NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Guanyinge (Kwan-in-Temple)ChinaGuanyinge Reservoir Management BureauF H I WTaizi216805/9009/9109/9510/9582104012401815V
0.10
(1)
(1)
0.70(1)0.70(1)270 -
280
7509139(F)
Queiles y ValSpainConfederación Hidrográfica del EbroFVal2501/9310/9505/9712/9882375480520V
0.33
(1)
(1)
0.80(5)0.80(1)30030080145(F)
Yangxishui Nº1ChinaCorporation of Energy Development, Ruyuan County, Guangdong ProvinceH IYangxishui10012/0010/0111/0206/0382244241340V(1)V
0.75
(1)
(1)*
0.70(12)300300  (F)
HengxiChinaYangxi100- /99- /00- /02- /0382              
LetanChinaGuangxi-Guiguan Electric Power Co. Ltd.,H I NXijiang950- /01- /03- /05- /068258650210           
Weihou
[A]
ChinaXilin River Hydropower Development Co. Ltd.HTuoniangiang13303/05- /0604/08- /0982              
Enlarged CotterAustraliaACTEW WaterWCotter7810/0908/1112/1205/1382350369400V(3')0.75(3')0.75(3')*300300
400
70120(F)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: China

Owner: Guanyinge Reservoir Management Bureau

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Taizi

Reservoir capacity: 2168 m3x106

Construction Dates

Start of Project: 05/90

Start of RCC: 05/90

End of RCC: 09/95

End of Project: 10/95

Specifications

Height: 82 metres

Length: 1040 metres

Volume of RCC: 1240 m3x103

Total volume: 1815 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.10Traditional concrete against formwork
Downstream
SlopeType
0.70Traditional concrete against formwork
Spillway
SlopeType
0.70Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
270  -750
280 

Cementitious material

Cement (kg/m3)
91
Pozzolan (kg/m3)Pozzolan Type
39Low-lime flyash (ASTM Class F)
  
Guanyinge (Kwan-in-Temple) completed
Guanyinge (Kwan-in-Temple) completed

Full Dam Information

Details

Country: Spain

Owner: Confederación Hidrográfica del Ebro

Type: Gravity

Purpose(s): Flood Control

River: Val

Reservoir capacity: 25 m3x106

Construction Dates

Start of Project: 01/93

Start of RCC: 01/93

End of RCC: 05/97

End of Project: 12/98

Specifications

Height: 82 metres

Length: 375 metres

Volume of RCC: 480 m3x103

Total volume: 520 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.33Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against precast concrete panels
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
145Low-lime flyash (ASTM Class F)
  
Queiles y Val completed
Queiles y Val completed

Full Dam Information

Details

Country: China

Owner: Corporation of Energy Development, Ruyuan County, Guangdong Province

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Yangxishui

Reservoir capacity: 100 m3x106

Construction Dates

Start of Project: 12/00

Start of RCC: 12/00

End of RCC: 11/02

End of Project: 06/03

Specifications

Height: 82 metres

Length: 244 metres

Volume of RCC: 241 m3x103

Total volume: 340 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
VerticalTraditional concrete against formwork
0.75Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.70Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): unknown

River: Yangxi

Reservoir capacity: 100 m3x106

Construction Dates

Start of Project: -/99

Start of RCC: -/99

End of RCC: -/02

End of Project: -/03

Specifications

Height: 82 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Guangxi-Guiguan Electric Power Co. Ltd.,

Type: Gravity

Purpose(s): Hydropower / Irrigation / Navigation

River: Xijiang

Reservoir capacity: 950 m3x106

Construction Dates

Start of Project: -/01

Start of RCC: -/01

End of RCC: -/05

End of Project: -/06

Specifications

Height: 82 metres

Length: 586 metres

Volume of RCC: 50 m3x103

Total volume: 210 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Letan completed
Letan completed

Full Dam Information

Details

Country: China

Owner: Xilin River Hydropower Development Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Tuoniangiang

Reservoir capacity: 133 m3x106

Construction Dates

Start of Project: 03/05

Start of RCC: 03/05

End of RCC: 04/08

End of Project: -/09

Specifications

Height: 82 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Australia

Owner: ACTEW Water

Type: Gravity

Purpose(s): Water Supply

River: Cotter

Reservoir capacity: 78 m3x106

Construction Dates

Start of Project: 10/09

Start of RCC: 10/09

End of RCC: 12/12

End of Project: 05/13

Specifications

Height: 82 metres

Length: 350 metres

Volume of RCC: 369 m3x103

Total volume: 400 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300
 400

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
120Low-lime flyash (ASTM Class F)
  
Enlarged Cotter completed