Dam Search Results
- Dimensions
- Height: 17 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Freeman diversion | USA | United Water Conservancy District | G | Santa Clara | 03/90 | 07/90 | 09/90 | - /91 | 17 | 366 | 101 | 110 | V | (1) | 0.80 | (17) | 0.80 | (17) | 300 | 300 | 125 | 83 | (F) | |
| Thornlea | South Africa | Umlaas Irrigation Board | I | Mlazi | 3 | 06/90 | 10/90 | 12/90 | 02/91 | 17 | 135 | 16 | 17 | V | (1) | 0.90 | (3)* | 0.90 | (1) | 170 | 170 | 38 | 87 | (S) |
| Nickajack Auxillary Spillway | USA | Tennessee Valley Authority | H | Tennessee | 311 | 08/89 | 07/90 | 02/91 | 04/92 | 17 | 427 | 79 | 79 | 0.25 | (3)* | 0.60 | (3)* | 0.60 | (3)* | 300 | 600 | 85 | 119 | (F) |
| Paxton | South Africa | Private farmer | I | Tsorwo | 1 | - /90 | 01/91 | 12/92 | - /92 | 17 | 70 | 3 | 3 | V | (3) | V 0.50 | (3) | 0.50 | (3) | 150 | 150 | 70 | 100 | (F) |
| Antacoto | Peru | Mantaro | 120 | - /98 | - /98 | - /99 | - /99 | 17 | 65 | (-) | ||||||||||||||
| Mangla Emergency Spillway Control Weir | Pakistan | WAPDA (Water and Power Development Authority) | H I | Jhelum | 6500 | 08/04 | 12/07 | 11/08 | 01/09 | 17 | 370 | 54 | 79 | V 0.30 | (3') (3')* | V 0.70 | (3') (3')* | 0.70 | (3')* | 300 | 300 | 60 | 120 | (S) |
| Salto Apiacás | Brazil | ENEL Green Power Salto Apiacás S.A | H | dos Apiacás | 2 | - /12 | - /14 | - /15 | - /16 | 17 | 486 | |||||||||||||
| Sinop | Brazil | Companhia Energetica Sinop-CES | H | Teles Pires | - /14 | - /15 | - /17 | - /19 | 17 | |||||||||||||||
| Priest Rapids Right Embankment | USA | Grant County Public Utility District | H | Columbia | 10/21 | 04/22 | 03/23 | 10/23 | 17 | 564 | 386 | V | (3') | V 0.75 | (3') (17) | none | 300 | 300 - | 87 | 137 | (F) | |||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: USA
Owner: United Water Conservancy District
Type: Gravity
Purpose(s): Groundwater Recharge
River: Santa Clara
Reservoir capacity: -
Construction Dates
Start of Project: 03/90
Start of RCC: 03/90
End of RCC: 09/90
End of Project: -/91
Specifications
Height: 17 metres
Length: 366 metres
Volume of RCC: 101 m3x103
Total volume: 110 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Unformed face of RCC |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 125 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 83 | Low-lime flyash (ASTM Class F) |

Details
Country: South Africa
Owner: Umlaas Irrigation Board
Type: Gravity
Purpose(s): Irrigation
River: Mlazi
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 06/90
Start of RCC: 06/90
End of RCC: 12/90
End of Project: 02/91
Specifications
Height: 17 metres
Length: 135 metres
Volume of RCC: 16 m3x103
Total volume: 17 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.90 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 170 | 170 |
Cementitious material
| Cement (kg/m3) |
|---|
| 38 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 87 | Ground-granulated blast-furnace slag |

Details
Country: USA
Owner: Tennessee Valley Authority
Type: Gravity
Purpose(s): Hydropower
River: Tennessee
Reservoir capacity: 311 m3x106
Construction Dates
Start of Project: 08/89
Start of RCC: 08/89
End of RCC: 02/91
End of Project: 04/92
Specifications
Height: 17 metres
Length: 427 metres
Volume of RCC: 79 m3x103
Total volume: 79 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.25 | RCC against formwork [stepped face] |
Downstream
| Slope | Type |
|---|---|
| 0.60 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.60 | RCC against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 600 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 119 | Low-lime flyash (ASTM Class F) |

Details
Country: South Africa
Owner: Private farmer
Type: Gravity
Purpose(s): Irrigation
River: Tsorwo
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/90
Start of RCC: -/90
End of RCC: 12/92
End of Project: -/92
Specifications
Height: 17 metres
Length: 70 metres
Volume of RCC: 3 m3x103
Total volume: 3 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork |
| 0.50 |
Spillway
| Slope | Type |
|---|---|
| 0.50 | RCC against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 150 | 150 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |

Details
Country: Peru
Owner: -
Type: Gravity
Purpose(s): unknown
River: Mantaro
Reservoir capacity: 120 m3x106
Construction Dates
Start of Project: -/98
Start of RCC: -/98
End of RCC: -/99
End of Project: -/99
Specifications
Height: 17 metres
Length: 65 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| No pozzolan used | |

Details
Country: Pakistan
Owner: WAPDA (Water and Power Development Authority)
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Jhelum
Reservoir capacity: 6500 m3x106
Construction Dates
Start of Project: 08/04
Start of RCC: 08/04
End of RCC: 11/08
End of Project: 01/09
Specifications
Height: 17 metres
Length: 370 metres
Volume of RCC: 54 m3x103
Total volume: 79 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.30 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Downstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.70 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Ground-granulated blast-furnace slag |

Details
Country: Brazil
Owner: ENEL Green Power Salto Apiacás S.A
Type: Gravity
Purpose(s): Hydropower
River: dos Apiacás
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/15
End of Project: -/16
Specifications
Height: 17 metres
Length: 486 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Companhia Energetica Sinop-CES
Type: Gravity
Purpose(s): Hydropower
River: Teles Pires
Reservoir capacity: -
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/17
End of Project: -/19
Specifications
Height: 17 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: USA
Owner: Grant County Public Utility District
Type: Gravity
Purpose(s): Hydropower
River: Columbia
Reservoir capacity: -
Construction Dates
Start of Project: 10/21
Start of RCC: 10/21
End of RCC: 03/23
End of Project: 10/23
Specifications
Height: 17 metres
Length: 564 metres
Volume of RCC: 386 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.75 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| none |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 - |
Cementitious material
| Cement (kg/m3) |
|---|
| 87 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 137 | Low-lime flyash (ASTM Class F) |

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates
