ministry of Land, Infrastructure, Transport and Tourism
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply
River: Nukapira
Reservoir capacity: 46 m3x106
Construction Dates
Start of Project: -/73
Start of RCC: -/73
End of RCC: -/19
End of Project: -/21
Specifications
Height: 57 metres
Length: 600 metres
Volume of RCC: -
Total volume: 180 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Estado
Type: Gravity
Purpose(s): Water Supply
River: Taquarembó
Reservoir capacity: -
Construction Dates
Start of Project: 05/08
Start of RCC: 05/08
End of RCC: -/19
End of Project: -/20
Specifications
Height: 33 metres
Length: 330 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Afghanistan
Owner: Ministry of Energy and Water
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Shakardar
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/19
End of Project: 04/21
Specifications
Height: 78 metres
Length: 303 metres
Volume of RCC: 270 m3x103
Total volume: 337 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.20 |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 105 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 45 | Natural pozzolan (ASTM Class N) |

Details
Country: Iran
Owner: Kerman Water Authority
Type: Gravity
Purpose(s): Groundwater Recharge / Irrigation / Water Supply
River: Gharanghou
Reservoir capacity: 44 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/19
End of Project: -/20
Specifications
Height: 44 metres
Length: 352 metres
Volume of RCC: 106 m3x103
Total volume: 147 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Sanchahe
Reservoir capacity: 1089 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/19
End of Project: -/21
Specifications
Height: 163 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Mexico
Owner: CNA (Comisión Nacional del Agua)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Mayo
Reservoir capacity: 478 m3x106
Construction Dates
Start of Project: 02/14
Start of RCC: 02/14
End of RCC: -/19
End of Project: 08/20
Specifications
Height: 73 metres
Length: 232 metres
Volume of RCC: 600 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Companhia de Gestão dos Recursos Hídricos
Type: Gravity
Purpose(s): Water Supply
River: Germinal
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/19
End of Project: 08/20
Specifications
Height: 28 metres
Length: 210 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Ministério da Integração Nacional
Type: Gravity
Purpose(s): Water Supply
River: dos Negreiros
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/19
End of Project: -/20
Specifications
Height: 37 metres
Length: 246 metres
Volume of RCC: 56 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: -
Reservoir capacity: 96 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: 03/20
End of Project: 01/21
Specifications
Height: 76 metres
Length: 173 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
River: Ouaar
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: 04/10
Start of RCC: 04/10
End of RCC: -/20
End of Project: -/20
Specifications
Height: 68 metres
Length: 370 metres
Volume of RCC: 580 m3x103
Total volume: 610 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |
| 0 |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Water Supply
River: Mudurnu
Reservoir capacity: 143 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/20
End of Project: -/23
Specifications
Height: 98 metres
Length: 357 metres
Volume of RCC: 800 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
| 0.35 |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 63 |
| 83 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 63 | |
| 83 |

Details
Country: Japan
Owner: Iwate Prefecture
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Yana
Reservoir capacity: 19 m3x106
Construction Dates
Start of Project: 12/14
Start of RCC: 12/14
End of RCC: -/20
End of Project: 03/21
Specifications
Height: 77 metres
Length: 243 metres
Volume of RCC: -
Total volume: 213 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Vietnam
Owner: Ministry of Agriculture and Rural Development
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Cai
Reservoir capacity: 219 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/20
End of Project: -/21
Specifications
Height: 67 metres
Length: 603 metres
Volume of RCC: 510 m3x103
Total volume: 640 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: USA
Owner: US Army Corps of Engineers - Nashville District
Type: Gravity
Purpose(s): Flood Control / Hydropower / Recreation / Water Supply
River: Caney Fork
Reservoir capacity: 940 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/20
End of Project: -/21
Specifications
Height: 40 metres
Length: 293 metres
Volume of RCC: 99 m3x103
Total volume: 122 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork [stepped face] |
| 0.83 |
Spillway
| Slope | Type |
|---|---|
| 0.83 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 93 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 93 | Low-lime flyash (ASTM Class F) |

Details
Country: Peru
Owner: Anglo American (Quellaveco copper mine)
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: -
Construction Dates
Start of Project: -/19
Start of RCC: -/19
End of RCC: -/20
End of Project: -/21
Specifications
Height: 40 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork with external geomembrane |
| 0.10 |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Daraa
Reservoir capacity: 247 m3x106
Construction Dates
Start of Project: 05/16
Start of RCC: 05/16
End of RCC: 09/21
End of Project: 06/22
Specifications
Height: 110 metres
Length: 317 metres
Volume of RCC: 833 m3x103
Total volume: 993 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Natural pozzolan (ASTM Class N) | |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Guir
Reservoir capacity: 220 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/21
End of Project: -/21
Specifications
Height: 62 metres
Length: 271 metres
Volume of RCC: 180 m3x103
Total volume: 210 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Natural pozzolan (ASTM Class N) | |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Bou Regreg
Reservoir capacity: 507 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/21
End of Project: -/22
Specifications
Height: 106 metres
Length: 345 metres
Volume of RCC: 900 m3x103
Total volume: 1 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Water Supply
River: Şenkale Deresi
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 06/17
Start of RCC: 06/17
End of RCC: -/21
End of Project: -/22
Specifications
Height: 67 metres
Length: 273 metres
Volume of RCC: 148 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Natural pozzolan (ASTM Class N) | |

Details
Country: Mexico
Owner: Peñoles
Type: Gravity
Purpose(s): Water Supply
River: Fuerte
Reservoir capacity: -
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/21
End of Project: -/22
Specifications
Height: 44 metres
Length: 240 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Toudgha
Reservoir capacity: 33 m3x106
Construction Dates
Start of Project: 11/17
Start of RCC: 11/17
End of RCC: -/21
End of Project: -/22
Specifications
Height: 68 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: Kagawa Prefecture
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Kaba
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: 10/14
Start of RCC: 10/14
End of RCC: 05/22
End of Project: 09/24
Specifications
Height: 89 metres
Length: 266 metres
Volume of RCC: 242 m3x103
Total volume: 448 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.40 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.77 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.77 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: Philippines
Owner: Wawa JV Co. Inc. (Prime Infrastructure Capital Inc and San Lorenzo Ruiz Builders and Developers Group)
Type: Hardfill
Purpose(s): Hydropower / Irrigation / Water Supply
River: Tayabasan
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/20
Start of RCC: -/20
End of RCC: 05/22
End of Project: 07/22
Specifications
Height: 24 metres
Length: 114 metres
Volume of RCC: 30 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.40 | RCC against formwork with external geomembrane (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.40 | RCC against formwork (GEVR/GE-RCC) |
| 0.92 |
Spillway
| Slope | Type |
|---|---|
| 0.92 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Low-lime flyash (ASTM Class F) |

Details
Country: Iran
Owner: Sistan & Balouchestan Water Authority
Type: Hardfill
Purpose(s): Irrigation / Water Supply
River: Kahir
Reservoir capacity: 314 m3x106
Construction Dates
Start of Project: 11/10
Start of RCC: 11/10
End of RCC: 07/22
End of Project: 08/25
Specifications
Height: 55 metres
Length: 383 metres
Volume of RCC: 550 m3x103
Total volume: 730 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Hanshui
Reservoir capacity: 221 m3x106
Construction Dates
Start of Project: 10/18
Start of RCC: 10/18
End of RCC: 11/22
End of Project: 07/23
Specifications
Height: 70 metres
Length: 349 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Assayad
Reservoir capacity: 79 m3x106
Construction Dates
Start of Project: 07/17
Start of RCC: 07/17
End of RCC: 12/22
End of Project: 07/23
Specifications
Height: 77 metres
Length: 830 metres
Volume of RCC: 1400 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Natural pozzolan (ASTM Class N) | |

Details
Country: Iran
Owner: Iran Water & Power Resources Development Company (IWPC)
Type: Arch-Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Zohreh
Reservoir capacity: 2300 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/22
End of Project: 07/23
Specifications
Height: 151 metres
Length: 680 metres
Volume of RCC: 1100 m3x103
Total volume: 1200 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.70 |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 160 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Iran
Owner: Boushehr Water Authority
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Baghan
Reservoir capacity: 32 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/22
End of Project: -/25
Specifications
Height: 58 metres
Length: 311 metres
Volume of RCC: -
Total volume: 220 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guizhou Shuicheng Water-investment Co. Ltd.
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Yuwanghe
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: 09/16
Start of RCC: 09/16
End of RCC: -/22
End of Project: 11/23
Specifications
Height: 50 metres
Length: 157 metres
Volume of RCC: 106 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Jialing River Tingzikou Water Resources and Hydropower Development Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply
River: Jialing
Reservoir capacity: 4067 m3x106
Construction Dates
Start of Project: 11/09
Start of RCC: 11/09
End of RCC: -/22
End of Project: -/25
Specifications
Height: 116 metres
Length: 995 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Iraq
Owner: Ministry of Agriculture and Water Resources in Kurdistan
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Bastora
Reservoir capacity: 215 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/22
End of Project: 10/24
Specifications
Height: 85 metres
Length: 577 metres
Volume of RCC: 1160 m3x103
Total volume: 1223 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.80 | [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Karakuz Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/22
End of Project: -/23
Specifications
Height: 46 metres
Length: 125 metres
Volume of RCC: 38 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 83 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 68 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Large and medium sized Irrigation District Service Center of Qiannan Prefecture
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Qingshui
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 04/20
Start of RCC: 04/20
End of RCC: -/22
End of Project: -/22
Specifications
Height: 32 metres
Length: 198 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 1.00 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| none |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Kirkpinarlar
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 10/21
Start of RCC: 10/21
End of RCC: 08/23
End of Project: 10/23
Specifications
Height: 28 metres
Length: 168 metres
Volume of RCC: -
Total volume: 60 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Nishiki
Reservoir capacity: 30 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/23
End of Project: -/24
Specifications
Height: 73 metres
Length: 300 metres
Volume of RCC: -
Total volume: 340 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/23
End of Project: -/24
Specifications
Height: 69 metres
Length: -
Volume of RCC: 204 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Akasya
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/23
End of Project: -/24
Specifications
Height: 59 metres
Length: 227 metres
Volume of RCC: -
Total volume: 189 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 45 | Low-lime flyash (ASTM Class F) |

Details
Country: Philippines
Owner: National Irrigation Administration (NIA)
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Jalaur
Reservoir capacity: -
Construction Dates
Start of Project: -/19
Start of RCC: -/19
End of RCC: -/23
End of Project: 07/24
Specifications
Height: 38 metres
Length: 150 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Philippines
Owner: National Irrigation Administration (NIA)
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Jalaur
Reservoir capacity: 229 m3x106
Construction Dates
Start of Project: -/19
Start of RCC: -/19
End of RCC: -/23
End of Project: 07/24
Specifications
Height: 109 metres
Length: 267 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Gölecik
Reservoir capacity: 36 m3x106
Construction Dates
Start of Project: 12/16
Start of RCC: 12/16
End of RCC: 06/24
End of Project: -/24
Specifications
Height: 95 metres
Length: 424 metres
Volume of RCC: -
Total volume: 900 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 48 | Low-lime flyash (ASTM Class F) |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Leben
Reservoir capacity: 200 m3x106
Construction Dates
Start of Project: 03/21
Start of RCC: 03/21
End of RCC: 06/24
End of Project: -/25
Specifications
Height: 71 metres
Length: 149 metres
Volume of RCC: 207 m3x103
Total volume: 257 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 110 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | |

Details
Country: Japan
Owner: Ministry of Land, Infrastructure, Transport and Tourism
Type: Hardfill
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Naruse
Reservoir capacity: 79 m3x106
Construction Dates
Start of Project: 05/18
Start of RCC: 05/18
End of RCC: 08/24
End of Project: 11/26
Specifications
Height: 115 metres
Length: 755 metres
Volume of RCC: 4450 m3x103
Total volume: 4850 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Mexico
Owner: CNA (Comisión Nacional del Agua)
Type: Gravity
Purpose(s): Water Supply
River: Verde
Reservoir capacity: 910 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/24
End of Project: 12/24
Specifications
Height: 80 metres
Length: 271 metres
Volume of RCC: 1100 m3x103
Total volume: 1200 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.83 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.83 | RCC against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 to |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 50 to | Ground-granulated blast-furnace slag |

Details
Country: Iran
Owner: Fars Water Authority
Type: Hardfill
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Firooz Abad
Reservoir capacity: 146 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/24
End of Project: -/26
Specifications
Height: 88 metres
Length: 230 metres
Volume of RCC: 260 m3x103
Total volume: 285 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.90 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 1.20 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 1.20 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Secretaria de Meio Ambiente e dos Recursos Hídricos do Estado do Rio Grande do Norte
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Piranhas
Reservoir capacity: 556 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/24
End of Project: 03/25
Specifications
Height: 35 metres
Length: 989 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Iran
Owner: Gilan Province Water Authority
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Kharshak
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/24
End of Project: -/26
Specifications
Height: 45 metres
Length: 195 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Department of Water Conservancy, Fujian Province
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Aojiang
Reservoir capacity: 297 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/24
End of Project: -/25
Specifications
Height: 91 metres
Length: 338 metres
Volume of RCC: 300 m3x103
Total volume: 663 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 |
Downstream
| Slope | Type |
|---|---|
| 0.76 |
Spillway
| Slope | Type |
|---|---|
| 0.76 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Beimen
Reservoir capacity: 191 m3x106
Construction Dates
Start of Project: 04/20
Start of RCC: 04/20
End of RCC: -/24
End of Project: 08/25
Specifications
Height: 52 metres
Length: 295 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: -
Reservoir capacity: 544 m3x106
Construction Dates
Start of Project: 06/20
Start of RCC: 06/20
End of RCC: -/24
End of Project: 12/25
Specifications
Height: 106 metres
Length: 596 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Çat
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/19
Start of RCC: -/19
End of RCC: -/24
End of Project: -/25
Specifications
Height: 42 metres
Length: 325 metres
Volume of RCC: 225 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Mexico
Owner: Organismo Servicios de Agua y Drenaje de Monterrey, IPD (SADM)
Type: Gravity
Purpose(s): Water Supply
River: Potosi
Reservoir capacity: 221 m3x106
Construction Dates
Start of Project: -/20
Start of RCC: -/20
End of RCC: -/24
End of Project: -/24
Specifications
Height: 47 metres
Length: 1915 metres
Volume of RCC: 1118 m3x103
Total volume: 1162 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: Iran
Owner: Sistan and Balouchestan Water Authority
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Simish & Mashkid
Reservoir capacity: 115 m3x106
Construction Dates
Start of Project: 10/17
Start of RCC: 10/17
End of RCC: -/24
End of Project: -/25
Specifications
Height: 36 metres
Length: 1450 metres
Volume of RCC: 650 m3x103
Total volume: 850 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Water Supply
River: Uçarsu
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/24
End of Project: -/25
Specifications
Height: 30 metres
Length: 199 metres
Volume of RCC: 50 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Philippines
Owner: Wawa JV Co. Inc. (Prime Infrastructure Capital Inc and San Lorenzo Ruiz Builders and Developers Group)
Type: Hardfill
Purpose(s): Water Supply
River: Marikina
Reservoir capacity: 120 m3x106
Construction Dates
Start of Project: 06/21
Start of RCC: 06/21
End of RCC: -/24
End of Project: -/25
Specifications
Height: 87 metres
Length: 439 metres
Volume of RCC: 1035 m3x103
Total volume: 1043 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.60 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3600 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Low-lime flyash (ASTM Class F) |
| 110 |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Tong
Reservoir capacity: 113 m3x106
Construction Dates
Start of Project: 06/22
Start of RCC: 06/22
End of RCC: 06/25
End of Project: -/26
Specifications
Height: 69 metres
Length: 288 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: USA
Owner: Denver Water
Type: Arch-Gravity
Purpose(s): Water Supply
River: South Boulder Creek
Reservoir capacity: 147 m3x106
Construction Dates
Start of Project: 04/22
Start of RCC: 04/22
End of RCC: 11/25
End of Project: 12/26
Specifications
Height: 144 metres
Length: 610 metres
Volume of RCC: 568 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: SRHS (Secretaria de Recursos Hídricos e de Saneamento)
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Sem Nome
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/25
End of Project: -/26
Specifications
Height: 38 metres
Length: 325 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Lebanon
Owner: EBML
Type: Arch-Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Ibrahim (Abraham)
Reservoir capacity: 38 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/25
End of Project: -/26
Specifications
Height: 162 metres
Length: 350 metres
Volume of RCC: 1450 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Water Supply
River: Zimari
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/25
End of Project: -/26
Specifications
Height: 37 metres
Length: 126 metres
Volume of RCC: -
Total volume: 80 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Water Supply
River: Sariçay
Reservoir capacity: 67 m3x106
Construction Dates
Start of Project: 08/19
Start of RCC: 08/19
End of RCC: -/25
End of Project: 07/26
Specifications
Height: 125 metres
Length: 441 metres
Volume of RCC: 1163 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Iran
Owner: Lorestan Water Authority
Type: Thin Arch
Purpose(s): Flood Control / Irrigation / Water Supply
River: Karkheh
Reservoir capacity: 55 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/25
End of Project: -/26
Specifications
Height: 73 metres
Length: 220 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: South Africa
Owner: Department of Water & Sanitation
Type: Gravity
Purpose(s): Water Supply
River: Groot Letaba
Reservoir capacity: -
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/25
End of Project: -/26
Specifications
Height: 44 metres
Length: 350 metres
Volume of RCC: 170 m3x103
Total volume: 226 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Niulushi
Reservoir capacity: 66 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/25
End of Project: -/26
Specifications
Height: 80 metres
Length: 391 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: USA
Owner: Upper Trinity Regional Water District
Type: Gravity
Purpose(s): Water Supply
River: Sulphur
Reservoir capacity: -
Construction Dates
Start of Project: 00/00
Start of RCC: 00/00
End of RCC: 00/00
End of Project: 00/00
Specifications
Height: 32 metres
Length: 215 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Ministère de l'Equipement, des Transports, de la Logistique et de l'Eau
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Moulouya
Reservoir capacity: 980 m3x106
Construction Dates
Start of Project: -/22
Start of RCC: -/22
End of RCC: -/25
End of Project: -/26
Specifications
Height: 73 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
River: Kert
Reservoir capacity: 44 m3x106
Construction Dates
Start of Project: 01/22
Start of RCC: 01/22
End of RCC: 01/26
End of Project: 10/26
Specifications
Height: 70 metres
Length: 684 metres
Volume of RCC: 800 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork [stepped face] |
Downstream
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | |

Details
Country: Morocco
Owner: AREP (Regional Project Execution Agency)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Assif Ouender
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: 11/23
Start of RCC: 11/23
End of RCC: 03/26
End of Project: 06/26
Specifications
Height: 45 metres
Length: 300 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.90 |
Spillway
| Slope | Type |
|---|---|
| 0.90 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Kenya
Owner: Ministry of Water and Sanitation
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Mwache
Reservoir capacity: 136 m3x106
Construction Dates
Start of Project: 04/22
Start of RCC: 04/22
End of RCC: 06/26
End of Project: -/26
Specifications
Height: 84 metres
Length: 526 metres
Volume of RCC: 610 m3x103
Total volume: 620 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 150 | |

Details
Country: Brazil
Owner: SRHS (Secretaria de Recursos Hídricos e de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: Una
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: 06/26
End of Project: -/27
Specifications
Height: 55 metres
Length: 311 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Iran
Owner: Iran Water & Power Development Company (IWPCo)
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Shafaroud
Reservoir capacity: 52 m3x106
Construction Dates
Start of Project: 03/12
Start of RCC: 03/12
End of RCC: 07/24
End of Project: 11/25
Specifications
Height: 101 metres
Length: 300 metres
Volume of RCC: 725 m3x103
Total volume: 740 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | RCC against formwork (GEVR/GE-RCC) |
| 0.50 |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Kheng Grou
Reservoir capacity: 1070 m3x106
Construction Dates
Start of Project: 04/22
Start of RCC: 04/22
End of RCC: 08/26
End of Project: -/26
Specifications
Height: 79 metres
Length: 196 metres
Volume of RCC: 550 m3x103
Total volume: 55 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 1.00 | Traditional concrete against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 1.00 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Zimbabwe
Owner: Zimbabwe National Water Authority (Zinwa)
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Gwayi
Reservoir capacity: 634 m3x106
Construction Dates
Start of Project: 09/04
Start of RCC: 09/04
End of RCC: -/26
End of Project: -/27
Specifications
Height: 72 metres
Length: 305 metres
Volume of RCC: -
Total volume: 300 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 140 | Low-lime flyash (ASTM Class F) |

Details
Country: Iran
Owner: Boushehr Regional Water Company
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Dashte Palang
Reservoir capacity: 151 m3x106
Construction Dates
Start of Project: 07/13
Start of RCC: 07/13
End of RCC: -/26
End of Project: -/28
Specifications
Height: 63 metres
Length: 800 metres
Volume of RCC: 540 m3x103
Total volume: 690 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guizhou Water Conservancy Investment Group Co, Ltd
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Guanyinsi
Reservoir capacity: 121 m3x106
Construction Dates
Start of Project: 12/21
Start of RCC: 12/21
End of RCC: -/26
End of Project: -/27
Specifications
Height: 109 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Degimendere
Reservoir capacity: 16 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/26
End of Project: -/27
Specifications
Height: 89 metres
Length: 396 metres
Volume of RCC: 430 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Construction Headquarters of Heibaoshan Reservoir Project in Wanyuan City
Type: Hardfill
Purpose(s): Irrigation / Water Supply
River: Dayan
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/22
Start of RCC: -/22
End of RCC: -/26
End of Project: -/27
Specifications
Height: 60 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: AREP (Regional Project Execution Agency)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Boujir
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: 07/24
Start of RCC: 07/24
End of RCC: -/26
End of Project: -/27
Specifications
Height: 25 metres
Length: 416 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 |
Downstream
| Slope | Type |
|---|---|
| 0.80 |
Spillway
| Slope | Type |
|---|---|
| 0.80 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Lakhdar
Reservoir capacity: 150 m3x106
Construction Dates
Start of Project: -/23
Start of RCC: -/23
End of RCC: -/27
End of Project: -/27
Specifications
Height: 110 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Indonesia
Owner: PUPR (Public Works and Public Housing Ministry)
Type: Hardfill
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Cibeet
Reservoir capacity: 83 m3x106
Construction Dates
Start of Project: 09/23
Start of RCC: 09/23
End of RCC: -/27
End of Project: -/28
Specifications
Height: 47 metres
Length: 960 metres
Volume of RCC: 371 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.90 |
Downstream
| Slope | Type |
|---|---|
| 0.90 |
Spillway
| Slope | Type |
|---|---|
| 0.90 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 106 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Italy
Owner: Consorzio di Bonifica della Sardegna Meridionale
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Monti Nieddu
Reservoir capacity: 35 m3x106
Construction Dates
Start of Project: 01/98
Start of RCC: 01/98
End of RCC: -/28
End of Project: -/28
Specifications
Height: 88 metres
Length: 360 metres
Volume of RCC: 333 m3x103
Total volume: 449 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.05 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Bahe
Reservoir capacity: 141 m3x106
Construction Dates
Start of Project: 04/22
Start of RCC: 04/22
End of RCC: -/28
End of Project: -/29
Specifications
Height: 71 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Iran
Owner: Khuzestan Province Power & Water Authority
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Harkesh
Reservoir capacity: 38 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/29
End of Project: -/31
Specifications
Height: 57 metres
Length: 350 metres
Volume of RCC: -
Total volume: 240 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates