SEARCHING
... please wait

Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
A VuongVietnamHVugia Thubon 34008/0301/0610/0711/0883240260350V(1)0.80(1)1.00(1)30030090150(N)
Huong DienVietnamHBo821- /10- /11- /12- /1383 260400        90100(N)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Vietnam

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Vugia Thubon

Reservoir capacity: 340 m3x106

Construction Dates

Start of Project: 08/03

Start of RCC: 08/03

End of RCC: 10/07

End of Project: 11/08

Specifications

Height: 83 metres

Length: 240 metres

Volume of RCC: 260 m3x103

Total volume: 350 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
1.00Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
150Natural pozzolan (ASTM Class N)
  
A Vuong under construction
A Vuong under construction

Full Dam Information

Details

Country: Vietnam

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Bo

Reservoir capacity: 821 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/12

End of Project: -/13

Specifications

Height: 83 metres

Length: -

Volume of RCC: 260 m3x103

Total volume: 400 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
100Natural pozzolan (ASTM Class N)
  
Huong Dien completed
Huong Dien completed

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates