Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
San RafaelMexicoCFE (Comisión Federal de Electricidad)F HSantiago2611/9305/9407/9407/944817681110V(5)0.66
0.80
(3)*separate 30030090130(N)
NtimbaleBotswanaDepartment of Water AffairsW 2611/0404/0609/0605/073315330            
Niuqiao
[A]
ChinaNiu Qiao Reservoir Development Co. Ltd.HQingtonghe26- /03- /0512/06- /0762201 710           
Longqiao
[A]
ChinaLichuan City Yujaing Valley Hudropower Ltd. Hubei ProvinceH RYujiang2612/0503/0602/0705/0791156135160curve(3')curve(3) (3)     
BaishiyaChinaH I WXijiang26- /04- /06- /08- /1074190230240  0.75        
Moula
[H-F]
TunisiaMinistre de l’Agriculture, TunisiaWBou Terfess2602/03- /08- /1011/1181324422450V(3') (3')* (3')*3003001200(-) -

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Mexico

Owner: CFE (Comisión Federal de Electricidad)

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Santiago

Reservoir capacity: 26 m3x106

Construction Dates

Start of Project: 11/93

Start of RCC: 11/93

End of RCC: 07/94

End of Project: 07/94

Specifications

Height: 48 metres

Length: 176 metres

Volume of RCC: 81 m3x103

Total volume: 110 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against precast concrete panels
Downstream
SlopeType
0.66RCC against formwork  [stepped face]
0.80 
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
130Natural pozzolan (ASTM Class N)
  
San Rafael completed
San Rafael completed

Full Dam Information

Details

Country: Botswana

Owner: Department of Water Affairs

Type: Gravity

Purpose(s): Water Supply

River: -

Reservoir capacity: 26 m3x106

Construction Dates

Start of Project: 11/04

Start of RCC: 11/04

End of RCC: 09/06

End of Project: 05/07

Specifications

Height: 33 metres

Length: 153 metres

Volume of RCC: 30 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Ntimbale completed
Ntimbale completed

Full Dam Information

Details

Country: China

Owner: Niu Qiao Reservoir Development Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Qingtonghe

Reservoir capacity: 26 m3x106

Construction Dates

Start of Project: -/03

Start of RCC: -/03

End of RCC: 12/06

End of Project: -/07

Specifications

Height: 62 metres

Length: 201 metres

Volume of RCC: -

Total volume: 710 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Lichuan City Yujaing Valley Hudropower Ltd. Hubei Province

Type: Thin Arch

Purpose(s): Hydropower / Recreation

River: Yujiang

Reservoir capacity: 26 m3x106

Construction Dates

Start of Project: 12/05

Start of RCC: 12/05

End of RCC: 02/07

End of Project: 05/07

Specifications

Height: 91 metres

Length: 156 metres

Volume of RCC: 135 m3x103

Total volume: 160 m3x103

Construction Methods

Facings

Upstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
curveRCC against formwork
Spillway
SlopeType
 RCC against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Xijiang

Reservoir capacity: 26 m3x106

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/08

End of Project: -/10

Specifications

Height: 74 metres

Length: 190 metres

Volume of RCC: 230 m3x103

Total volume: 240 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
0.75 
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Baishiya completed
Baishiya completed

Full Dam Information

Details

Country: Tunisia

Owner: Ministre de l’Agriculture, Tunisia

Type: Hardfill

Purpose(s): Water Supply

River: Bou Terfess

Reservoir capacity: 26 m3x106

Construction Dates

Start of Project: 02/03

Start of RCC: 02/03

End of RCC: -/10

End of Project: 11/11

Specifications

Height: 81 metres

Length: 324 metres

Volume of RCC: 422 m3x103

Total volume: 450 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
 RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
 RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
120
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Moula completed
Moula completed

 