SEARCHING
... please wait

Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Les OlivettesFranceDepartement de l’HeraultFLa Peyne408/8612/8610/8703/88362558085V(1)0.75(16)0.75(1)*300300 130(R)
PindobaçuBrazilCERB (Companhia de Engenharia Ambiental e Recursos Hidricos da Bahia)I WItapicuru-Aço17- /01- /03- /04- /05442107585      3003005614(N)
Can Asujan
[H-F]
PhilippinesNational Irrigation AdministrationICan Asujan210/03- /04- /05- /054213575850.60(8)0.60(7)0.60(1)1701701000(-) -
MeanderAustraliaRivers and Water Supply Commission, TasmaniaI WMeander4301/0601/0708/0712/07471808585V(4)0.70(10)0.70(10)300300700(-) -

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: France

Owner: Departement de l’Herault

Type: Gravity

Purpose(s): Flood Control

River: La Peyne

Reservoir capacity: 4 m3x106

Construction Dates

Start of Project: 08/86

Start of RCC: 08/86

End of RCC: 10/87

End of Project: 03/88

Specifications

Height: 36 metres

Length: 255 metres

Volume of RCC: 80 m3x103

Total volume: 85 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75Mechanically compacted unformed face of RCC
Spillway
SlopeType
0.75Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
130ROLAC (mixture of flyash and slag with or without limestone fines)
  
Les Olivettes completed
Les Olivettes completed

Full Dam Information

Details

Country: Brazil

Owner: CERB (Companhia de Engenharia Ambiental e Recursos Hidricos da Bahia)

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Itapicuru-Aço

Reservoir capacity: 17 m3x106

Construction Dates

Start of Project: -/01

Start of RCC: -/01

End of RCC: -/04

End of Project: -/05

Specifications

Height: 44 metres

Length: 210 metres

Volume of RCC: 75 m3x103

Total volume: 85 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
56
Pozzolan (kg/m3)Pozzolan Type
14Natural pozzolan (ASTM Class N)
  
Pindobaçu completed
Pindobaçu completed

Full Dam Information

Details

Country: Philippines

Owner: National Irrigation Administration

Type: Hardfill

Purpose(s): Irrigation

River: Can Asujan

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 10/03

Start of RCC: 10/03

End of RCC: -/05

End of Project: -/05

Specifications

Height: 42 metres

Length: 135 metres

Volume of RCC: 75 m3x103

Total volume: 85 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.60RCC against precast concrete panels with geomembrane
Downstream
SlopeType
0.60RCC against precast concrete panels
Spillway
SlopeType
0.60Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
170170

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Can Asujan completed
Can Asujan completed

Full Dam Information

Details

Country: Australia

Owner: Rivers and Water Supply Commission, Tasmania

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Meander

Reservoir capacity: 43 m3x106

Construction Dates

Start of Project: 01/06

Start of RCC: 01/06

End of RCC: 08/07

End of Project: 12/07

Specifications

Height: 47 metres

Length: 180 metres

Volume of RCC: 85 m3x103

Total volume: 85 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork with external geomembrane
Downstream
SlopeType
0.70RCC against precast concrete blocks
Spillway
SlopeType
0.70RCC against precast concrete blocks

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Meander completed
Meander completed

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates