SEARCHING
... please wait

Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Beydag
[H-F]
TurkeyDSI - State Hydraulic WorksI WKucuk Menderes24804/9407/0604/0811/0895800235026500.25(6)0.80(1)*0.80(1)*3003006030(F)
Site CCanadaBC HydroHPeace2644- /1507/1710/2108/25718001740 V(1)0.80(3')0.80(3')*30030080130(F)
Ghiz Ghalek (formerly Dashte Palang)IranBoushehr Regional Water CompanyF I WDashte Palang15107/13- /22- /26- /2863800540690           

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Hardfill

Purpose(s): Irrigation / Water Supply

River: Kucuk Menderes

Reservoir capacity: 248 m3x106

Construction Dates

Start of Project: 04/94

Start of RCC: 04/94

End of RCC: 04/08

End of Project: 11/08

Specifications

Height: 95 metres

Length: 800 metres

Volume of RCC: 2350 m3x103

Total volume: 2650 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.25Traditional concrete against precast concrete panels with geomembrane
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
30Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Canada

Owner: BC Hydro

Type: Gravity

Purpose(s): Hydropower

River: Peace

Reservoir capacity: 2644 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: 10/21

End of Project: 08/25

Specifications

Height: 71 metres

Length: 800 metres

Volume of RCC: 1740 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
130Low-lime flyash (ASTM Class F)
  
Site C completed
Site C completed

Full Dam Information

Details

Country: Iran

Owner: Boushehr Regional Water Company

Type: Gravity

Purpose(s): Flood Control / Irrigation / Water Supply

River: Dashte Palang

Reservoir capacity: 151 m3x106

Construction Dates

Start of Project: 07/13

Start of RCC: 07/13

End of RCC: -/26

End of Project: -/28

Specifications

Height: 63 metres

Length: 800 metres

Volume of RCC: 540 m3x103

Total volume: 690 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates