Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
GameleiraBrazilCODEVASFF I R WGameleira14507/9012/9004/9105/91291502729V(1)   (1)*4004005213(-) -
BertarelloBrazilCORSAN (Companhia Riograndense de Saneamento)WArroio Burati6- /9808/9807/99- /002921980115V(13) (12)* (12)*3003007218(N)
Poço do MagroBrazilCompanhia de Desenvolvimento dod Vales do Sao Francisco do Parnaiba 37- /03- /04- /05- /06295405464        6416(N)
Genesee #2USAGenesee Water and Sanitation DistrictWBear Creek106/0611/0611/0610/072916824 V     300300   
Kasegawa auxiliary dam
[H-F]
JapanMinistry of Land, Infrastructure, Transport and TourismF H I WKase103/0810/0906/1009/102911652680.80(12)0.80(12)0.80(12)250750800(-) -
Ait Moulay AhmedMoroccoDirection des Aménagements HydrauliquesI WAin Leuh210/09- /1001/1110/11291361820V(5)0.75(1)*0.75(1)*3003007030(N)
Passos MaiaBrazilDesenvixHChapecó - /09- /10- /11- /1129 66         7218(N)
DevecikonagiTurkeyMCK Elektrik Uretim A.S.H IEmet605/1003/1109/1201/1329313541500.10(2)0.75(3)0.80(12)3003008040(F)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Brazil

Owner: CODEVASF

Type: Gravity

Purpose(s): Flood Control / Irrigation / Recreation / Water Supply

River: Gameleira

Reservoir capacity: 145 m3x106

Construction Dates

Start of Project: 07/90

Start of RCC: 07/90

End of RCC: 04/91

End of Project: 05/91

Specifications

Height: 29 metres

Length: 150 metres

Volume of RCC: 27 m3x103

Total volume: 29 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
  
Spillway
SlopeType
 Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
400400

Cementitious material

Cement (kg/m3)
52
Pozzolan (kg/m3)Pozzolan Type
13No pozzolan used  -
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: CORSAN (Companhia Riograndense de Saneamento)

Type: Gravity

Purpose(s): Water Supply

River: Arroio Burati

Reservoir capacity: 6 m3x106

Construction Dates

Start of Project: -/98

Start of RCC: -/98

End of RCC: 07/99

End of Project: -/00

Specifications

Height: 29 metres

Length: 219 metres

Volume of RCC: 80 m3x103

Total volume: 115 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalReinforced concrete cast against precast units or slip-formed facing elements
Downstream
SlopeType
 Reinforced conventional concrete cast after RCC placement  [stepped face]
Spillway
SlopeType
 Reinforced conventional concrete cast after RCC placement  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
72
Pozzolan (kg/m3)Pozzolan Type
18Natural pozzolan (ASTM Class N)
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: Companhia de Desenvolvimento dod Vales do Sao Francisco do Parnaiba

Type: Gravity

Purpose(s): unknown

River: -

Reservoir capacity: 37 m3x106

Construction Dates

Start of Project: -/03

Start of RCC: -/03

End of RCC: -/05

End of Project: -/06

Specifications

Height: 29 metres

Length: 540 metres

Volume of RCC: 54 m3x103

Total volume: 64 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
64
Pozzolan (kg/m3)Pozzolan Type
16Natural pozzolan (ASTM Class N)
  
Poço do Magro completed
Poço do Magro completed

Full Dam Information

Details

Country: USA

Owner: Genesee Water and Sanitation District

Type: Gravity

Purpose(s): Water Supply

River: Bear Creek

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 06/06

Start of RCC: 06/06

End of RCC: 11/06

End of Project: 10/07

Specifications

Height: 29 metres

Length: 168 metres

Volume of RCC: 24 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Genesee #2 completed
Genesee #2 completed

Full Dam Information

Details

Country: Japan

Owner: Ministry of Land, Infrastructure, Transport and Tourism

Type: Hardfill

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Kase

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 03/08

Start of RCC: 03/08

End of RCC: 06/10

End of Project: 09/10

Specifications

Height: 29 metres

Length: 116 metres

Volume of RCC: 52 m3x103

Total volume: 68 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.80Reinforced conventional concrete cast after RCC placement
Downstream
SlopeType
0.80Reinforced conventional concrete cast after RCC placement
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Kasegawa auxiliary dam completed
Kasegawa auxiliary dam completed

Full Dam Information

Details

Country: Morocco

Owner: Direction des Aménagements Hydrauliques

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Ain Leuh

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 10/09

Start of RCC: 10/09

End of RCC: 01/11

End of Project: 10/11

Specifications

Height: 29 metres

Length: 136 metres

Volume of RCC: 18 m3x103

Total volume: 20 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against precast concrete panels
Downstream
SlopeType
0.75Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.75Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
30Natural pozzolan (ASTM Class N)
  
Ait Moulay Ahmed on Google Earth
Ait Moulay Ahmed on Google Earth

Full Dam Information

Details

Country: Brazil

Owner: Desenvix

Type: Gravity

Purpose(s): Hydropower

River: Chapecó

Reservoir capacity: -

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/11

End of Project: -/11

Specifications

Height: 29 metres

Length: -

Volume of RCC: 66 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
72
Pozzolan (kg/m3)Pozzolan Type
18Natural pozzolan (ASTM Class N)
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: MCK Elektrik Uretim A.S.

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Emet

Reservoir capacity: 6 m3x106

Construction Dates

Start of Project: 05/10

Start of RCC: 05/10

End of RCC: 09/12

End of Project: 01/13

Specifications

Height: 29 metres

Length: 313 metres

Volume of RCC: 54 m3x103

Total volume: 150 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork with external geomembrane
Downstream
SlopeType
0.75RCC against formwork
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
40Low-lime flyash (ASTM Class F)
  
Devecikonagi completed
Devecikonagi completed

 

Search again