NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
TashkumyrKyrgyzstanMinistry of Power IndustryH INaryn140- /8203/8712/8912/90753201001300V(1)0.78(1)0.78(1)4004009030(N)
Puding
[A]
ChinaGuizhou Qianyuan Power Co. Ltd.H I WSanchahe37703/8906/9205/9302/9475196103145V(1)0.35(1)ogee
0.35
(1)
(1)
30030085
54
103
99
(F)
SuoshaiChinaGuizhou Hongfeng Hydropower PlantHSancha420- /89- /90- /93- /9475196 88           
YoshidaJapanKagawa PrefectureF WYoshida207/9107/9302/9503/9675218265304V(1)0.75(1)0.75(1)2507508436(F)
TaolinkouChinaDepartment of Water Resources, Hebei ProvinceF H I R WQinglonghe85911/9212/9412/97- /98755015851350V
0.15
(1)0.78(1)ogee
0.65
(1)
(1)
300300135
70
70
85
(F)
BaishaChinaChina Huadian CorporationF HWanshou199- /04- /05- /06- /0675172211239           
MaojiaheChinaChina Power Investment CorporationHBeipanjiang - /06- /07- /08- /0875              
Naen
[A]
ChinaHBaidu22- /06- /08- /08- /0975              
Wadi DayqahOmanMinistry of Regional Municipalities and Water ResourcesWWadi Dayqah10008/0601/0804/0911/0975410590650V(3')0.75(3')*0.75(3')*3001200126
112
54
48
(M)
Batu HamparMalaysiaJabatan Bekalan Air Negeri SembilanWBatu Hampar311/0710/0904/1005/1075236200203 (3') (10) (10)30030065120(F)
Abou Al Abbas Sebti - formerly TaskourtMoroccoDirection des Aménagements HydrauliquesI WAl Mal2501/0804/0909/1004/1175408415490V(5)0.80(1)*0.80(1)*3003001050(N)
SaladilloArgentinaProvincia de San LuisWQuinto 02/0909/0909/1001/1175215210249 (5) (5)       
Kotanli II
[A-G]
TurkeyEBD En. Ür. ve Tic. A.S.HKura2010/1305/1404/1507/15752502402470.15(3)0.70(3')*0.70 30030085130(N)
LidiChinaHLancang75- /10- /13- /15- /1675346             
AkçakocaTurkeyDSI - State Hydraulic WorksI WSarma201/1305/1510/16- /1875148851300.10(3)0.80(3)0.80(12)300    
Cisokan PSS (Lower dam)IndonesiaPLNH  - /14- /16- /17- /1875294 490           

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Kyrgyzstan

Owner: Ministry of Power Industry

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Naryn

Reservoir capacity: 140 m3x106

Construction Dates

Start of Project: -/82

Start of RCC: -/82

End of RCC: 12/89

End of Project: 12/90

Specifications

Height: 75 metres

Length: 320 metres

Volume of RCC: 100 m3x103

Total volume: 1300 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.78Traditional concrete against formwork
Spillway
SlopeType
0.78Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
400400

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
30Natural pozzolan (ASTM Class N)
  
Tashkumyr on Google Earth
Tashkumyr on Google Earth

Full Dam Information

Details

Country: China

Owner: Guizhou Qianyuan Power Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower / Irrigation / Water Supply

River: Sanchahe

Reservoir capacity: 377 m3x106

Construction Dates

Start of Project: 03/89

Start of RCC: 03/89

End of RCC: 05/93

End of Project: 02/94

Specifications

Height: 75 metres

Length: 196 metres

Volume of RCC: 103 m3x103

Total volume: 145 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.35Traditional concrete against formwork
Spillway
SlopeType
ogeeTraditional concrete against formwork
0.35Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
54
Pozzolan (kg/m3)Pozzolan Type
103Low-lime flyash (ASTM Class F)
99 
Puding completed
Puding completed

Full Dam Information

Details

Country: China

Owner: Guizhou Hongfeng Hydropower Plant

Type: Gravity

Purpose(s): Hydropower

River: Sancha

Reservoir capacity: 420 m3x106

Construction Dates

Start of Project: -/89

Start of RCC: -/89

End of RCC: -/93

End of Project: -/94

Specifications

Height: 75 metres

Length: 196 metres

Volume of RCC: -

Total volume: 88 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Japan

Owner: Kagawa Prefecture

Type: Gravity

Purpose(s): Flood Control / Water Supply

River: Yoshida

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 07/91

Start of RCC: 07/91

End of RCC: 02/95

End of Project: 03/96

Specifications

Height: 75 metres

Length: 218 metres

Volume of RCC: 265 m3x103

Total volume: 304 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
84
Pozzolan (kg/m3)Pozzolan Type
36Low-lime flyash (ASTM Class F)
  
Yoshida completed
Yoshida completed

Full Dam Information

Details

Country: China

Owner: Department of Water Resources, Hebei Province

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Recreation / Water Supply

River: Qinglonghe

Reservoir capacity: 859 m3x106

Construction Dates

Start of Project: 11/92

Start of RCC: 11/92

End of RCC: 12/97

End of Project: -/98

Specifications

Height: 75 metres

Length: 501 metres

Volume of RCC: 585 m3x103

Total volume: 1350 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.15 
Downstream
SlopeType
0.78Traditional concrete against formwork
Spillway
SlopeType
ogeeTraditional concrete against formwork
0.65Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
135
70
Pozzolan (kg/m3)Pozzolan Type
70Low-lime flyash (ASTM Class F)
85 
Taolinkou completed
Taolinkou completed

Full Dam Information

Details

Country: China

Owner: China Huadian Corporation

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Wanshou

Reservoir capacity: 199 m3x106

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/06

End of Project: -/06

Specifications

Height: 75 metres

Length: 172 metres

Volume of RCC: 211 m3x103

Total volume: 239 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Baisha completed
Baisha completed

Full Dam Information

Details

Country: China

Owner: China Power Investment Corporation

Type: Gravity

Purpose(s): Hydropower

River: Beipanjiang

Reservoir capacity: -

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/08

End of Project: -/08

Specifications

Height: 75 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Maojiahe completed
Maojiahe completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower

River: Baidu

Reservoir capacity: 22 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/08

End of Project: -/09

Specifications

Height: 75 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Oman

Owner: Ministry of Regional Municipalities and Water Resources

Type: Gravity

Purpose(s): Water Supply

River: Wadi Dayqah

Reservoir capacity: 100 m3x106

Construction Dates

Start of Project: 08/06

Start of RCC: 08/06

End of RCC: 04/09

End of Project: 11/09

Specifications

Height: 75 metres

Length: 410 metres

Volume of RCC: 590 m3x103

Total volume: 650 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
3001200

Cementitious material

Cement (kg/m3)
126
112
Pozzolan (kg/m3)Pozzolan Type
54Milled sand
48 
Wadi Dayqah completed
Wadi Dayqah completed

Full Dam Information

Details

Country: Malaysia

Owner: Jabatan Bekalan Air Negeri Sembilan

Type: Gravity

Purpose(s): Water Supply

River: Batu Hampar

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: 11/07

Start of RCC: 11/07

End of RCC: 04/10

End of Project: 05/10

Specifications

Height: 75 metres

Length: 236 metres

Volume of RCC: 200 m3x103

Total volume: 203 m3x103

Construction Methods

Facings

Upstream
SlopeType
 RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
 RCC against precast concrete blocks
Spillway
SlopeType
 RCC against precast concrete blocks

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
65
Pozzolan (kg/m3)Pozzolan Type
120Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Morocco

Owner: Direction des Aménagements Hydrauliques

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Al Mal

Reservoir capacity: 25 m3x106

Construction Dates

Start of Project: 01/08

Start of RCC: 01/08

End of RCC: 09/10

End of Project: 04/11

Specifications

Height: 75 metres

Length: 408 metres

Volume of RCC: 415 m3x103

Total volume: 490 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against precast concrete panels
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
105
Pozzolan (kg/m3)Pozzolan Type
0Natural pozzolan (ASTM Class N)
  
 Abou Al Abbas Sebti - formerly Taskourt completed
Abou Al Abbas Sebti - formerly Taskourt completed

Full Dam Information

Details

Country: Argentina

Owner: Provincia de San Luis

Type: Gravity

Purpose(s): Water Supply

River: Quinto

Reservoir capacity: -

Construction Dates

Start of Project: 02/09

Start of RCC: 02/09

End of RCC: 09/10

End of Project: 01/11

Specifications

Height: 75 metres

Length: 215 metres

Volume of RCC: 210 m3x103

Total volume: 249 m3x103

Construction Methods

Facings

Upstream
SlopeType
 Traditional concrete against precast concrete panels
Downstream
SlopeType
 Traditional concrete against precast concrete panels
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: EBD En. Ür. ve Tic. A.S.

Type: Arch-Gravity

Purpose(s): Hydropower

River: Kura

Reservoir capacity: 20 m3x106

Construction Dates

Start of Project: 10/13

Start of RCC: 10/13

End of RCC: 04/15

End of Project: 07/15

Specifications

Height: 75 metres

Length: 250 metres

Volume of RCC: 240 m3x103

Total volume: 247 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.15RCC against formwork
Downstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.70 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
Pozzolan (kg/m3)Pozzolan Type
130Natural pozzolan (ASTM Class N)
  
Kotanli II completed
Kotanli II completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Lancang

Reservoir capacity: 75 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/15

End of Project: -/16

Specifications

Height: 75 metres

Length: 346 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Lidi completed
Lidi completed

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Sarma

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 01/13

Start of RCC: 01/13

End of RCC: 10/16

End of Project: -/18

Specifications

Height: 75 metres

Length: 148 metres

Volume of RCC: 85 m3x103

Total volume: 130 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10RCC against formwork
Downstream
SlopeType
0.80RCC against formwork
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300 

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Akçakoca completed
Akçakoca completed

Full Dam Information

Details

Country: Indonesia

Owner: PLN

Type: Gravity

Purpose(s): Hydropower

River: -

Reservoir capacity: -

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/17

End of Project: -/18

Specifications

Height: 75 metres

Length: 294 metres

Volume of RCC: -

Total volume: 490 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

 