SEARCHING
... please wait

Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
DodairagawaJapanGunma PrefectureF WKabura503/8606/8801/9003/9270300167350V
0.40
(1)
(1)
0.75(1)0.75(1)1805009624(F)
Mae SuaiThailandRoyal Irrigation Department (RID)IMae Suai7311/9910/0001/0207/02593403003500.15(15)0.80(1)*0.80(1)*3003007080 to  100(F)
A VuongVietnamEVN (Electrictie de Vietnam)HVugia Thubon 34008/0301/0610/0711/0883240260350V(1)0.80(1)1.00(1)30030090150(N)
KavsaktepeTurkeyDSI - State Hydraulic WorksIRobozik1609/08- /14- /16- /17712683303500.15(3')0.70(3')*0.70(3)3003008139(N)
Cisokan PSS (Upper dam)IndonesiaPLNHCirumanis - /14- /16- /17- /1898375 350           

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Japan

Owner: Gunma Prefecture

Type: Gravity

Purpose(s): Flood Control / Water Supply

River: Kabura

Reservoir capacity: 5 m3x106

Construction Dates

Start of Project: 03/86

Start of RCC: 03/86

End of RCC: 01/90

End of Project: 03/92

Specifications

Height: 70 metres

Length: 300 metres

Volume of RCC: 167 m3x103

Total volume: 350 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.40Traditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
180500

Cementitious material

Cement (kg/m3)
96
Pozzolan (kg/m3)Pozzolan Type
24Low-lime flyash (ASTM Class F)
  
Dodairagawa completed
Dodairagawa completed

Full Dam Information

Details

Country: Thailand

Owner: Royal Irrigation Department (RID)

Type: Gravity

Purpose(s): Irrigation

River: Mae Suai

Reservoir capacity: 73 m3x106

Construction Dates

Start of Project: 11/99

Start of RCC: 11/99

End of RCC: 01/02

End of Project: 07/02

Specifications

Height: 59 metres

Length: 340 metres

Volume of RCC: 300 m3x103

Total volume: 350 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.15RCC supported by fill shoulders
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
80  toLow-lime flyash (ASTM Class F)
  
Mae Suai completed
Mae Suai completed

Full Dam Information

Details

Country: Vietnam

Owner: EVN (Electrictie de Vietnam)

Type: Gravity

Purpose(s): Hydropower

River: Vugia Thubon

Reservoir capacity: 340 m3x106

Construction Dates

Start of Project: 08/03

Start of RCC: 08/03

End of RCC: 10/07

End of Project: 11/08

Specifications

Height: 83 metres

Length: 240 metres

Volume of RCC: 260 m3x103

Total volume: 350 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
1.00Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
150Natural pozzolan (ASTM Class N)
  
A Vuong under construction
A Vuong under construction

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Gravity

Purpose(s): Irrigation

River: Robozik

Reservoir capacity: 16 m3x106

Construction Dates

Start of Project: 09/08

Start of RCC: 09/08

End of RCC: -/16

End of Project: -/17

Specifications

Height: 71 metres

Length: 268 metres

Volume of RCC: 330 m3x103

Total volume: 350 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.15RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.70RCC against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
81
Pozzolan (kg/m3)Pozzolan Type
39Natural pozzolan (ASTM Class N)
  
Photo coming soon

Full Dam Information

Details

Country: Indonesia

Owner: PLN

Type: Gravity

Purpose(s): Hydropower

River: Cirumanis

Reservoir capacity: -

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/17

End of Project: -/18

Specifications

Height: 98 metres

Length: 375 metres

Volume of RCC: -

Total volume: 350 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates